How to reset  already posted GL line item attributes

Hi Experts,
I have an issue with GL line items for Bank clearing account. At the time of conversion posted the line items in bank clearing account which are not open items and also not cleared items. Now I want to make it as open items in order to clear from this account.
Please share your experiences and thoughts.
Thanks in advance.
Regards
Aditya

Dear:
            What i understood from your query is. You had a Bank Clearing account which formerly was not maintained on Open item basis. However you converted it to OIM management latter on. Now you have old entries standing in this account that belongs to period before OIM was turned on .. Am i right? If this is so then answer is you can only clear those entries on Open item basis in F-03 or in any other t code for open item processing which were posted on or after OIM was turned on. This is for your information.
Regards

Similar Messages

  • How to avoid duplicate posting of noted items for advance payment requests?

    How to avoid duplicate posting of noted items for advace payments request?

    Puttasiddappa,
    In the PS module, we allow the deletion of a component pruchase requisition allthough a purchase order exists. The system will send message CN707 "<i>A purchase order already exists for purchase requisition &</i>" as an Iinformation message by design to allow flexible project management.
    If you, however, desire the message CN707 to be of type E you have to
    modify the standard coding. Doing so, using SE91, you can invoke the
    where-used-list of message 707 in message class CN, and to change the
      i707(cn)
    to
      e707(cn)
    where desired.
    Also, user exit CNEX0039 provides the possibility to reject the
    deletion of a component according to customers needs e. g. you may
    check here whether a purchase order exists and reject the deletion.
    Hope this helps!
    Best regards
    Martina Modolell

  • How to view ACCNTS payble reconaccount Line Item wise after cheking tick

    I want to see the ACCOUNTS Payble RECONCILITION acoount LINE ITEM wise.
    I had seen the GL Master and their I found that The LINE ITEM was not Checked.
    later I had checked the Line Item Display, but Iam not able view the previous transactions Line Item Wise For that GL Account.
    1. Kindly suggest me how I can see the Previous Line Items after cheking the Line Item Disply.
    2. kindly Tell Me if I can Run any Programme.
    3.If its so what programme I can run and how.
    4. Is there any problem by checking the line item display to the GL account.
    Thanks In Advance
    I will definately reward the points
    Akash Narayana

    Hi,
    1. Enable Line Item Display in GL master.
    2. Block the GL for Posting in Company Code.
    3. Run the Program RFSEPA01.
    4. Check whether Line item details are available and then unblock the GL.
    Regards
    Hari

  • Transfer Posting for Line Items between Reconciliation Account

    HI,
    My customer want to transfer costing the line items between a old Reconciliation Account and a New Reconciliaton Account.
    For example, i have a Account Group Vendor with a old Reconciliation Account " Vendor CEE".
    This reconciliation account has the line items concern differents Vendors.
    Edit a new Account Group calling ( CEE) to replace a Old Account Group.
    After changing in Vendor Master data the Reconciliation account, we need to transfer posting the line items in the new account reconciliation
    In Sap system is there a report can do it? Can you help me?
    Regards

    Hi,
    Thank you for the answer.
    I did that, and exactly:
    - In Trx Obbw insert the reconciliation account and Adjustement account.
    - and execute the trx FAGLF101 in test but the sap system give me the following error:
      " Account determination for transaction A00 is missing for account 0205016001 ZM P001 "
       Message no. FR005
    Can you help me?
    Regards
    Edited by: Marika De Cesare on Oct 18, 2011 1:06 PM

  • How to delete the Cost center line item data

    How to delete the cost center line item data of particular cost center and only one cost center is exisiting for that company code.
    Is there any way to delete the line items in that cost center.
    Can data archiving & deleting can help us..........
    does it have any effect over other cost center data....
    any input needed.........
    regards
    rajesh

    Hi,
    i found 2 reports for you:
    1) CO_TOTAL_WRI - Archiving CO Totals Records   
    2) RKCOITW1     - Archiving CO Line Items: Write Program        
    from 2) is a linlk to customize archiv-parameters
    -> start it with transaction se38 / sa38
    A.

  • How to Count Number of completed line items in past 6 months / 12 months ?

    How to Count Number of completed line items in past 6 months / 12 months ?
    Hi,
    I am trying to count "Number of Completed Line Items in Purchase Order Document" for my Key Figure ZPO_CNT.
    Purchase Order document = ZEBELN
    Line Item = ZEBELP.
    I need to find and count if the Line Item has been received in the past 6 months from today and similarly in the past 12 months.
    I have "Delivery Completed" field, ELIKZ.
    So, based on this would I be able to calculate it in Query Designer?
    If so, Please let me know how

    Hello Deva
    If youe want to calculate the completed line item for last 6 or 12 month then i think u will be displaying the query data for these montrhs...create a customer exit to give you date range and restric it in filter area....
    Now Choose any of the below option
    1. I would suggest to implement an additional key figure "counter" in cube and fill values with one for which delivery is completed.
    Now use calculated key figure in Query Designer based on logic
    IF counter = 1 THEN counter ELSE 0
    OR
    2. create a formula variable based on ELIKZ and use replacement path variable, it will display you no. of docs for which delivery is completed....
    Award points if it solves your problem
    Revert back in case of further assistance...
    Thanks
    Tripple k

  • How can I add a new line item for production order?

    HI all,
    How can I add a new line item for production order through BAPI/FM? Thanks in advance.

    Hi Mil,
      Unfortunetly SAP is not in front of me.
    But if possible go to BAPI transaction , check for any production order's bapi for CHANGE purpose. Where you will be able to add your new line.
    Reward if useful!

  • How to make reports on FI Line items

    Hi all,
    Let me know  how to make reports on FI Line items especially drill down reports. suggest me steps for developing reports through Bex query designer. Am new in reporting on FI. How to make the drilldown reports. Plz let me know step by step.
    Thanks,
    Jack

    Hi
    Follw the steps
    Step1
    Lets take an example of ODS Accounts Payable: Line Items  Technical Name: 0FIAP_O03
    install all this 0FIAP_O03  ODS from the Business content.
    For more details on FI Line item ODS
    http://help.sap.com/saphelp_nw04/helpdata/EN/af/16533bbb15b762e10000000a114084/frameset.htm
    Step2
    After installing make sure that all the infoobjects and transfer rules and update rules are in active state
    Step3
    Now type the transaction code RRMX , you will get into the query designer
    Step4
    Select the Infoprovider from the above example 0FIAP_O03 . now you will arrive to the screen where you can see Rows and colums
    Step5
    Drag and drop the  characteristic infoobject in to the row which is necesseayfor the report output
    Step6
    Drag and drop the  Keyfigure infoobject into the column which is necesseayfor the report output
    Step7
    Now under Free characteristics draga and drop the charactor infoobject which you need to navigate in the reporting.
    Note: Before dragging the objects in the freecharacteristic make sure that you need to check the navigation in the ODS level
    Step8
    Now save the report , when you save give the technical name of the report and save
    now execute the report
    Santosh
    Edited by: Santhosh Nagaraj on Nov 15, 2009 1:35 AM

  • How can create and change PCA line items.

    How can create and change PCA line items.
    Please tell me the process and t.codes.

    If you are in version < 4.7 ee then use 9KE0 tcode for passing profict center entries or trasnafer of balances from one profit center to another.
    If you are in new GL regular FI entry like FB50 will hold good for account types "S"

  • Please let me know how to Count Number of completed line items in past 6 mo

    How to Count Number of completed line items in past 6 months / 12 months ?
    Hi,
    I am trying to count "Number of Completed Line Items in Purchase Order Document" for my Key Figure ZPO_CNT.
    Purchase Order document = ZEBELN
    Line Item = ZEBELP.
    I need to find and count if the Line Item has been received in the past 6 months from today and similarly in the past 12 months.
    I have "Delivery Completed" field, ELIKZ.
    So, based on this would I be able to calculate it in Query Designer?
    If so, Please let me know how
    Krishna

    Hi Experts,
    I dont have a defined Restricted key figure yet.
    I have populated 0COMPL_DEL(Delivery Completed Indicator)  and 0EBELN (Purchasing Document Number) and 0EBELP (Line Item Number in Purchasing Document) .
    This is what I think how I need to calculate:
    Number of completed line items in past 6 months:
    If  Delilvery Completed Indicator (0COMPL_DEL) = x, calculate No. of Line Items (ZPO_CNT) from 0CALDAY to 6 months
    and
    Number of completed line items in past 12 months:
    If  Delilvery Completed Indicator (0COMPL_DEL) = x, calculate No. of Line Items (ZPO_CNT) from 0CALDAY to 12 months
    Please let me know if the logic is correct. If so, how I can create this in report

  • Line item attributes

    why we use line item attributes for account dimension

    Line item detail provides a mechanism to collect detailed information about a balance in HFM.

  • How to Post Intercompany line items- DP93 ?

    hi,
    I am trying to do intercompany billing using DP93. In DIP profile   source is given as Intercompany line items. i have posted activity confirmation.But while doing DP93, i am getting error as non expenditure items found.
    Can any one tell  , how to set up DIP profile and posting for DP93

    Hi,
    Is DIP profile assigned to your sales orer ( item detail->Sales B tab) and Please check the consistency of your DIP profile by ODP2, check if there is any error?
    Furthet check if you have followed the below steps.
    There is useful link available in sdn sap wiki with the title intercompany resource related billing.
    Check and above steps and revert back.
    Regards
    Ashu

  • Bapi for posting IR line item at a time

    Hi....
    Do we have a bapi for posting invoive receipt line item wise instead of posting the PO at a time......this wud be more precise for my requirement.....presently i'm using bapi_acc_document_post but this wud clear the document with single document number.....but i want it to be posted line item wise to see the amount individually item wise instead of combined one....similar to what we have in the IR which shows amount of individual items........

    This is an old bug that keeps popping up:
    https://forums.lenovo.com/t5/T400-T500-and-newer-T-series/Vertical-scrolling-got-reset-everytime-I-use-Ultra-Nav-to-scroll/td-p/343477

  • How value determined for Inv offsetting line items

    Hi,
    I want to know the following for the reversal of Process Order for materials for which the price control is 'S'.
    How the value for GBB (Inventory offsetting) is determined. I have observed it taking the weighted rate of the (Summation of the Total Actual Cost / Sumation of Actual Qunatity) * Reversal Quantity. The BSX line item is determined by Standard Price * Reversal Quantity
    The balance is posted in the Price difference.
    I want to know why this difference is determining tge line items.
    I have gone thru SAP Note 216080 in this regard but failed to understandard the basic resaon why this is happening.
    Regards
    Partha

    Hi,
    When you do the reversal of the Production consumption.
    There may be two type of consumption for production,the raw matrerial with V price determination & Semi finished goods with the S pricing.
    So when you do the reversal entry the Value & Qty update will be happen in the Inventory.
    Say when consume the system will capture from GBB with valuation class.the G/L with P&L Account.
    When you reverse the same then it will reverse with same G/L & assignment.
    There will be 2 entry one is reversal from consumption G/L & post to Price difference,then other document with reverse price difference & post in the inventory account Balance sheet account.
    So 2 entry will be entered during reversal.
    If there is any difference then the difference amount will posted to price difference account.it will update the inventore also with qty & value.
    Regrds,
    Raj.

  • How to calculate open balance Vendor Line Item Display(FBL1N)..?

    hi,
    is there any way to fetch data for open balnce in vendor report display(FI).
    As I have to calculate Credit , Debit and Open balace , also Balance  as on date. in Zreport with reff of FBL1N.
    Vendor item data has been calculated from BSIk table. also  open balance has to be fetched from with reference of Clearing doct and posting doct. i have
    so if any FI technical or non techincal person has gone thru these things, those who have clear picture on these plese let me know.
    Thnks in advance.

    Please note that most vendor line items wont have a PC assigned to them.
    I am not sure if you are refering to classic view or new GL data.
    Anyway you can use the sum button, and sub total for your levels.
    If you want to get the information sub totalled by PC, then I guess you are using the new GL and document splitting.
    If that is the case you cannot use FBL1N for this.
    There is however a set of reports in Accounts Payable, called new Gl reports and they will provide you the general ledger view and not the entry level view, and you can use the sum and sub total option.
    Please award points if this is useful.
    Come back if you need further help.

Maybe you are looking for

  • How can I set a value in a field before create when a New button is clicked

    Hi, I am using JDeveloper 10.1.3.1.0.3984 and JHeadstart 10.1.3.1 release 10.1.3.1.26 I have one group and there is a detail group under that group. From main group to detail group there are 3 field relating those groups. field1 field2 fieldSEQ (auto

  • Adding a photo from iPhoto to a document in text edit

    I wrote a letter in text edit and i would like to add a picture from my iphoto library. i have tried dragging the photo but when i do all i get is the photo info, name, date and size, no picture. just the discription of the picture. can anyone help m

  • Error in Importing standard SAP DCs to Production system

    Hi All I am trying to do a transport from QA to Production system. 3 of the standard components sap.com_GP-CORE sap.com_CAF-MF sap.com_CAF are not getting imported  to Prod. It gives an error caused by Exception:com.sap.cms.tcs.beans.exception.TCSDep

  • Animation chart not display in mac firefox

    i am viewing a stock index chart with firefox ver26.0 in mac and it is not showing up at all... but the stock index chart will show up with safari in mac without any issue... any idea why there is issue with firefox but not with safari?... i hope you

  • Problem message on outlook email page

    Have been receiving banner messages on my Outlook email page as to a problem.  Could not reach support and went to the MSN forum.  Was given a support number and he said I was being hacked, full of viruses and wanted to sell me $200 protection.  I am