How to correctProcess Order confirmation data posted in the previous month
Hi All PP Gurus,
Can anybody tell me the answer of following
How we can correct the process order confirmation data posted in the previous month.
Dear Ashok/Brahmankar,
Actually i am facing the following problem:-
1) If you cancel the confirmation done in the previous month by the tcode CORS, the CO document is posted in the previous period because we cannot change the posting date in CORS. But the previous period is already closed.
Can we change the posting date in CORS manually? Or do you have any other idea?
2) When reading the master data in COR2, I face the error because the status of PO is already set as 'DLV'.
Do we need to read the master data even when the value is changed in KP26?
Thanks,
Narayan
Similar Messages
-
Purchase order Confirmation data from SRM to MM
Hi,
I am trying to send Purchase order Confirmation data from SRM to MM via PI. In SRM portal i am able to see that the data has been send successfully. But i am not able to receive any data in PI nor iam able to any messages going from SRM in SXMB_MONI.
Please help me.
Thanks & Regards
Kasturika PhukanHi,
In SRM check in sxmb_moni is there any queue is blocked.
If not then,
Check your proxy settings.Select Go To and check connection Test.
Go to sm59 and check H type RFC destination is maintained.
Go to sxmb_adm check the Global setting value,
Application system,dest://RFC destination is maintained.
In XI,
Go to SLD.
Check Technical system (client with logical system) maintained.
Check Business System maintained with role of application system,Related integration engine
maintained.
Regards,
Prakasu.M -
Sales Order confirmed date in work days
Is there a way to change configuration so a Saler Order will confirm based on the Factory Calendar??
I created a new Order Type (VOV8) but see no option to change from calendar days to work days.
Bascially, I need the sales order confirmation date to be based on work days and not calendar days.
Is this possible???Hi,
Sales Order is created for particular Sales Area i.e. SO + DC + Div. And Sales Org. is the highest org unit in SD.
At Sales Organizational level you maintain Sales Org calendar and not factory calendar.
Factory Calendar is basically used at plant level which comes under MM module.
So, by SAP std practice i dont think it will be possible..............
Or you can do one thing that is,........maintain the same sales org calendar as factory calendar..........so i think it will help you....
But can you elaborate you point so that we can understand properly.............
regards,
Sagar -
How would I do a http post of the below listed XML string within a JSP?
Hi,
How would I do a http post of the below listed XML string within a JSP?
<DoService xmlns="http://www.gdinrw.org/wss" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" service="WSS" version="1.0">
<ServiceRequest DCP="HTTP_POST" mimeType="text/xml" encoding="UTF-8"><![CDATA[REQUEST=GetCapabilities&SERVICE=WMS]]></ServiceRequest>
<AuthMethod>urn:opengeospatial:authNMethod:OWS:1.0:password</AuthMethod>
<Credentials>guest,guest</Credentials>
<FacadeUrl>https://bern:8443/wss_umn_wms/WSS</FacadeUrl>
</DoService>
Thanks,
JohnYes,
I need to set up data as POST format before I POST it.
To be more specific I know how to post within a JSP if an xml element is like:
<AuthMethod>urn:opengeospatial:authNMethod:OWS:1.0:password</AuthMethod>
where the field is AuthMethod and the value is urn:opengeospatial:authNMethod:OWS:1.0:password
but what I am not sure of is when the field has values embedded within it like:
<ServiceRequest DCP="HTTP_POST" mimeType="text/xml" encoding="UTF-8"><![CDATA[REQUEST=GetCapabilities&SERVICE=WMS]]></ServiceRequest>:
It has a field of ServiceRequest and a value of ![CDATA[REQUEST=GetCapabilities&SERVICE=WMS]]
but it also other value embedded with ServiceRequest like mimeType="text/xml" .
Thanks,
John -
How to find out which data control do the page layout components come from?
hi,
work in Jdev 11.1.2.3
After have drag and drop data control into pages designer, how to find out which data control do the page layout component (such as a field in form layout) come from?
--i cannot find data control related information in the property pallete for the page layout component.
Regards.This information can be found in the page definition file.
Select the field in the page and then click the binding tab. -
I loos my APPLE ID, Now I have a new one, how can get access to data stored in the old one?
Do you have the email & password of the old Apple ID?
-
How to Include order creation business process in the project.
Hi,
I have created Implementation Project in Project Administration. Now I want to Include order creation business process in the project.
Can anybody guide me how to incude order creation business process in the project. & which T-codes I need to use.
Many Thanks
Praveen KHi Praveen,
It is S User ID and password you can get the sam in ur company .
The SAP material can't be shared in that way & pls follow the rules
https://wiki.sdn.sap.com/wiki/display/HOME/RulesofEngagement
Do not ask to send you an email.
The question you ask and the solution to it is often also interesting for other users of the community. If you ask somebody to send you the answer per email, you deprive others of also learning to know the answer. Therefore any requests for sending material or answers to an email address will be modified by the forum moderators.
In addition, do not use an email address as a user name. These will be removed as well. Email addresses can be added to a Business Card or wiki profile. Their usage in the forums is inappropriate unless we are referring to [email protected]
Edited by: Prakhar Saxena on Oct 15, 2009 12:38 PM -
How to get the last day of the previous month
Hello Team,
If my input date is today , then i need to find out the last day of the previous month for the same.
Can someone help me to find out .. how can this be done.
Regards,
RaviHi,
Try the below code.
// get a calendar object
GregorianCalendar calendar = new GregorianCalendar();
// convert the year and month to integers
int yearInt = Integer.parseInt(year);
int monthInt = Integer.parseInt(month);
int dayInt = Integer.parseInt(day);
// adjust the month for a zero based index
monthInt = monthInt - 1;
// set the date of the calendar to the date provided
calendar.set(yearInt, monthInt, dayInt);
int day = calendar.getActualMaximum(GregorianCalendar.DAY_OF_MONTH);
return Integer.toString(day);
Regards
Venkat -
How to download Standard Price of the Previous Months
Hi,
I have a request to download the standard prices of the previous month.
Below is the Example:
Material A having the current standard price of $ 100 in Jan,2011 and $ 90 in Dec,2010.
I can see the standard price of $90 under Accounting View 1 against "Period 12.2010" Tab.
I would like to know how can I download the previous month standard prices for the whole list of Materials using Tables or any standard Report.
PanduHi Pandu,
You can meet your requirement through SAP standard report. Find more details:
Use t-code: S_P99_41000111 - Analyze/Compare Material Cost Estimates.
Enter the below details in selction screen:
Plant,
Material................ To ................
Costing Variant,
Costing Date, Valid From (enter the range of dates. e.g. 01.10.2010 to 01.01.2011)
Costing Status = FR (Released Without Errors).
Execute the above selction.
Check in your output layout/change the layout to get Costing date (Key), Costing Status. Material, Plant, etc.
You will be able to view/download the current month & previous month standard prices.
Thanks & Regards,
ADI -
For selection parameter the default date should be of the previous month.
Hi all,
In my selection-screen what i want is for the selection parameter "Selection period month" the default value to be the previous month.
For example today is 24.09.2008 so the default value of this field has to be 200808 instead of 200809 today.
please tell me how should i do this.
thanks in advance.Hi,
Check the following code:
data: f_date type sy-datum,
f_dd(2) type c,
f_mm(2) type c,
f_yyyy(4) type c,
f_pdt type sy-datum.
parameters: p_date like sy-datum.
initialization.
f_date = sy-datum.
f_dd = sy-datum+6(2).
f_mm = sy-datum+4(2) - 1.
f_yyyy = sy-datum+0(4).
if f_mm eq 0.
concatenate f_yyyy '12' f_dd into f_pdt.
elseif f_mm eq 1 or
f_mm eq 2 or
f_mm eq 3 or
f_mm eq 4 or
f_mm eq 5 or
f_mm eq 6 or
f_mm eq 7 or
f_mm eq 8 or
f_mm eq 9.
concatenate f_yyyy '0' f_mm f_dd into f_pdt.
else.
concatenate f_yyyy f_mm f_dd into f_pdt.
endif.
p_date = f_pdt.
start-of-selection.
write : / f_date,
/ f_pdt.
Regards,
Bhaskar
Edited by: Bhaskar Chikine on Sep 24, 2008 12:49 PM -
Function module to get the same date of the previous month
Hi
Can anybody tell me how to get the
same date of the previous month.
example if i am entering date as 30 may 2007
i want the date as 30 april 2007CALL FUNCTION 'RP_CALC_DATE_IN_INTERVAL'
EXPORTING
date = pa_end
days = '00'
months = '01'
signum = '-'
years = '00'
IMPORTING
calc_date = pa_end.
ENDIF.
nd try below FMs as well...
CCM_GO_BACK_MONTHS
HR_PT_ADD_MONTH_TO_DATE
RP_CALC_DATE_IN_INTERVAL
Hope it will solve your problem...
Reward points if useful..
Thanks & Regards
ilesh 24x7 -
hi,
I want a function module which could calculate the previous month's start date and end date...
Say todays date is like 29.05.2007(start date) it should return
01.04.2007 and 30.04.2007...
IS there any FM for this ... or how to go about this scenario ???
thanks in advance
sammSee the below Logic :
DATA :g_date(2) TYPE n, " Date
g_month(2) TYPE n, " Month
g_year(4) TYPE n , " Year
g_bill_low(10) TYPE n, " From date
g_bill_high(10) TYPE n, " To date
g_month1(2) TYPE n, " Month
g_year1(4) TYPE n, " Year
g_date1(2) TYPE n, " Date
g_year2(4) TYPE n, " Year
g_datum LIKE sy-datum. " System date
RANGES : r_bdate FOR vbrk-fkdat. " Billing date
g_datum = p_date + 10.
g_month = g_datum+4(2).
g_year = g_datum+0(4).
IF g_month = 1.
g_year = g_year - 1.
g_month = 12.
g_date = 1.
ELSE.
g_month = g_month - 1.
g_date = 1.
ENDIF.
Passing the date to billing date-low
CONCATENATE g_year g_month g_date INTO g_bill_low.
r_bdate-low = g_bill_low.
r_bdate-sign = 'I'.
r_bdate-option = 'BT'.
g_month1 = g_datum+4(2).
g_year1 = g_datum+0(4).
IF g_month1 = 1.
g_year1 = g_year1 - 1.
g_month1 = 12.
ELSE.
g_month1 = g_month1 - 1.
ENDIF.
CASE g_month1.
WHEN 1.g_date1 = '31'.
WHEN 3.g_date1 = '31'.
WHEN 4.g_date1 = '30'.
WHEN 5.g_date1 = '31'.
WHEN 6.g_date1 = '30'.
WHEN 7.g_date1 = '31'.
WHEN 8.g_date1 = '31'.
WHEN 9.g_date1 = '30'.
WHEN 10.g_date1 = '31'.
WHEN 11.g_date1 = '30'.
WHEN 12.g_date1 = '31'.
ENDCASE.
g_year2 = g_year1.
IF g_month1 = 2.
g_year2 = g_year2 MOD 4 .
IF g_year2 = 0.
g_date1 = 29.
ELSE.
g_date1 = 28.
ENDIF.
ENDIF.
Passing the date to billing date-high
CONCATENATE g_year1 g_month1 g_date1 INTO g_bill_high.
r_bdate-high = g_bill_high.
APPEND r_bdate.
Reward Points if it is helpful
Thanks
Seshu -
Posting Depreciation for the previous months
HI Experts,
We got new asset AS100SA capitalized on 28.02.2013 (Fiscal Year Period 4 2014 ) and we want to start depreciation this asset
start from Feb 2014 (Fiscal Year Period 4 2014),
We have run the depreciation for all asset in current Month ( Period 5 2014) , when we try run the depreciation for new asset AS100SA
for the previous months in the Current Period , system prompt error msg : "Period 4 is already posted".
Asset Master Data
when I view the posted values Tab in the Asset Explorer (AW01N), system is showing the planned values beginning period 5 (Fiscal Year = March 2014)
AFAB - Depreciation Run
Period 4 (Previous Month for new asset)
Error Message
kindly advise on this issue. thanks in advance.Hi Ginee,
Radio button planned posting run can only be choose once per period and when you choose planned posting run you should not specify your asset number.
As for your case, you can run the depreciation (AFAB) by choosing the repeat button (specify your asset number) since you already done the planned posting run for period 4 and after the depreciation posted you can check the posted value tab in AW01N again, system will show the posted value in period 4.
Ex : asset acquisition : 01.01.2014, in AW01N it start with period 2 but the depreciation start from period 1.
run AFAB with this parameter
AW01N after AFAB
Regards,
Lelyana -
Filter a List for data from the Previous Month
Hello,
I have audit data for each month of the year. At the beginning of one month I pull a report from the previous month. I would like to have a view in my SharePoint list that shows only the data from the previous month.
I am not a programmer or developer, so I was wondering if this is possible without out of the box tools.
Here is what I have done so far:
Created two calculated columns to find the start and end date of the previous month
Previous Month Start =DATE(YEAR([Date of Review]),MONTH([Date of Review])-1,1)
Previous Month End =DATE(YEAR([Date of Review]),MONTH([Date of Review]),0)
I have verified these two calculations do show the correct dates.
So I can generate the dates, but I don't know how to set up a view filter that will show only data from the previous month.
Please help.What you need is the calculated column to display the start and the end of the next month, not the previous month. Then you can do a view filter where Start<Today & End>Today.
EX: If you have a document with date 15-03-2014, you need to save the dates 01-04-2014(start) and 30-04-2014(End).
Then If Start < [Today] and End > [Today], you can show the document -
How do I cancel my annual membership within the first month without calling to their phone?
I want to cancel my annual membership during the first month, but I can not call to their phone. Anybody has a solution? Thanks.
Hi,
thanks, but their instructions lead you to contact them, and I can not call them.
Am 06-Nov-2014 12:42:38 +0100 schrieb [email protected]:
HOW DO I CANCEL MY ANNUAL MEMBERSHIP WITHIN THE FIRST MONTH WITHOUT CALLING TO THEIR PHONE?
created by Kartikay_Sharma in _Creative Cloud Download padding: 10px; margin-top: 20px;">
Please note that the Adobe Forums do not accept email attachments. If you want to embed a screen image in your message please visit the thread in the forum to embed the image at https://forums.adobe.com/message/6904898#6904898
Replies to this message go to everyone subscribed to this thread, not directly to the person who posted the message. To post a reply, either reply to this email or visit the message page:
To unsubscribe from this thread, please visit the message page at . In the Actions box on the right, click the STOP EMAIL NOTIFICATIONS LINK.
Start a new discussion in Creative Cloud Download & Install by email or at Adobe Community
For more information about maintaining your forum email notifications please go to http://forums.adobe.com/thread/416458?tstart=0.
Maybe you are looking for
-
My iphone 4S only start whit cable plug in and then show battery very low (with red line end) then try to turn on but show searching in operator name command and not connecting and no work properly and when I plug out it turn off!!! what should I do?
-
Two questions before migrating to Revel
Hello, Two questions, please: 1. I chose Photoshop.com because it was the only service which did not reduce the photo quality of the files I uploaded. Will Revel maintain that same policy? 2. If I move the photos, will I need to update any link of an
-
I updated iOS in iPhone 5 just now... But I can not download/install apps (Skype,Facebook etc.) from apple store...it shows error code -1009... What can I do...?
-
How to see states in contact-form?
I used a simple contact form on my muse site. after clicking on submit, I would like, that the customer can be aware of the process, meaning: message processing, message error or message submitted. how is this possible? thanks for response
-
Update on iPod Software??
My wife has just got the new iPod nano and I love the new user interface with coverflow and other improvements. Is this available for my iPod video??