Hi, Experts,
We added the statistical cost element of 90 category for project stock BS account.
Now we find that some of the project stock don't have statistical cost,
some of the project stock have statistical cost(Value type: WRTTP=11).
How can we reconstruct the statistical cost of project stock to make it right?
Thanks a lot in advance.
Best Regards,
Nansen
Try running CJEN for your project. Make sure you remove the test run tick.
Regards
Similar Messages
-
How to get the list of deployed projects in OSB through commond line
How to get the list of deployed projects in OSB through commond line; as we are able to get in weblogic.
You can go with standard JMX API using WLST
http://www.oracle.com/technology/sample_code/products/osb/index.html
http://download.oracle.com/docs/cd/E14571_01/apirefs.1111/e15033/index.html
or you can try a little bit tricky way like
ls $DOMAIN_HOME/osb/config/core/ | grep -v ^_:-) -
In Australia, how much would the gap cost to upgrade an iPhone 4S 16g with an iPhone 4S 32g? I really need more space, I didn't know that 1,000+ photos would take up this much room!
Apple does not do trade in
You would have to sell your iPhone and buy a new model
Apple Prices no carrier lock see here on Apple Store AU
http://store.apple.com/au
Or speak to your carrier if you on contract to see whether you are eligible for a carrier upgrade -
How to make the delivery cost changeable after cancellation of GR?
Create a PO (with Delivery cost), then GR (101) , then cancel the GR (102), but the delivery cost still cannot be modified eventhough the GR has been cancelled - how to make the delivery cost changeable after cancellation of GR?
Hi
"You are not allowed to add new delivery costs in a purchase order once goods receipt has been carried out as these would then be proposed in the invoice verification. The related posting to the clearing account for goods receipt and invoice receipt would not then balance, if no further goods receipt took place.
After the invoice has been received successfully, it is not possible to change the delivery costs in the order. This is because information necessary for problem-free operation is no longer available for the delivery costs that have already been posted for subsequent reversals or invoices, or the operation can no longer be done without errors.
It is also not possible to change delivery costs for stock transfers with SD shipping after goods have been successfully issued, as this can lead to errors during cancellation."
I think you have to delete the line item and create a new line item with revised delivery conditions..
MRao -
How to bring the labour cost into costestimate
Hi friends,
How to bring the labour cost into costing run, please let us know. i have given the configuration settings but i am not able to get the accurate result. so friends please help me on this.
where were i have to give the config settings and the links please tell me.Dear,
The cost sheet format is,
1. Material cost,
*2. Labour cost -
SPRO -> Controlling -> Product Cost Controlling -> Product Cost Planning -> Basic Settings for Material Costing -> Overhead -> Costing Sheet: Components -> Define Calculation Bases*
1. Here just check whether you have assigned the Labour cost Cost elements with Labour group or not.
2. T Code - OKTZ : Check whether you have assigned the Cost elemnts here or not
3. Labour cost is based on : Activity types and Cost center figures updation in KP26
Let us know if you still need any help
Thanks
Edited by: nkonnipati on Feb 15, 2012 4:01 PM -
Once my free trial of adobe edge animate has finished, how much does the app cost?
Once my free trial of adobe edge animate has finished, how much does the app cost? I currently have a student subscription to CC.
Cloud Plans https://creative.adobe.com/plans
-and subscription terms http://www.adobe.com/misc/subscription_terms.html -
How to Get the Job, Cost center, Position description using select query
Hi all,
How to get the Job, Cost center, Position description through select query without using the Function module?
thanks,
Prasaduse adhoq query and take the report chose both text and value
-
How to reconstruct the missing parts list (co24)
Dear All
How to reconstruct the missing parts list (co24).by using report PPCOXPR1.?
Rgds
Pankaj AgarwalHi Pankaj,
You need to run the program "PPCOXPR1" using SE38. This program will create missing part index in RESB table.
Hope this helps you, Reward your points.
Regards,
Prasobh -
How to find the Commitment cost for a PM order using tables ?
Hello all ,
How to find the Commitment cost for a given PM order using table .
Thanks and regards ,
Prem.Issue got resolved
-
How to see the material document for Blocked stock
Hello Experts
I having some blocked stock in plant X , How to see the material document for this stock.
Thanks in Advance
Prashanth.v
Edited by: prashanth.venkategowda on Aug 11, 2010 7:38 PMwhich material documents do you want to see?
Material documents can be found and displayed in MB51 transaction.
in MMBE you can put the cursor onto your stock line and then choose from menu Environment > material documents and SAP will list all relevant material documents.
block stock status is not a selection criteria, material number, plant storage location, batch number are selection criterias.
if you want only documents to block stock, then you need to select by movement type, e.g. 343 and 344 are movements that change status from unrestricted to blocked or vica versa. -
How to find the cpu cost and i/o cost by a query
I have a query that give the cpu utilization for a session.
select s.name, m.value from v$statname s, v$mystat m
where s.statistic# = m.statistic#
and name = 'CPU used by this session';
But how do you find the cpu cost and i/o cost by a query?Sounds like you want to use TRACE.
http://download.oracle.com/docs/cd/B19306_01/server.102/b14211/sqltrace.htm#PFGRF01020 -
How to get the colums from a project view
Greetings,
I have a PjView-object from type Microsoft.Office.Interop.MSProject.View
and I can output the name of the view (MsgBox(PjView.Name.ToString)
So far so good.
But now I have two questions:
1. How do I access the columns that are included in this view?
2. If I have a column, how can I read the Title property (In Project: Field Settings -> Title)
Thank you!
MichaelThis code will get the fields that exist on the Gantt Chart view in the current project:
Public Sub GetCurrentViews()
Dim vw As View
Dim vw_sng As ViewSingle
Dim vw_com As ViewCombination
Dim tbl As Table
Dim fld As TableField
Set vw = ActiveProject.Views("Gantt Chart")
If vw.Single Then
Set vw_sng = vw
Else
Set vw_com = vw
Set vw_sng = vw_com.TopView
End If
Set tbl = vw_sng.Table
Debug.Print tbl.Name
'step through each column on each table
For Each fld In tbl.TableFields
'check that it isn't the "Insert column" marker
If fld.Field <> -1 Then
'if it is an actual field, output field title
Debug.Print " " & fld.Title
Debug.Print " " & fld.Field & " - " & Application.FieldConstantToFieldName(fld.Field)
End If
Next fld
End Sub
Hope that helps,
Andrew
Andrew Simpson
Founder – Eversight Ltd
E: [email protected]
W: www.eversight.co.uk
Download Eversight for MS Project — a free add-on which helps users build high quality schedules with MS project. -
How to keep the same cost in Sales order and return order?
Hi experts,
When I create a sales order with item cost 100 USD.
Then the cost of item changed and down to 90 USD.
When I do goods return refer to the sales order. How can I keep the same cost (VPRS) 100 USD but not 90 USD?
I made a test the cost in sales order is 100 USD but 90 USD in return sales order.
I want the cost in return sales order is 100 USD.
How can I do?
Thanks,
LanceHi,
Let me tell u my understanding of your requirement, after the sales the cost of the item is changed to some thing low than it was in sales order or invoice, in this scenario you need to transfer the cost of the material as it is in the sale order or invoice (which you are taking as reference to create a Return Order), am i right?
If so, you can proceed like this.
In the copy controls of Billing to Sales orders ( F2 to RE) we have the pricing type N assigned to it ( Transfer pricing components unchanged, New Cost) here the system is reading the change of the cost again from the material master. if you don' t want it to read the material master data again we can have a change try with pricing type 'D' (Copy Pricing elements unchanged), and try now.
let me know the result.
hope this will solve your problem. -
How to get the loaded cost for the Parked Purchase Order Invoices.
Hi,
Could any one of you please help me out to find out how the loaded cost is calculated for Parked Purchase Order Invoices which have not been posted. The problem is that if the invoice is posted the ekbe-wrbtr field contains the total amt for any particular line item, i.e. the (material cost + unplanned costs + taxes ).
But for the documents which are not posted ekbe-wrbtr does not have all the key data fields as that of a posted document. Is there any way out to find the total cost for the line item which is not posted.
Please try to help me..
Thanks & Regards,
Sanjay.in that case u have to get the document amt of that accouting Document of PO invoice.
how --->
get the IR number from EKBE
CALL FUNCTION 'FI_DOCUMENT_RECORD'
EXPORTING
I_AWTYP = 'RMRP'
I_AWREF = W_AWREF1----->IR of Po
I_AWORG = W_GJAHR1----->year
I_AWSYS = ' '
I_AWTYP_INCL = ' '
I_AWTYP_EXCL = ' '
I_BUKRS = ' '
TABLES
T_DOCUMENTS = T_DOC.--->here u get the accouting document number.
Regards
Prabhu -
How to add the shipment costs in to material costs
Dear friends
I am implenting the transportation module.
In purchase process and STO processes, the client requirement is received material cost should be added with shipment cost.
I mean the material cost is 1000/-
The shipment cost is 100/-
Client Requirement: Freight liability should get loaded on the inventory being it is part of purchase cost.
Now the material cost: 1000+100
We are not entering the freight costs in PO.
We are creating the shipment cost documnets for calculating the ship.costs.
When we do the MIGO/Inbound delivery the system need to capture whole amount as a material cost.
With regards
LakkiDear Vinod,
Already i created the shipment cost document with reference to inbound delivey document.
Now the ship.cost value is 100/-
The material cost is 1000/-
But i want to show the accounting document for meterial document with 1100/-(Material cost and ship.cost)
But when we do the PGR, sys will generate the accounting document with material cost only, sys should not add the ship.cost. Because we didnot enter any ship.cost value in PO or delivery.
We are maintaining the ship.cost in saperate documents.
How to do that?
With regards
lakki
Maybe you are looking for
-
AP1231G-A-K9 access points - very slow throughput - Is TKIP the issue?
I recently setup our small office network using the following setup: Cablemodem <--> router <--> 1231AP(role root bridge with wireless clients) <-> 1231AP(role non-root bridge with wireless clients) Code on both APs: 12.3(8)JEE Office network general
-
Error Occured while working with the configuration (scanning)
Hi We are trying to open the configtool for our double stack NW04s system. When we go to the mapped drive on our PC and then try to open the configtool from usr/sap/<SID>/DV*/j2ee/configtool/configtool.bat, it prompts if you wnat to use the default s
-
AGAIN! When I am playing scrabble I want to be able to go to Dictionary and Two Letter words when I am playing the game - these are being blocked much to my aggravation! How do I stop the blocking?
-
I have been using Lightroom 5.6 for weeks. Today I went to open a catalog and I got the message "assertion failure". I have gone through Adobe's posted fix for this, the Pictures folder is linked to My Pictures folder. Still no luck, in fact Light ro
-
Lost a file with all my photos in it? HOW??
I closed one of the two Bridge windows that were open and suddenly I no longer had my 2010 folder of all the photos I have taken this year!! HELP!! How do I get it back. Apple did all they could and it's not in the trash. Did I seriously just los