How to load delta for 0PC_C01 cube?

Hi all,
I am working on Product Cost Controlling Infoarea. In that I am working on cubes
CO-PC: Cost Object Controlling :0PC_C01 Having Info sources 0CO_PC_02,0CO_PC_01 when I am scheduling Infopak it is having update option only " Full Update".
I have done the FULLUPDATE. But the problem is now I have to do "Delta Update"
What i have to do ?
how I will load delta into Infocube?
Plaese suggest me regarding this.
Points will be Rewrding.
Thanks,
kiran.

Hi Kiran,
hwat version of BI in?
if its not 7 you can try this...
Do you have the option to dona n Init in your infopackage?
If yea, run an init. Only if you have have an init for a target, does the new infopackage (which you will hve to make to do a delta after an init), gives you an option of a delta.
Let me know if it workeed.
Tke cre
Message was edited by:
        Tessy Thomas

Similar Messages

  • How to load data to a cube from multiple infosources ?

    Hi friends,
    How to load data to a cube from multiple infosources ? could u please answer this question .
    thanks in advance......

    Hi ,
    say for example you need to load data to 1 cube from 3 info sources:
    1) You need to create 3 update rules for the Cube.
    2) Each time you create the update rules. Mention the name the name of the Info source. and create update rules correspondingly.
    Regards
    satish
    Message was edited by:
            satish murthy

  • How to load image data into cube?? Is it possible??

    How to load image data into cube?? Is it possible??
    Any sugession??

    Hi Andre,
    Document will be of ASCII characters right?? but image data will be in binary format. as per database concept it is stored as binary large object. But in datawarehousing the back end is also going to be some database such as Oracle or other DBs.
    which can take blob's. so it would be possible to store the binary data.
    If any one has faced this situation can reply.to this ques.
    can post the step to load image(jpg/bmp or any image format) data in to info cube??
    hi andre if u have done loading image data as you say.pls reply me if you have the steps with you.
    thanks Andre

  • How to load delta, changing the name of file for every day with open hub?

    Hi gurus,
    I load daily delta data from ODS to flat file, using open hub.
    The file is located on server. Now, if I do delta load from ODS to flat file, every day the file is overwritten, because it has the same name.
    I want to load delta data everyday to different file name, for example BW_20060101 , BW_20060102, BW_2006_01_03 ....
    How do I do that?
    Best regards,
    Uros

    Hi Uros,
    This thread may give you some idea
    Changing the file name n Flat file Extraction
    https://websmp107.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_OBJECT=011000358700002201112003E
    Regards,
    BVC

  • How to initialize delta for a new data target

    Hi
    I have an ODS from which there are several other targets getting updated thru an export datasource. The delta initialization happend some 6 months back. I now have a new ODS into which i need to load the data from the original  ODS. How can i initialise the delta to my new target without changing the delta initialization of the other targets and continue the delta for all of them together?
    can i use the same initialization for my new target??
    If i do a full update and then a initialise w/o data transfer, will the further delta bring the data from the correct point, is there a possiblity of data loss??
    Regards,
    Sujai

    Hi Ajay,
    the steps are as follows.
    1 delete the initialization. open infopackage >> menu scheduler >> Initialization options for source systems >> delete the request thats there.
    2. Now go to the Update tab of the infopack >> select option Initialize Delta process >> check the option initialize without Data transfer
    3. Goto Schedule tab and start the job.
    here the data targets will be all the targets the infopack loads.
    4. Create a new infopack
    5. goto Data targets tab >> select data targets >> put a check on your new ODS/Cube
    6. Goto Update tab >> select the option Full update
    7. goto menu Scheduler >> select Repair full request >> put a check on Indicate request as Repair Request >> hit OK
    8. Goto schedule tab >> start the job.
    9. Continue with the existing Delta infopack that was load the old ODS/Cubes  and make sure your new ODS/Cube is also cheked for the delta.
    Regards
    Sujai

  • How to Enable Delta for a Custom MM Purchase Order History ODS ???

    Hi all,
       We have a Customized MM Purchase Order History ODS with Full Update on Monthly basis. We want to enable the DELTA for this ODS and how can I proceed, PLEASE.
    Please find the Key Figures and Data Fields in the below:
    ODS Structure for PO History ODS:     
    Key Fields
    SAP R/3 Field Description             Technical Name
    Purchasing Document Number             EKBE-EBELN
    Purchasing Line Item Number             EKBE-EBELP
    Sequential number of account assignment     EKBE-ZEKKN
    Transaction/event type, purchase order history     EKBE-VGABE
    FI Fiscal Period     FISCPER (from BKPF-GJAHR + BKPF-MONAT) in the format YYYYPPPP
    Number of Material Document             EKBE-BELNR
    Item in Material Document             EKBE-BUZEI
    Data Fields
    SAP R/3 Field Description     Technical Name
    Company Code     EKKO-BUKRS
    Plant     EKPO-EWERK
    Account Number of the Vendor                   EKKO-LIFNR
    Currency Key (of PO)                           EKKO-WAERS
    Deletion indicator in purchasing document     EKPO-LOEKZ
    Purchasing Document Date                   EKKO-BEDAT
    Responsible salesperson at vendor's office    EKKO-VERKF
    Vendor's telephone number                   EKKO-TELF1
    Incoterms (part 1)                           EKKO-INCO1
    Incoterms (part 2)                           EKKO-INCO2
    Short text                                   EKPO-TXZ01
    Material Group                                   EKPO-MATKL
    Material Number used by Vendor                   EKPO-IDNLF
    Expected Delivery Date                           EKET-EINDT
    Order unit (UOM)                           EKPO-BSTME
    Delivery Completed Indicator                   EKPO-ELIKZ
    Account assignment category                   EKPO-KNTTP
    Business Area (from PO)                           EKKN-GSBER
    Name of requisitioner/requester                   EKPO-AFNAM
    Purchasing organization                           EKKO-EKORG
    Purchasing group                           EKKO-BKGRP
    G/L Account Number (from PO)                   EKKN-SAKTO
    Cost Center (from PO)                           EKKN-KOSTL
    Work Breakdown Structure Element (WBS Element)     EKKN-PS_PSP_PNR
    Payment Terms (from PO)                           EKKO-ZTERM
    PO History Category                            EKBE-BEWTP
    Movement Type                        EKBE-BWART, MSEG-BWART
    Debit/Credit Indicator                     EKBE-SHKZG
    Reference from Invoice                     RBKP-XBLNR
    Payment Terms (from Invoice)             RBKP-ZTERM
    Posting Date      RBKP-BUDAT for IR, MKPF-BLDAT for GR
    Document Date      RBKP-BLDAT for Invoice, MKPF-BLDAT for GR
    Baseline Date     RBKP-ZFBDT
    FI Document Number      BKPF-BELNR, found through BKPF-AWKEY (IR # or GR # + fiscal year) or MSEG-LFBNR
    FI Dcoument Year          BKPF-GJAHR
    FI Document Type          BKPF-BLART
    Fiscal Variant     Hardcoded: S4
    Payment Method (invoice header level)     RBKP-ZLSCH
    GL Account (from GR/IR document)     MSEG-SAKTO for GR, DRSEG-SAKNR for IR (DRSEG is a structure)
    Cost Cener (from GR/IR document)     MSEG-KOSTL for GR, DRSEG-KOSTL (DRSEG is a structure) for IR
    Business Area (from GR/IR document)     MSEG-PARGB; not sure on IR
    Local Currency                             BKPF-HWAE
    Local Currency 2                     BKPF-HWAE2
    Amount posted to GR/IR Clearing (LC)     EKBE-AREWR
    Amount posted to GR/IR Clearing (GC)     EKBE-AREWR converted to Group Currecny found through BKPF-KURS2 if BKPF-HWAE2 is USD
    Purchase order quantity                           EKPO-BSTMG
    Price Unit (for PO)                           EKPO-PEINH
    Net price in purchasing document (in document currency)                                           EKPO-BPREI
    Amount in local currency; amount in document currency     MSEG-DMBTR for material document, RSEG-WRBTR for invoice
    Amount in local currency; amount in document currency (GC)     MSEG-DMBTR for material document,
            RSEG-WRBTR for invoice converted to USD
    Quantity      MSEG-ERFMG for material document;
                    RSEG-MENGE for Invoice
    Delivery costs' share of item value     RSEG-BNKAN
    Delivery costs' share of item value (GC)RSEG-BNKAN converted to USD
    Tax Amount (accrued)             BSEG-PSWBT
    Freight Amount (accrued)     BSEG-PSWBT
    Discount Amount (invoice header level)     RBKP-WSKTO
    Thanks.

    Hi Venkat,
    If you are using a Custom DataSource/Extractor the main problem is that you are collecting data from a lot of tables, so it is really difficult to determine a field for the delta.
    If for you is important only a change at Key Fields Table (EKBE) you can set the Generic Delta only on a field of this table (Doc Number or Position Number - Date - Timestamp).
    But if you are interested in all changes you have to determine a single field for every tables...
    I think it is really difficult to find a delta in all these tables.
    Maybe you can think to use in BW an ODS without Reporting BEx flag to determine Delta, and then introduce delta records in a Cube.
    Ciao.
    Riccardo.

  • How to load stocks for the months prior to initialization ?

    Hello,
    We load a cube stock from 3 ODS for BF,BX and UM extractors.
    We are in a monthly snapshot scenario(we have read the specific how to but we must use 3 ODS one for each datasource because of data integrity (strong customer architecture contrainst).
    For opening stock and the future month the solution is ok.
    How to load the data for the 12 month prior the loading of opening stock ?
    Specific datasources, full loading ?
    Thanks to share our experiences
    Best regards
    Christophe

    your previous months closing stock becomes opening stock for current month. Try the infostructure S039,this holds the closing stock of each month. You can populate this infostructure with program rmbs039. create a generic data source on this and populate opening and closing stock for each month.

  • How to load delta to 2 target ODS 's from a single ODS using process chains

    Hi BW Gurus
    I am having a current ODS based on 2LIS_02_SCL, deltas also are working fine for it.
    our  requirement was based to have 2 target ODS on this existing ODS by using export generate datasource.
    I have to build a process chain that should enable us to load delta in our target ODS.
    Earlier manually for DEV purposes ,i was using the Update data into data targets from the source ODS, this was enabling us to load deltas. But to automate this process we will require a process chain.
    Finally , is there any process type in process chain for " Export generate Datasource".
    please suggest a good methodology for this scenario.
    Thanks in advance.

    Hi Ashfaq,
       Loading from ODS to CUBE is same as loading from datasource to ODS only.
    1. Create export datasource.
    2. Create update rules from ODS(export datasouce) to CUBE.
    3. Create infopackages(if you dont want to use generated once).
    4. include infopackage in process chain to load fromODS to CUBE.
        Intialize first manually and change settings in process chain infopackage to "Delta".
    5. You can append/enhance existing process chain(loading from datasource to ODS).
    Hope it Helps
    Srini

  • How to load data in the cube

    dear all,
    I need some help: I'm new to OWB and I'm trying to load a cube with dimensions keys data. I have successfully deployed the cube and dimensions without any problems. Now when I deploy the mapping to load the cube I cannot get any data there...
    - I have tried mapping by using dimension operator and cube operator by mapping dimension business keys with keys in the cube...and still no data...
    -I have also tried joining all the dimensions with the joint operator and joint condition with the cube as input and have the output to the cube...but still no data. I have also disable the constraints on the cube for the purpose of loading the data, but without much success. What am I doing wrong?
    Any help and guidance will be greatly appreciated. Thanks much!
    Akym

    It sounds like you are not getting any matching keys for loading into the cube.
    Do you have a time dimension created by OWB in the cube? The key used by the cube operator for an OWB time dimension is a formatted number. The time dimension keys are stored as follows;
    Day Level - YYYYMMDD
    Month Level - YYYYMM
    Week Level - YYYYWW
    Quarter - YYYYQ
    Year - YYYY
    If you have a source that has a SQL date datatype for example and want to construct the key for a cube's time dimension at the day level something like the following expression can be used to construct the time reference from a SQL date...
    to_number(to_char( time_key, 'YYYYMMDD'))
    It may not be this but just a thought.
    Cheers
    David

  • How to maitain Deltas for generic master data source

    Hi Friends,
    I created a view using MARA and MARC table. This view fields maitained by attributes of ZWMAT_PLT Characteristic.
    Now i faced the problem with deltas.
    How i need to maitain delta for above view.
    please give me solution for above problem.
    Thanks & Regards,
    Guna.

    Hi,
    If you have timestamp field in the view it is better use the Timestamp for the generic delta. Else try to include a timestamp field in the view.
    Also check this forum.
    How to set the delta for existing generic data source
    Delta Updating a Master Data Infoobject
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/84bf4d68-0601-0010-13b5-b062adbb3e33
    Assign points if this is helpful
    Rgs,
    I.R.K

  • How to load init for non cumulative values?

    Hi folks,
    anyone here, who can tell me how to load initial amounts from DSO to non cumulative values in InfoCubes?
    I found only poor documentation about this.
    Thanks!

    hi Timo
    you load initial of load as you do in the normal case only thing you have to keep in mind that before loading opening balance you have to UNCLICK  NO MARKER UPDATE from the infocube and compress the request ASAP as it will greatly effect your query performance.
    sanjeev

  • How to set delta for the generic data source(FM)

    Hi Guru,s.
    we have created datasource with FM with using templet RSAX_BIW_GET_DATA_SIMPLE  . we want to set up delta for that funtion module.plz send me any templet for delta setup.My mail ID is [email protected]
    Regards.
    hari

    Hi,
       Use the template RSVD_BW_GET_DELTA_DATA instead.
       Or a little bit of coding can be done using the field L_S_SELECT in RSAX_BIW_GET_DATA_SIMPLE to get the Delta records. If your datasource has a timestamp field which can be used for delta settings in RSO2. The last delta timestamp  is captured in the field L_S_SELECT.
    Use this field as one of the selection criteria in your Select statement. This worked in our case and should be helpful if ur delta field is a Timestamp field.
    Hope this helps...
    Cheers,
    Raj

  • Records is not coming in Delta for Inventory Cubes.

    Hi..All
    We are working on BW3.5 SP11 since 01.07.2005.
    We are facing a very serious problem in Inventory management data extraction from R/3 since 24.08.2005.
    Our active data sources of Inventory Mangement are as follow.
         2LIS_03_BF
         2LIS_03_BX
         2LIS_03_UM
    We were regularly getting records through delta as per given schedule after intialisation on 01.07.2005 to till 23.08.2005.
    On 24.08.2005 -- Delta schedule we had find out there are some records that were created in R/3 did not come in BW.
    On 24.08.2005 -- records loaded in PSA was 20550. The same is appering in RSA3(EXTRACTORS) also.
    The Last material document loaded was 4900154552 date 23.08.2005 time 16:56:05 of R/3, but there are many other material documents that were created on the same day but are missing in the extraction.
    On 25.08.2005 delta schedule records are getting 0 (Zero). Not a single record is getting in RSA3 (Extractor).
    on 26.08.2005 situation is still as it is. No record is coming.
    Where as our average records per day is approx. 20000 nos.
    The update mode for inventory is Unserialised V3 update, and the update program in R/3 is running perfectly fine as per schdule with no errors.
    We could not understand why suddenly stop the extraction of records FOR INVENTORY MANAGEMENT. Because rest all
    data sources like Purchasing,Sales and Distribution,Quality Mangement, and PP is working fine on same date.
    We checked the data in extractor checker with giving UPDATE MODE "F"-Transfer all requested data.
    Still it is showing 0 (Zero Records) for data sources 2LIS_03_BF,2LIS_03_UM.
    The situation is still as it is as of now.
    This is very crutial for our business. All inventory reports are showing data which is 3 days old.
    Please give your advice on this issue. And how to get the records in PSA from R/3.
    Regards,
    Navin

    Hi Ravindra,
    Thanks for giving input. The problem got solved.
    There was a problem with QRFC Table. Tcode LBWQ
    Status was wait.
    Thanks for giving feedback.
    Regards,
    Navin

  • How to intialize delta for another ODS with same infosource

    Hi Experts,
                    We have one ODS having update routines , daily  DELTA loads are ruuning in production system.Now we got one requirement like need to develope another ODS with different update routines on the same infosource. is it possible ? if we do means is there any effect for 1st ODS ? please suugest me how to do that ..its in production system ...little bit urgent..
    Thanks & Regards
    pcrao.

    hi,
    just create another ods2 ,but take the infosource as template and then at the time of update rules ,take again infosource as template.ok.
    and then go for creating infopackage and schedule it.
    before scheduling check the time of scheduled time for the ods1 as one of our frnds said.
    if u want any update routines first do them before scheduling.
    thatsit..

  • How to retrieve DELTA for Particular date for FIGL(ECC) into BI

    Hi,
    Model of this ODS is in BW3.5.  (DS --> ODS --> Infocube)
    My loads are daily from 0FI_GL_4 (line Items) into ODS. There was from error in the load, so I deleted the request (manage & and made QM status RED in monitor also) from ODS and also from PSA for a particular date(xx.xx.xxxx).
    Now I tried loading the Infopackage, but the data is not coming for that date (xx.xx.xxxx) into ODS.
    I have set to DELTA REPEAT in RSA7(ECC) , but after saving, it is again coming back to DELTA UPDATE.
    All the Previous and Next day load was fine,but i did not get the data for xx.xx.xxxx.
    In Selection screen for DS and Infopackage does not have 0CALDAY or 0PSTNG_DATE.
    Can you please help me out in telling how to get the data for that particular date (xx.xx.xxxx) into BI.
    DOES REPAIR FULL REQUEST SOLVE MY PROBLEM?
    Full Points will be assigned.
    Regards,
    Bindu.

    Hi Viren,
    Initially I have tried what you have said, but ERROR is coming as AS YOUR PREVIOUS DELTA IS INCORRECT, YOU CANNOT LOAD THIS DELTA. I am not getting any option of REPEAT DELTA.
    "I have set to DELTA REPEAT in RSA7(ECC) , but after saving, it is again coming back to DELTA UPDATE."
    As I am not getting REPEAT DELTA, to get that I tried saving the 0FI_GL_4 as DELTA REPEAT in RSA7 (ECC).
    Please let me know any more information required.
    Thanks,
    Bindu.