How to change Order and maintain other User ID in CHANGED_BY field in Orderadm_h
Hi Frds,
There is a funcationality that user can approve the order through Email, using FM 'CRM_STATUS_CHANGE_EXTERN_OW' . When approving through Email the changed_by field in Orderadm_h table taking system batch name. so my ques is how can i change the field at run time.
Please suggest.
Thanks
Imran
Hi Imran,
I assume you would have done this Approval Process via email using Work Flow.
Check in that work flow, as soon as the User Approves via email, if you are able to read his User ID.
If yes, in your work flow call the below FM to update the CHANGE_BY = USERNAME.
CRM_ORDER_MAINTAIN
CRM_ORDERADM_H_MAINTAIN
If not workflow, please let me know the process you are using for E-Mail functionality.
Cheers
Sandeep
Similar Messages
-
How to change shopping carts of other users
Hi Experts,
Please advise if there is any transaction which SRM admin can use to change shopping carts of other users. I found that BBP_MON_SC is only able to delete the shopping carts.
Regards,
KamalHi,
As Manish told, you can not change shopping carts for other users. I think as per as my knowledge even SAP will not recommend these type of funcitonalites.
thanks
Ravi -
i have changed computers and the new user of my old computer wants to use itunes. i deauthorised the computer and uninstalled itunes. when he reinstalled itunes all my songs and apps are still there. how do i get rid of them for him?
Erase the internal drive and install a fresh OS.
(104285) -
How to restrict the functions in People Enter and Maintain - Others LOV
I want to restrict the functions appearing when i click on People Enter and Maintain -> Others screen.
Can this be done through form personalization ?
If not how can this be achived.
I want to restrict the list in Assignmnet -> Others list also.
Thanks in advance
-DebojyotyChange the underlying taskflow.
In the form function parameters, you can find the taskflow name for the WORKFLOW parameter.
Make a copy of the seeded taskflow and add/remove nodes as you wich.
4 nodes in a taskflow can be checked to appear as a button, if you have more nodes linked to the form, they will appear under the other button.
This is configuration, no customization or personalization! -
How to change the text of a user defined field in dynamic selections?
Logical Database PSJ is used by t code CJI3 - we added a couple of user fields into the dynamic selections of CJI3.
Now - how to change the text of this user filed (USR01 of structure PRSP_R in logical database PSJ)?
Found an OSS note - 86980 - that tells that this is not possible.
But when we read the documentation on the user field (CJI3 - dynamic selections - double click on user field - F1), it shows the following text:
User-defined field in which you can enter general information with a length of up to 20 characters.
Dependencies
The names (key words) for user-defined fields depend on the field key.
Now the question is where to change the field key..
Thanks,
VenMadhu - you did not get the question I think.
Anyways - I found an OSS note 1266643 - this code change should take care of the issue - it will then reflect the details maintained in custoizng at transaction code OPS1..
Thanks, -
How to change header and footer in login page in oracle apps r12
Hi all,
how to change header and footer in login page in oracle apps r12 and login button background color, please help me
thanks
saranhow to change header and footer in login page in oracle apps r12 and login button background color, please help meTips For Personalizing The E-Business Suite R12 Login Page (MainLoginPG) [ID 741459.1]
How to Personalize Login page in R12? [ID 579917.1]
R12 Login Page: How to Personalize the Logo ? [ID 849752.1]
Thanks,
Hussein -
How can I login and retrieve my user file from the trash?
I was trying to find out where all my HD had gone, which a did using ‘What Size’.
I found what looked like an old backup file so I put the file in the trash.
It turns out that the file was my user file. So now I can’t login to as the user.
How can I login and retrieve my user file from the trash?The Digital Editions forum is here, in case this is what you are talking about:
http://forums.adobe.com/community/adobe_digital_editions
If you are not, I apologize for the misunderstanding. -
How to change printer and or system settings to print in color
How to change printer and or system settings to print in color
You can change the brightness with an RGBImageFilter which converts the rgb values to HSV, increases the value, and converts back to rgb.
-
HT4099 How to change it and keep permanent?
I have two accounts and changing between them changes Login panel back to US Layout. I would like to keep Colemak layout all the time. How to change it and keep permanent?
I have this problem too. Any solutions?
-
How to change SGA and PGA in 10g r2 RAC
Hi,
How to change SGA and PGA in 10g r2 RAC, its Linux.Hi,
Here is the way i followed to change SGA and PGA in RAC.
Action Plan to change the memory parameter in the production environment(5/21/2010)
Note:
=====
Practice should be done in the DEV/TST environment before moving to Production;
Although the procedure could be applied in the testing environment the changing values
used in the testing environment should be modified since RAM number are not the
same between the testing servers and production servers.
1. Make changes to these two parameters in one of
the prod instance, e.g. PROD1
====================================================
login as sysdba on sqlplus
Change :
alter system set sga_target=28G scope=spfile sid='*';
Change :
alter system set pga_aggregate_target=4G scope =spfile sid='*';
sql>alter system set pga_aggregate_target=4G scope=both;
sql>show parameter pga_aggregate_target;
-- should see the altered number on both instances
Change:
sql>alter system set sga_max_size=28G scope=spfile sid='*';
sql>alter system set sga_max_size=28G scope=spfile ;
sql>alter system set sga_target=28G scope=spfile;
3. shutdown database PROD (two instances should be shut down)
$>srvctl stop database -d PROD
$>. /$ORA_CRS_HOME/bin/crs_stat -- to check for the database status
4. bring up database PROD (two instance should be brought up)
$>srvctl START database -d PROD
$>. /$ORA_CRS_HOME/bin/crs_stat -- to check for the database status
login into both instances as sysdba to check
sql>show parameter pga_aggregate_target
sql>show parameter sga_max_size
-- should see the altered number still there in both instances
-- from step 1
-- After confirming above two parameters are altered on both instances,
-- then issue the syntax below in one instance
5) check everything is ok -
How to change country and keeping all application upgraded ? thx
how to change country and keeping all application upgraded ? thx
you may change the userID/ passwd from menu or create conn segment for each of the userID/ passwd combination .
-
The Notification Center Yosemite primary user does not work in my Macbook pro and the other users if it works. How can I fix it?
The Notification Center Yosemite primary user does not work in my Macbook pro and the other users if it works. How can I fix it?
-
my iTunes library is on an external hard drive; how do I set it so other users (accounts) on my imac, will also have the same library, with the same playlists
Quit iTunes.
Sign into another user account.
Hold Option, launch iTunes.
Select Choose library... and select the iTunes folder on the external.
Do this for all users.
NOTE: You must quit iTunes when switching users as the library can only be opened by one user at a time. -
Please, advice how to optimize optimizer_index_cost and the other optimizer
I need to tune my performance. I have too many db_file_sequential read due to index lookups. The tables are Large and indexes are also large. I would like to only cache the indexes that are actually used.
Please, advice how to tune optimizer_index_cost and the other optimizer_index parameters.
Thanks a lot,
MJOracle will only cache blocks from objects that are used. I'm not sure, therefore, what it is you are trying to cache (or not cache) here.
What version of Oracle are you using? Assuming you're using 9i or later, gathering system statistics is generally preferrable to adjusting optimizer initialization parameters.
You are also in the somewhat unique position of, apparently, complaining that the CBO is using too many indexes rather than doing full table scans. While it is certainly true that full table scans may be more efficient than index lookups, it is pretty rare for the CBO to erroneously use indexes when it shouldn't-- it tends to be much less index hungry than the RBO was, for example. It sounds like you likely have inefficient SQL that needs to be tuned, not that you have initialization parameters to tune.
Justin
Distributed Database Consulting, Inc.
http://www.ddbcinc.com/askDDBC -
How do i share pictures with other users on my Mac without using iCloud or photo stream
How do I share pictures woth other users on my Mac without using iCloud or photo streaming?
Simplest way is probably to put copies into the Users/Shared folder.
Maybe you are looking for
-
Hi, This is my first post. I was getting behind on a particular project so my boss asked me to commission a design agency to complete work being done on some prospectuses I started designing. The agency did their bit and sent the Indesign files back
-
No options left except to leave.
Over the past 3 months my BT Infinty 2 Unlimited connection has gone from being very good to useless. The reason for this imo is BT Sport. Before BT Sport was introduced Infinity was already a big gamble on copper wires from the cabinet,but now it is
-
Cannot load network driver for T43 into WinPE 1.6
Hi, I am having a really hard time to get WinPE 1.6 to recognize the Broadcom driver. I have downloaded the driver from IBM here , but WinPE just sits at "waiting for network resources" and never loads the NIC driver. Does anyone know if there is som
-
No songs now in i-tunes library but all still on i pod
help dont know what has happened cant play any songs on i tunes, all still on i pod. on i tunes still has song names but most with ! beside it. i cant locate these songs as they are empty. any help or suggestions would be appreciated thansk pter
-
Some days long ago one of my senior DBA invoked some GUI tool which was like web page for monitoring resources of Veritas SFRAC. I would like to know how to find URL for this?? -Yasser.