How to Change the Validity period

Hi All,
Could any one please explain how to change the validity period of SAP as when i am trying to post the PO with a delivery date in year 2011 it is not allowing me more than 2010 year. When i checked in Calender Maintenance the last entry in it is 2010. When i am trying to change the validity of the Indian settings it is not allowing me to change the year from 2010 to 2012 or any other.
regards
PSNG

Hi,
Just check "FOPC_CONSIST_CHECK" T-Code .
Acthually this is for "Consistency Check on Validity Period"
I am not very sure weather change option is there or not.
Thanks
Mayank

Similar Messages

  • How to change the Validility period of the cost element

    Hi All,
    how to change the validity period of the cost element. In tranc code Ka02 only the text is allowed to change but i want to change the validity period of the cost element.
    best Regards
    stephen

    Hi All,
    Thanks for your response...........
    My  concern is, i have a document posted to 43100 GL Expense acct, which is also defined as cost element, GL field status G004(cost accts). But when the original document is posted no is no assignment of any cost object.
    But i have to reverse the document and when i use FB08, the reversal is popping up with error " Assignment of CO object is neccesaary " Assign the cost center.
    Is there any way we can update the cost center for posted docuemnt? if so how? and can i make the cost element invalid for previous month so that it will not ask for cost object and change the field status of the GL from g004 to G001 only for reversal and set it back after posting is done.
    Appreciate ur feedback and suitab;le points are rewarded with points.
    best

  • Urgent:How do i change the validity period of cost element !!!!!!!!

    How do i change the validity period of cost element like:
    From 03/01/2008 to 01/01/9999
    To 01/01/2000 to 01/01/9999
    Please help me.I will assign you points.Thanks in advance.

    hi,
    pls go to t.code ka02 and select that particular cost element and go to menu bar and select edit -analysis period and select other analysis period there we can change
    if it is useful to you pls assign the points
    Thanks & Regards
    phaneendra

  • How to change the retention period of os watcher log,

    How to change the retention period of os watcher log, by default it is 7 days. but in our exadata env. automatically oswatcher logs are deleted , so i want to check the retention period.
    Regards,
    Ani

    Hi Ani,
    Go to :- /opt/oracle.cellos/validations/init.d/oswatcher
    Open the file "oswatcher" file.check for the line "/startOSW.sh X Y Z". Where X is the snapshot interval
    make the change and you are done
    Regards,
    Sunil Bhola

  • How to change the posting periods

    HI,
    could anyone tell me that how to change the posting periods in SD module
    regards,
    chary

    Welcome to the forum
    What do you mean by this and where to change ??  Please be clear in your question.  Also before posting, please make a search in the forum
    [Forum Search |http://forums.sdn.sap.com/search!default.jspa?objID=f246]
    thanks
    G Lakshmipathi

  • How to change the MM Period

    Hi Dear
    I wanna change the posting period from 02 - 2010 to 12 - 2009 means back date, Please help how it has to be done.
    i had tried in MMPV, MMRV, but no result. Give calender related error.
    Thanks in Advance
    Rakesh Paal

    Rakesh Paal,
    If you want to open previous period for reversal entry or additional entry
    The following are steps for Opening previous period in MM :
    1. Go to TCode SU01 (see OSS NOTES 487381)
    2. Choose "change" tab with your loging Name
    3. Choose "Parameter" tab
    give Parameters MMPI_READ_NOTE with date format as YYYYMMDD
    (say today 20071201)
    4. SAVE.
    5. Go to T-code MMPI
    6. open the old periods which you want to post into,
    Note :
    the period opening will be valid for only for the particular day only.
    7. Complete the posting you want to reverse or add
    8. Go to MMPV to close the periods.
    These steps first do it dev or quality then proceed furthere .

  • How to check the validity period of saprouter ?

    Dear all,
    As per sap note 1178684, we can check the validity period of the saprouter by executing "sapgenpse get_my_name -n validity"
    I am wondering how to run that command in as/400 ?
    Please advise. I am not familiar with as/400 OS.
    Thanks
    Regards,
    Kent

    Hi Kent,
    please proceed as described on the http://www.easymarketplace.de/snc-iseries-setup.php
    logon with sidadm (or sidofr):
    (depending on the user, that is running the SAPRouter)
    CD DIR('/usr/sap/saprouter')
    ADDLIBLE LIB(SAPROUTER)    ??? or whereever the stuff is ...
    RMVENVVAR ENVVAR('SECUDIR')
    ADDENVVAR ENVVAR('SECUDIR') VALUE('/usr/sap/saprouter')
    RMVENVVAR ENVVAR('SNC_LIB')
    ADDENVVAR ENVVAR('SNC_LIB') VALUE('/usr/sap/saprouter/sapcrypto')
    CALL PGM(SAPGENPSE) PARM('get_my_name')
    Regards
    Volker Gueldenpfennig, consolut international ag
    http://www.consolut.net - http://www.4soi.de - http://www.easymarketplace.de

  • How to extend the validity period of Cost estimate

    Hi Gurus,
    The validity period of Standard Cost estimate is up to the end of fiscal year. how can we get the same Cost estimate from the begining of new fiscal year.
    for example let Materila X, which has 550 as a Cost estimate.the validity period of this cost estimate is up to 31/03/2009. now i want same cost estimate for Material X, from 01/04/2009  on wards.
    is it possible to get the same cost estimate from the 01/04/2009 or Do I need to run CK11N, CK24?
    can anybody help me.
    Thanks&Regards
    Prareddy

    hi,
    If you want to get the same cost estimate for future use. You have to create a new cost estimate using the Dates as below
    Costing date from :01/04/2009
    Costing date to :Any date you desire (preferably end of 2009 financial year)
    Qty structure date: As of your previous cost estimate for the material X
    Valuation date :As of your previous cost estimate for the material X
    Using this procedure you will have the old costs ie 550 in the cost estimate but will extend the same to as long as you desire.
    Revert back for more information
    Thanks

  • How to change the valid from date of the bom header?

    ECM is active in the system.
    I want to change the valid from date of the BOM header with the help of a change number.
    How can I change it?

    Hello
    Lets assume that, we are going to change Management for controlling Valid From date
    Steps to be followed for creation of Change No
    Tcode CC01 for Change No
    Click on Change Master
    Once you enter into Change master, maintain the description
    In the Valid from Date, maintain the date from which you BOM should be current
    Maintain the Status (01)
    Click on Ojbect Type, maintain for which Object types is the Change no needs to be active i.e. for BOM, Rtg, etc
    save the Change No
    After the change no is created
    Enter the Change No during the creation mode of BOM
    THe system copies the Valid from date from Change No

  • How to change the current period in material master

    hi everybody,
    as i have installed sap 4.7 ides version on my home pc for practice , but hwenver i am creating the new material  master in the system , i observe that in accounting1 tab the current period is 12 2002 , how should i change the current posting period so that i can start the transaction in current uear 2009 and then later i can work in 2010 ....
    i have tried  the transaction mmrv, mmpv, mmpi through some resources but i didnt know how to do the settings in the system in IMG (SPRO) kindly help me through , i have wasted lot of time in this..
    i hope MM team will help me out of this...
    AMIT BATHLA

    Hi,
    Check in OMSY Transaction that, Which current month and year is having your comapny code.
    and go to T.Code MMPV
    enter Next Month of that cureent period and Year
    and Execute. You find the message that your current period has changed.
    Do the same process month by month till reaches to current period and year.
    Let me know if you have further queries.
    Padma.

  • How to change the posting period !

    Hello everyone
    I get the problem with posting period. I ready open the posting period for 2014.  The posting periods should be set per month and have erroneously been defined as per year.
    I ready follow the guide, but it is only successful in my test of SAP and it is not working in our company SAP system. I can not restrict the curent posting date range to 30.04.2014 such as my picture below: Pleas help me. Thanks

    Hi Mr Son
    Nice to meet you. I read the guide about this problem and it said that we can change if we had postings in this period. And I try it in test of my SAP company and it is ok. but when i apply in my SAP company, it is not working, i don't know why. I am only normal accountant, and i don't know the user and pass to access to your link. if you are in Vietnam now, how i can contact with you? do you have any email or phone number or skype. Please help me solve this problem.
    Please check this file
    Business One in Action – How to Correct Posting Periods?
    And this is my result in testing SAP
    http://scn.sap.com/servlet/JiveServlet/showImage/2-14962466-431165/u2.png

  • How to change the Validator's colour and thickness?

    Hi,
    I am using a custom skin for my TextInput and a Combobox component. I am also validating these two using StringValidator and checking if they are empty. If validation fails, it generally shows up a thin red line on it's border. But since, I am using custom skin, this red thin border is not shown up at all. If I remove the skin in my css file, it works fine.
    I was wondering, it would be visible if I increase the thickness of that thin red line, when validation fails. How can I do so? Also, is there a way to change that colour from red to something else? Any overrrides for it pls?
    Screenshots for your reference:
    TexInput without the custom skin style, which works fine:
    TextInput with the custom skin, whcih does not show up the thin red line:
    ComboBox without custom skin, which works fine:
    ComboBox with the custom skin, whcih does not show up the thin red line as the border:
    -Deepak

    Hi,
    You can change color of error border by using errorColor style:
    <mx:ComboBox errorColor="#00FF00"/>
    or in actionscript using setStyle().
    If you want to use your own skin the error border will not be visible because it will be overriden by your skin
    I think you have at least 2 options to solve this problem:
    1. Extend ComboBox and create new style for "errorSkin", handle the style change and create errorSkin programmatically or in Illustrator/Photoshop.
    2. User Flex 4 and its new skinning capabilities.
    Regards,
    Adrian Wiecek

  • How to check CRL validity Period before doing CA Migration ?

    Hi ALL,
    I am performing a CA migration so for doing that my first step is to
    Check that CRLs have a validity period that extends past expected migration duration
    So can any one please let me know how can I check the CRLS validity period ??
    If not, publish CRLs - ensure that published CRLs have a duration that is reasonably longer than the estimated duration of the migration.
    So can any one please let me know how can I should ensure that published CRLs have a duration that is reasonably longer than the estimated duration of the migration ??

    Why even try to determine what is remaining in the existing CRLs. Publish a new base/delta CRL period that will last the duration. For example, if you think it will take five days, then change the validity period for both the base and delta CRL to five days,
    publish a new set of CRLs, and do the migration.
    certutil -setreg CA\CRLPeriodUnits 5
    certutil -setreg CA\CRLPeriod "Days"
    certutil -setreg CA\CRLDeltaPeriodUnits 5
    certutil -setreg CA\CRLDeltaPeriod "Days"
    Restart ADCS
    Copy *.crl \\webserver\Share
    Just remember to change it back to your previous intervals
    after the migration.
    Brian

  • How to change the field 'Current Planning Period' in xRPM portal?

    Hello All,
    In xRPM portal, under portfolio management --> financial planning, we have a field 'Current Planning Period'.
    Can anybody tell how to change the values of this field for all the projects/items at once?
    Also, when I am trying to change for individual projects. its opening the F4 help but not  selecting the date on which I double click.
    Thanks
    Niti.

    No, you cannot add another vPC peer-keepalive configuration.
    Taking down vPC peer-keepalive will not affect your vPC peer-link and vPC operation. It will be a problem if and only if vPC peer-link went down after the peer-keepalive is down first, this will cause dual active.
    Regards,
    jerry

  • How to get the split period wage type amount in payslip?

    How to get the split period wage type amount in payslip?
    Payroll period for 01.01.09 to 31.01.09.
    1.     Employee is active from 1.1.09 to 10.01.09
    2.     Employee is inactive from 11.01.09 to 20.01.09
    3.     Employee is again active from 21.01.09 to 31.01.09
    In Result Table three split periods are created.
    From 01.01.09 to 10.01.09 u2018Basic Salaryu2019 Wtype  1101 amt is 20.00
    From 11.01.09 to 20.01.09 u2018Basic Salaryu2019 Wtype 1101 amt is 00.00
    From 21.01.09 to 31.01.09 u2018Basic Salaryu2019 Wtype 1101 amt is 10.00
    My requirement is to print only the last split period in payslip from 21.01.09 to 31.01.09. May you please help me in this regard.
    Thanks in advance
    Regards,
    Rajesh.

    Hi
    Try to read the below:
    WPBPC : Distribute Lump Sum Wage Elements to WPBP Periods
      Object
        Operation
      Use
        Operation WPBPC distributes the amount of the current wage type to the
        active WPBP periods in the payroll period.
      Input
        The current wage type in the header entry of table OT is used as input
        for this operation.
      Procedure
        Within payroll, wage types are assigned to a fixed WPBP period by
        infotype 0014 Recurring Payments/Deductions, for example. However, you
        may want to distribute this payment to all active WPBP periods, which is
        what would happen if the wage type were entered in basic pay. Therefore,
        various specifications exist for parameter S:
        o   If the specification is 'A', and if several active WPBP periods
            exist, the amount is simultaneously reduced on a calendar-day basis.
        o   If the specification is 'D', the wage type is distributed to all
            existing WPBP periods without the amount being reduced.
        o   If the specification is 'S', and if the validity period starts or
            ends during the period, the entry in table WPBP is split using this
            date. The wage type is stored in table OT for the corresponding WPBP
            period.
            This parameter is only allowed if processing was accessed using
           function P0014.
           In this case, infotype 0014 must be processed before absence
           valuation and function PARTT. Otherwise, rejections occur during
           payroll processing.
       o   Specification 'X' is the combination of 'A' and 'S'.
           This parameter is only allowed if processing was accessed using
           function P0014.
       o   If the specification is 'W', and if the validity period starts or
           ends during the period, the entry in table WPBP is split using this
           date (as with option 'S'). Unlike 'S', the wage type is not stored
           in table OT.
           This parameter is only allowed if processing was accessed using
           function P0014.
       o   If the specification is ' ', the wage type is stored in table OT for
           each WPBP period in which the validity interval fits.
           This parameter is only allowed if processing was accessed using
           functions P0014 or P0015.
       If the WPBP split is set for a wage type, the wage type is stored
       without changes in table OT. If you specify a different wage type name
       in the second parameter, the wage type is stored with this name in table
       OT. Before you execute operation WPBPC, you may therefore need to delete
       the split using operation ELIMI.
       If a country-specific split (C1, C2, or C3 split) is set, the operation
       interprets it as an error. The employee in question is rejected by
       payroll. All other splits are transferred as they are.
      Output
        The processed wage type, or the wage type specified in the operation
        call, is written to table OT (output table) with the appropriate split
        indicator and reduced amount as operation output for each WPBP period.
        Parameter specification 'W' is the only exception.
      Syntax
        OOOOOSVVVV
        OOOOO       WPBPC       Operation name
        S
                    blank       distribute to all WPBP periods
                    S           split and distribute WPBP
                    W           split but do not distribute WPBP
                    A           distribute to active WPBP periods
                                with calendar-day reductions
                    D           distribute to all existing
                                WPBP periods
                    X           combination of 'S' and 'A'
        VVVV                    Results wage type
                    blank       input wage type = results wage type
                    wage        wage type name of input wage type is replaced
                     type       by wage type name of results wage
                     name       type
        Wage type before operation:
      Example
        M100        02          3000
        WPBP split
        01  June 01 - June 20 active
        02  June 21 - June 30 active
        VVVV                    Results wage type
                    blank       input wage type = results wage type
                    wage        wage type name of input wage type is replaced
                     type       by wage type name of results wage
                     name       type
        Wage type before operation:
      Example
        M100        02          3000
        WPBP split
        01  June 01 - June 20 active
        02  June 21 - June 30 active
        Wage type before operation:
        WType       WPBP        Amount
        M100        00          3000.-
        M200        02          2000.-
        Operation:   WPBPCA
        Wage type after operation:
        WType       WPBP        Amount
        M100        01          2000.-
        M100        02          1000.-
        M200        02          2000.-
        Operation:   WPBPC
        Wage type after operation:
        WType       WPBP        Amount
        M100        01          3000.-
        M100        02          3000.-
        M200        02          2000.-
    Regards
    Team Member.

Maybe you are looking for

  • RAID pro´s look this way

    Need some help. See my specs below... Got my two Maxtor UATA133 80GB two days ago. Yesterday i started to set up my RAID and decided to go for the "0" knowing its a bit of a risk... True. After having struggeled a bit with the ACARD driver that came

  • BW Objects inactive in DEV system

    Hi All, In Our BW DEV System ,All objectu2019s have become inactive and in revised mode, we cant figure out what happened, bcoz of this we are facing a lot of problem to initiate transport or to install or activate again anyhting. Is there any Functi

  • Do we still use iframes to embed vimeo in dw cc 2014?

    Not sure how much iframes are being discouraged as dreamweaver evolves.

  • Fit to Screen in an Action

    How do I put "fit on screen" in an action. CS5 won't let me record "fit screen" or {ctrl}{0}. I have a script to fit to screen upon opening a document, but that script is ignored when Bridge runs Image Processor. So, the other solution would be to re

  • Canon PowerShot A620 fully compatible with OS 10.4.6 and iPhoto 6?

    I am about to buy my first digital camera... the Canon A620 looks like the one, but I'm a little confused about whether it's fully compatible with iPhoto 6. The Canon website says (implies, really) that it is, but I've seen some reviews by people who