How to unblock a material in scheduling agreement which is blocked previous

Dear All
    Please let me know the procedure for making a material unblocked in scheduling agreement which was blocked previously .
Regards
Abhijit Das

Hai,
In MM02 basic data 1/purchasing views Xplant and plant specific mat status field make it blank.
Regards,
BSK

Similar Messages

  • Configurable material in scheduling agreement

    When I use DS scheduling agreement with LPN as item category with configurable material, I cannot input value for configuration. But if I use normal TAN instead of LPN, I can input value for configuration.
    Why?
    Does SAP do not allow configurable material in scheduling agreement or quantity contract?
    Thanks in advance for any suggestion.

    Deat Amy,
    Please check the item category settings related  to configuration through VOV7 transaction.
    Go to VOV7 transaction then select item category LPN then go in to the detain here you check the configuration related settings under Bill Of Material /Configuration tab.
    If want you refer the standard Config.at Mat.Levl itemcategory TAC settings, same way you can do settings for your item category then try.
    Note:- Not advaisable to change the standard one, so you copy the standard itemcategories do the changes,
    I hope this will help you,
    Regards,
    Murali.
    Edited by: Murali Mohan.Tallapaneni on Nov 13, 2008 5:20 AM

  • Explode LUMF material in scheduling agreement

    Hi SAP experts,
    In short: Is it possible to have LUMF materials explode in a scheduling agreement?
    At our company we have a lot of projects. We are in the process of selecting an appropriate way to handle these in SAP. We came to the conclusion that a scheduling agreement could do what we want.
    Unfortunately we discovered a problem in our current configuration with respect to scheduling agreements and LUMF materials.
    When we add a LUMF material to a standard SD document, the LUMF material explodes in all the necessary materials.
    When we do the same in a scheduling agreement we get the error that the T 184 table does not contain a position type for ZLZM LUMF.
    Would it be possible to configure this? Could you give us a clue on how to make this possible?
    With kind regards,
    Nanne Sluis

    Thanks for your answers. I am not sure if we are talking about the same here. I get the feeling you are talking about scheduling agreements for vendors.
    I need sales scheduling agreement as described in http://help.sap.com/saphelp_erp2005/helpdata/en/33/4361299d7a11d194e200a0c9306794/frameset.htm
    We are currently using quanity contracts but they lack a delivery date and MRP relevance. In the SAP help it is in this case described that you need a scheduling agreement.
    Edited by: Nanne Sluis on Jan 22, 2008 2:47 PM

  • How are deliveries automatically created from scheduling agreement?

    How are deliveries automatically created from the schedule line of the scheduling agreement? Can anybody explain this step by step? Can we use the code VL10BATCH for this purpose? If we can, how is this code used?
    Thanks in advance.

    hi
    A customer scheduling agreement is an outline agreement with the customer containing delivery quantities and dates. These are then entered as schedule lines in a delivery schedule. You can either create schedule lines when you create the scheduling agreement or you can create them later.
    You fulfill a scheduling agreement by creating the deliveries in the schedule as they become due. You process deliveries for a scheduling agreement in exactly the same way as you process a normal delivery. After you have carried out the delivery, the system updates the Delivered quantity field in the scheduling agreement item with the delivery quantity.
    The scheduling agreement is used as a basis for delivering a material. The customer sends in scheduling agreement releases, referred to as delivery schedules, at regular intervals to release a quantity of the material.
    Document Types
    To configure document types for scheduling agreements, choose Sales -> Sales Documents -> Sales Document Header -> Define sales document types in Customizing for Sales and Distribution.
    The R/3 System contains the following document types for component suppliers:
    LZ - Scheduling agreement with delivery schedules (no external agents)
    LZM - Scheduling agreement with delivery orders
    LK - Scheduling agreement with delivery schedules (external agents)
    ED - Delivery by external agent (consignment issue)
    EDKO - External agent correction
    RZ - Scheduling agreement returns (no external agents)
    KAZU - Consignment pick-up for external agents
    KRZU - Consignment returns for external agents
    Item Categories
    To configure item categories for scheduling agreements, choose Sales -> Sales Documents -> Sales Document Item -> Define item categories in Customizing for Sales and Distribution.
    The system determines the following item categories for the related document types in
    documents containing materials with item category group NORM:
    Item category LZN for scheduling agreement type LZ
    Item category LZMA for scheduling agreement type LZM
    Item category LKN for scheduling agreement type LK
    Item category KEN for document type ED
    Item category EDK for positive corrections (or the manual alternative EDK1 for
    negative corrections) for document type EDKO
    Item category REN for document type RZ
    Item category KAN for document type KAZU
    Item category KRN for document type KRZU
    Schedule Line Categories
    To configure schedule line categories for scheduling agreements, choose Sales -> Sales Documents -> Schedule lines -> Define or Assign schedule line categories in Customizing for Sales and Distribution.
    The R/3 System contains the following schedule line categories for component suppliers:
    L1, BN, L2, and CN for item category LZN
    E4, E0, E5, and BN for item category LKN
    L2 for item category LZMA (standard for delivery order processing)
    Schedule Line Types
    To configure schedule line types for scheduling agreements, choose Sales -> Sales Documents -> Scheduling Agreements with Delivery Schedules -> Define schedule line types in Customizing for Sales and Distribution.
    Creating Scheduling Agreements
    To create a scheduling agreement with delivery schedules:
    1. In the Sales menu http://Ext. choose Scheduling agreement ->Create.
    2. Enter scheduling agreement type LK (standard) or LZ (external agents) and the
    relevantorganizational data.
    3. Choose ENTER.
    4. Enter the following data:
    Sold-to or ship-to party number
    Purchase order or closing number
    Material or customer material number
    You can use the Description field to identify the scheduling agreement. For
    example,
    you could enter the model year for a particular production series.
    The system allows up to 35 digits for a customer material number.
    Rounding quantity
    Usage
    Choose Goto -> Header -> Sales to enter the usage at header level, or Goto ->
    Item-> Sales A to enter it at item level. The system proposes usage S, for series, as default in both cases.
    Planning indicator
    Choose Goto -> Header ->Sales.
    Target quantity
    Mark an item and choose Goto -> Item -> Sales A
    Partners
    For scheduling agreements with external agents , choose Goto -> Header
    ->Partners to enter the external agent as forwarding agent and special stock partner
    on the partner function screen.
    5. Create a delivery schedule
    Mark an item in the scheduling agreement and choose Goto -> Item -> <Delivery
    schedule>. Enter:
    A delivery schedule number and date
    The cumulative quantity received by the customer
    The last delivery confirmed by the customer
    A schedule line with date, time, and quantity
    To enter additional data in the delivery schedule, choose DlvSch.Hdr (delivery schedule header).
    configuration:
    img->SD->Sales->sales document->scheduling agreements with delivery schedules->
    step1: define schedule line types
    schedule line types are not schedule line categories. Schedule line types are used for information purpose only.
    stds are 1. fixed date 2. backlog 3. immediate requirement
    4. estimate
    step2: maintain planning delivery sched. instruct/splitting rules
    The planning delivery schedule is an internal delivery schedule used to plan requirement s more efficiently.  It is sub divided into 3 parts
    2.1 delivery schedule splitting rules
    2.2 dly schedule instrusctions
    2.3 assign dly schedule splitting rules
    step3: define sales documents type
    step4 : define item categories
    step5: define schedule line categories
    step6: maintain copy control
    PROCESS
    step1:  create scheduling agreement
    VA31
    enter SP,SH valid from, valid to,
    goto ITEM OVERVIEW tab
    enter material, rouding qty
    select ITEM  click on FORECAST DLSCH
    enter different dly dates and qties
    save it.
    step2: create sales order with reference to above
    step3: create delivery
    step4: create billing
    regards
    krishna

  • How to set delivery complete in scheduling agreement automatically

    Hi. I would like to request for help on how to flag delivery complete in an scheduling agreement?
    When creating a goods receipt against a scheduling agreement, do we need a user-exit  or how is it configured in order to check the quantity receivedthe quantity in the goods receipt and compare it with the quantity in the scheduling agreement (/- de tolerance) and, in case the full ordered quantity has been received, set the flag Delivery completed in the scheduling agreement.
    Thanks.

    Hi,
    We regret that the functionality  setting of "delivery completed"       
    indicator automatically for a scheduling agreement is not included in   
    the SAP standard system.                                                
    For scheduling agreements, you must maintain the final delivery              
    indicator only in the scheduling agreement item.                             
    A maintenance from the goods receipt is useless for scheduling               
    agreements since the current schedule line situation is generally not        
    final. Even if all schedule lines are supplied, this does not mean that      
    no new schedule line might be added. Therefore, for scheduling               
    agreements,maintenance of final delivery indicator is planned only from      
    the document item.                                                                               
    Regards,
    Edit

  • How to create correction delivery in schedule agreement

    Hi all -
    I am loading legacy data into SAP and am creating schedule agreements.  I create the agreement using SD_SALESDOCUMENT_CREATE, then COMMIT, then update the schedule lines using BAPI_SALES_DEL_SCHEDULE_CREATE also followed by a COMMIT. This works, and creates the schedule agreement with schedule lines.
    At this same time, or even in another BAPI or function call if need be, I need to create a CORRECTION DELIVERY for this schedule agreement.  I am populating the CORR_***_QTY_IN and CORR_***_QTY_INX in BAPI_SALES_DEL_SCHEDULE_CREATE  with values in every field, and the return tells me 'CORR_CUMQTY_IN has been processed successfully', but when I look at the schedule agreement in VA32, there is no ***. issued qty or ***. delv qty, and no correction delivery has been created.
    What am I missing??
    Thanks so much...
    Sharon

    Hi Shyam -
    I am calling the BAPI_TRANSACTION_COMMIT function right after the BAPI_SALES_DEL_SCHEDULE_CREATE function.  When I call that create function, I am adding schedule lines, so my return table has all of the other successful messages you would expect -
    ORDER_HEADER_IN has been processed successfully
    CORR_CUMQTY_IN has been processed successfully
    DEL_SCHEDULE_IN has been processed successfully
    SCHEDULE_IN has been processed successfully
    Sched. Agr. w/ Rel. 1030000058 has been saved.
    It even says the corrective *** qty was successful....but when I open the schedule agreement, and go to the Forecast Delivery Schedule tab on the line item, the Cml. iss. qty and Cml. dlv. qty fields are blank, and there are no deliveries associated with the order.
    Do I have to use a seperate BAPI to create the correction delivery?  I've looked at BAPI_OUTB_DELIVERY_CREATE_SLS, but I don't see how to specify that this is a correction delivery and not a 'regular' delivery.
    Thanks,
    Sharon

  • Converting MM scheduling agreements to SD sales order

    Hai all,
    How to convert the Material managemnt scheduling agreement to SALES order for processing the export requirments.

    Sheduling Agreements are transactions with Processing type Outlline Agreement while Standard Sales Order is a transaction of processing type Sales Order
    Both Scheduling Agreement and Standard sales order are in a way orders. It is the processing that differs for both. While normal Sales Order has focus on Sold-To, Ship-To, Material, Qty and the requested delivery date, the Scheduling Agreement, which is normally used for buying large volumes of components (high-tech, automotive) in make-to-order scenarios, the focus is on the schedule lines also.
    The next processing step for scheduling lines is pick-pack and deliver.

  • How to create a standard order with using the Scheduling agreement.

    Hi All,
    Could any body tell me step by step process of creating a standard order using the Scheduling agreement reference.
    Thanks,
    srinivas.

    HI
    In Scheduling Agreements the subsquent process is not order it is actually delivery
    Scheduling Agreements contains Fixed Delivery dates and quantities and the same can be seen in schedule lines of the
    Scheduling Agreement which you have prepared
    The word fixed carries a lot of meaning here
    On the due date
    the system actually creates deliveries or it appears in the delivery due list
    You cant create order referring to scheduling agreement
    This is business logic and SAP logic too
    Scheduling Agreements means your order is sheduled for delivery
    Raja

  • To generate Schedule lines for scheduling Agreement when MRP is run.

    Hi,
    Please help advise on my following requirement:
    When I run the MRP for 'Single Item - Multi level' (MD02) for a material, I want MRP to generate delivery schedule lines for that material in Scheduling agreement.
    Please advise as to how i can go about with this.
    Regards,
    Manju

    Hi Manju,
    For this you need to set creation indoactor for planning run in SPRO.
    The path is spro-MM-CBP-Carry out overall maintenance of plant parameters-Click on maintain-give your plant-click on external procurement under planning run-here you can give your option for the schedule line creation.
    Traction code is omi8. Hope this will help you.
    Cheers
    Ravi

  • SCHEDULING AGREEMENT AND SCHEDULING LINE CREATION

    Hello Guys,
    I trying creating a scheduling agreement(SA) for vendor & material combination.
    I have created a Scheduling agreement in ME31L then maintained in ME38.
    In ME38 i have also mentioned the delivery date. when i am checking EKKO for Purchasing document , its created with the delivery date specified.
    My question is how to create a schedule line ? Do we need to maintain a source list of that material, plant and vendor.
    If we have the source list maintained, then what is the next step after SA is created and maintained.
    Do we need to do MIGO? because i tested by creating one SA in ME31L and maintained in ME38. I mentioned the delivery date as today and when i checked EKKO table the Purchasing document is created.
    Do i need to create a Purchase Order?
    If no then do i need to do MIGO? If i need to do MIGO, for what reference do i need to do MIGO???
    My client never maintained a Scheduling agreement, they want the scheduled lines to be created and sent to vendor and we need to receive  the goods on specified delivery date.
    Help will be appreciated.
    Thanks.

    Hi,
    You need to make a distinction between the scheduling agreement (ME31L/ME32L) and the delivery schedule creation (ME38/ME84)
    With ME31L you create the scheduling agreement. In the scheduling agreement which is created for a vendor you maintain the parts that you will order at this vendor, the target quantity that you will order over a certain period and the price.
    In ME38 you use the scheduling agreement number that is created with ME31L to create schedule lines (manually). These schedule lines consist of a date and an quantity. This is the data that needs to be transmitted to the vendor and against which the vendor is shipping the ordered materials.
    Once the vendor ships the materials you post the goods receipt in Migo against the scheduling agreement number.
    That is the basic working of the scheduling agreement and the delivery schedule.
    Now some remarks.
    You need to set-up the required output conditions for transmitting the data to the vendor either via print, fax, email or EDI.
    You can do this manually in each scheduling agreement and each release but typically you maintain the output condition records.
    For scheduling agreement contract (ME31L) you use transaction MN07.
    For the delivery schedule (ME38/ME84) you use transaction MN10.
    In order for you to be able to post the goods receipt the delivery schedule needs to have been transmitted otherwise you will get a message that not requirement are found when trying to post goods receipt.
    Also the goods receipt can only be posted if the requirements are valid on the day that you are performing MIGO. This means if you would post GR today then the open requirements in the scheduling agreement need to be for today or already from previous dates. The system will not allow you to post GR for quantities that are only due tomorrow (if this is required a user exit needs to be set-up).
    If you want schedule lines created via MRP then you need to set-up a source list using ME01. You have to make sure that the MRP key is set to 2 in orer for the system to generate schedule lines and you also have to make sure that you have the correct MRP parameters set-up.
    You can use ME84 to transmit the delivery schedule lines generated by MRP if no changes are required. With the ME84 you can transmit multiple releases at once, however this transaction can not be used to make manual changes to the MRP proposal.
    The scheduling agreement offers lot's more possibilities but the above should get you going with the basics.
    Hope this will help you on your way.

  • Scheduling Agreement invoice verification

    Hi friends,
    This is the issue I'm facing with my client
    Buyer created the scheduling agreement and delivery lines.
    item cost 2$ per piece
    user received the material against scheduling agreement line item.
    system generated the material document.
    Due to wrong price in Scheduling agreement buyer updated the price form 2$ to 3 $
    but when we are doing invoice verification system taking 2$ not 3$.
    How to handle this situation.
    Is it any way we can update material document price?
    User want to do invoice verification for 3$.
    Please suggest.

    Hi Sunil..
    Is it a GR Based INV Verification? If not GR based then there shd be no issue.
    So the Buyer has already updated the SA to 3 $ or not yet.
    Try to replicate the entire scenario in ur testing client and try to do update the SA
    with new price and do a reversal of the material document and once again redo the GR and then follow on with IR.
    Is  IR Posted or not yet ?? If IR is posted the Material Doc will look for the price from IR not SA.
    Regards
    Balaji

  • GRN vs Schedule Agreement validity Date

    Dear All,
    We got very severe issue, we have created the Scheduling Agreements(document type -LP) between the two plants (Cross Company Codes) with the vendor code created under the Account Group : 0007.
    During the creation of the Scheduling Agreements , we have not assigned the Plant code in Vendor Master (In Purchasing organisation data-> Extras-> plant Assignment).
    So the shipping data did not get determined per material in scheduling agreement and scheduling agreements created as the normal Scheduling agreements (NOT as Stock transfer scheduling agreements)
    and plants started doing the transaction(In Production server) as Normal Purchase Sale (by creating sale order and GRN via Scheduling Agreement) .
    But now , it is required to change the process via Sale -Purchase to Stock Transfer , so we have changed the Vendor master and assign the Plant to the vendors.
    But the transaction has been going on already created scheduling agreements. So how Delete/Close the existing  scheduling agreements. and we need to create new scheduling agreements(Stock transfer scheduling agreements).
    I have tried out with Validity period (by shortning the Validity Period) , so that existing SA should NOT be invalid for GRN, but GRN date has no control with Validity period of SA.
    Please suggest how to go about it.
    Regards
    Nitiin

    Hi,
    Try This
    Do not maintain Delievry Schedule in Me38 or you can try with setting Block vendor in Source List or you can change validity period in source list.
    Regards,
    Vikas

  • Scheduling Agreement question

    I'm trying to figure out how scheduling agreements are used and have referred the SAP help at: http://help.sap.com/saphelp_scm50/helpdata/en/35/3c6c39c71c0324e10000000a114084/frameset.htm. Please let me know if my understanding is correct. Scheduling Agreement is basically a source of supply which creates a Tlane is APO. So, the Tlane is between the supplier and the plant, right? When there is a demand on the plant and heuristics runs, what is created at the supplier location based on the scheduling agreement?

    Hi,
    Delivery schedule lines are created which specify how much quantity of a material and by what date it should be delivered.
    These delivery schedule line are with reference to the scheduling agreement which is  a like contract between a company and a supplier to supply a list of materials within the specified time frame, at agreed time frame and with the agreed advance notice.
    Regards
    Datta

  • MRP To Generate SCHEDULE LINES for Scheduling Agreement

    Hi
    I have followed the below steps but still the Schedule lines is not generated for scheduling agreement.
    1Maintain MRP views 1,2,3,4 for the material in material mste.(MM01)
    2. Maintain Purchase Info Record for the vendor plant & material combination.(ME11)
    3. Create Scheduling agreement using ME31L
    4. Maintain source list for the material & the scheduling agreement # and Line item set the MRP relevant indicator 2 (Necessary ?) ME01
    During Run MRP for the material.the below details entered///
    Processing key NETCH Net Change in Total Horizon
    Create purchase req. 1 Purchase requisitions in opening period
    Schedule lines 3 Schedule lines
    Create MRP list 1 MRP list
    Planning mode 1 Determination of Basic Dates for Planned
    Run MDBT or MD02 but still doesn't create the schedule lines......Anything else missing.
    MRP1:
    MRP Procedure: PD
    MRP Group: 0000 (External Procurement only)
    Lot Size: EX (Lot For Lot)
    MRP2:
    Procurement Type: F
    Sched Margin Key: 000
    MRP3:
    Avilablity chec: 02 (Individual requirement)
    MRP: 4
    Nil

    Raj,
    Source List a Mandatory for Scheduling Agreement, if you want to create automatic Scheduling line.
    Plz use (2) in MRP RELEVENT tab in ME01 (Source List).
    rest of the thing is ok, make sure a material master(MRP 2 VIEW) in that view you have to give a planed delivery days. it is must.
    HOPE IT WILL WORK
    Regards:
    Poision

  • Planned delivery cost for the scheduling agreement

    Hi Experts
    1. I have an requirement to post Invoice ver. for the Planned delivery cost (freight,customs duty,CVD etc) against the Scheduling Agreement just like Import Purchases with checking off the GR Based IV Indicator before doing the GR
    I tried it but its giving me that no delivery costs are Planned in the Scheduling agreements it runs fine in case of the PO because PO is a time independent.  Please inform how to post the same for schedule agreement with time dependent indicator on. I tried switching off the time dependent indicator and the system allowed, but my requirement is to Post I.V for the delivery cost with the time dependent indicator on.
    Appreciate if you can suggest something in this case Urgently .
    2. Aother issue is we have some uploaded Scheduling agreement from legacy system with Time dependent conditions. For this we need to post planned delivery cost in Miro. Since the system is not allowing to post, how to about for this. Shall we enter the delivery cost in unplanned delivery cost in Miro and post.  Please suggest if any alternate solution is available.
    Regards
    Arvind

    Hi,
    As you know if the delivery cost document is not posted during GR the
    delivery cost is not proposed during invoice (MIRO). Planned delivery
    cost will be proposed in invoice only when there are records in EKBZ
    table. The EKBZ table will be updated when delivery cost is posted
    during GR itself.
    Please ensure in the PO itself thatr the conditions have been defined
    properly with the relevant amounts and values.
    During GR when planned delivery cost conditions are present in PO,
    system checks for values in amount field. Then only appropriate
    calculations will be done for delivery cost and planned delivery cost
    document will posted during GR and hence updates EKBZ table.
    Solution to this issue is described in below steps,
    1) reverse the invoice document
    2) reverse GR document.
    3) You have to give values in amount field in relevant conditions ZGDS
       in the PO.
       If you face any issues changing the values, delete above conditions
       and put it again manually and give values in amount field also.
    4) Post GR once again, delivery cost document will also be posted.
       You can check it in PO history.
    5) During invoice select Item + planned delivery cost and post the
       invoice. If you need planned delivery cost to be posted separately,
       then you can post individual invoice for item and delivery cost.
    Please note it is not possible to post delivery costs for documents with
    multiple accountassignments. 
    For your second question, I am afraid I can not answer. Please open a new ntry in the forum, so that someone else can answer it.
    Best Regards,
    Arminda Jack

Maybe you are looking for

  • Saving a PowerPoint Presentation as a pdf from With Outlook Code

    I'm trying to write a macro in Outlook that will open a Powerpoint Presentation (that part works) then save it as a pdf.  The code I've seen does not seem to work when running the code from Outlook.  Here's what I've got so far, all the commented lin

  • Error message on email send attempt

    Hi all I have suddenly started getting email send failures messages on my iCloud account.  It doesn't seem to be for all messages and I have not changed any settings. The delivery failure message is as listed below: Your message cannot be delivered t

  • Ios7 laggy on iphone 4 8gb

    apple needs to start signing ipsw for a4 devices like iphone 4 that are struggling with ios7. seriously its annoying ive never had any lag issues until now.

  • How to delete a role?

    I could not find the catalog which FCPX may keep the role. And I also can not delete them within FCPX itself,so...what can I do?

  • Problem of variation of color between Firewoks CS5 and CS6 ?

    Hy everyone ! I have problem of variation of color between Firewoks CS5 and CS6. An Hexa color defined in a CS5 file, dont have the same Hexa component when opened with Firewoks CS6 ? Example with au GREEN color : #80BB39 (Created with Firewoks CS5)