Hyperthreaded CPU Scheduling via Hyper-V

I searched forums and documents (and books) all over for this answer pertaining to Hyper-V.
When a guest VM is assigned 2 virtual CPUs with 100% reservation on a Hyper-V host with a processor featuring hyper-threading, does the guest VM receive guaranteed access to two
physical cores or two logical cores?  For a thought experiment, on a single socket 2-core processor with hyper threading (4 logical cores), from my understanding Hyper-V takes physical core 0 by default leaving a single
physical core for VMs.  What would be the result of configuring a VM with 2 virtual CPUs on this host with 100% reservation?  Would you be allowed to?  Would the vCPU scheduling be across two logical processors or would the VM fail to start
because it requires two physical cores?

Hi Nickmeister,
"So,a virtual machine’s CPU count means the maximum number of threads that it is allowed to operate on physical cores at any given time. I can’t set that virtual machine to have more than two vCPUs because the host only has two CPUs. Therefore,
there is nowhere for a third thread to be scheduled. But, if I had a 24-core system and left this VM at 2 vCPUs, then it would only ever send a maximum of two threads up to the hypervisor for scheduling. Other threads would be kept in the guest’s thread scheduler
(the supervisor), waiting their turn. "
Based on my understanding , we can image the procedure of physical cpu processing  can be divided to alot of
time slices ,  more than one thread can be scheduled/switched to be processed by a processor/core .
Hope the following article is helpful to you regarding to CPU reserve in hyper-v :
http://blogs.msdn.com/b/virtual_pc_guy/archive/2011/02/17/hyper-v-cpu-scheduling-part-1.aspx
Also :
http://blogs.technet.com/b/redpill/archive/2011/02/19/hyper-v-cpu-scheduling.aspx
Best Regards
Elton Ji
We
are trying to better understand customer views on social support experience, so your participation in this
interview project would be greatly appreciated if you have time.
Thanks for helping make community forums a great place.

Similar Messages

  • ERROR in Scheduling via Transaction-IP30

    Hello Gurus,
    When I am scheduling the maint plan 1234, system is throwing Error message IP202-Maintenance plan 000000001234 NOT scheduled.
    I am using following scenario in * ECC5.0*:
    I've created a single cycle plan 1234, with measuring point as a counter . The Cycle/Unit is say 1440min.
    Tasklist is attached.
    Call horizon 100%.
    SchedPeriod 365 Day.
    And Cycle modification factor as 1.00 Other parameters are NOT maintained.
    Counter (Category M) is having character unit as "minute".
    Created Measuring document in IK11and started scheduling via IP10. I got Scheduled Called/Scheduled Hold.
    Everything is fine up to this step.
    Now I want to run IP30 manually for next 30 day but I am getting Error message IP202- Maintenance plan 1234 NOT scheduled.
    What is possibility of this error?
    This is very strange to me.
    I'll really appreciate for your efforts.
    Best Regards,
    Ganesh.

    Hi All,
    Thanks for your response.
    Details of Maintenance Plan and Call Object:
    Maintenance Plan cycle : Single Cycle Plan with Cycle/Unit 1440 min
    Counter: Characteristic (say RUNTIME) with Unit Min
    Task List: General task list assigned
    Scheduling Parameters: Call Horizon=100%; SchedPeriod 365 DAY;
    I've created 4-5 measuring documents.
    Initially done scheduling using IP10.... (ofcourse restated number of times)...
    Still I am getting same error.
    I'll urge please consider I am using ECC5.0
    Request you to guide me what went wrong....
    Call Object is Preventive Order (PM02)
    Regards,
    Ganesh

  • [Forum FAQ] Cannot perform a backup schedule via Windows Server Backup and receive "The system cannot find the path specified." Error

    Symptom One
    You attempt to
    schedule a backup every day via Windows Server Backup on Windows Server 2008 R2. At the beginning, the backup works without issue. But after a few days it failed and you receive the error “Windows Server Backup:
    The system cannot find the path specified.”
    Cause
    The issue may occur if there is
    no shadow copy storage space available on the backup volume.
    Verify
    You can use the List ShadowStorage command to check if you have enough storage space to store the newly created shadow copy. If you've reviewed the size of the backup snapshot and discovered
    that there is no allocated space for the storage association, you need to resize shadowstorage.
    Solution
    You could run the command below to create shadow copy storage space on the backup volume:
    vssadmin resize
    shadowstorage /for=<ForVolumeSpec> /on=<OnVolumeSpec> [/maxsize=<MaxSizeSpec>]
    More Information
    Vssadmin resize shadowstorage
    http://technet.microsoft.com/en-us/library/cc788050.aspx
    Symptom Two
    When you add
    another external hard drive to backup schedule via Windows Server Backup on Windows Server 2012, it fails and you receive the error “The System cannot find the path specified.”
    Cause
    The issue is due to the
    Original Destination Disk was not attached to the server.
    Verify
    You could check the disk status in Disk Management to see if the Original Destination Disk is offline or removed.
    Solution
    You need to attach
    Original Destination Disk to the Server then choose another external hard drive as backup target. After that, you could remove the Original Destination Disk.
    Workaround
    To work around this issue, please use the WBADMIN command line tool to add disk.
    WBADMIN ENABLE BACKUP -addtarget :{ DiskID}
    The AddTarget parameter takes disk ID as parameter. It can be retrieved by running "WBADMIN GET DISKS" command.
    Example:
    WBADMIN ENABLE BACKUP
    -addtarget :{ aa123d14-bba0-1dd9-0d93-80aaaa6bbb63}
    More Information
    Wbadmin enable backup
    http://technet.microsoft.com/en-us/library/cc742130.aspx
    Please click to vote if the post helps you. This can be beneficial to other community members reading the thread.

    good

  • Servlet CPU Scheduling

    Using Weblogic 5.1 SP3 under Solaris 2.7
              We are using the native Performance Pack which allocates 3 Posix readers
              can
              we or should we tune this???
              We have an unusual situation where we want to essentially do an long
              running
              post so we can stream data back to a client much like a file transfer.
              What we are seeing is that depending on the number of Execute Threads we
              see the first
              say 12 Clients - (Using Execute Thread Count 15) start and we dont see
              our other
              say 288 clients until each of our 12 clients are almost finished
              processing.
              It would appear that the cpu allocation timeslice is not switiching
              between concurrent http clients effectively if the servlets are long
              running.
              Is there some tunning which can be done to change this???
              I know this is an unusual situation but given the nature of
              firewalls/proxyservers/load balancing hardware like ArrowPoint,F5 etc we
              need to try to use http vs native
              t3 protocol out to our clients who will be both jfc and web based.
              Any help in this area would be greatly appreciated.
              

    naruto8 wrote:
    write a program in any language that will simulate cpu scheduling SRTF.
    1.the program will ask the user how many process to run
    2.then the program will let the user input the cpu burst time for the following processes
    3.the user will also input the arrival time for the processes
    4.the program will then simulate the cpu scheduling srtf
    5.the program should show he gantt chart, the ATT and the AWT
    pleas help me with this program...We won't do your homework. What have you done so far? What's the problem?

  • Windows 2008 R2 CPU Scheduling

    I have a Windows 2008 R2 Vmware VM running one application published by Citrix. I noticed the CPU usage spiked to 100% while doing an EDI export to MS Excel 2010. I increased the CPU cores by one totaling 1 Socket 6 cores. Now core 0 is higher than the other
    5 consistently. After contacting vmware I was told to ask Microsoft about CPU  scheduling. Not sure where to go from here to balance out the processes amongst all the cores.The only difference between this server and the rest is in Performance Options
    this server is set to Let Windows choose what's best for my computer instead of Adjust for best performance.

    You can also tune the priority of CPU shares through Windows System Resource Manager (WSRM), an optional server feature used for managing processor and  memory usage. WSRM's new built-in policy Weighted_Remote_Sessions can be used to assign users and
    groups into three priorities: Premium, Standard, and     Basic. As should be obvious, users in higher priorities will be given greater CPU shares than those in lower priorities.
    Regards
    Milos
    Reference: Windows IT Pro, Q&A

  • Problem Scheduling via cmc,multiply copies are being send

    Post Author: babutang
    CA Forum: Administration
    hello , im Scheduling a webi report via the cmc Schedule option. Destination - Email (SMTP) The values to be used at schedule time are set manually. Schedule For option is set to be Schedule for specified user groups. The problem is that the emails recipients specified in the destination are Receiving as many copies as the user groups users. For example: if i have 6 users under "x group" which i chose at the "group Schedule For option" , each one of them will recive 6 copies of the report. if i have 3 users under "x group" each one of them will recive 3 copies of the report. hope i'm clear Enough. thank u.problem Scheduling via cmc,multiply copies are being send

    Post Author: stick_slinger
    CA Forum: Administration
    Hi
    Are you using the Job Server defaults for the Email - SMTP destination? I wouldn't use the "Schedule for" here unless you've got Universe Restrictions for these users and you're Multi-Pass Bursting the report.
    Destination - Email (SMTP) untick the "Job server defaults" option
    In the "To" field enter the recipient(s) email addresses - or get your email admin to create a group and then you can enter the smtp address of the group
    Hope this helps you
    J

  • How to install Solaris 9 connected via Hyper Terminal

    Hi All ,
    We have planned to Install Solaris 9 in E250. We have connected the console throgh Hyper Terminal.
    We are not able to see the options clearly in the console. The options are not in clear way. It is very difficult to install.
    Please advice how to install Solaris 9 in Text mode and terminal type for installing the solaris 9 via Hyper Terminal.
    I am awaiting for your reply.
    Regards,
    R. Rajesh Kannan.

    When the install starts, select a terminal type of VT100
    The screens should display correctly then.

  • RDS CPU Scheduling for 2012 R2

    Seeing as the Windows System Resource Manager was removed from 2012 R2 how do admins prevent a user’s session from killing a server CPU wise?
    The big culprit is web browsers Internet Explorer and Google Chrome

    Hi,
    Thank you for posting in Windows Server Forum.
    For your case, I can suggest you to use Fairshare CPU Scheduling option. With this feature, if more than one user is logged on a system, processing time is limited for a given user based on the number of sessions and their loads. You can GPO setting “Turn off
    Fair Share CPU Scheduling” option and other registry setting for this. Please check below article for information.
    Resource Sharing in Windows Remote Desktop Services
    Hope it helps!
    Thanks.
    Dharmesh Solanki

  • CPU Scheduling and BarGraphs

    Hey there :) ,
    I have wrote a code which include FCFS, SJF, RR, and priority scheduling algorithm for CPU scheduling. Now what exactly my code does is it calculates the average waiting time for each algorithm. What i wanted to do is to show the result in a comparative way like for eg wanted to show average waiting time of all the algo in terms of bar graphs. Can anyone guide me how should i do that ? Thanks :) your little consideration will be a great help to me.

    ashish.escape wrote:
    Exactly, can you suggest some less complicated library or any other method to draw bar charts for different values. It all depends on what exactly you are trying to achieve. The simplest would be to divide your numbers by x and then use that number to create a String of "*" which you then display with a println call. More complex and pretty would be to create a Swing app, override a JPanel's paintComponent and start drawing rectangles with its Graphics object. If you tweak this enough to make it look decent, pretty soon you're investing enough time where it may be worth your while to study JFreeChart rather than trying to re-invent the wheel (BDLH's picture link notwithstanding).
    Bottom line: If you still want it done yourself, though, I think that you'll have to describe your desires in a lot greater detail before anyone will know just what to suggest.

  • How do I create a new schedule via the Metadata Navigator Web interface?

    Hi All,
    Just wondering if it is possible to create a new schedule via the Metadata Navigator Web interface? What security rights do you need? Is this even possible? I have logged in as SUPERVISOR and It still looks like I can't do it.
    Thanks,
    Erik

    You can't. To create a new schedule, use the Operator or Designer tool.
    Craig

  • Ability to "task schedule" via small utilities backup/optimize

    Include small utilites with Lightroom that can be used with the system "task scheduler" that will perform catalogue backup and optimize on a user defined schedule.

    (Replying to myself here no edit option) Is there a way to optimize the catalog via single command line or in a bat file with sqlite3.exe and/or Contig.exe?

  • PS Scheduling via Windows Task Scheduler

    Hi All,
    I have been pulling my hair out trying to schedule my APIWSUSCleanup.ps1 file from this thread (http://social.technet.microsoft.com/Forums/en-US/eee88f8a-57de-46db-8d60-efb0e72d57b9/running-5-commands-using-array-elements-and-waiting-between?forum=winserverpowershell)
    to run as a scheduled task. Running interactively from a remote PS session the script file runs fine and produces the log file that it should.
    I have tried so many different combinations (including nonsensical just to be certain and rule them out) that I'm sure I have started going around in circles, there doesn't seem to be a definitive answer out there so hopefully someone on here can see what
    I'm doing wrong for my situation.
    I cldn't find any references for WSUS Management Shell cmdlets so I'm assuming that there isn't one that needs to be passed for the script to work like Exchange requires?
    Environment: Server 2012 WSUS Core install being administered with Server Manager from a GUI Server 2012 install. Scheduled task being added via Computer Management. I have setup the script
    execution using "set-executionpolicy remotesigned" from a Remote Powershell session, assuming that this sets it for x64 and x86? I did see one comment stating that is doesn't.
    Task: Run as SYSTEM (have tried local admin account), Run whether logged on or not, Run with highest privileges, Configure for Server 2012, Run on demand enabled.
    Task Action:
    Program: Have tried
    powershell
    powershell.exe
    %windir%\system32\WindowsPowerShell\v1.0\powershell.exe
    %windir%\SysWOW64\WindowsPowerShell\v1.0\powershell.exe
    C:\Windows\System32\WindowsPowerShell\v1.0\powershell.exe
    C:\Windows\SysWOW64\WindowsPowerShell\v1.0\powershell.exe
    Arguments: Here goes
    (The c:\powershell has been substituted by .\ when "start in" populated also as a test and I have also tried the shorthand version of commands such as -c instead of -command)
    All of the below have been run prefixed with nothing, -file and then -command (not at the same time)
    C:\Powershell\APIMonthlyWSUSCleanup.ps1
    "C:\Powershell\APIMonthlyWSUSCleanup.ps1"
    ("C:\Powershell\APIMonthlyWSUSCleanup.ps1")
    {C:\Powershell\APIMonthlyWSUSCleanup.ps1}
    "{C:\Powershell\APIMonthlyWSUSCleanup.ps1}"
    {"C:\Powershell\APIMonthlyWSUSCleanup.ps1"}
    &{C:\Powershell\APIMonthlyWSUSCleanup.ps1}
    &"C:\Powershell\APIMonthlyWSUSCleanup.ps1"
    &'C:\Powershell\APIMonthlyWSUSCleanup.ps1'
    {&"C:\Powershell\APIMonthlyWSUSCleanup.ps1"}
    &{"C:\Powershell\APIMonthlyWSUSCleanup.ps1"}
    (&"C:\Powershell\APIMonthlyWSUSCleanup.ps1")
    (&{C:\Powershell\APIMonthlyWSUSCleanup.ps1})
    "&{C:\Powershell\APIMonthlyWSUSCleanup.ps1}"
    "& "C:\Powershell\APIMonthlyWSUSCleanup.ps1"
    "& 'C:\Powershell\APIMonthlyWSUSCleanup.ps1'"
    ". 'C:\Powershell\APIMonthlyWSUSCleanup.ps1'"
    Start in: Have tried
    C:\Powershell\
    C:\Powershell
    Last Run Result: 0x0 & 0xFFFD0000
    History - Action Completed with return: 0, 1, 4294770688 & 2147746132
    It would be much appreciated if someone out there can help me to save my sanity.
    If there is one command that you think should work please let me know so I can try it and post back the exact result for that command.
    FYI - I have also tried to run this using CMD and parsing the powershell.exe in the arguments; I'm not keen on doing it that way though due to the string length limitations for future usage.
    Cheers

    There was  two ) ) after param ([String]str$))
    Here is corrected version (Add line to show the date)
    Param ([string]$p) # Parameter for test.ps1
    function LogParameter {
    param ( [string]$str) Add-Content "C:\PowerShell\Test.Txt" (Get-Date)
    Add-Content "C:\Powershell\Test.txt" $str
    LogParameter -Str $P # body of test.ps1
    I tested with a domain\user with domain admins rights. (Selected Run whether user is logged on or not)
    I set the task to run every 5 minutes indefinitely
    At the bottom the page of the Settings tab, I selected "Stop the existing instance" from the list.
    I checked c:\Powershell\test.txt and it shows it is going every 5 minutes.
    In the task manager details page, I can see taskeng.exe running for the doman\user

  • DHCP via Hyper-V VM, Server2012r2 Hyper-V host, clients not getting IP address

    You have to authorize a dhcp server as Britv8 says. That's the only way it'll start dishing out leases. That's standard for Windows DHCP server in an AD Domain.
    Also there's 0 reason to mention Hyper-V here. The whole point of virtualization is to do hardware level abstraction.

    I recently encountered this. Setup:
    Initial setup of the system was at a different location from its final destination, with different network equipment (switches) between the two. No teaming is involved, however.
    Set up the system at its final destination, with DHCP via a Hyper-V VM (Server2012r2), Server2012r2 Hyper-V host, physical clients on the lan were not getting IP address.
    The physical server box has a 4-port Intel Gigabit ethernet card.
    I moved the setup (Hyper-V Virtual Switch manager) so that the interface for the DHCP server VM was isntead using one of two built-in Broadcom adapters.
    While this topic seemed promising,
    http://community.spiceworks.com/topic/251317-hyper-v-vm-not-leasing-ip-s-dhcp
    unfortunately, "fiddling about" was not what I was looking for as possible solution.
    My notes for the resolution:
    Hyper-V system running...
    This topic first appeared in the Spiceworks Community

  • Single Socket , Dual Core , No Hyperthreading CPU installed - SCHED_MC

    I upgraded my old laptop CPU from a AMD x64 turion to an AMD x64 X2 turion. I reconfigured my kernel with CONFIG_SMP and everything seems to work.
    However, I cannot find more information about CONFIG_SCHED_MC. I don't need/want CONFIG_SCHED_SMT since /proc/cpuinfo indicates I don't have hyperthreading. (e.g. siblings = cpu cores).
    Could anyone sched (hihi) some light on this? The Kconfig yields not much information. Google yielded only a Gentoo forum post indicating the difference between SMT and MC. Grepping through the kernel sources only shows CONFIG_SCHED_MC in /kernel/sched/core.c with very little information.
    The only thing I found is a powersaving tunable, but that's it!
    One paper seems to explain this in more detail here.
    Is that all there is?

    Ah, found it here.

  • Generate Delivery Schedules via MRP Planning run

    The company wants to create Scheduling Agreements and generate the Delivery Schedules from the MRP Planning run - MRP 2 view via JIT.
    Can you generate Delivery Schedules from Schedule Agreements if the company does not have an EDI server or APO set up?
    Thanks,

    Shirley Globe,
    You seem to be putting the experts to the test.
    As it was told you, you can generate schedule lines via MRP run. MRP run can be done (e.g.) trough MD01 /MD02 / MD03. Of course, you have to use the proper selection parameters to achieve your goal.
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/f4/7d2da044af11d182b40000e829fbfe/frameset.htm
    As for how to use SA with MRP please check SAP online help:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/3b/66596eda7b11d1b6330000e8a738dc/frameset.htm
    Regards,
    Csaba
    Edited by: Csaba Szommer on Apr 9, 2009 7:40 PM

Maybe you are looking for