How to allocate external process cost on the units of Production order
Hi Gurus,
I am facing a cost allocation issue.
The scenario is a make-to-stock scenario in discrete manufacturing industry. I am using production order (PP01) and confirming the material issued to production and operations manually. There is an electrical cost incurred by the client. The total cost of electricity is allocated on the number of units that comes out from the production. Say, total electrical cost is 1000, number of units produced using the production order is 100, then per unit is charged 10 (1000/100).
Can anyone help me how can I perform the cost allocation? Should I go for an activity type in work center OR should I use the cost sheet. Kindly help me.
Thanks and Regards,
Hi
activity type would be better choice...
Ajay M
Similar Messages
-
How to stop goods receipt before issueing the goods for production order
Hi All,
I try to follow the thread SAP ERP Manufacturing - Production Planning (SAP PP) to do it, however it is not working. I already created the status profile, assigned it to 'StatusProfile Header' in OPJH for the correct order type. However when I change the status to permitted GR, it is still not able to give me to do it in MIGO. Any idea?
Thanks.Hi Justin,
User status will not sutiable for your requirement, the best way is to use User exit or BADI
Implement the BADI - WORKORDER_GOODSMVT in this there is method
MANUAL_GOODS_RECEIPT under that
write this code
if_ex_workorder_goodsmvt~manual_goods_receipt.
data: lt_resb type standard table of resb,
wa_resb type resb.
select * from resb into table lt_resb where rsnum eq i_order_header-rsnum and xloek eq space and bdmng gt 0.
check sy-subrc eq 0.
loop at lt_resb into wa_resb.
if wa_resb-enmng < wa_resb-bdmng.
message E499(sy) with 'Order is not fully consumed. Processing is STOPed'.
endif.
endloop.
endmethod.
Enhancement: MBCF0002
Function module: EXIT_SAPMM07M_001
Code for your copy pasting in the source code of ZXMBCU02.
Remember to activate the program. In SMOD enter the enhancement, press F8 and then click on activate button.
*& Include ZXMBCU02
Regards,
Sankaran -
Production Variance Analysis for External Process Cost
Dear all,
We are on 4.7 R3.
In production order we have routing/operation with mutliple external processes. The problem is production order cost analysis (CO03) displayed the external process cost variance in lump sum (it adds multiple external processes cost into a single line).
We need to be able to analysis the external process cost variance by each process. We want to generate a report that displayed the external process cost variance for each processes, however in table COSPA there is no information of the external process name, it also displayed the cost in a lump sum amount.
How to enable the external process cost variance by each process? What table capture the external process cost with the information of the external process name/ID?
Thank you very much in advance for your kind assistance.
Rgd,
Dahlia TanHi
Use KKO0 reports..
Assign Cost Comp Structure in OKN0 and choose Prod Group = Material Group in OKN0
Transport these settings across to all clients...
Run KKRV to collect data and then run KKO0 reports
Br, Ajay M -
Internal processing Vs external processing with in the networks under a WBS
Dear Gurus,
please give an over view about internal processing Vs external processing with in the networks under a WBS element ,
is there any different process for creating reservatios & PRs in both the above ?
rgdsI think for internal processing the procurement indicator willbe 140 (when PR is not required) & for external processing the procurement indicator willbe 130 (when PR is required)
Regards,
Indranil -
How to restrict the GR for Production Order when Goods Issue is not done
Hi Gurus
How to restrict the GR for Production Order when all the required components for production order are not issued with all required quantity. Even for partial issue system should not allow GR with 101. The user status with RMWA, RMWF & CGFB is not working.
Pls suggest best solution.
Abhijit.Hi,
You can club together the GI nad GR at the time of confirmation..
I.e Backflush for the components and auto GR for the Product.
So that you can stream line the Process.
The best Option would be to use the User Exit:
Enhancement - MBCF0002
Functional Module - EXIT_SAPMM07M_001
Include - ZXMBCU02
Refer below link for further details..
How to stop the goods receipt before issueing the goods for production orde
Regards,
Siva -
How to find out the list of Production orders created for sales orders
Dear All,
Our company wants to generate a report for a List of Materials sold out in a particular Product Hierarchy. Along with that we want to know the list of Production orders created for the sales orders.
How to identify the production orders which are created based on Sales orders.
Kindly suggest.
Regards,
MullairajaCheck these threads
[Sale Order & Production Order|Sale Order & Production Order;
[Re: Linking Production Order against a Sale Order MRP run|Linking Production Order against a Sale Order MRP run;
thanks
G. Lakshmipathi -
How can I figure out where are the heaviest volumes in order to get rid of the useless stuff?.
How about a few specific NOUNs to replace the vague references you have made. A little context.
Volumes of WHAT ?
What sort of STUFF are you trying to eliminate ? -
How to compare the variances of production order type and get report
Hello All,
I want to compare the variances of production order type wise.
for ex. i want variances of order type PP 01 and PP 02 in a single report.Hi Sachin,
You have to maintain summarization hierarchies to achieve this.
1. Maintain summarization hierachies with hierarchy level - order type in the t.code.KKR0
2. Generate the hierarchy in KKRC
3. Run the report KKBC_HOE
Regards,
Mukthar -
Changing the Assignment of production order in sales order in MTO scenario.
Hello all!
I have following problem:
After the MRP a production order was created for a sales order. Because of the production in another plant
the production order which was created automatically had to be technically completed and a new one
created.
If you want to check now the availability, the sales order finds nothing, because it's linked to the one,
which was technically completed. Now is the question how can I change the production order for this
sales order. (In the production order the correct sales order is connected!)
As I found out it's connected to the field AUFNR in the table VBEP. But how can I change this
field within a transaction and not in the database?!?No replies
-
About the variance of production order difference.
hi all
now i am practicing producting. i have closed the production order by technocially completed.and the variance (difference between standard cost and actual cost) will be settled to production order difference account through our customization.
when we are doing the delivery and billing, it is taking the standard price. but that variance is cost of this Finished product,but it is not including when we are doing delivery and billing. the variance is shows in P&L debit as a expenses.
When the SD people defien the sales price in "PR00", do they consider this variance also?
please let me know about this. can u give me the complete details.Hi
I suspect based on the price control 'S' maintained for FG, the billing would happen at this standard price. Any variance in production would be settled to a separate variance account and would be available for analysis, based on which you could alter the standard price for the following period
Thank You, -
Selection Of BOM & Routing at the time of production order creation
Hi guys,
Please clarify how i can go about for the following mentioned scenario
I have one Master BOM(Finished Product Level) & alternative BOMs for that,similarly i have one Master Routing & alternate routings for the same finished product
At the time of production order creation is it possible for me to choose one of the BOMs & One of the routings of that particular finished product without creating a production version?
Awaiting for a quick response
VijaiHi vijai prasad shanmugam ,
In the material master MRP-4 view under the BOM selection you can maintain on what fatcors you want the BOM to be selected Viz. Selection by order quant.,Selection by explosion date.Selection by production version etc.
As far as the master recipe is concerned ........ I guess that if there are more than one valid master recipe maintained then SAP will prompt to select the one manually.........
But it the standard practice to maintain the production version ....... for the similar situation to the one that you have mentioned.
Please Let me know if I can help you in any way regarding this........
Please reward the points......... in you find the ans helpful.....
Thanks
Kaushik -
What is the use of production order without material?
Hi gurus,
can anyone plz tell what is the use of production order without material?
n steps involve to perform this task?Dear amnpp,
It's widely used for capturing the rework activities(components and activity cost),both for final rework and inprocess rework
activities.
Check these links,
Rework order manually (not Trigger)
rework order
Rework Order Steps
Re: Coustomization order type for Rework
Regards
Mangalraj.S -
The relationship between production order and purchase requistion After running MPS
Dear Experts:
I met a issue . My users want to know the relationship between production order and purchase requistion . In my company we create production order and purchase req. by running MRP. our operations are:
1. T-CODE: MD41 create planned order .
2. T-CODE: CO41 convert planned order to production order .
3. T-CODE: MD15 convert planned order to purchase Requisition.
but I can't find the relation of them. would you like to give me some advices? thank you very much.Hello
On the standard MTS process there is no link between the requirement (STO) and the replenishment element (production order).
See the below extraction from note 12955:
There is no index that the system could use to determine which issue element (sales order, planning, reservation, dependent requirement, ...) is covered by a certain receipt element (purchase order, production order, purchase requisition, planned order, stock level ...).
A production order, for example, can be created to cover several different requirements, even when you are using lot sizing procedure EX.
You can use transaction MD09 or MD04to determine the pegged requirements, but they are calculated dynamically and there is not fixed link between requirement and receipt.
BR
Caetano -
Can we restrict the partially confirmed production order from getting delet
Dear all,
Can we restrict the partially confirmed production order from getting deleted?
I.e. if the production order is having status PCNF then the deletion flag indicator (status DLFL) should not be allowed to set
SmanS
Edited by: SAP PP Consultant on Feb 4, 2009 6:12 AMHi,
Then must be there is change in BS22.Check allowed transaction setting for Status PCNF/CNF .For reference purpose compare it with other client IDES or sand box.
For your reference I have pasted Error log on the same.
Balance of ORD 1000000702 is not zero
Message no. KO115
Diagnosis
The balance on object ORD 1000000702 is not zero. That is, there are still costs on the object.
System Response
The object cannot be closed and the deletion flag must not be set.
regards,
Dhaval -
How to round quantity with FMS for some items in Production order lines?
Hello,
How to round the quantity with FMS or SP for only some items in the composition of Production order (lines) and the bill of materials like a box or a stick that should not be with commas.
Exemple of Production Order
P1
M1 | 234,78
M2 | 104,04 --> 104
M3 | 60,7
M4 | 512, 00
M5 | 107,67 --> 108
and others will not be rounded
Thanks,
HafidHi Gordon,
you're always the first to respond, thank you.
Its when adding the production order, before its creation or when entering the quantity of product in OWOR.
Like :
SELECT CASE WHEN ($[$37.4.0] = 'M2') OR ($[$37.4.0] = 'M5') THEN ROUND (T0.[PlannedQty],0)
ELSE T0.[PlannedQty] END AS PlannedQty FROM WOR1 T0
or
SELECT ROUND (T0.[PlannedQty],0) FROM WOR1 T0 WHERE T0.[ItemCode] =$[$37.4.0] AND (T0.[ItemCode] = 'M2' OR T0.[ItemCode] = 'M5)
Thanks,
Hafid
Maybe you are looking for
-
After upgrading to IOS 8 several things on my iPhone 5 stop working, like safari, maps, mail, messages. When you go in on these apps they only shut down. How can i fix this?
-
I need a link to download CS5 Design Standard
I need a link to download CS5 Design Standard.
-
Error message "Unable to lock resource channel ' BTS '"
i have a solution which use Biztalk 2010 and Dynamic AX 2009. recently the Biztalk server always raise error: Error message "Unable to lock resource channel '<BTS>'". the Biztalk can not receive message from Dynamic AX and the message in queue of Dyn
-
ASM and CONFIGURE RETENTION POLICY TO REDUNDANCY 1
I have a 11gR2 database in Linux. ALL the database files (including ARCHIVELOGs) are in ASM. I'm configuing and using RMAN in order to backup the DB & ArchiveLogs. I have "CONFIGURE RETENTION POLICY TO REDUNDANCY 1" configured. Please help me underst
-
Hello, We have many short ~2 minute files with long filenames (so they can cleanly be used to form the chapter descriptions for the disc) organized into folders and, as mentioned in another thread, we are having difficulties preparing these files in