How to Customize OTL Time sheet

Hi,
Can anybody suggest how to customize the OTL Timesheet.
We need to add extra LOV field in the timesheet.
Krishna

Hi,
U can add lov for standard page in various methods ,but the best approach is customization.
---In Time sheet page create one stacklayoutRN via personalization.
---Then come to jdev right clik on jpr create new region in that region create lovitem.
---In lov.server create lov region,lovvo,lovam all the componenets in custom package.
---set properties for Lov rn and lov item.
---Move these components to server and run import command for lovregion.
---Extend stacklayoutRN with custom region.
set propery Extend: custom region eg:xxx.oracle.apps.po.msg.webui.customRN
---Apply
u can achive this by co extension also.
Regards
Meher Irk

Similar Messages

  • How to make visible Time Sheet link

    Hi,
    I want to know how to make visible Time Sheet link on portal for a particular Personnel Area so that employees of this PA can fill their Time Sheet from the portal.

    HI,
    Use Tcode - CAT 2
    Regards,
    Shadeesh.G

  • OTL -Time Sheet Hour Type field detail required.

    Hi all,
    I'm working on a Report which gets time sheet data for an employee. My time sheet structure has project, Task,Type and Hour type. I have got all the column data as required for my report but i'm not able to find out where the hours type info (as mentioned above) is stored.
    I do know that the LOV for the Hour Type column is from hxc_alias_values table. But i want to know the table /column where hour type info is stored when a person enters the time sheet.i.e., For an employee entered time sheet - project-task-type-hour type and number of hrs against it.
    We tried a lot of options but were unable to find out. Any help on this will be very helpful.
    Thanks,
    Suresh

    The value will be available in HXC_TIME_ATTRIBUTES with Attribute_Category = ELEMENT - <Element Type Id>. This cane be retrieved by joining HXC_TIME_BUILDING_BLOCKS > HXC_TIME_ATTRIBUTE_USAGES > HXC_TIME_ATTRIBUTE_USAGES.

  • Need Help in Customization of OTL Time Keeper Layout for Projects.

    Hi All,
    Need help in customization of OTL Time Keeper.
    Requirement:
    Required to change the Project Layout Template as Payroll Layout Template.
    In Payroll Layout Template the days consits of start and end time and total time per day.
    Similary need to reproduce the same content Layout as it is in Payroll.
    Can Anybody suggest the procedure to achive this task
    Thanks and Regards,
    Chaitanya.

    Hi,
    Can someone please Help me on this ...
    Regards,
    Tarun

  • How to configure Time-sheet in Project server 2013 please share the doc with screen shot

    How to configure Time-sheet in Project server 2013 please share the doc with screen shot
    Thanks and Regards, Rangnath Mali

    Hi,
    Please refer to the following Youtube video and article.
    https://www.youtube.com/watch?v=lZWvg4q17JE
    https://support.office.com/en-sg/article/Set-up-timesheets-and-task-status-672fa06f-8c4b-4e43-bfbc-4c355d681605
    Please don't forget to mark it answered, if your problem resolved or helpful.

  • I'm trying to make a time sheet and include a grid, but I'm having a hard time figuring out how to print a full grid on my spreadsheet.  There are options for shaded grids but I want a defined grid, and I have spent the last 2 hours looking for the answer

    I'm trying to make a time sheet and include a grid, but I'm having a hard time figuring out how to print a full grid on my spreadsheet.  There are options for shaded grids but I want a defined grid, and I have spent the last 2 hours looking for the answer.  Any ideas?

    Hi Cynthia,
    Are you planning to have this table do any of the calculation, or is is to be used as the electronic equivalent of a sheet of paper with a grid printed on it—a place to record the data.
    For your seven column table:
    Are you using one or more rows at the top of the table to label the data below? If so, you might want this row (or these rows) to be set as Header Rows.
    Are you using the leftmost column to label the rows? If so, you may want this column to be a Header column.
    The default table supplied on the "Blank" templates contains one header row and one header column. If you need more (or fewer) Header rows or columns, select the table, then go Table (menu) > Header Rows > (choose the number you need). Repeat to set the number of Header Columns.
    To make a seven column table from the table supplied by default, click on any cell in column H (The eighth column), and drag right to add more cells to the selection, until you get to the last column of the table. With these cells selected, Go Table > Delete Columns.
    To make the remaining seven columns fit across a single page:
    Go View > Show Print View to show the table as it would appear when printed to paper.
    Select the table by clicking its icon in the Sheets List to the left (easy method), OR by carefully clicking on the outside boundary of the table itself (fiddley method).
    With the table selected, you will see square white handles at each corner and at the middle of each side (including the top and bottom).
    With the mouse, grab the handle in the middle of the right side of the table and drag right (or left) until the table just fits onto the width of the defined page.
    With the table still selected, set the thickness and colour of the cell boundaries using the Gaphics Inspector (as described by Jerry), or using the Stroke, Thickness and Color Well controls in the Format bar above the working portion of the Window.
    Regards,
    Barry

  • How to add customized column in the time sheet CATS (transaction CAT2) ?

    Hello,
    I need to be able to add some columns in the time sheet CAT2 containing:
    - the name and first name of the person (in addition of the number), in display mode in the CATS time sheet.
    - a  text that I will found by reading some tables and values...
    Does anyone have any idea how to do so ? and if it's possible or not?
    Thanks a lot in advance for your help.
    Best regards
    Fanny GROUX

    Hi,
    Thanks a lot, it's really help...don't know why I didn't see this customized point before in SPRO.
    But I have an other issue, my new fields is added in the CATS screen and now I'm trying to put default value by using the user exit of extension CATS0009.
    When I complete the value of my new fields in structure CATSD_IMP, there are not taking into account and the CATS screen doesn't display the value.
    Am I using the wrong table ? wrong user-exit ? or my code ..
    Thansk a lot again for your help.
    Fanny GROUX

  • How do you Customize the weather on the home page and make it default to that setting? I have Customize several times and it keeps changing back to McLean, VA in English

    How do you Customize the weather on the home page and make it default to that setting? I have Customize several times and it keeps changing back to McLean, VA in English.
    [email protected]

    '''''What''''' webpage do you have set as your homepage? <br />
    Are you saving cookies for that page?

  • How to create "time sheet" bar chart?

    Hi Experts,
    I am using Crystal Reports 2008 and I would like to ask the steps to create a time sheet liked bar chart with following information:
    Imagine I collected the CPU usage of a computer every 30 seconds.
    In the report layout, X-axis should be the time of date. Such as 00:00, 06:00, 12:00 and 18:00. Y-axis should be the exact date. Such as 2009/05/01 to 2009/05/31. Highlight color should be applied to identify the usage. Such as <30% is gray, 30~70% is blue and >70% is red.
    Here is my target layout: [timesheet|http://img200.imageshack.us/img200/1292/timesheet.png]
    I tried to use bar chart template but crystal report sum up the total duration, not the exact time. When using Gantt chart, it almost fulfilled my requirement. But the bars of same date is not aligned horizontal, just like stairs.
    Thanks a lot for help!
    Regards,
    Albert Lai

    Thank you for reply!
    I tried "horizontal stacked bar chart" but it still have problem...
    Let's see my screen dumps: [Chart Expert - Data|http://img514.imageshack.us/img514/6595/timesheet2.png], [Chart Expert - Highlight|http://img411.imageshack.us/img411/1924/timesheet3.png], [Result|http://img269.imageshack.us/img269/8195/timesheet4.png]
    Is that no one will use Crystal Reports like my sample?
    Regards,
    Albert Lai
    Edited by: Albert Lai on Jun 4, 2009 3:24 PM

  • How to push the outstanding time sheet for terminated employee?

    Hello Everyone,
    Sometimes employees who are leaving the company forget to submit last time sheet. They get terminated before time keeper has a chance to push the time sheet. Are you aware of any method of pushing time for ex-employees?
    I found the note on Metalink which explains ability for "further payroll processing to occur for the assignment up
    to the Last Standard Process / Final Process dates" (Note: What is the Definition of Final Process Date [ID 824817.1]). I tried to follow it by changing Last Standard Process on the employee term form but I didnt get results.
    Is there a way to push time for ex-employee?
    I appreciate you advice.
    Thanks,
    Kasia

    usual fix, reverse the termination and complete all the flow, then terminate again.
    --Shiv                                                                                                                                                                                           

  • How to activate multiple approval in time sheets

    Hi Experts,
    I have a business requirement where we require multiple approval of time sheets. The requirement is is such that either of the two managers or the director should be able to approve the time sheets of the consultants.
    We use project systems and we have assigned the director as the person responsible in the project and the managers for person responsible for the WBS elements and the consultants have been assigned to the WBS elements. As of now only the director can approve the time sheets of the consultants. (i.e the person responsible for the project). But we want the ability where the other 2 managers also to approve the time sheets.
    Your valuable inputs in your earliest are highly appreciated.
    Thanks in Advance
    Dasuni

    Hi Lucas,
    Thank you for replying  my query. We use cj20n to create the project and the WBS elements and assign a person responsible for the projects & as well as for the WBS element. These persons have been maintained in OPS6 along with their user ID
    Thanks in advance
    Dasuni

  • How to Find Actual Time Spent on a TASK in TFS 2013 by using the scrum template

    Hi! Currently we are using the TFS 2013 version with Scrum template this template contains only Remaining work measure for Task item and there is no
    other option for getting the Actual time spent on particular Task and Bug having the option called Effort. How to find the Actual Time spent or Actual effort hours on particular TASK is it possible? In the similar way the Agile Template having the These options
    like
    1 Original Estimate
    2 Completed Work
    3 Remaining Work 
    Can i use these 3 for Scrum Templete also?
    We require the feature similarly like Atlasian JIRA product (JIRA consist the Actual time, Estimation Time and Log).

    The Scrum template doesn't have these fields, tracking "spent time" is not really in line the philosophy of Scrum. it's tracking data that is not really useful anyway, unless you have to do some form of reporting. In which case you probably already
    have a system to track time in at a higher level. 
    The way TFS tracks time is very hard to use when you have a highly collaborative team, it would require you to create tasks for each person contributing to a task or constant re-asssigning of tasks to track the correct time spent. How else would you track
    two peopleworking together? Pair programming, for example is a practice we at scrum.org highly promote. As well as pairing a tester and a developer up on applying ATDD when working on a story together. When a story is taking "too long" to move off
    the board a technique called swarming is often applied, in which all team members help out to move the story along at a higher pace or to get it unstuck. These ways of workign are very, very, very hard to capture in TFS. But we think the threshold to use these
    techniques should be very low. People should default to these ways of working and not be punished by bad functioning tooling.
    As mentioned by Alexandr, you can extend the Scrum template with the same fields the MSF templates use, but I would not recommend it. Instead, if you need to track time, first consider doing it in different tool and at a different level than task. Maybe
    feature, activity or product backlog item.
    If you still want to track time, then a tool like
    Imaginet Time Sheet can extend TFS in ways that make it a lot easier to track time against any work item.
    As a last resort, consider
    adding the fields from the MSF template, but I beg you to reconsider.
    My blog: blog.jessehouwing.nl

  • Dropdown Custom Field in CATS Time Sheet in ESS

    I have added a custom field in CAT2 transaction with drop down values from the custom table.  When I log on to ESS I was not able to see the dropdown in timesheet for that field. I am able to configure the field to have a search help dialog box.
    Let me know how can I configure the field to show dropdown values in time sheet in ESS? Appreciate your replies.
    Thank you,
    Rohit

    check CL_XSS_CAT_VALUE_HELP*
    or
    use implicit enhancement of CL_Xss_cat_value_help_general for the purpose
    build_f4_help Method in the class CL_XSS_CAT_RFC_COMMAND_TOOLS.
    or note 914125 on how to get different helps
    The table TCATS_SHLP_ITS also can be explored

  • Operation cost and time sheet booking

    Hi,
    In my current project we have SAP PP and SAP HR too.
    My production order is against WBS, I am issuing materials and confirming operations in CO11N to capture material cost and operation cost. then i am doing GR of finished goods and then order settlement and then goods issue ( of finished goods) to project to post the cost to project. Also in HR, time sheet booking is done in CAT2. This will lead to double cost posting to project i.e. once thru PP and then thru HR.
    How to avoid this??
    Regards.

    I am not sure how you have defined your std value parameters in the Routing.
    in the Production order we are trying to capture the cost incurred to the order, these hours are for Product costing purpose need not  be used for Salaries.
    in CAT2 we are trying to post only the manual labour hrs for the Project. thses hrs for Salary wage settlement purpose.
    Regards
    Ratan

  • Question fractions of an hour formulas on Time Sheets

    I am trying to build a time sheet. Sometimes the time entered needs to be less than one hour. But when it then multiplies by the hourly rate, I get a problem.
    The formula calculates the "hours" by subtracting the start time from the end time in the fields where I enter them. If those total less than one hour, it either changes the duration to "minutes" or if I force it to hold the duration at hours, it always rounds up to one hour. As an example, a reported task that runs from 11:30 a.m. to 12 p.m. is entered, it usually posts a result of 30 minutes. But when it then goes to multiply the hourly rate, it multiplies by 30 (hours) rather than by 30 (minutes) or .5 (hours). How can I get it to post .5 hours so the math is right on the extended total?

    Assume cell a1 is formatted as date and time with only time shown. Enter data in form of h:m in that cell. Convert to fraction of hour that can be multiplied by hourly rate with formula as follows: =timevalue(a1)*24. Add in hourly rate as follows: =timevalue(a1)24[rate value].

Maybe you are looking for

  • Posting A Park document of year 2005 in 2007( Error message no. FP 041)

    Hi All I have a parked document in year 2005 and know the user want the same to post in 2007. while changing the header(posting date and making as 01.01 2007) through T.code MR44. I am getting the following error. Changing of document number or fisca

  • SAP r/3 4.7x110 installation

    Hi all, I was wondering is there a way to install SAP r/3 4.7x110 on oracle 10g. As there is no installation media available for oracle 10g for this version in service marketplace. but when i saw the product availability matrix it is indicated there

  • Long startup and save times for Fc

    Its taking almost 5-7mins to open my FXP file (file size 256MB). I think Im running a pretty decent machine Intel Duo Core 2.4GHz, 2.4GHz with 4GB memory. It also take a long time to save the file - almost 7mins. And often the Fc instance crashes wit

  • Any way to seperate duplicates so both aren't deleted

    I have loaded a lot of duplicates and when you display them how can you delete just one of the duplicate so you still have one left? ie two of the same song if you highlight or delete all you don't have a copy left. It is further complicated by the f

  • Is echo sign included in the pdf pack?

    Is echo sign included in the pdf pack?