How to calculate the depreciation for an asset under repair for a month
Hi,
I have placed an asset (Laptop) into service 01.01.2013 and I have calculated the depreciation for the 1st period and in the second period 01.02.2013 the laptop is broken and which was sent to the service center and for that entire month no depreciation is calculated. I wanted to start the depreciation for the same asset on 01.03.2013.
how to process for the depreciation for 3rd period and for the 2nd month what should be the activity of the asset?
Please explain in detail.
Thanks,
Santhosh.
Hi,
If you do not want to post depreciation for an asset, then assign depreciation key 0000 for the asset.
OR
Use the asset shutdown option in field status group in time dependent tab.
Regards
Srinivas
Similar Messages
-
How to get the depreciation areas for an asset in particular period
Hi frndz,
how to get the depreciation areas for an asset in a particular period for writeup or manual depreciation method.
Thanks and regards.
Harisumanth.ChTry table ANLB, then read ANLC.
Regards. -
How to accelerate the depreciation posting for the desired usefull life
Hi,
we are having issues in accelerating the depreciation on some assets, we want these assets to depreciated based on the revised usefull life
For example: if the asset CAP date is 01/01/2009 with usefull life 3 years
we change the useful life on assets from 3 years to 2.5 years (As we want this asset to fully depreciate in May 2011), how can we do with out using ABAA. these assets should be fully depreciated on the desired period as mentioned above.
We don't have smoothing turned on, but system is not calculating correctly, either it is fully depreciating the total amount earlier or later than expected period.
any help is truely appreciated.
Thanks
SmithaHi Ajay,
Thanks a lot for your response!
We just went live in Sept 2010 and our company doesn't want to go for unplanned depreciation option/ transfering the assets,
as in the legacy system they were able to enter the remaining usefull life on the asset and the assets were depreciating as intented.
we have given the above options but they were requesting for some other ideas.
what is the use of expaired usefull life in asset master record, we were changing the expired usefull life but it is not at all effecting the depreciation calculation.
Please advice
Thanks
Smitha -
How to calculate the unit for RATE?
Hey All,
I am not sure if there is something standard for this or not.
I am calculating the 'Rate' by using 'Value/Amount' and 'Quantity' as follows -
Rate == Value / Quantity
I need to calculate the unit for the rate as below -
Rate unit == Value unit (Currency) / Quantity unit (Base_uom)
(for example -
if value is 1000 USD and quantity is 10 TO then Rate should come out as 100 USD / TO)
Could anyone please suggest how to calculate the unit in this case?
Many Thanks!
TanuHi,
Go through the below link it may give some idea
http://help.sap.com/saphelp_nw04/Helpdata/EN/19/1d7abc80ca4817a72009998cdeebe0/content.htm
Regards,
Marasa. -
Revision: 10545
Author: [email protected]
Date: 2009-09-23 13:33:21 -0700 (Wed, 23 Sep 2009)
Log Message:
Make DataGrid smarter about when and how to calculate the modulefactory for its renderers when using embedded fonts
QE Notes: 2 Mustella tests fail:
components/DataGrid/DataGrid_HaloSkin/Properties/datagrid_properties_columns_halo datagrid_properties_columns_increase0to1_halo
components/DataGrid/DataGrid_SparkSkin/Properties/datagrid_properties_columns datagrid_properties_columns_increase0to1
These fixes get us to measure the embedded fonts correctly when going from 0 columns to a set of columns so rowHeight will be different (and better) in those scenarios
Doc Notes: None
Bugs: SDK-15241
Reviewer: Darrell
API Change: No
Is noteworthy for integration: No
tests: checkintests mustella/browser/DataGrid
Ticket Links:
http://bugs.adobe.com/jira/browse/SDK-15241
Modified Paths:
flex/sdk/trunk/frameworks/projects/framework/src/mx/controls/DataGrid.as
flex/sdk/trunk/frameworks/projects/framework/src/mx/controls/dataGridClasses/DataGridBase .as
flex/sdk/trunk/frameworks/projects/framework/src/mx/controls/dataGridClasses/DataGridColu mn.asHi Matthias,
Sorry, if this reply seems like a products plug (which it is), but this is really how we solve this software engineering challenge at JKI...
At JKI, we create VI Packages (which are basically installers for LabVIEW instrument drivers and toolkits) of our reusable code (using the package building capabilities of VIPM Professional). We keep a VI Package Configuration file (that includes a copy of the actual packages) in each of our project folders (and check it into source code control just as we do for all our project files). We also use VIPM Enterprise to distribute new VI Packages over the network.
Also, as others have mentioned, we use the JKI TortoiseSVN Tool to make it easy to use TortoiseSVN directly from LabVIEW.
Please feel free to contact JKI if you have any specific questions about these products.
Thanks,
-Jim -
How to calculate the size each PSA request or all PSA for the Datasources?
Hi All,
Can anybody tell me how to calculate the size of each PSA Request or all PSA's requests for all datasources?
Regards,
RajeshHi ,
PSA technical name can be found as,
1)Right click on your Data Target,go to Display dataflow,click on the PSA ,here you can find the technical name.
2)Goto RSRV tcode>PSA Table>Consistency between PSA Partitions and SAP Administration-->Give your Infosoure name,it gives u PSA technical name also,
Thanks&Regards,
Praveena. -
Required to calculate the depreciation from 01.04.2011
Hello Experts
My client did the capitalization of certains assets through WBS settlement with a capitalization data as 31.03.2011 (he is folloiwng the fiscal year variant as April to March). However, as per his internal policy the depreciation calculation is required from next financial year onwards ie., 01.04.2011 onwards
They are struck in depreciation run, since the system considered the depreciation to be posted (for one days) for those assets are posted with a capitalization date as 31.03.2011.
Is there any way that the depreciation should not be posted for the selected assets as on 31.03.2011 and need to calculate the depreciation only from 01.04.2011 (next financial year onwards)
Kindly revert
Regards
AnilHi Anil
The only way is to change the Dep Start Date for these assets in AS02
You can use Substitution: Mass Change transaction in order to process them in a mass mode (OACS)
br, Ajay M -
How to Calculate Diminshing Depreciation
Hi Everyone,
My task it so calculate dimishing depreciation,the exact requirement
Meter number(s) will be given as input along with a specified date (which may be a future date also). The program is supposed to calculate the depreciated value of the meter from the time of acquisition to the specified date. The depreciated value calculation is to be done as per the specifications given by Meter Testing Dept. as follows:
1) Method of calculation: Diminishing value
2) Rate of depreciation:
Meters purchased up to 1991: 6.00 %
Acquisition Date before 31.03.1991
Purchase year 1992 & 1993: 8.24%
Acquisition Date between 01.04.1992 to 31.03.1993
Meters purchased after 1993: 12.77%
Acquisition Date between 01.04.1993 to 31.03.2005
4) Calculation of partial year: Rounded to nearest year
Acquisition Date after 01.04.2005 calculate on Monthly basis and after 12 months the value is Zero.
pls help me in this regard or if u want any otther info let me,
Thanks,
CAPCHi CAPC,
for the meters purchased until 31.03.2005
- determine acquisition year ("Rounded to nearest year")
- determine depreciation percentage according to purchase date
- determine year for result ("Rounded to nearest year")
and then
[symbolic code]
value = <acquisition value>.
DO <result year> - <acquisition year> times.
value = value * ( 100 - <depreciation percentage> ) / 100.
ENDDO.
For meters with "Acquisition Date after 01.04.2005" (should be 01.04.2005 or later, because after 01.04.2005 does not include 01.04.2005) there i a contradiction in specification: What is "Rounded to nearest year" with "Monthly basis". Probably they want to express that they choose linear depreciation for those meters: Value = <month after acquisition> / 12 for the first 12 months, ZERO after.
Regards,
Clemens
P.S.: Why not use ASSET MANAGEMENT depreciation methods?
[added P.S.]
Message was edited by:
Clemens Li -
How to calculate the Current APC (Acquisition and Production Cost)
Hi,
Please help me how to calculate the Current APC.
The Current APC (Acquisition and Production Cost) is a calculated value based on Previous Year Acquisition balance plus any value changes up to the time of the report.
The Asset History Report (RAGITT_ALV01) calculates the Current APC value &
The Current APC can also be found in the Asset Explorer (transaction code AW01N) under Country Book 10/ Posted Values tab then the line Acquisition Value and column Posted values.
I suppose that the calculation of Current APC (Acquisition and Production Cost) is getting done in the GET statements in the report RAGITT_ALV01, but unable to find the actual logic.
Please help me.
Thanks in advance,
SatishHi,
you'll find the logic in fm FI_AA_VALUES_CALCULATE
A. -
How to calculate the Current APC
Hi,
Please help me how to calculate the Current APC.
The Current APC (Acquisition and Production Cost) is a calculated value based on Previous Year Acquisition balance plus any value changes up to the time of the report.
The Asset History Report (RAGITT_ALV01) calculates the Current APC value &
The Current APC can also be found in the Asset Explorer (transaction code AW01N) under Country Book 10/ Posted Values tab then the line Acquisition Value and column Posted values.
Thanks in advance,
SatishHi,
I suppose that the calculation of Current APC (Acquisition and Production Cost) is getting done in the GET statements in the report RAGITT_ALV01, but unable to find the actual logic where it is being done.
Please help me.
Thanks in advance,
Satish -
How to calculate the Daily Call Volume
Hello,
Can anyone please advise how to calculate the daily call volume in a contact center - the counts of the calls terminated in ICM ?
Is there any webview report or a SQL query which provides the count ?
Many thanks in advance for the help!
Thanks & Regards,
NareshThe ICM software generates a Termination_Call_Detail record for each call that arrives at the peripheral. From This report you can get the number of calls to ICM as well as the call details.
To get the report run this sql query
select * from dbo.t_Termination_Call_Detail where convert (varchar(10), DateTime, 101) = '12/03/2010' -
How to calculate the quota base quantity in quota arrangement?
Hi all,
As we all know, when a new supplier is added in the quota arrangment, we take the help of quota base qunatity so that the new supplier does not get any unfair advantage over the existing suppliers. Would you please help me on how to calculate the quota base quantity or on what basis the quota base quantity is calculated?*
Regards,
RanjanDear,
Quota arrangement divides the total requirements generated over a period of time among the sources of supplied by assigning a quota.
Quota u2013 quota is equal to a number and its represents the proportionate of requirements. Total quota of all the vendors is equal to 100% of requirements.
This quota arrangement is also specific to material and plant level.
Quota rating = quota allocate quantity + quota base quantity / quota.
Quota based quantity used only when a new vendor introduced.
In the as on date situation, the minimum quota ratings will considered as preferred vendor.
The 2 vendors has 2 same quota rating, the vendor who is having the highest quota will considered first.
In the running quota, a new source of supply is included. (In situation of short supply) including a new source not means to reduce the quota for existing.
Regards,
Syed Hussain. -
How to calculate the individual sums of multiple columns in a single query
Hello,
Using Oracle 11gR2 on windows 7 client. I have a question on calculating sum() on multiple columns on different columns and store the results in a view. Unfortunately I could not post the problem here as it keeps on giving error "Sorry, this content is not allowed", without telling where or what it is! So I had to post it in the stack-overflow forum, here is the link: http://stackoverflow.com/questions/16529721/how-to-calculate-the-individual-sums-of-multiple-columns-in-a-single-query-ora
Will appreciate any help or suggestion.
Thanksuser13667036 wrote:
Hello,
Using Oracle 11gR2 on windows 7 client. I have a question on calculating sum() on multiple columns on different columns and store the results in a view. Unfortunately I could not post the problem here as it keeps on giving error "Sorry, this content is not allowed", without telling where or what it is! So I had to post it in the stack-overflow forum, here is the link: http://stackoverflow.com/questions/16529721/how-to-calculate-the-individual-sums-of-multiple-columns-in-a-single-query-ora
Will appreciate any help or suggestion.
ThanksLooks like you want a simple group by.
select
yr
, mnth
, region
, sum(handled_package)
, sum(expected_missing_package)
, sum(actual_missing_package)
from test
group by
yr, mnth, region
order by
yr, mnth, region;I wouldn't recommend storing your data for year / month in 2 columns like that unless you have a really good reason. I would store it as a date column and add a check constraint to ensure that the date is always the first of the month, then format it out as you wish to the client.
CREATE TABLE test
year_month date,
Region VARCHAR2(50),
CITY VARCHAR2(50),
Handled_Package NUMBER,
Expected_Missing_Package NUMBER,
Actual_Missing_Package NUMBER
alter table test add constraint firs_of_month check (year_month = trunc(year_month, 'mm'));
ME_XE?Insert into TEST (year_month, REGION, CITY, HANDLED_PACKAGE, EXPECTED_MISSING_PACKAGE, ACTUAL_MISSING_PACKAGE)
2 Values (to_date('2012-nov-12', 'yyyy-mon-dd'), 'Western', 'San Fransisco', 200, 10, 5);
Insert into TEST (year_month, REGION, CITY, HANDLED_PACKAGE, EXPECTED_MISSING_PACKAGE, ACTUAL_MISSING_PACKAGE)
ERROR at line 1:
ORA-02290: check constraint (TUBBY.FIRS_OF_MONTH) violated
Elapsed: 00:00:00.03
ME_XE?Insert into TEST (year_month, REGION, CITY, HANDLED_PACKAGE, EXPECTED_MISSING_PACKAGE, ACTUAL_MISSING_PACKAGE)
2 Values (to_date('2012-nov-01', 'yyyy-mon-dd'), 'Western', 'San Fransisco', 200, 10, 5);
1 row created.
Elapsed: 00:00:00.01
ME_XE?select
2 to_char(year_month, 'fmYYYY') as year
3 , to_char(year_month, 'fmMonth') as month
4 , Region
5 , CITY
6 , Handled_Package
7 , Expected_Missing_Package
8 , Actual_Missing_Package
9 from test;
YEAR MONTH REGION CITY HANDLED_PACKAGE EXPECTED_MISSING_PACKAGE ACTUAL_MISSING_PACKAGE
2012 November Western San Fransisco 200 10 5
1 row selected.
Elapsed: 00:00:00.01
ME_XE?Then you have nice a nice and easy validation that ensures you data integrity.
Cheers, -
How to calculate the average inventory in ABAP
Dear All,
Please find the below formula and this formula how to calculate the Average inventory at value.Please let me know the abap base tables and the corresponding fields.
Formula
Inventory Turnover = Cost of Goods Sold (COGS) / Average Inventory at value.
Thanks
Regards,
SaiHi Arivazhagan,
Thanks for your quick response .
The field MBEWH from the table is fulfill the average inventory at value.
For Eg :I want to calculate Inventory Turnover = Cost of Goods Sold (COGS)/
Average Inventory at value.
so shall i take Inventory Turnover = Cost of Goods Sold (COGS)/MBEWH
The above formula will meet my requirement to find the average inventory Turnover.
Thanks
Regards,
Sai -
How to calculate the number of sent/received emails of a certain domain
Thank you for what you have helped me with!
How to calculate the number of sent/received emails of a certain domain in a certain period? It is Messaging Server 5.2, Directory Server 4.2. Is there a log option for this?
Thank you.Not sure where you find, "LOG_MESSSAGE_ADD". I don't actually find this option in the documentation.
The domains that mails are coming from and being sent to are certainly logged in the normal mail.log, so why mess with additional logging options? If you're talking about "LOG_CONNECTION", I actually see no additional data that is useful to you.
If you decide to change the option.dat, you do indeed need to
imsimta cnbuild (note, it's not cnrebuild)
imsimta restart
If I were facing the same issue, I'd be looking at the log parsing perl script, and simply modifying it to do what I wanted.
Maybe you are looking for
-
I can't change the date on my photos in events. I click on adjust date and time of selected photos and the date that I can edit is the oldest photo date and not the earliest. Help?
-
how do i open .sit files? its a star wars galactic battles demo and its in an .sit format please help soon
-
In Connect 8, Chat from Participants to Presenters not visible to other participants?
From what I can see, Chat pod entries from a participant are visible to all participants. This is a change from previous version. Q&A pod is limiting because Presenter must answer a specific Question, and can't just initiate a communication to partic
-
How to clean install Yosemite on imac 10.9.5
-
Trouble using with FM transmiter
I've been using an FM transmitter with my ipod since i bought it close to 2 years ago and it has randomly stopped working, the transmiter seems to still be picking up the signal there is just no audio coming out. I've purched a new transmitter and us