How to kill a job in SM37

hi All,
         can someone wxplain me how to kill a job in SM37 which is delaed by 10,000 secs.
cheers

Hi Rase,
goto SM37 and click on the active selection and enter the jobname and then click excute the particulr job should appear highlight the jobname then click on the stop iconthat appears on the taskbar( 3 rd from left)
or goto SM50 Click on the process and select process->stop without core
or
set a running infopack of the chain (in RSMO) to red, thats will stop the chain (if there are no parallels, else set all parallels to red).
****Assign Points If Helpful****
Regards,
Ravikanth

Similar Messages

  • How to CANCEL ACTIVE JOB in SM37??

    Hi Experts,
    Pls. let me clarify one simple doubt that, am trying to CANCEL a ACTIVE jon in SM37, bcoz its taking too much time, like 60 hrs, so am suspecting that, some thing is wrong in report prog./SELECT!!!
    So, I tried, SM37>MENU>JOB-->CANCEL ACTIVE JOB,
    but, its not getting canceeled or DELETED??
    So, How Cal I CANCEL/DELETE a ACTIVE job in SM37??
    thanq

    thanq,
    its worked out.
    but, i dont know that Wht happened to my browser/SDN/system, I am unable to see the Rewarding points option!!!!!!!!!!
    So, as soon as i see this option, will post the reward points.

  • How to kill old jobs

    Hi all,
    I'm having problems with my 10.2.0.3 Enterprise Oracle version to kill some old jobs. These were datapump jobs.
    I've all these jobs when I query the dba_datapump_jobs:
    OWNER_NAME JOB_NAME OPERATION JOB_MODE STATE ATTACHED_SESSIONS
    SYSTEM EXPORT_FULL_20111118 EXPORT FULL DEFINING 1
    SYSTEM SYS_EXPORT_SCHEMA_01 EXPORT SCHEMA DEFINING 0
    SYSTEM SYS_EXPORT_SCHEMA_02 EXPORT SCHEMA DEFINING 0
    SYSTEM SYS_EXPORT_SCHEMA_03 EXPORT SCHEMA DEFINING 0
    SYSTEM SYS_EXPORT_SCHEMA_04 EXPORT SCHEMA DEFINING 0
    SYSTEM SYS_EXPORT_SCHEMA_05 EXPORT SCHEMA DEFINING 0
    SYSTEM SYS_EXPORT_SCHEMA_06 EXPORT SCHEMA DEFINING 0
    SYSTEM SYS_EXPORT_TABLE_01 EXPORT TABLE DEFINING 0
    If I try to drop it, I've this error:
    SYSTEM@SPA3> exec dbms_scheduler.drop_job('EXPORT_FULL_20111118');
    BEGIN dbms_scheduler.drop_job('EXPORT_FULL_20111118'); END;
    ERROR at line 1:
    ORA-27475: "SYSTEM.EXPORT_FULL_20111118" must be a job
    ORA-06512: at "SYS.DBMS_ISCHED", line 178
    ORA-06512: at "SYS.DBMS_SCHEDULER", line 544
    ORA-06512: at line 1
    I've tried doing expdp commands but was impossible:
    [oracle@serverpro ~]$ expdp system/xxxx attach=EXPORT_FULL_20111118
    Export: Release 10.2.0.3.0 - 64bit Production on Viernes, 18 Noviembre, 2011 11:59:13
    Copyright (c) 2003, 2005, Oracle. All rights reserved.
    Connected to: Oracle Database 10g Release 10.2.0.3.0 - 64bit Production
    With the Real Application Clusters option
    ORA-31626: job does not exist
    ORA-06512: at "SYS.DBMS_SYS_ERROR", line 79
    ORA-06512: at "SYS.KUPV$FT", line 430
    ORA-31638: cannot attach to job EXPORT_FULL_20111118 for user SYSTEM
    ORA-31632: master table "SYSTEM.EXPORT_FULL_20111118" not found, invalid, or inaccessible
    ORA-00942: table or view does not exist
    Any ideas about how to kill them?
    Best regards,
    dbajug

    Hi Fran,
    Yes I tried it.
    These jobs doesn't appears on mgmt_job table:
    SYS@SPA3> select job_id, job_name, job_owner from sysman.mgmt_job where job_owner = 'SYSTEM';
    no rows selected
    But yes if I make a query over dba_datapump_jobs:
    SELECT owner_name, job_name, operation, job_mode, state, attached_sessions
    FROM dba_datapump_jobs WHERE job_name NOT LIKE 'BIN$%' ORDER BY 1,2;
    OWNER_NAME JOB_NAME OPERATION JOB_MODE STATE ATTACHED_SESSIONS
    SYSTEM EXPORT_FULL_20111118 EXPORT FULL DEFINING 1
    SYSTEM SYS_EXPORT_SCHEMA_01 EXPORT SCHEMA DEFINING 0
    SYSTEM SYS_EXPORT_SCHEMA_02 EXPORT SCHEMA DEFINING 0
    SYSTEM SYS_EXPORT_SCHEMA_03 EXPORT SCHEMA DEFINING 0
    SYSTEM SYS_EXPORT_SCHEMA_04 EXPORT SCHEMA DEFINING 0
    SYSTEM SYS_EXPORT_SCHEMA_05 EXPORT SCHEMA DEFINING 0
    SYSTEM SYS_EXPORT_SCHEMA_06 EXPORT SCHEMA DEFINING 0
    SYSTEM SYS_EXPORT_TABLE_01 EXPORT TABLE DEFINING 0
    SYSTEM SYS_EXPORT_TABLE_02 EXPORT TABLE DEFINING 1
    I found many DMxx processes (Coordinates the Data Pump job tasks performed by Data Pump worker processes and handles client interactions) but I can't kill the sessions or OS processes.
    How could I kill all these datapump jobs?
    Regards,
    dbajug

  • How to kill datapump jobs?

    hi all,
    i tried to export data using expdp. i read somewhere that using expdp creates a background process so that even if i turn off my client machine, it won't stop the export.
    problem is i need to stop the expdp process. how do i kill it?
    when i query the database using
    select *
    from DBA_DATAPUMP_JOBS;
    the jobs are still there with a value of NOT RUNNING in the STATE column. i think the jobs are already done in this case but how do i remove them from the list? also how do i kill a currently running datapump job?
    any suggestions?
    thanks

    hi,
    thanks for the link. although, i was not able to find a way on how to delete the records showing in my dba_datapump_jobs view.
    unfortunately i'm not in the expdp> prompt anymore since i turned my machine off. is there a way to get back there?
    here's the record in the dba_datapump_jobs
    OWNER_NAME JOB_NAME OPERATION JOB_MODE STATE DEGREE ATTACHED DATAPUMP
    SYSTEM SYS_IMPORT_FULL_01 IMPORT FULL NOT RUNNING 0 0 0
    TIME_OWNER_QA IMPTIME IMPORT FULL NOT RUNNING 0 0 0
    thanks

  • How to identify a job in sm37

    Hi gurus,
    am new to BW. could any one please denote some processes that are run in sm 37 and denote wat it stands for? for example ODS activation it is BI_ODSA* etc
    Thanks,
    anil

    Hi Anil,
    you can copy the tech name or generated name in some cases and use it in SM37 to find out the status of the job.
    Today - Indian Republic Day.

  • How to find the job and job status from RSPCM

    hi all,
    suppose we got an error and in rspcm the process was failed.i want to know the status of that particular job.and if any i want to stop that job in SM37.
    plz tell me how to find the job and job ststus from RSPCM...and how to stop that job in SM37
    thanks,
    jack

    Hi Jack,
    RSPCM: T.Code
    This transaction is used to monitor the process chains
    First:
    here you need to add the process chains into the sheet
    Second:
    Then you can monitor the process chains in this transaction code
    Like you can see the :  status ,proces chain ,Last run date ,Last run time ,Log ID
    Status : Green when sucessful,Yellow when running & Red when you get errors
    Now when yoy click on any of the process chain in RSPCM you will go to the LOG VIEW as you see in RSPC transaction
    SM37:T.code
    This transaction is used for Job Overview
    you can see many options in SM37
    like Released,active,cancelled,finished,etc
    Just select the ACTIVE  jobs and also pass STAR in JOB ID & USER ID
    here you can only see the active jobs
    Goto Step in toolbar
    select the program displayed
    then chose option GOTO - Variant in main menu bar
    in the variant you can see the job belong to which Process chain
    if you want to cancel this job come back to SM37 Display screen
    Select the Job and select the JOB DETAILS tab in Tool Bar
    Collect the WIP ( Work Permit ID)
    Go to SM50 T.code and find the WIP
    in Main Menu Bar you find the option Cancel with Core choose this it will cancel the Job
    Regards
    Hari

  • How to kill EPMA Deployment

    Hi,
    I have EPMA 11.1.1.3 and after making some changes in account and location dimensions i started deploying the app.It was initialed at around 6pm..i informed by client that it usaully takes aroung 6 and half hours to complete the deployment but after 8 hours i checked the Job its still it was going on and it might have hung up at 6%..Main thing all the changes have been reflectd in Hyperion Planning...So my question is how to kill this job running on?
    Thanks in advance.
    Pranav

    So my question is how to kill this job running on?^^^I thought I was going to hear "Nuke it from orbit, it's the only way to be sure" EPMA can be Alien-like.
    it usaully takes aroung 6 and half hours to complete the deployment but after 8 hours ^^^Really? That's amazing. I suspect you are forcing a dense restructure this time so that might be part of the issue. Has the Essbase restructure happened yet?
    I would be unbelievably suspicious/completely unaccepting of any metadata build that took 6 hours. There has to be a better way.
    Regards,
    Cameron Lackpour

  • Unable to Cancel Job in SM37 (R3)

    Dear Guys,
                    Regards.We got a situation :Unable to Kill the Background job (BI_REQ*).It shows "ACTIVE" and been running for more than 19,000 secs (2 days..) .When this job started ,the PROCESS ID was : 244277..But after a day,this PROCESS ID : 244277 has been allocated to some other R3 Program(Monitored in SM50).But the Background Job is  still "ACTIVE".Tried killing the Job in SM37--->Cancel Active Job or Delete the Job) but ,when tried to "Cancel" the Job,we get a message : The job is NOT ACTIVE !!!. Then when tried to "DELETE" the job ,we get a message " Job is still ACTIVE"......!!!!
    >Since  there is no Work Process in SM50,what is the alternative solution  to Kill this Job..........???
    (In BW ,there is no Update of data records,with the monitor showing RED)....
    Guys,would appreciate your time and help on this................
    Manythanks
    Arun

    Hi.......
    Go to SM37 >> select the job >> Click on the JOB  tab in the top >> Click on Check status............
    Then it status will show cancel...........
    Actually sometimes it happens job gets cancelled but staus shows active....then we need to do this..........actually job is already cancelled......
    Hope this helps you.......
    Regards,
    Debjani.....

  • Kill a job with status "Ready"

    HI all,
    Is there any way that I can delete or cancel a job which has a status "Ready"?
    Thanx in advance.
    Rgds
    Lalit Rana

    please only post your question in 1 forum.
    I answered you at How to kill a job in "Ready" status.

  • Killing a job in "Ready" Status

    HI all,
    Is there any way that I can delete or cancel a job which has a status "Ready"?
    Thanx in advance.
    Rgds
    Lalit Rana

    please only post your question in 1 forum.
    I answered you at How to kill a job in "Ready" status.

  • Kill DBMS_SCHEDULER jobs

    Hi,
    How to kill a job which gave only job_name and owner. no other details like sid etc.. how to kill this job?
    Regards

    user738145 wrote:
    I tried this, but it's still sunning .
    SQL> exec DBMS_SCHEDULER.stop_JOB (job_name => 'MM.MM_WEEKLY_JOB');
    PL/SQL procedure successfully completed.
    SQL> exec DBMS_SCHEDULER.DROP_JOB (job_name => 'MM.MM_WEEKLY_JOB');
    BEGIN DBMS_SCHEDULER.DROP_JOB (job_name => 'MM.MM_WEEKLY_JOB'); END;
    ERROR at line 1:
    ORA-27478: job "MM.MM_DAILY_JOB" is running
    ORA-06512: at "SYS.DBMS_ISCHED", line 182
    ORA-06512: at "SYS.DBMS_SCHEDULER", line 615
    ORA-06512: at line 1
    Edited by: user738145 on Sep 20, 2011 6:11 PMIf MM_WEEKLY_JOB was doing many, many DML,
    then it may take a while to ROLLBACK all previously made changes

  • How to kill a background job

    Hi Experts,
    I would like to ask on how to kill a background job in SAP? I have tried to cancel it via sm50, sm37, dpmon, and even the kill -9 command but none of those commands can solve the issue still the job is running.
    Can you guide me on how to deal to such issue and if you know a command on how to kill that particular job.
    Hoping for your immediate response.

    Hi,
    I think you may not have proper authorization to kill the job.
    You can kill the job through SM50 as follows.
    SM50 -> Choose the background job -> click Process -> and then click Cancel without core.
    If the job is still not getting killed you can ask your basis person to kill it.
    Regards
    Vimal

  • How to find process chain using background job in sm37

    How to find process chain using background job in sm37

    Better is to select the job.
    Select (Define) Step (s) or F6.
    Select the line and Menu Goto>Variant.
    The variant contains the name of the CHAIN and its VARIANT.
    Success
    We faced an old job and via job monitoring we were informed about a cancelled job every 'interval'.
    We noticed that the related chain was deleted but still the job was scheduled each interval again and was cancelled because an event was missing
    We could not find the scheduled job via SM37.
    Via view V_OP, view over tbtco abd tbtcp, we find the related entry.
    We delete these entries via function BP_JOB_DELETE....
    Edited by: Jack Otten on Jul 9, 2010 2:50 PM

  • How to edit the job name in SM37

    Hi All,
    I have job in SM37 with the mane ZBI_PROCESSING and the Job in Release status. Now I want to change the Job Name to Z_PROCESSING_SS. Please let me know how to edit the Job Name.
    Regards,
    Ravi

    Hi Ravi,
    In SM37 when you have the list of all jobs, right-clic on the job you want to rename, copy, enter the new name.
    Then you can delete the first job. The copied one will then be executed.
    Regards,
    Fred

  • How to check who has cancel jobs in SM37

    Hello every one.
    Can any one explain how to check  who has cancel jobs in SM37(job overview).
    Is it possible to know such logs.
    In sm37 its only gives details about jobs what ever.
    Thanks & Regards.

    hi.
         Use SM 36 for creating the job...and SM 37 for displayin the job...here
    u can see some details such as job name,job modifier name,modified date from which date to which date....but u must know the job name den only u can find the modifier name there...
    it is possible to know such logs.....
          select the job..in that screen job log button is there..select the button,can get the job log ..ie start time and end time and some  other informations..
    hope this helps u..
    assign sum points if applicable...
    regards,
    ramanan

Maybe you are looking for

  • Error while processing message

    I have WS2RFC interface that use to work. I recieve in the RWB this error message from the RFC Reciever. 10/6/08 1:20:10 PM aa98b6f0-9398-11dd-94cf-0017a43cc516 Message processing failed. Cause: com.sap.aii.af.ra.ms.api.RecoverableException: error wh

  • How to create dynamic calc account in multi-plan type application

    Hi expert, I have a planning application with 3 plan types. I created a calculation script which fixed on accounts in plan type 1 only and the calculation suppose to calculate a "dynamiccalc" account with a member formula attached. Everytime I run th

  • How to display query variable in text element and format the text element

    Hi All, I want to display the value of the value of variable against fiscper3 and the value of the variable against 0fiscyear in the web application template from the query in the text element in the web template in BI 7 Web application designer. Als

  • Linkys ac1600 and macbook pro late 2013

    Hi i have linksys AC1600 and Macbook pro LATE 2013 , when i try to search for my 5GHZ network i cannot found and i cannot know how to turn it on. can anyone please help on this?

  • Assigning variables using the index in a cfloop

    I would like to make this code give each stp or alt the index of it so with the #Stp#i## it would end up being #Stp@i# or Stp1.