How are deliveries automatically created from scheduling agreement?

How are deliveries automatically created from the schedule line of the scheduling agreement? Can anybody explain this step by step? Can we use the code VL10BATCH for this purpose? If we can, how is this code used?
Thanks in advance.

hi
A customer scheduling agreement is an outline agreement with the customer containing delivery quantities and dates. These are then entered as schedule lines in a delivery schedule. You can either create schedule lines when you create the scheduling agreement or you can create them later.
You fulfill a scheduling agreement by creating the deliveries in the schedule as they become due. You process deliveries for a scheduling agreement in exactly the same way as you process a normal delivery. After you have carried out the delivery, the system updates the Delivered quantity field in the scheduling agreement item with the delivery quantity.
The scheduling agreement is used as a basis for delivering a material. The customer sends in scheduling agreement releases, referred to as delivery schedules, at regular intervals to release a quantity of the material.
Document Types
To configure document types for scheduling agreements, choose Sales -> Sales Documents -> Sales Document Header -> Define sales document types in Customizing for Sales and Distribution.
The R/3 System contains the following document types for component suppliers:
LZ - Scheduling agreement with delivery schedules (no external agents)
LZM - Scheduling agreement with delivery orders
LK - Scheduling agreement with delivery schedules (external agents)
ED - Delivery by external agent (consignment issue)
EDKO - External agent correction
RZ - Scheduling agreement returns (no external agents)
KAZU - Consignment pick-up for external agents
KRZU - Consignment returns for external agents
Item Categories
To configure item categories for scheduling agreements, choose Sales -> Sales Documents -> Sales Document Item -> Define item categories in Customizing for Sales and Distribution.
The system determines the following item categories for the related document types in
documents containing materials with item category group NORM:
Item category LZN for scheduling agreement type LZ
Item category LZMA for scheduling agreement type LZM
Item category LKN for scheduling agreement type LK
Item category KEN for document type ED
Item category EDK for positive corrections (or the manual alternative EDK1 for
negative corrections) for document type EDKO
Item category REN for document type RZ
Item category KAN for document type KAZU
Item category KRN for document type KRZU
Schedule Line Categories
To configure schedule line categories for scheduling agreements, choose Sales -> Sales Documents -> Schedule lines -> Define or Assign schedule line categories in Customizing for Sales and Distribution.
The R/3 System contains the following schedule line categories for component suppliers:
L1, BN, L2, and CN for item category LZN
E4, E0, E5, and BN for item category LKN
L2 for item category LZMA (standard for delivery order processing)
Schedule Line Types
To configure schedule line types for scheduling agreements, choose Sales -> Sales Documents -> Scheduling Agreements with Delivery Schedules -> Define schedule line types in Customizing for Sales and Distribution.
Creating Scheduling Agreements
To create a scheduling agreement with delivery schedules:
1. In the Sales menu http://Ext. choose Scheduling agreement ->Create.
2. Enter scheduling agreement type LK (standard) or LZ (external agents) and the
relevantorganizational data.
3. Choose ENTER.
4. Enter the following data:
Sold-to or ship-to party number
Purchase order or closing number
Material or customer material number
You can use the Description field to identify the scheduling agreement. For
example,
you could enter the model year for a particular production series.
The system allows up to 35 digits for a customer material number.
Rounding quantity
Usage
Choose Goto -> Header -> Sales to enter the usage at header level, or Goto ->
Item-> Sales A to enter it at item level. The system proposes usage S, for series, as default in both cases.
Planning indicator
Choose Goto -> Header ->Sales.
Target quantity
Mark an item and choose Goto -> Item -> Sales A
Partners
For scheduling agreements with external agents , choose Goto -> Header
->Partners to enter the external agent as forwarding agent and special stock partner
on the partner function screen.
5. Create a delivery schedule
Mark an item in the scheduling agreement and choose Goto -> Item -> <Delivery
schedule>. Enter:
A delivery schedule number and date
The cumulative quantity received by the customer
The last delivery confirmed by the customer
A schedule line with date, time, and quantity
To enter additional data in the delivery schedule, choose DlvSch.Hdr (delivery schedule header).
configuration:
img->SD->Sales->sales document->scheduling agreements with delivery schedules->
step1: define schedule line types
schedule line types are not schedule line categories. Schedule line types are used for information purpose only.
stds are 1. fixed date 2. backlog 3. immediate requirement
4. estimate
step2: maintain planning delivery sched. instruct/splitting rules
The planning delivery schedule is an internal delivery schedule used to plan requirement s more efficiently.  It is sub divided into 3 parts
2.1 delivery schedule splitting rules
2.2 dly schedule instrusctions
2.3 assign dly schedule splitting rules
step3: define sales documents type
step4 : define item categories
step5: define schedule line categories
step6: maintain copy control
PROCESS
step1:  create scheduling agreement
VA31
enter SP,SH valid from, valid to,
goto ITEM OVERVIEW tab
enter material, rouding qty
select ITEM  click on FORECAST DLSCH
enter different dly dates and qties
save it.
step2: create sales order with reference to above
step3: create delivery
step4: create billing
regards
krishna

Similar Messages

  • Outline agreement or automatic schedule from scheduling agreement

    Hello Master's,
    Plz find the below workflow which will brief u abt the complete process;-
    1.User raises indent(me51n) and then releases(me54n) else as per our MRP, indent/PR gets generated automatically.
    2. Standard Practice is that we invite offers, negotiate and place order (me21n) else f we have rate contract for any item we go for direct ordering (me21n) and then get it released (me29n)
    For around 20-30k material codes we have rate contract finalized with various suppliers for a period of time.
    When we find any indent/pr falling into this category, we dont invite offer but go for ordering as per the finalized price. The price is maintained in excel or pdf format.
    Problem is we want to map material codes with vendor and rates associated with the contract.
    For this either we have to go for outline agreement(me31k) of scheduling agreement(me31l) so that whenever any indent/PR gets generated in this category, order/delivery schedule will be generated automatically in SAP.
    Points in which i need help from you:-
    1. How to generate automatic po from outline agreement or automatic schedule from scheduling agreement.
    2. complete understanding of the difference between outline agreement and scheduling agreement.

    Hi Nilson,
    The data contained within the global outline agreement is distributed as purchasing contracts or scheduling agreements to the backend systems of the release-authorized purchasing organizations of the relevant corporate group. These purchasing organizations can then use the purchasing contracts or scheduling agreements according to the terms agreed centrally within the global outline agreement.
    For more details.
    http://help.sap.com/saphelp_srm50/helpdata/en/42/f93dfd975f3ee6e10000000a1553f7/frameset.htm
    Nishant

  • How to set delivery complete in scheduling agreement automatically

    Hi. I would like to request for help on how to flag delivery complete in an scheduling agreement?
    When creating a goods receipt against a scheduling agreement, do we need a user-exit  or how is it configured in order to check the quantity receivedthe quantity in the goods receipt and compare it with the quantity in the scheduling agreement (/- de tolerance) and, in case the full ordered quantity has been received, set the flag Delivery completed in the scheduling agreement.
    Thanks.

    Hi,
    We regret that the functionality  setting of "delivery completed"       
    indicator automatically for a scheduling agreement is not included in   
    the SAP standard system.                                                
    For scheduling agreements, you must maintain the final delivery              
    indicator only in the scheduling agreement item.                             
    A maintenance from the goods receipt is useless for scheduling               
    agreements since the current schedule line situation is generally not        
    final. Even if all schedule lines are supplied, this does not mean that      
    no new schedule line might be added. Therefore, for scheduling               
    agreements,maintenance of final delivery indicator is planned only from      
    the document item.                                                                               
    Regards,
    Edit

  • How do you automatically create a page from an entry in another list?

    I have a custom list with lots of entries and I would like to set it up so that by adding a new entry to my list a new site page is automatically created for that entry. I thought I could configure this by using lookup columns by adding these colums to the
    site pages list which are linked to the columns in my custom list. That way the site pages list will be populated as I add more entries to my custom list. However I tried this and none of my entries from my custom list were displayed.So how would I go about
    doing this? It would be great if a new page was automatically created from a template as well.
    Thanks!

    Hi,
    Please check URL
    http://sharepointryan.com/2013/09/10/create-a-sharepoint-site-spweb-using-rest-in-spd-2013-workflow/ it might help you !!
    Regards
    PT

  • How do you automatically create paragraph styles from a document?

    Hi,
    (posted in general indesign as well - advised to post over here)
    I know I've seen this somewhere but can't for the life of me find it...
    How can I automatically create paragraph and character styles in an InDesign CC document? I'm sure I saw a script to do this and though I'll download that later...only i can't find it now.
    The scenario is that I have a document created by someone else which has lots of paragraph styles, but each one has over-rides on (so they're not really much use). I'm wanting something that will go through the document and create all the different styles that have been used.
    Any ideas?
    Thanks

    Hi
    I was given this tip to try: PerfectPrepText (http://indesignsecrets.com/perfectpreptext-a-smart-way-to-style-local-formatting.php) but couldn't get it to do what i was after unfortunately...however it did point me in the direction of something that does the trick:
    PowerStyles (DTP Tools - Power Styles for Adobe InDesign).
    Not sure if it's available for CC yet though.
    Thanks

  • I have created a scheduling agreement for a material i want to cancel.

    i have created a scheduling agreement with a material i want to use the material in a contract with another vendor, is there any way i could use the material or i have to terminate the scheduling agreement and create the contract. in case of canceling the agreement what are the steps involved i mean the T Codes.

    Hi,
    First af all you have not mention that is ther any subsequent delivery documents are exist against that scheduling agreement or not....if yes then you cannot delete the scheduling agreement unless u reverse the deliveryin t-code VL09 and by cancelling billing docs in VF11(if invoice created) as well...
    If thr is no Deliveries, then you can delete that scheduling agreemnt very well, by going VA32 enter agreement no., press enter
    on top selct sales doc option and delete the agreeement...
    Reg
    JJ
    Edited by: Jagsap on Jul 9, 2009 2:11 PM

  • Info record creation from schedule agree, with all conditions

    HI
    We wish to create Inforrecord from schedule agreements, When we used Info update indicator B its creating Info record but not copying conditions from schele agreement only order history is updated
    Is there any way we can copy all conditions from schedule agreement to info record?
    Thanks

    I realized, standard SAP behaviour is
    Info record does not exist
    Quotation
    Time-dependent conditions and their supplementary conditions are adopted
      Scheduling agreement
    Is set as last document; order price history is updated
      Contract
    Time-dependent conditions and their supplementary conditions are adopted
      Purchase order
    Is set as last document; order price history is updated
    IS THERE ANY OTHER WAY TO ACIEVE CPYING OF ALL CONDITIONS FROM SCHEDULE AGREEMENT TO INFORECORD
    Edited by: Sasi nagireddy on Jan 12, 2011 5:37 AM

  • How do I automatically create bookmarks in adobe using the Scanjet pro 3000 s2?

    How do I automatically create bookmarks in adobe using the Scanjet pro 3000 s2?

    Does the file you are writing have a timestamp in it?  If so you could read the timestamp from the last time it was written and see if the day has changed, handling the name of the file appropriately.  The easiest way to record the timestamp is probably to write the timestamp as the number of seconds that have elapsed since 12:00 am on Firday January 1st 1904 in UT.  The "Get Date/Time in Seconds" function will give you this value.
    Message Edited by jmcbee on 03-05-2009 12:56 PM
    CLA, CLED, CTD,CPI, LabVIEW Champion
    Platinum Alliance Partner
    Senior Engineer
    Using LV 2013, 2012
    Don't forget Kudos for Good Answers, and Mark a solution if your problem is solved.

  • VA31 - Create a scheduling agreement

    Dear Gurus,
    When trying to create a scheduling agreement using VA31, I input the following data:
    Sched. Agreemt Type
    Sales Organization   2200   France, Paris
    Distribution Channel 14     Service
    Division             00     Cross-division
    Sales Office         2200   Office Paris
    Sales Group          2200
    Now, I cannot choose any Scheduling agreement type from a drop down menu as none seems to be linked or created for that sales area.
    Can anyone help me create a list of Scheduling agreement I can choose from?
    Thanks
    Chris

    Scheduling agreement type should have been created in VOV8 and then this document type should have been assigned to your sales area 2200 / 14 / 00 in OVAZ.  Check whether you have assigned your scheduling agreement type in OVAZ.
    thanks
    G. Lakshmipathi

  • Funktion to create MM Scheduling agreement

    Dear all,
    I am looking for a funktion/bapi to create material scheduling agreements in SAP. I think BAPI_PO_CREATE1 does only create purchase orders. Any ideas how to create scheduling agreements by funktion?
    Kind regards
    Roman

    Hi,
    Did you read the FM documentation.
    there a table parameter for Schedule lines.
    Parameter: POSCHEDULE
    PO_ITEM = 00001
    SCHED_LINE = 0001
    DELIVERY_DATE = 02.12.2002
    QUANTITY = 6.000
    PO_ITEM = 00001
    SCHED_LINE = 0002
    DELIVERY_DATE = 03.12.2002
    QUANTITY = 5.000
    PO_ITEM = 00001
    SCHED_LINE = 0003
    DELIVERY_DATE = 04.12.2002
    QUANTITY = 4.000
    Parameter: POSCHEDULEX
    PO_ITEM = 00001
    SCHED_LINE = 0001
    PO_ITEMX = X
    SCHED_LINEX = X
    DELIVERY_DATE = X
    QUANTITY = X
    PO_ITEM = 00001
    SCHED_LINE = 0002
    PO_ITEMX = X
    SCHED_LINEX = X
    DELIVERY_DATE = X
    QUANTITY = X
    PO_ITEM = 00001
    SCHED_LINE = 0003
    PO_ITEMX = X
    SCHED_LINEX = X
    DELIVERY_DATE = X
    QUANTITY = X
    Check it...
    you can use it to create the schedule lines also...
    Regards
    vijay

  • How do you automatically include from a reply

    How do you automatically include
    < <
    from a reply to someonelses post.
    Do you type it manually

    BTW, in case there are any Americans out there,AA
    has
    nothing at all to do with alcohol dependency inthis
    case - it's the Automobile Association.
    RObinThanks for that
    RPWithey and God bless you
    By George he's got it!
    That's not what he asked for :?

  • How can I automatically create the files with serie-name?

    Hello, Everyone,
    I have a question again.
    How can I automatically create the file with a serie-filename?
    e.g. I have a program, it will repeat 5 times, and every time it will create a bmp-file, and I want to let this program automatically save these 5 files with a Serie-filename like File001.bmp, File002.bmp, .... File005.bmp.
    How can I do it?`
    Thanks a lot.
    Regarts,
    Johnny

    Hi Deepu,
    one more comment
    The format code should be "%04d" to get leading zeros and have filenames with same length...
    Best regards,
    GerdW
    CLAD, using 2009SP1 + LV2011SP1 + LV2014SP1 on WinXP+Win7+cRIO
    Kudos are welcome

  • Error in creating a schedule agreement

    hi friends
    i got an error in creating a scheduling agreement
    the error reads- 'zjk5(the output type ) is not defined'
    condition records,port definition,partner profiles everything is fine.
    another error that reads is 'No communication data is set for medium 6ie edi'
    please answer this problem.thanks is advance.

    Hi,
    Check the Output type was created or not for that Scheduling Afreement?
    check the table T685 for that Output type?
    And n the diocument have you configured the Output type with the correct medium (EDI  value 6) and have you assigned the same in NACE tcode?
    check
    reward points if useful
    regards,
    Anji

  • How are ePrint apps created and maintained?

    Just bougt a new small HP printer for my home office and discovered ePrint and apps support. And amazed, did not expect this technology in entry level small/home office type printers.
    And immediately new questions on what possibilities this opens up for printing applications
    What is required to create new apps?
    Is it possible to use this technology to add local office apps? I.e. to print site/office specific forms, trivial network interactions and maybe a bit more.
    Is subscription type apps supported/allowed, where the app is only available as part of a third party subscription package?
    A lot can be built around the email based ePrint service alone, but having ability to also do some simple interaction with the user at the printer would open for a wide range of new possible uses.

    Hi,
    Double post, please use:
        http://h30434.www3.hp.com/t5/Printer-All-in-One-Install-Setup/How-are-ePrint-apps-created-and-mainta...
    Regards.
    BH
    **Click the KUDOS thumb up on the left to say 'Thanks'**
    Make it easier for other people to find solutions by marking a Reply 'Accept as Solution' if it solves your problem.

  • BAPI for creating sales scheduling agreement

    Hi All,
    I have a scenario where i need to create a sales scheduling agreement using VA31. I have tried using a function module "SD_SALESDOCUMENT_CREATE". I am able to create the document by inserting the correct data in "SALES_HEADER_IN", "SALES_ITEMS_IN", "SALES_PARTNERS" and using the update flag as " I ".
    When I try to insert data in "SALES_SCHEDULES_IN" the function module returns error message "No schedule line category could be determined during quantity adjustment".
    please provide help in finding out the right procedure for creating the scheduling agreement with schedule lines data.
    Regards.
    Anurag

    Hi,
    Did you shown this to your functional team.
    Regards,
    Madhu.
    Edited by: madhurao123 on Nov 21, 2011 3:29 PM

Maybe you are looking for

  • XS066EA pavilion dv6-3140EE

    My hard drive fail, so i replaced it with sata 3 solid state drive, but i i'm sure that i'm geeting only sata 2 speed by intel rapid storage technology and by benchnmark testing. My question is: do my board support sata 3 ,( I have been told that it

  • IDVD Slide show audio issue

    Slide shows created on iDVD look and sound great during preview, however after burning to disk, audio drops out for about 5 seconds after every 99 slides?  I have been told that this is a known issue with iDVD.  How can I correct this error??

  • Used ipod 5 stuck on activation icloud lock

    I bought a secondhand ipod touch 5 ios 7.0.4 cant get ahold of original owner apple is no help is there any way to get this working if this is not fixable then I am out some serious cash and not happy with apple or the aeller I bought this from is th

  • I cannot access itunes from appletv to rent a movie. I just get the perpetual clock after clicking the verification ok box

    I cannot access itunes from appletv to rent a movie. I just get the perpetual clock after clicking the verification ok box

  • How do you cancel a download

    I ordered a tv show that I now do not want. Every time I open itunes it begins the download. I pause the download and hit cancel but it comes right back and starts a download again. This has been ongoing for months and I can't count how many times/wa