How to carry MRP run based on MRP areas

Hi All,
I want to run MRP for selected MRP area irrespective of plant and material.
Is there any configuration to get this option.Please let me know ASAP.
Regards

Please check these answered links:
Run MRP by MRP area - Tcode?
MRP-Run settings
Re: material provide to vendor for MRP run
Re: mrp run
Re: MRP Run in an excluded Storage Location
Edited by: Afshad Irani on May 5, 2010 12:30 PM

Similar Messages

  • How to find a materail based on Sales Area ??

    Dear All,
    How to find a materail based on Sales Area ??
    please let me know ..
    Thanks
    Venkat

    Hi Venkat
    Its actually the other way round- you extend a material to a sales area
    The quickest way to find all the sales areas to which a material is extended,  is to go to  transaction SE16 and give table MVKE and then give the relevant parameters.
    Please reward points if this helps you

  • In scope of planning ( md01), How to maintain MRP areas in scope of plg?

    Hello PP members,
    In scope of planning ( md01), How to maintain plant or MRP areas in scope of planning ?
    What is the transaction code for maintaining plants or MRP areas in the scope of planning
    I tried transaction code SAMP, Also went to SE93( Maintain transaction) for any related transaction codes for maintaining plants in scope of planning, it wasn't much help
    Thanks for your time,
    Thanks Again,
    Suren R

    Hi,
      we can use Total planning(MD01) for a single plant or use scope of planning to control whether total planning is to be carried out for single plant/sevaral plant/ for one MRP Area/sevaral MRP areas/ combination of plant and MRP Areas.
    Steps :
    1.Group together the plants which are to be planned in spro in --->Define scope of planning.(OM0E)
    2. Define the scope of planning as 999 for ex and give description. 
    2. Now select that and Specify the sequence in which Plants and  MRP Areas are to be planned,
    3.Goto new entries and enter the plant as 1000/MRP Area as 1000 with counter 1 and plant as 1100 with counter 2 and save.
    4.Execute the total planning either as online job or as background job.
    5.The planning run has to be always started with paralle processing.
      In SPRO in define parallel processing in MRP enter the destination for parallel processing for ex your server name and enter the no .of sessions as 1 and save.
    6.Tcode MD01 enter the scope of planning group and selet the parallel processing and enter.
    7. All the materials to be planned in the plant / mrp area will be planned now.
    Regards,
    nandha

  • How do I pin RUN.LNK when there are no Pin To Taskbar verbs

    None of the RUN.LNK shortcuts have a Pin To Taskbar verb.
    I have searched every RUN.LNK on the disk, none have it.
    Under Win8, I can find the Run icon in the Apps panel, and pin it to both the Taskbar and Start Menu.
    This is a puzzler for me.
    I want to do this with Powershell, which I already use to pin all the other common apps that I require.

    Apparently, I have not provided sufficient detail.
    This is entirely a scripting issue. 
    In the Win8 apps tile collection, a series of icons are available for Pinning to either the Start or Taskbar systems.  Right-click on the icon shows a series of verbs applicable to these shortcuts. 
    In Powershell, I locate the .LNK file I want to Pin
    $objItem = $objShell.Namespace($cDesktop).Parsename($strFullPathToLink)
    In Powershell, I then extract the Verb in this LNK
    $objVerb = $objItem.Verbs() | ? { $_.Name -like '*Pin to Tas*' }
    Finally, my Powershell script executes the Pin verb:
    $objVerb.Doit()
    The RUN item on the Metro tiles is unique.
    The Properties shows the two Pin verbs, but these are not visible to Powershell.

  • MRP Area Setting

    Hi, expert
    I have the following scenario:
    I got a transit sloc 1510 where goods will be backflush to this location first, then use mvt 311 to transfer to 1530 (fg whse) and 1520 (fg whse), and we want to seperate the material planning for 1530 and 1520.
    So, we use MRP area to do this:
    I set up 2 storage location MRP area: 1530, 1520
    sloc 1530 assigned to MRP area 1530, rec loc 1530
    sloc 1520 assigned to MRP area 1520, rec loc 1520
    Item A MRP4 setting:
    Production Version: Issue storage location: 1910, rec sloc: 1510
    Already assigned MRP area 1530 to this item A
    I created a sales order for ITEM A, in sales order, I specific the sloc 1530. Then I run MD02 using MRP area 1530. When I view the result in MD04, the rec loc for plan order is 1530 instead of 1510 (seems like MRP 4 production version setting is ignored).
    I try to add sloc 1510 in MRP area 1530 in SPRO, and then run MD04, the planned order rec loc becomes 1510, and this is what I want. But the problem is when I assign 1510 to MRP area 1520, system prompt error that 1510 already assign to other MRP area, it seems that only 1 sloc can be assigned to 1 MRP area, but based on my scenario, both 1520 and 1530 sharing 1 transit loc 1510, and I want the planning to be diff for 1520 and 1530, how should I proceed? how to configure MRP area?

    I only want to have 1 transit sloc 1510, all the goods will backflush to this sloc first, then later distribute to diff sloc. If follow what you said, I need to create multiple dummy storage location for each MRP area, If I have 8 MRP area, means 8 dummy sloc need to be created, this is not very practical and very hard to maintain.
    Any better suggestion?

  • Problem in MRP Area

    Hi
    one problem which i s related to MRP Area
    how to creat MRP area and how to assign Storage locations to that MRP area
    i tried but it is created for plants , not created for Storage locations.
    regards
    sesidhar

    Hi Sesidhar
    Try this Path in IMG
    Production-> Material Requirement Planning-> Master Data-> MRP Area-> Define MRP Area-> New Entry
    Enter Storage Location, In MRP Type select 2 (Storage Location), Rec storage Location.
    Hope this will help
    Regards
    Samarth

  • SAP AFS SD AFS Allocation run based on Customer group

    Hi all, 
             Please help me in the issue . How to do Allocation run based on Customer Group .
    Thanks in advance

    solved

  • How to run MRP only for MRP area ?

    Dear Gurus,
    I am going to run collective MRP only for one MRP area, not for whole plant. How to do it?
    MD03----is only for one material.
    MD01----is at plant level
    Thanks in anticipation.
    Jason
    Edited by: Jason Ma on May 6, 2008 4:44 PM

    Can you be more specific?
    MD21 - Display Planning File Entries? Is this related to MRP run and how?

  • How to Check MRP/MPS ASCP planning manager running or not

    Hi Team,
    How to Check MRP/MPS ASCP planning manager running or not.
    Could you please navigation for the same.
    Regards
    Jagadeesh

    Hi Jagadeesh,
    You can check whether the planning manager is running or not from the following navigation:
    Material Planner (R)  -> Setup -> Planning Manager
    You can get more information on planning manager from the below note:
    11.5 - Planning Manager Related Issues - A Complete Troubleshooting Guide (Doc ID 131051.1)
    Hope that helps!!
    Regards,
    Mohan Balaji
    NOTE: Please mark the post as Helpful or Answered if the update has really helped you. This would also bring the thread to logical conclusion and will be helpful for the viewers.

  • MRP area for running a sale order MRP

    Hello PP experts,
    I come across a scenario where , I need to do the  MRP run for sale order in a MRP area. I have checked , I can put PIR with respect to MRP AREA , but when I open MD50 screen for running MRP for sale order. I did not found the MRP AREA
    field in the screen.
    In short , my question is , How the sale order MRP run ,  system will do in a MRP
    area defined for the material ?
    Here , I have already defined the material is MRP AREA and also I have created
    MRP area segment in the material master.
    I have also configured the MRP area in SPRO.
    Waiting for your reply.
    Regards,

    Hello ,
    Thanks for reply.
    I am using plant MRP area. For FERT , I am using make to order strategy 20.
    I want to specify the real problem. It is like below.
    Suppose 'A ' is sumassembly goes to a variant configured MTO KMAT say 'V'.
    The same 'A'  subassembly is a child for a make to stock FERT say ' S'.
    Presently  using strtegy 11 for MTS fert 'S' and 10 for the subassembly ---'A'.
    Now the planner want to plan for the subassembly.
    He is putting the PIR for the subassembly as sales order is not availble and he is putting the PIR for FERT 'S'.
    When sales order is coming then additinal quantity planning is happening.
    So I suggested to use the strategy 70 for subassembly 'A' , so the sales order (of 'V') OF  quantity will be offset for the PIR of the SUBASSEMBLY 'A'.
    But the consumption of PIR of 'A' will  be apllicable to MTS  FERT that is 'S'.
    So how can we prevent the system from offsetting the dependent requiremet triggered from the PIR of 'A'.
    That means the consumption  (that is the usage of stategy 70) of the FERT requirement should only work for ' A' and sales order based KMAT 'V'.
    The same offseting should not work for subassembly 'A' and MTS FERT 'S'.
    For for Make to order KAMT 'V' , if I use MRP area and do the sales order planning in MRP area. Will I get the desired result ?
    Waiting for reply.
    Regards,
    Ravindra

  • MC74 : how transfer SOP to PIR for a specific mrp area

    Dear guru ,
    i want to transfer Planning Data of a SOP Version for a single material to Demand Management.
    The copy to Demand is run directly into the plant of the SOP Version.
    I manage MRP Area.
    How can I transfer directly SOP to PIR for a specific mrp area ?
    Thanks in advance

    Hi..
    In  MC87 you have to first create  planning data.. SOP.
    Then if you go to MC74 your planning data will be transferred..
    Ii.e you will get the PIRs automatically from Demand management..
    Hope the above clarifies..
    karthick

  • Run MRP by MRP area - Tcode?

    Experts -
    How I can run MRP for MRP area? We have few MRP areas and assigned to many materials. MD01 is for plant level, I am looking for simmliar transaction (not background job) that can run MRP for MRP area.
    Thanks for your time-

    Hi Air, 
    Normally Planning of materials takes place on a plant level
    By usung MRP Areas - Specific storage locations can also be grouped together and planning takes place on that grouping area (MRP Area)
    Ex : Plant 3200/Sloc 50 & Plant 3200 /Sloc 51 is one MRP Area this is done in Configuration
    When activated materials can now be planned per MRP area and MRP runs can also be done on MRP area
    Consumption history will be kept on MRP area level
    i'm also forwarding a link which would be very helpful to you
    www.sap123.com/showthread.php?t=57
    In case if this information is found helpful do please do reward
    accordingly
    Thanks & Regards
    Pavan

  • MRP Area Wise Run for Sales Requirenment

    Greetings..
                                I have two raw material (Trading).....in MRP view i defines these material under MRP area ...(Respective setting done in SPRO)
    Now i created sales order for these Raw material .
    Now in MD04 ...i m getting requirement but under plant....if i choose MRP area i m not getting Requirement...so if i try MD01 ...under MRP i m not getting Result of MRP..
    I need two Run MRP only for MRP area which assigned to Raw material in Material Master
    i m using Startegy 40..
    What else setting i have to do for getting Run with MRP area (MD01)

    1) Convert planning file entries - you must first convert the existing planning file entries at plant level to MRP area level in the planning file  (OM0F)
    2) Activate MRP for MRP areas (Production ->MRP -> Master Data -> MRP areas -> Activate MRP for MRP areas)
    3) Define MRP areas
    4) Assign material to MRP areas in Material master MRP1 view
    The allocation to a storage location MRP area is made using the storage location that the system determines during the planning run. This is determined on the basis of the storage location entered in the BOM (BOM item), in the work center (production supply area), or in the production version or in the material master. This storage location must be included in the MRP area that you have assigned in the material master. In addition, it is necessary that the view "Storage 1" or "Storage 2" exists for this storage location in the material master.
    Sales orders are assigned to a MRP area depending on their storage location (the issue storage location in the shipping screen of the item details).

  • How to assign materials to MRP Area

    Dear All,
    How to assign materials to MRP Area
    Thanking you
    Regards
    Prashant

    Hi
    Go to SPRO
    Production Planning>>>> Master Data>>> MRP AREAS>>>Define MRP Areas, Create New MRP AREA
    Then come to Material Master ( MM02)
    Go to MRP1 view
    In this Tab, Go to MRP AREAS BUTTON
    Here you can assign the MRP AREA to that material
    For any other info, Plz revert
    Regards
    BRSR

  • How can I extend the MRP Areas?

    How can I extend the MRP Areas of a material for different warehouses by LSMW? Is there a specific field for it?

    Ok, this is how my recording is built up (it ends with the same screen from the start):
    RMMDDIBE 1000
        BDC_CURSOR                     SO_WERKS-LOW
        BDC_OKCODE                     =UCOMM4
        SO_MATNR-LOW                                        MATNR                matnr
        SO_WERKS-LOW                                        WERKS                plant
        BDC_SUBSCR                     RMMDDIBE
    RMMDDIBE 1000
        BDC_OKCODE                     =CMDM
        SO_MATNR-LOW                                        MATNR                matnr
        SO_WERKS-LOW                                        WERKS                plant
        BDC_SUBSCR                     RMMDDIBE
        BDC_CURSOR                     SO_BERID-LOW
        PANE                           X
        SO_BERID-LOW                                        MRP_AREA             mrp_area
    RMMDDIBE 0101
        BDC_CURSOR                     SDIBE_MASSFIELDS-XLGP
        BDC_OKCODE                     =SAVE
        SDIBE_MASSFIELDS-XDISGR        X
        MDMA-DISGR                                          DISGR                MRP_group
        SDIBE_MASSFIELDS-XDISMM        X
        MDMA-DISMM                                          DISMM                planningskenmerk
        SDIBE_MASSFIELDS-XMINBE        X
        MDMA-MINBE                                          MINBE                bestelpunt
        SDIBE_MASSFIELDS-XDISPO        X
        MDMA-DISPO                                          DISPO                Mrp controller
        SDIBE_MASSFIELDS-XDISLS        X
        MDMA-DISLS                                          DISLS                lotzsize
        SDIBE_MASSFIELDS-XBSTFE        X
        MDMA-BSTFE                                          BSTFE                fixed lotsize
        SDIBE_MASSFIELDS-XSOBSL        X
        MDMA-SOBSL                                          SOBSL                special procurement key
        SDIBE_MASSFIELDS-XLGPRO        X
        MDMA-LGPRO                                          LGPRO                issueing storage loc
        SDIBE_MASSFIELDS-XLGFSB        X
        MDMA-LGFSB                                          LGFSB                stor location external procurement
        SDIBE_MASSFIELDS-XPLIFZ        X
        MDMA-PLIFZ                                          PFLITZ               planlevertrijd
        MDMA-PLIFZX                    X
    RMMDDIBE 1000
        BDC_CURSOR                     PA_PROSA
        BDC_OKCODE                     =ONLI
        SO_MATNR-LOW                                        MATNR                Matnr
        SO_WERKS-LOW                                        WERKS                plant
        PA_PROSA                       X
        BDC_SUBSCR                     RMMDDIBE
        PANE                           X
        SO_BERID-LOW                                        MRP_AREA             mrp_area