How to carry MRP run based on MRP areas
Hi All,
I want to run MRP for selected MRP area irrespective of plant and material.
Is there any configuration to get this option.Please let me know ASAP.
Regards
Please check these answered links:
Run MRP by MRP area - Tcode?
MRP-Run settings
Re: material provide to vendor for MRP run
Re: mrp run
Re: MRP Run in an excluded Storage Location
Edited by: Afshad Irani on May 5, 2010 12:30 PM
Similar Messages
-
How to find a materail based on Sales Area ??
Dear All,
How to find a materail based on Sales Area ??
please let me know ..
Thanks
VenkatHi Venkat
Its actually the other way round- you extend a material to a sales area
The quickest way to find all the sales areas to which a material is extended, is to go to transaction SE16 and give table MVKE and then give the relevant parameters.
Please reward points if this helps you -
In scope of planning ( md01), How to maintain MRP areas in scope of plg?
Hello PP members,
In scope of planning ( md01), How to maintain plant or MRP areas in scope of planning ?
What is the transaction code for maintaining plants or MRP areas in the scope of planning
I tried transaction code SAMP, Also went to SE93( Maintain transaction) for any related transaction codes for maintaining plants in scope of planning, it wasn't much help
Thanks for your time,
Thanks Again,
Suren RHi,
we can use Total planning(MD01) for a single plant or use scope of planning to control whether total planning is to be carried out for single plant/sevaral plant/ for one MRP Area/sevaral MRP areas/ combination of plant and MRP Areas.
Steps :
1.Group together the plants which are to be planned in spro in --->Define scope of planning.(OM0E)
2. Define the scope of planning as 999 for ex and give description.
2. Now select that and Specify the sequence in which Plants and MRP Areas are to be planned,
3.Goto new entries and enter the plant as 1000/MRP Area as 1000 with counter 1 and plant as 1100 with counter 2 and save.
4.Execute the total planning either as online job or as background job.
5.The planning run has to be always started with paralle processing.
In SPRO in define parallel processing in MRP enter the destination for parallel processing for ex your server name and enter the no .of sessions as 1 and save.
6.Tcode MD01 enter the scope of planning group and selet the parallel processing and enter.
7. All the materials to be planned in the plant / mrp area will be planned now.
Regards,
nandha -
How do I pin RUN.LNK when there are no Pin To Taskbar verbs
None of the RUN.LNK shortcuts have a Pin To Taskbar verb.
I have searched every RUN.LNK on the disk, none have it.
Under Win8, I can find the Run icon in the Apps panel, and pin it to both the Taskbar and Start Menu.
This is a puzzler for me.
I want to do this with Powershell, which I already use to pin all the other common apps that I require.Apparently, I have not provided sufficient detail.
This is entirely a scripting issue.
In the Win8 apps tile collection, a series of icons are available for Pinning to either the Start or Taskbar systems. Right-click on the icon shows a series of verbs applicable to these shortcuts.
In Powershell, I locate the .LNK file I want to Pin
$objItem = $objShell.Namespace($cDesktop).Parsename($strFullPathToLink)
In Powershell, I then extract the Verb in this LNK
$objVerb = $objItem.Verbs() | ? { $_.Name -like '*Pin to Tas*' }
Finally, my Powershell script executes the Pin verb:
$objVerb.Doit()
The RUN item on the Metro tiles is unique.
The Properties shows the two Pin verbs, but these are not visible to Powershell. -
Hi, expert
I have the following scenario:
I got a transit sloc 1510 where goods will be backflush to this location first, then use mvt 311 to transfer to 1530 (fg whse) and 1520 (fg whse), and we want to seperate the material planning for 1530 and 1520.
So, we use MRP area to do this:
I set up 2 storage location MRP area: 1530, 1520
sloc 1530 assigned to MRP area 1530, rec loc 1530
sloc 1520 assigned to MRP area 1520, rec loc 1520
Item A MRP4 setting:
Production Version: Issue storage location: 1910, rec sloc: 1510
Already assigned MRP area 1530 to this item A
I created a sales order for ITEM A, in sales order, I specific the sloc 1530. Then I run MD02 using MRP area 1530. When I view the result in MD04, the rec loc for plan order is 1530 instead of 1510 (seems like MRP 4 production version setting is ignored).
I try to add sloc 1510 in MRP area 1530 in SPRO, and then run MD04, the planned order rec loc becomes 1510, and this is what I want. But the problem is when I assign 1510 to MRP area 1520, system prompt error that 1510 already assign to other MRP area, it seems that only 1 sloc can be assigned to 1 MRP area, but based on my scenario, both 1520 and 1530 sharing 1 transit loc 1510, and I want the planning to be diff for 1520 and 1530, how should I proceed? how to configure MRP area?I only want to have 1 transit sloc 1510, all the goods will backflush to this sloc first, then later distribute to diff sloc. If follow what you said, I need to create multiple dummy storage location for each MRP area, If I have 8 MRP area, means 8 dummy sloc need to be created, this is not very practical and very hard to maintain.
Any better suggestion? -
Hi
one problem which i s related to MRP Area
how to creat MRP area and how to assign Storage locations to that MRP area
i tried but it is created for plants , not created for Storage locations.
regards
sesidharHi Sesidhar
Try this Path in IMG
Production-> Material Requirement Planning-> Master Data-> MRP Area-> Define MRP Area-> New Entry
Enter Storage Location, In MRP Type select 2 (Storage Location), Rec storage Location.
Hope this will help
Regards
Samarth -
SAP AFS SD AFS Allocation run based on Customer group
Hi all,
Please help me in the issue . How to do Allocation run based on Customer Group .
Thanks in advancesolved
-
How to run MRP only for MRP area ?
Dear Gurus,
I am going to run collective MRP only for one MRP area, not for whole plant. How to do it?
MD03----is only for one material.
MD01----is at plant level
Thanks in anticipation.
Jason
Edited by: Jason Ma on May 6, 2008 4:44 PMCan you be more specific?
MD21 - Display Planning File Entries? Is this related to MRP run and how? -
How to Check MRP/MPS ASCP planning manager running or not
Hi Team,
How to Check MRP/MPS ASCP planning manager running or not.
Could you please navigation for the same.
Regards
JagadeeshHi Jagadeesh,
You can check whether the planning manager is running or not from the following navigation:
Material Planner (R) -> Setup -> Planning Manager
You can get more information on planning manager from the below note:
11.5 - Planning Manager Related Issues - A Complete Troubleshooting Guide (Doc ID 131051.1)
Hope that helps!!
Regards,
Mohan Balaji
NOTE: Please mark the post as Helpful or Answered if the update has really helped you. This would also bring the thread to logical conclusion and will be helpful for the viewers. -
MRP area for running a sale order MRP
Hello PP experts,
I come across a scenario where , I need to do the MRP run for sale order in a MRP area. I have checked , I can put PIR with respect to MRP AREA , but when I open MD50 screen for running MRP for sale order. I did not found the MRP AREA
field in the screen.
In short , my question is , How the sale order MRP run , system will do in a MRP
area defined for the material ?
Here , I have already defined the material is MRP AREA and also I have created
MRP area segment in the material master.
I have also configured the MRP area in SPRO.
Waiting for your reply.
Regards,Hello ,
Thanks for reply.
I am using plant MRP area. For FERT , I am using make to order strategy 20.
I want to specify the real problem. It is like below.
Suppose 'A ' is sumassembly goes to a variant configured MTO KMAT say 'V'.
The same 'A' subassembly is a child for a make to stock FERT say ' S'.
Presently using strtegy 11 for MTS fert 'S' and 10 for the subassembly ---'A'.
Now the planner want to plan for the subassembly.
He is putting the PIR for the subassembly as sales order is not availble and he is putting the PIR for FERT 'S'.
When sales order is coming then additinal quantity planning is happening.
So I suggested to use the strategy 70 for subassembly 'A' , so the sales order (of 'V') OF quantity will be offset for the PIR of the SUBASSEMBLY 'A'.
But the consumption of PIR of 'A' will be apllicable to MTS FERT that is 'S'.
So how can we prevent the system from offsetting the dependent requiremet triggered from the PIR of 'A'.
That means the consumption (that is the usage of stategy 70) of the FERT requirement should only work for ' A' and sales order based KMAT 'V'.
The same offseting should not work for subassembly 'A' and MTS FERT 'S'.
For for Make to order KAMT 'V' , if I use MRP area and do the sales order planning in MRP area. Will I get the desired result ?
Waiting for reply.
Regards,
Ravindra -
MC74 : how transfer SOP to PIR for a specific mrp area
Dear guru ,
i want to transfer Planning Data of a SOP Version for a single material to Demand Management.
The copy to Demand is run directly into the plant of the SOP Version.
I manage MRP Area.
How can I transfer directly SOP to PIR for a specific mrp area ?
Thanks in advanceHi..
In MC87 you have to first create planning data.. SOP.
Then if you go to MC74 your planning data will be transferred..
Ii.e you will get the PIRs automatically from Demand management..
Hope the above clarifies..
karthick -
Run MRP by MRP area - Tcode?
Experts -
How I can run MRP for MRP area? We have few MRP areas and assigned to many materials. MD01 is for plant level, I am looking for simmliar transaction (not background job) that can run MRP for MRP area.
Thanks for your time-Hi Air,
Normally Planning of materials takes place on a plant level
By usung MRP Areas - Specific storage locations can also be grouped together and planning takes place on that grouping area (MRP Area)
Ex : Plant 3200/Sloc 50 & Plant 3200 /Sloc 51 is one MRP Area this is done in Configuration
When activated materials can now be planned per MRP area and MRP runs can also be done on MRP area
Consumption history will be kept on MRP area level
i'm also forwarding a link which would be very helpful to you
www.sap123.com/showthread.php?t=57
In case if this information is found helpful do please do reward
accordingly
Thanks & Regards
Pavan -
MRP Area Wise Run for Sales Requirenment
Greetings..
I have two raw material (Trading).....in MRP view i defines these material under MRP area ...(Respective setting done in SPRO)
Now i created sales order for these Raw material .
Now in MD04 ...i m getting requirement but under plant....if i choose MRP area i m not getting Requirement...so if i try MD01 ...under MRP i m not getting Result of MRP..
I need two Run MRP only for MRP area which assigned to Raw material in Material Master
i m using Startegy 40..
What else setting i have to do for getting Run with MRP area (MD01)1) Convert planning file entries - you must first convert the existing planning file entries at plant level to MRP area level in the planning file (OM0F)
2) Activate MRP for MRP areas (Production ->MRP -> Master Data -> MRP areas -> Activate MRP for MRP areas)
3) Define MRP areas
4) Assign material to MRP areas in Material master MRP1 view
The allocation to a storage location MRP area is made using the storage location that the system determines during the planning run. This is determined on the basis of the storage location entered in the BOM (BOM item), in the work center (production supply area), or in the production version or in the material master. This storage location must be included in the MRP area that you have assigned in the material master. In addition, it is necessary that the view "Storage 1" or "Storage 2" exists for this storage location in the material master.
Sales orders are assigned to a MRP area depending on their storage location (the issue storage location in the shipping screen of the item details). -
How to assign materials to MRP Area
Dear All,
How to assign materials to MRP Area
Thanking you
Regards
PrashantHi
Go to SPRO
Production Planning>>>> Master Data>>> MRP AREAS>>>Define MRP Areas, Create New MRP AREA
Then come to Material Master ( MM02)
Go to MRP1 view
In this Tab, Go to MRP AREAS BUTTON
Here you can assign the MRP AREA to that material
For any other info, Plz revert
Regards
BRSR -
How can I extend the MRP Areas?
How can I extend the MRP Areas of a material for different warehouses by LSMW? Is there a specific field for it?
Ok, this is how my recording is built up (it ends with the same screen from the start):
RMMDDIBE 1000
BDC_CURSOR SO_WERKS-LOW
BDC_OKCODE =UCOMM4
SO_MATNR-LOW MATNR matnr
SO_WERKS-LOW WERKS plant
BDC_SUBSCR RMMDDIBE
RMMDDIBE 1000
BDC_OKCODE =CMDM
SO_MATNR-LOW MATNR matnr
SO_WERKS-LOW WERKS plant
BDC_SUBSCR RMMDDIBE
BDC_CURSOR SO_BERID-LOW
PANE X
SO_BERID-LOW MRP_AREA mrp_area
RMMDDIBE 0101
BDC_CURSOR SDIBE_MASSFIELDS-XLGP
BDC_OKCODE =SAVE
SDIBE_MASSFIELDS-XDISGR X
MDMA-DISGR DISGR MRP_group
SDIBE_MASSFIELDS-XDISMM X
MDMA-DISMM DISMM planningskenmerk
SDIBE_MASSFIELDS-XMINBE X
MDMA-MINBE MINBE bestelpunt
SDIBE_MASSFIELDS-XDISPO X
MDMA-DISPO DISPO Mrp controller
SDIBE_MASSFIELDS-XDISLS X
MDMA-DISLS DISLS lotzsize
SDIBE_MASSFIELDS-XBSTFE X
MDMA-BSTFE BSTFE fixed lotsize
SDIBE_MASSFIELDS-XSOBSL X
MDMA-SOBSL SOBSL special procurement key
SDIBE_MASSFIELDS-XLGPRO X
MDMA-LGPRO LGPRO issueing storage loc
SDIBE_MASSFIELDS-XLGFSB X
MDMA-LGFSB LGFSB stor location external procurement
SDIBE_MASSFIELDS-XPLIFZ X
MDMA-PLIFZ PFLITZ planlevertrijd
MDMA-PLIFZX X
RMMDDIBE 1000
BDC_CURSOR PA_PROSA
BDC_OKCODE =ONLI
SO_MATNR-LOW MATNR Matnr
SO_WERKS-LOW WERKS plant
PA_PROSA X
BDC_SUBSCR RMMDDIBE
PANE X
SO_BERID-LOW MRP_AREA mrp_area
Maybe you are looking for
-
I get the following: the feature you are trying to use is on a network resource that is unavailable when I am upgrading iTunes
-
SORT ORDER FOR APPLE TV ~ IS BY TITLE POSSIBLE?
Apple TV displays my images sorted by date. I would prefer they be displayed sorted by title. Can this be accomplished?
-
When I need to upgrade or add a package I know what to do and how to check them. But I just tried to put in a typing tutor for my kids and I don't know where to look or how to get it working. I did pacman -S gtypist and it downloaded and installed wi
-
Older itune version 10.6 trying to reinstall, library problem?
I reinstalled older itune version 10.6 on Win7 after I reformatted the drive. 1. Now i have a library problem? the itunes will not open and i get a message "itunes library.itl" is from newer pgm. how can i work around it? 2. i want to restore my itu
-
My iphone 5 random shut down , this time is 2 time it shut down by itself , I don't known why , I have to press and hold power button some Seccond then it come back , ????? please some one tell