How to Customize UD (usage decision) in QM.

Hi All,
Could you please let me know, how to Customize UD (usage decision) in QM for movement of quality stock to unrestricted or blocked stock
Thanks in advance.
Amit

Hi
The customization for defining the posting direction (e.g. unrestricted use or block stock) is here.
SPRO > Quality Management > Quality Inspection > Inspection lot completion > Define inventory postings. There are the fields what you can see in QA11 for stock posting, if you'd like to add new fields waht you want, then add that there and also need to activate the user exit QEVA0001 with your soure code, please go to SMDO to read the documentation.
If you'd like to post the stock automatically according to respective UD code inputted, then you can go to QS51 and tick on the field 'Stock screen background' and select the posting direction for the UD code, then the system will automatically post all of the stock without asking user to input the quantity to be posted.

Similar Messages

  • How to Create Custom Usage Decisions

    Hi,
    I am working in ECC 6.0. I want to create a Custom Usage decision (Plant Specific). I can not remember where to go to set this up?
    If I use transaction QS41 and set up my own Code Group under Catalog type 3 (Usage Decision), where can I attach the Selected Set that tells the system how to post the Usage Decision (i.e. Unrestricted, Restricted, Scrap...)
    Any help with this would be huge.
    Thanks so much,
    -Bruce

    Thanks for your quick feedback.
    I get confused sometimes with this.
    When I go into QS51..I get to choose Catalog Type 3 (Usage Decision) and my Plant. Then I create my Selected Set. I highlight that and Double Click on Selected Set Codes. Inside there I create my Accept and Reject codes and assign Posting Proposals. From there I save.
    I just ran a MIGO transaction and created an 01 type Inspection Lot. I tried to go in and do a Usage Decision on it. When I hit the drop down...it gives me the Original SAP Catalog. I do not see my Selected Set I just created.
    Can you tell me what I'm doing wrong?
    Thanks a Ton!

  • Usage decision - Reversal

    Hi
    How to reverse the Usage decision if we did by mistake ?. Any help will be appreciated
    Thanks
    JJ

    Hi JJ,
    for cancelling usage decision use user exit QEVA0008.With the help of Abaper Proceed with following steps.Once you apply this exit you can reset the UD.
    1) GOTO T. CODE CMOD
    2) CREATE NEW PROJECT FOR EXAMPLE "ZUDRE"
    3)GIVE SHORT BTEXT & SAVE IN REQUIRED PACKAGE
    4)CLICK ON ENHANCEMENT ASSIGNMENT PUSHBUTTON
    5)ASSIGN USER EXIT QEVA0008
    6)CLICK ON COMPONENTS PUSHBUTTON
    7)DOUBLE CLICK ON" EXIT_SAPMQEVA_008"
    8)DOUBLE CLICK ON "INCLUDE ZXQEVU10"
    9)WARNING MESSAGE WILL APPEAR ON STANDARD TOOL BAR IN YELLOW COLOUR
    10)HIT THE ENTER BUTTON OF KEYBOARD
    11)CREATE OBJECT MESSAGE APPEARS . CLICK ON YES
    12)SAVE CREATED OBJECT IN REQUIRED PACKAGE
    13)CLICK BACK TWO TIMES TO COME TO SCREEN OF DISPLAY PROJECT
    14)SINGLE CLICK ON ICON IN FRONT OF FUNCTION EXIT UNDER COLUMN EXP.
    15)COPY THE DISPLAYED PROGRAM
    16)COME BACK TO "INCLUDE ZXQEVU10" AND PASTE COPIED PROGRAM INTO "INCLUDE ZXQEVU10."
    17)SAVE AND COME BACK TO SMODE INITIAL SCREEN AND CLICK ON ACTIVATE PROJECT ICON.
    18) NOW ON UD SCREEN U WILL GET CUSTOMER FUNCTION PUSHBUTTON.CLICK ON THIS BUTTON, UD WILL GET REVERSED.
    Regards
    Amit

  • Usage Decision(UD)

    Dear Friends
    How to set For Usage Decision, recording of all results to be mandatory (i.e system should not save the UD until all parameter should enter)
    Thanks
    Gajendranath

    HI
    You can create the user status profile like without RREC( Result Recording) system will not allow the UD status.
    Create the status profile using BS02 t.code and assign the same in Inspection type, which you want use in the inspection lot.
    To assign the status profile into the inspection lot Go to SPRO-QM-QI----Maintain Inspection Types.
    In that select the inspection type which you want to use and assign the status profile
    Regards
    Ramanujam

  • Wrong usage decision

    Dear sirs,
    I have one issue.
    One of materials is assigned to quality.
    GR (101 mvt type) is posted for that material for 20000 litres and inspection lot is created.
    While performing transaction QA32, usage decision is to be made with 20000 litres and this much quantity is to be moved from quality stock to unrestricted stock.
    Unfortunately user has posted usage decision with zero quantity.
    With this,20000 litres of stock is left in quality only.
    Now how can I change usage decision?
    Please suggest me the solution
    Regards,
    Sastry

    Dear sir,
    When I take QA32 and try to post usage decision for the same inspection lot, system is throwing error message "The function you selected can not be carried out"
    When I try to post "return deliery to vendor " using MIGO keeping the stock type as Quality stock, then also system throws message "You do such changes in quality"
    Please help me
    Regards,
    Sastry

  • Changing posting date at usage decision for handle units. How?

    Does anybody know how to change posting date at usage decision for handle units (HU)?
    If the material is not managed by HU, SAP allows this modification (there's a button with a hat on it referring the material document header).
    For HU I cannot seem to change posting date!
    Seba

    Yes it's possible! Well,...unless for versions 4.6C, 4.7 and ECC 5.
    I've found SAP Note #752131 by which SAP declares that you can create the pushbutton from the Screen Painter referring the document header.
    That's all,.....so simple, and it works fine!
    This note applies ONLY to version 4.6C, 4.7and ECC 5 (which is the version the customer I am with has installed).
    Thanks anyway.
    Sebas

  • How to recover scrap in usage decision in QA32

    Hi friends,
    I have done tra QA32 , and in usage decision i enter the unrestricted qty and scrap qty. but in scrap qty i havent specify the sto location. so can i recover my scrap qty.
    and how.
    thanks in advance,
    solomon Macwan

    Hi,
    In your scenario,When the material is rejected transfer the material to blocked stock.When u need for production then u can make a transfer posting to unrestricted from blocked stock.
    When you are transfering the material to scrap with cost center then that material cannot be restored.So you should be aware before putting the material to scrap.
    Hope this helps...
    Manoj.N

  • How to make RR result recording mandatory before UD usage decision.

    Hi Team,
    My clients requirement is  to make RR mandatory, before UD.
    Pls suggest  me required settings.
    Thanks

    Hi
    This is possible in Two ways
    1.QEVA0010 UD: Usage decision check.
    here check whether RR is done .
    2.Use User Status profile
    Re: Usage Decision(UD)
    Regards
    Sujit

  • Customizing mmbe screen to diplay Usage Decision????

    Hello everyone,
    I am SAP QM/MM consultant..
    My client wants a customized mmbe screen, in which besides the Unrestricted and QI stock, there should be an additional column for Usage Decision in which the Usage Decision ( wrt QM ) for that particular batch should be displayed.
    I have never done this and have no idea how mmbe screen can be customized in order to display Usage decison..
    Please provide your valuable inputs to my query asap..
    I would really appreciate.
    Thanks n Regards
    Neha

    Hi,
    Its not a good idea to customize MMBE screen with the field info that is not provided by standard SAP's configurable values.  Simply provide him a ZMBE report which you might have understood by now....Remember, MMBE would be used by your client's global users.  Just for his sake, if you attempt to change it, you would be facing the global users..If I were, I would never do it.
    Regards

  • Error while doing the Usage Decision in transaction QA32

    Hello Friends,
    While doing the goods receipt for customer returns from customer, system generated a inspection lot with inspection type 06.
    So in QA32 transaction, system is showing that inspection lot, but in same screen, against the column InspPlan: Material, system is not showing any entry.
    Later on after analysis, i found that no inspection plan was assinged to the material, Plant for which that inspection lot was created. When i checked that inpection lot in transaction QA03, in Insp. Specifications tab, agaisnt the Assigned Specification section, system was not showing any entry in fields Group, Group Counter, Plant, Usage.
    And against that inspection lot,status CRTD, PREQ, CHCR are active.
    Because of  which, when user is trying to do the UD against this lot system throwing the error message as Status check error.
    When i checked again i found that status CRTD is throwing the error message.
    Hence friend, i want to do the Usage decision  for that inspection lot than how to do?
    Now user has assigned the material, plant to the inspection plan in QP02.
    Should i go to QA02 transaction, and in Insp. Specification tab, for fields group, group counter, usage, Plant, maintain the values?
    Will this allow me to do the usage decision against the inspection lot which got generated when no inspection plan was assingned to that material, plant?
    Waiting for your valuable inputs.

    For Result Recording and Ud the inspection lot status must be REL as u told ur status is CRTD it Mean Some master
    is missing in inspection lot,generally inspection plan for that u run QA02 enter inspection lot no go to specification tab
    there a button assigned specification there click on that as u click on button u will find that plan for above material copied to lot and it will show u plan detail line group and group counter no.
    then go to next screen Sample if sample management is active and click on sample then system will calculate sample size then save ur lot. it would get Status As REL now ui can enter result or take UD
    for QM setting Refer
    http://sap-questions.blogspot.com/

  • Unable to change stock posting date at usage decision while inspecting HUs

    If we were using materials without WMS it's simple: thereu2019s a button in the screen for stock posting by which we're able to change document date and posting date; but we're using WM and the screen is slightly different: the button I'm referring it's gone!
    So, how to change the posting date at posting stock in QA11 when we're using handle units? Some end-user told me that in version 4.7 this was possible. I don't think so ...unless there was something customized at WM IMG...or maybe they were using a USER EXIT to bring a pop-up window for this (I'm starting to believe that this was implemented..). This is the first time I work with HUs, so I don't know how to manage this.
    Anyone?
    Seba
    Edited by: Sebastian Sniezyk on Apr 3, 2009 10:16 AM

    I solved it in this topic: Changing posting date at usage decision for handle units. How?

  • Selection of usage decision based on % of rejection done thorugh Insp Lot

    My business scenario is as follows:-
    I have created new usage decision codes as mentioned below through QS41and assigned the same to code group RI-UD and catalog 03. 
    I3     INITIAL REJECTION >75% to <=100 % (1) 
    I4     INITIAL REJECTION >50% to <=75% (40)
    I5     INITIAL REJECTION >25% to <=50% (60)
    I6     INITIAL REJECTION <=25% (80)
    and quality score maintained the same through QS51
    Code Group     Code     Shot Text for a code                                               Code Valuation         Quality Score
    RI-UD     I3     INITIAL REJECTION >75% to <=100 % (1)     R Rejected (not OK)     1
    RI-UD     I4     INITIAL REJECTION >50% to <=75% (40)     R Rejected (not OK)     40
    RI-UD     I5     INITIAL REJECTION >25% to <=50% (60)     R Rejected (not OK)     60
    RI-UD     I6     INITIAL REJECTION <=25% (80)                          R Rejected (not OK)     80
    I need to automate the selection of usage decision code to be done by system based on the accepted/rejected quantity entered.
    How to go about it.  Can anybody on this please?
    Thanks in advance.
    Ravi

    Anything can be done SAP!   But what you want would be all custom.  There is no SAP functionality that would do that for you.  I'd start with the auto UD program first.  Have the programmers modify the selection parameters to select the list of lots.  Than process those lots with the logic you want o use and change the UD accordingly.  I'd make sure I could run the program manually as well.  Similar to some of the other UD workload programs.
    FF

  • WM - QM usage decision scrap - automatic TO creation

    How can I realize an automatic transfer order processing for the following scenario:
    MIGO Goods receipt posting with reference to PO into quality
    QA11 Usage decision Scrap
    Transfer requirement (WM mtype 551 / IM mtype 553) is being created but although the correct storage type (902 GR area external rcpts) is being determined the system cannot process the transfer order in background since the respective storage bin (dynamic  IM-material document) cannot be determined => error message u201CSystem cannot find source storage binu201D.
    I am able to process the transfer order in foreground successfully. Via u201Cstock figuresu201D (F7) the system is able to determine the respective storage bin (including stock search with inspection lot) correctly so I wonder why this is not being done in the background processing.

    Hi,
    Bin can be determined automatically only based on the strategy (for your case, it's removal strategy) assigned to the storage type in question. For 902, it's a interim storage type without strategy assigned.
    I am afraid you can only manually process the TR in foreground for your scenario. Otherwise, you may consider putting away QI stock from 902 into a normal storage type. You should then be able to process the TR of scrap in background.
    Hope it helps.

  • Return process for the PO which has done the usage decision with QM

    Hi Guru,
    We are running below process right now, and stop there, don't know how to return to vendor:
    PO for external vendor -> Goods purchased physically arrive -> Create a inbound delivery for this PO -> Post the GR with the inbound delivery created -> QA team performed the usage decision and rejected.
    At this moment, how can we reverse the good receipt? We canu2019t use VL09 to reverse the inbound delivery, and we can not use MBST to reverse the material doucment which created during Post good receipt.
    What's the correct process to return it to vendor?
    Thanks,

    Hi Rick,
    Can use t.code MIGO and select return delivery for material document or delivery note.
    Then select the respective document, it will display the details, now you can select the material which you want return and unselect the materials which you dont want to return and the quantities accordingly.
    Save the document.
    This will use movement type 122.
    Regards
    vk

  • Partial quality inspection & partial usage decision?

    Hello Friends
    Inspection lot is created when GR is done against purchase order, in normal case result is recorded for whole lot and usage decision is made partially / fully.
    Say business want to inspect (record result) only 50 pieces and want to do usage decision of 50 pieces immediately and again want to inspect (record result) another 50 pieces of same lot and want to do the usage decision u2026u2026u2026u2026how to do it?
    As per my knowledge once inspection is done & usage decision is done system stops to inspect that lot again.
    Looking for your valuable input as soon as possible.
    Thanks & Regards
    Swanad

    hi
    inspect (record result) only 50 pieces and want to do usage decision of 50 pieces immediately and again want to inspect (record result) another 50 pieces of same lot and want to do the usage decision
    For result recording to be done for  qunatity In control indicator of each char tick on long term Inspection.
    This will allow you to do RR after UD has taken.
    For UD to be done Partially means stock posting partially ...
    You can create a UD code(AP) & in customization do not post it automatically.
    Then You can only post 50 Qty initially with UD -AP
    then for rest of the  qty in QA32 select those lots with UD & stock post rest of the items when you carry out RR for rest of 50 .
    This is the solution
    Regards
    Sujit

Maybe you are looking for

  • In urgent hurry Please Fatal Error

    Hello. First of all i'd like to apologize for my username. I made quite while ago and wasn't even thinking about what i was doing. Ok so now back to the topic, today i was going to try manage ftp site with flash catalyst, but when i just clicked, its

  • PO Number is not copied when create SD document from Reference

    Hi Gurus, I created Billing request document (VA01) by reference with a contract (VA41) , but the PO number field ( VBKD-BSTKD) is not copied over. I have checked all the data transfer rountines, but still could not find out. Please help , which data

  • 2 Differnt Vendor in single PO

    Hi we have purchased some materials from one vendor1, and there is another vendor2 who transport this material to our company, now PO is made against vendor1, IN PO condition details In can put the second vendor name. At present the company is raisin

  • Phone will not boot, any hope to Recover Data?

    Is there a way to get data off a phone that will not boot up? My phone is constant rebooting. It reboots over and over and hangs on the eyeball screen, never getting to the home screen. (I plan to do a Factory Reset.) I hadn't done a back up recently

  • How to supress dialog pop

    Hi,   I am displaying the error message with pop-up window in 3.1i version from F4 help.The window is not closing properly, when i click on enter button in pop-up  window. Still it is showing with small icon of the pop-up. Can any body let me know th