How can I return material against an SA by 161 movement ?
Thanks and regards,
Suranjana
Hi
Is there an "Returns Item" check box in SA?, i guess, you'll have to create a separate PO with "Returns Item" checkbox inorder to receive goods with movement type 161.
Thanks
E.Avudaiappan
Similar Messages
-
How to modify item quantity in an scheduling agreement
Hi,
I'm trying to modify target quantity (ekpo-ktmng) in an item of a scheduling agreement (you can see it in me33l transaction).
When the users tries to modify, using me33l, the quantity of an item in an scheduling agreement, I need to pick this value (ktmng) and modify it according to some rules.
To catch the value I use EXIT_SAPMM06E_016 user-exit, and when the user modifies a value in the i_ekpo register of the user exit I see the new value that the user introduced. But I need to put a new value and it isn't enough with modifying this structure (i_ekpo).
So I think in a bapi, first of all I've tried with BAPI_PO_CHANGE but I receive the following error:
"Not possible to process a scheduling agreement using this function"
How can I change the target quantity of an item in a scheduling agreement?
thanks in advanceThanks for your reply, I'm trying with the following piece of code:
DATA: w_ekko TYPE ekko,
t_ekpo TYPE STANDARD TABLE OF ekpo WITH HEADER LINE,
t_ekpo2 TYPE STANDARD TABLE OF ekpo WITH HEADER LINE,
START-OF-SELECTION.
SELECT SINGLE * INTO CORRESPONDING FIELDS OF w_ekko
FROM ekko
WHERE ebeln = '5500000001'.
SELECT * INTO TABLE t_ekpo
FROM ekpo
WHERE ebeln = '5500000001'.
t_ekpo2[] = t_ekpo[].
READ TABLE t_ekpo2 INDEX 1.
t_ekpo2-ktmng = '69'.
MODIFY t_ekpo2 INDEX 1.
CALL FUNCTION 'ME_UPDATE_AGREEMENT_PO'
EXPORTING
i_ekko_new = w_ekko
I_EKKO_OLD =
I_LOGSY =
TABLES
XEKBES =
xekpo = t_ekpo
YEKPO = t_ekpo2
XSVAB =
But I receive a dump from SAP.
In t_ekpo I put all the items of the scheduling agreement, the I modify one of the (first) and store it in t_ekpo2, but I'm not very sure of this is the good way of working.
Any help would be very appreciated.
Thanks again -
How to activate a material once it is created using MM01 in ECC 6.0
Hi,
How to activate a material once it is created using MM01 in ECC 6.0.
i am encoutering a error " the material test1 does not exist or is not activated " when i want to display it in MM03.hi,
the material might not be created.
check updation might be failed.
before saving check for incomleteness.
try to create again and check. -
Creating Schedule lines in Scheduling agreement using LSMW
Hi,
I want to upload multiple schedule lines in scheduling agreement using LSMW. I have done the recording and maintained multiple lines in input file. However during execution LSMW creates only one line and keeps on ovewritting the same line. Please let me know how can I create multiple schedule lines.
RegardsFirst you should search for existing standard LSMW migration objects that possibly cover your scenario. These normally take care of complex header / multiple items / multiple subitems relations.
With a recording you can only load flat structures. Sometimes a "create new lines" / "enter first line" / "save transaction" logic can be constructed to load multiple items to a header (or even subitems to an item?) with a recording, but this can be pretty awkward.
Thomas -
Unable to generate a JIT schedule on a Vendor Schedule agreement using ME38
Hi,
I am having a problem generating a JIT schedule on a Vendor Schedule agreement using ME38
The message I get is 'Error generating release against scheduling agreement (cause 2)'
Yet when I use ME33L I can see the output under Header>Messages.
Any help gratefully appreciated...
RobinRobin,
ME38 is to Maintain schedule lines. In ME38 Select line item and press 'Delivery Schedule' or 'F2' to see the schedule lines. Maintain the schedule line here.
ME84 is the transaction to generate JIT.
Please ensure to have JIT Indicator set in Material Master Purchasing View.
Regards,
Hari. -
How to add info record text into Schedule agreement
Dear,
how can I put the info record text into Schedule Agreement. normally it can contains the short text , but in my company, it needs some more specific description.so we want to add info record text on it.
via ME32L ? or ...
thanks for your kind help
Meng HMHi,
In the inforecord trasnaction code ME11,go to info record text and double click on 'Info record note' -
Now system will open word document & put whatever text you needed(more) & save.
With Regards,
Jaheer -
How to view pricing conditions in a scheduling agreement?
Dear Friends
Will you please tell me how to see pricing condition and tax conditions in a scheduling agreement?
Thanks
ChandraHi chandra,
U can select line item & use shift+F6 u wll find conditions.
If u want to see conditions like in PO. Select line item go to header tabs in item select price simulation
Here put the qty u want to have simulation then see the result.
Hope this will solve ur problem.
Pls give ponts if answer is correct.
Regards
Gitesh -
How can I return software that I can't use
Just recently purchased Photoshop Elements 13 on line, however it's a Windows version and I'm using Mac. How can I return this or get the correct software?
Thank you
DarleneOr are you merely asking how to remove the wrong version from your cart and haven't paid for anything, yet? Since you said "return" that suggests payment and a serial number.
If you haven't actually paid, then just edit your cart and delete the version you put there:
My cart
Once your cart is empty, go to the Products link at the bottom of every adobe.com page and click the Buy button next to Elements:
Products -
Can use Scheduling agreements using VB/V1 reorder point MRP?
Hi,
Curretly client is using MRP PD with forward scheduling of 120 days and total horizon of 240 days (it is scheduling 6 months back and 6 months forward from current date) so that Vendor will always have at least 6 months of forecast requirement and client wants to use Min/Max and Reorder point as the key fields for inventory? will this is possible by changing MRP type VB or V1 or R1?
I have a taken a test material and changed MRP to VB and it did not ran for forward dates as the stock was not below reoder point? what are the points i'm missing here?
Appreciates everyone time and help.
Thanks
SivaVB is consumption based planning and Scheduling agreements can be used only with PD MRP
-
Schedule Agreement used to create a sales order
We are trying to use schedule agreements to create a sales orders, but
the delivery quantity in not updated within the Item data / schedule
lines of the schedule agreement.
LP (schedule agreement)-> OR (sales order) -> LF delivery (PGI)
Completing the above process, the delivery quantity does not get
updated. Can standard SAP handle this functionality?
Fábio BrancatiHi Brancati,
As per the standard you can create directly delivery from the scheduling agreement no need to creation of sales order.
I hope it will help you,
Regards,
Murali. -
Creating Scheduling Agreement using Bapi
Hi Gurus,
I want to Create Scheduling agreement , InfoRecords using Bapi.
I use BAPI_AGREEMENT_MAINTAIN .But it's not creating agreement.It throwing error message .
Useful Answers will be rewarded with Points.Hi,
Error Messages are Not Possible to determine a consumption account and No batch input data for screen.
Could you suggest what all the Input field I need to pass it .
Thanks for Your help -
WM: Return Purchase order process issue-Using 161 movement type
Hi
i did return PO with using 161 movementype .when i do GRN, WM is appear 601 movement type and storage type is 916 .
i think is wrongly triggered the movementype and storage type 916 .
so where i made mistake the configuration.pls suggest me to do the configuration.
with regards
dinesh
Edited by: code acess on Jul 8, 2011 7:50 AMYou can ask SAP AG why it was designed this way - I already told you my explanation I have no better thoughts.
Just remark: WM-mvt 601 is not only related to sales process. Just check the WM/IM interface and you will see it (e.g. IM-mvt 261, IM-mvt 541 are assigned to it). I think it generally means outbound delivery process.
If the stock is not in the right place and system cannot find it based on the search strategy you use, you have to enter the data manually.
Edited by: Csaba Szommer on Jul 8, 2011 11:41 AM
Edited by: Csaba Szommer on Jul 8, 2011 11:48 AM -
How do I get rid of what looks like time capsule pages and return to my original bookmark pages?
How do I get rid of what looks like time capsule pages and return to my original bookmark pages?
-
I have the latest version of Firefox, 5.0 installed today, but no arrow in upper left part of screen that previously would let me return to previous page.
can I somehow edit the location of where I can find all the sheets (right now they are on top of the page, and you can't see all of them listed at quick glance but must scroll/arrow through them)
On my machine I just hit shift-command-j (the keyboard shortcut I assigned in System Preferences) and a list of the sheets in the current document pops up:
I type a number from the list and jump immediately to that sheet. The hands never have to leave the keyboard.
(This particular document had a sheet named for each month. But the sheets in your document automatically will be listed instead.)
This is done via a Jump to Sheet Automator Service (Dropbox download). To install just doubleclick the .workflow package and (if needed) click 'Download Anyway' in System Preferences > Privacy & Security.
Installation will cause a new item to appear in your Numbers > Services menu. Then, if you want a keyboard shortcut, go here in System Preferences and add one:
You can rename or remove the service by holding down the option key in Finder and choosing Go > Library > Services. You can also view the AppleScript contaned within the service by opening the .workflow package in Automator.
Note, also, that in Numbers 3 you don't have to use those left-right arrows upper right to slowly scroll left-right to the sheets that are out of view. Just move your cursor up to the "band" with the "tabs" and drag left or right. That's much faster than using the arrows.
SG -
Upgrade to V8 overwrote the existing version of Firefox. It was only then I found that V8 will not work with my OS
Matt may not have noticed that you were using both the old OSX 10.4.1 and have PPC hardware.
There is a third-party option for PPC Macs at http://www.floodgap.com/software/tenfourfox/ though do note http://code.google.com/p/tenfourfox/wiki/PluginsNoLongerSupported
Maybe you are looking for
-
ITunes 11.1 won't connect to AirPort Express
Hello, I just updated iTunes to ver. 11.1.0.126 from the previous version of 11.0.5. Prior to this, everything worked fine, no issues ever with connecting to my airport express from iTunes. Now that I've updated to 11.1 I get the following message
-
How to see an IDOC type & FM, "WHERE USED LIST"?
Hi Experts, I nned to create an IDOC of WMTCID01 and message type is WMTOCO. I wanna to see that, Where Where this IDOC was used(especially, in "Z" objects) so that, I can get some idea abt. it and do my coding. So, let me know that, How to see this
-
Elements 12 and Windows Vista Camera Raw
Is there a way to get my Elements 12 to work with Vista in camera Raw for my D610?
-
What is wrong with the app store and how long before its fixed, im downloading atna very slow pash and i have a 10mb uncontested line.
-
hi gurus, 20% of fact table is line item dimension how to find it practicaly.is thr any way to find it? what is impact analysis? thanks in advance raja