Inspection for every 10th piece or lot

Hi Experts
We have good supplier and good manufacturing processes at the client site.
They do not want to inspect every other piece,
They want to inspection every 10th piece or lot for purchased parts and also for produced materials in shop floor.
Pls advise in detail how this can be done.
Many Thanks.
Gaurav

Hi,
You can use DMR as other poster suggested.
Pl go through the link for details regarding dynamic modification of the inspection scope.
http://help.sap.com/printdocu/core/print46b/en/data/en/pdf/QMQCDYN.pdf
Regards
K.M.Arun

Similar Messages

  • Inspection for HU: inspection lot not created upon packing

    Hi All,
    I want to inspect a material by Handling Unit, I have set "Inspection for HU" within the Inspection Setup of the material master. I created PO and inbound delivery, in the inbound delivery I did packing, but inspection lot is not created after packing. When I go on with MIGO, system throws error message "Change the inspection stock of material in QM only", according to this message, there should be an inspection lot already created, but I cannot find it in QA32.
    Regards
    Danny

    Hi,
    There are two prerequisition:
    1) Check configuration setting : SPRO --> Logistics - General --> Handling Unit Management --> Basics --> Technical Basics--> Materials Management--> Inventory Management --> Set QM Check and Delivery Type for Each Movement Type. the respective movement type is not deactivated for quality inspections. The indicator QM not active is not set.
    2) In material master, Handling unit should be active for inspection type.

  • QM In-Process Inspection for Batch Managed Material

    Hi,
    I have a issue related to UD of In-Process inspection for batch managed material. The production process is discrete manufacting for a cold rolling mill. A production order can have mutiple coils as per the production amount. To track the individual coil , batch management has ben activated. We have both in-process as well as inspection after production here.
    For inspection after production we are fine as we are doing partial confirmation after every coil and have separate inspection lot having different batch number.
    But for in-process I can have only one inspection lot for the production order (created on release of the production order). I can do the result recording but while trying to do UD u2013 it is asking for a batch number as the material is batch managed. W/o entering the batch number system is not allowing me to do the UD.
    Is there any solution/work around of this problem.
    -Regards
    ashim

    Hi Ashim,
    you raised a very good question? i am helpless here to execute same scenario,
    but i disussed with my QM guy here, he said, once the material is batch managed then it has to ahve batch in UD.
    so i discussed ur case, which is very much valid for heavy ind like cement and all,
    so what i suggest, u create a dummy batch in the UD for in process (no inventory posting)
    and at confimation give ur usual batch (if system propose the dummy batch which u give in the UD for inprocess, try to change there--- i hope it should allow)
    i would really like to here answer from u for this.
    try to do as suggested, and let me know the results.
    REgards,
    Pravin mukkawar

  • In-process  inspection for rework operation

    Hi all,
    i have a production order to which the in-process inspection characteristics are assigned in routing. when a production order is released, an in-process inspection lot is created. Inspection is carried after the end of an operation.  During which rework will be carried out if the product is rejected.   Rework operations are trigged through trigger points assigned to the production order. A reference operations set indicating the rework operations is assigned to the trigger point. rework operation in the reference opeation set is also assigned with inspection characteristics.  But during the results recording, the rework inspection characteristics are not displayed for results recording.....
    pls explain the possible solution.
    regards,
    sravan kumar v

    Hello
    I think that the process can be mapped in one of these ways:
    - according to what you describe this is closer to a good receipt inspection and not to in-process inspection, as the trigger for the inspection is the GR and not the release of the order. So, why dont you give a chance to a 04 inspection type, with inspection lot creation for every GR ? Check the indictor in MM02, QM view for "04" inspection, and uncheck the "Stock in quality", so you dont get caught by the stock in quality and resembles in process "Non-stock relevant" inspection
    - alternatively you can define the use of inspection points ? So you are adding new results as new confirmations are made. Disadvantage: you can only give one usage decision to the inspection Lot, irrespective of the number of samples you have analyzed.
    Regards

  • REG selective and % inspection for 03 and 04 types for batch material

    Hello Gurus,
    The scenariois:
    1. Material is batch managed and 03 & 04 types activated.
    2. Against a production order, several batches will be generated.
    Client requirement is:
    1. After the relase of PO, only the first batch will be inspected.
    2. After that, if required, 10% of that PO will be inspected (type 03)
    3. After all these inspection, RR and UD, next stage will be confirmation of PO and generation of 04 type lot.
    Is that possible in SAP? I have my doubts. If we activate 03 type in mat master, it should generate lot for every batch. Is it possible to manage the scenario with 04 type, where next stage becomes stock transfer?
    Really appreciate quick help on this.

    Sorry.  I would say you would have to develop all your own custom sample procedures for this.  I don't see any easy way for this to be done in standard SAP.
    It would even be difficult if you had one PO for each batch.  Maybe others might have some ideas but I don't at this time.
    FF

  • In process inspection for partial confirmation of production order

    Hi QM Guru,
    how i will do in process inspection for partial confirmation of production oder
    Senior is this  I have maintain inspection type 03 in finish material u2026..suppose production order quantity 20 kg..there are 2 operationu202610 and 20.. I have maintained MIC on operation 20u2026after release the production order  lot are generatingu2026but when they confirm operation 10 they do partial confirmation for 10 kgu2026.then again when do confirmation 20..they checku2026for quality resultu2026
    Then I do the result record ok of 10 kgu2026then they confirm 20 operationu2026.
    Now. again he do the confirmation of rest production order 10 kg..opration 10 ok..but in operation 20..system does not check for qualityu2026..
    Again I want to do the quality inspection of 10kg on 20 operationu2026
    How I will do. kindly suggest me
    Regards
    Aqueel

    Hello
    I think that the process can be mapped in one of these ways:
    - according to what you describe this is closer to a good receipt inspection and not to in-process inspection, as the trigger for the inspection is the GR and not the release of the order. So, why dont you give a chance to a 04 inspection type, with inspection lot creation for every GR ? Check the indictor in MM02, QM view for "04" inspection, and uncheck the "Stock in quality", so you dont get caught by the stock in quality and resembles in process "Non-stock relevant" inspection
    - alternatively you can define the use of inspection points ? So you are adding new results as new confirmations are made. Disadvantage: you can only give one usage decision to the inspection Lot, irrespective of the number of samples you have analyzed.
    Regards

  • Inspection for Material used in Machines

    Dear All,
    I want to make inspection of oil used in different kinds of machines. Also i want to schedule this.
    Thanks to all

    You ae still inspecting the machine.  This is the same as measuring the wear on a die or other part of the machinery.  No different.  Each part has specific characteristics you might test, like surface corrision, wear, thickness, etc....
    So for Oil you have viscosity, containments, pH, specific gravity, etc..
    In the plan, I would normally set up a different operation for each major component of the machine I was testing.
    Oper 10 - General inspection
    Oper 20 - Die inspection
    Oper 30 - Hydraulic Oil inspeciton
    Oper 40 - Cooling water inspection
    etc.
    Each operation has the characteristics that are related to that part of the machine.
    Another option:
    If you want to set up regular inspections of the oil you can do it as 09 inspections for recurring inspection.  Set up a material called "Machine Oil".  Make it batch managed.  Create a batch for each machine, you can maybe use a machine number as the batch number.  Then set up the next inspection date.  Make the inspection interval 7 days if you inspect every week.  Set up the deadline monitoring program as a batch job.  It will create inspection lots each week for each batch.  You can set the initial inspection date manually so that the inspections can be spread out over the week.
    Craig

  • Autocorrection for every keyboard not working in iOS 6

    Apple promised at WWDC "Autocorrection for every keyboard".  I am using a Bluetooth keyboard on an iPad 2 with iOS 6 and it's not working.  The same is true on iPhone 5.  I have it enabled in settings and it works with the virtual keyboard.

    I have an iPhone 4 with current iOS.
    I've noticed this over the past few months. I always notice it on the FB app. My short cuts stop working. I will check email or note. I figured restarting the phone would fix it.
    Here's the thing. Obviously I use FB a lot, but this short cut issues never happens in text messages, Whatsapp, or email. Always with FB.
    In fact I noticed that I get sluggish typing performance typing using the FB app whether I use the keyboard short cuts or not.
    Just wondering if this common among iPhone 4 users.

  • MPCUI metadata driven CustomUI Table is refreshing for every second

    I have a table in my home page when I customized the home page with metadata driven MPCUI.
    My table is getting populated with SQLDataService qrery. when I try to scroll down the table, it is not allowing me to scroll down as for every 1 second the table is getting refreshed.
    Can some tell me how to get rid of this refreshing.
    I am pasting my code here
    <SqlStatements>
    <Sql name="HC_EXA_REPORT"><![CDATA[
    // The actual SQL code is here and do not want to paste the SQL...
    ]]>
    </Sql>
    </SqlStatements>
    <ActivityDefinition>
    <mp:Page id="hcReportsPg" label="Exadata HealthChecks Reports"
    xmlns:mx="http://www.adobe.com/2006/mxml"
    xmlns:mp="http://www.oracle.com/mpcui"
    >
    <mp:services>
    <mp:SQLDataService id="hcReport" queryID="HC_EXA_REPORT" properties="{props('EMIP_BIND_TARGET_GUID',appModel.target.guid)}" />
    </mp:services>
    <mx:VBox width="100%" height="100%">
    <!-- 1st row -->
    <mx:HBox width="100%" height="100%">
    <mp:Region title="Exadata HealthChecks Reports" width="100%" height="100%">
    <mp:Table id="repSummaryTable2" dataProvider="{hcReport}">
    <mp:columns>
    <mx:AdvancedDataGridColumn dataField="Metric"/>
    <mx:AdvancedDataGridColumn dataField="Check name"/>
    <mx:AdvancedDataGridColumn dataField="name"/>
    <mx:AdvancedDataGridColumn dataField="Instance name"/>
    <mx:AdvancedDataGridColumn dataField="Parameter"/>
    <mx:AdvancedDataGridColumn dataField="Status"/>
    <mx:AdvancedDataGridColumn dataField="Outfilepath"/>
    <mx:AdvancedDataGridColumn dataField="Fail Message"/>
    <mx:AdvancedDataGridColumn dataField="Risk Message"/>
    <mx:AdvancedDataGridColumn dataField="Benefit/Impact Message"/>
    <mx:AdvancedDataGridColumn dataField="Recommendation Message"/>
    <mx:AdvancedDataGridColumn dataField="Alert"/>
    <mx:AdvancedDataGridColumn dataField="Collection Timestamp"/>
    <mx:AdvancedDataGridColumn dataField="Exachk Results From"/>
    <mx:AdvancedDataGridColumn dataField="Exachk Results Timestamp"/>
    </mp:columns>
    </mp:Table>
    </mp:Region>
    </mx:HBox>
    </mx:VBox>
    </mp:Page>
    </ActivityDefinition>

    Hi, sorry, I haven't played with MPCUI yet but it we're excited about the capabilities it appears to provide. We'd like to "combine" a lot of our reports and one-offs into OEM so things are better-organized.
    That said... I dug around a bit and thought this might help. Could you add timePeriod & interval to your own c:Table id element (is that the correct term)?
    In the case of the table component, you can specify the metric directly also:
    <c:Table id="processesTable" width="100%" height="100%"
    metricName="CPUProcessesPerf"
    metricColumns="['ProcUser', 'ProcCPU', 'ProcCmd']"
    timePeriod="REALTIME"
    interval="30"
    >
    <c:columns>
    <mx:AdvancedDataGridColumn width="50" dataField="key" />
    <mx:AdvancedDataGridColumn width="100" dataField="ProcUser" />
    <mx:AdvancedDataGridColumn width="80" dataField="ProcCPU" />
    <mx:AdvancedDataGridColumn width="400" dataField="ProcCmd" />
    </c:columns>
    </c:Table>
    Source: http://docs.oracle.com/cd/E24628_01/doc.121/e25161/mgt_ui.htm#CHDEGFBG
    HTHs...
    Edited by: Richard Evans on Dec 29, 2011 1:31 AM - forgot the URL

  • How do I perform a trigger that collect the data for every rising edge continuously and then automatically put the data in a .xls file??

    I need to collect the data for every rising edge a trigger perfoms. So far I could collect the data but it seems that it only collect the data in the start of triggering, but not continuously. I also want to put the data in an excel spreadsheet and automatically add new set of data when the next rising edge occur. Please help.
    thanks a lot.

    LabWindows/CVI actually ships with a comprehensive set of examples for just about every area of programming you can use it in, including triggered analog data acquisition and ActiveX control of Microsoft Excel for data logging. Go to the following two directories on your computer to find respective examples for the two areas you are inquiring about:
    1) C:\MeasurementStudio\CVI\samples\DAQ\Ai\DAQsingleBufExtTrig.PRJ
    2) C:\MeasurementStudio\CVI\samples\activex\excel\excel2000dem.prj
    Just make sure to study the examples carefully so that you fully understand the processes followed for triggered analog acquisition and the process of launching an ActiveX automation server for control, and then you should be able to merge the concepts shown in both of the example
    s to make the application you desire.
    Jason F.
    Applications Engineer
    National Instruments
    www.ni.com/ask

  • Impact of Running COGI program for every two HRS...

    Hi,
    As per requirement in my business scenario, we have lot of materials with negative stocks currently.
    Now for physical inventory purpose, customer wants us to remove these negative stocks and want us to run COGI program every 2 hrs.
    As we are going to deactivate negative stocks for all materials, the error due to goods movements will get accumulated heavily in COGI.
    For countering this previously they were monitoring COGI once in a day.
    Now we have decided to schedule COGI in background job for every 2HRS.
    Is there any impact on system from PP prospective if we run COGI for 2hrs daily.
    Your view points will be highly appreciated.
    Rgds,
    Yogesh...

    Hello Yogesh,
    it is not possible to schedule COGI (report CORUAFFW) in background.
    But you may schedule report CORUAFWP (which was designed for background running) with option "failed goods movements" in order to clear your COGI records.
    There is no real impact, however, if there are that much records in COGI, you should schedule it for a time with low business in order to avoid lock errors.
    Regards,
    Andreas

  • InDesign "Save As" dialog box for every operation in INDB book file; updating page numbers, etc.

    So I haven't used INDB files in awhile in InDesign, and today was the first time I attempted to adjust an old INDB (created originally with CS5).  For every operation of adjusting the book file, such as updating page/section number or adding/removing an INDD file I get a Save As dialog box for each constiuent INDD file.  This is quite annoying since the book has lots of INDDs, and I have to click through the tedious save as with each.  I previously worked with INDBs in CS5, and never encountered this, there was no need to save each INDD in the book just to update the page numbers.  I tried creating a new INDB in CS5.5 thinking that maybe it was because I was working from a file created with an older version of InDesign.  Does anyone know if there is a way to suppress the Save As dialog?  Another thing I noticed that is supremely frustrating is that this new build of InDesign doesn't default to saving the file in its original location, and I have unwittingly ended up saving files in other places, only to later realize it.  I am using InDesign CS5.5 Ver. 7.5.2 on Mac OSX 10.7.3  Any help is greatly appreciated. 

    It will only happen once (and frankly, what you are doing is a very bad idea).
    When you open the old book in CS5, you are converting to the new format. All of the legacy files also need to be converted, even if added to a new book in CS5.5, hence the Save As since ID will not overwrite the old versions until you tell it to (and that's the bad idea). I strongly recommend (though it's too late for any books you've already updated and overwritten) that you either continue to edit in the old version, or that you take the time to open each file in the original version if it's older than CS5, then export to interchange format (.inx or .idml, depending on version), open those files in CS5.5, save with new names so you don't overwrite anything, then add to a new book and proceed.
    One of the reasons I recommend this seemingly time-consuming approach is that there are too many reports (another one yesterday) of some sort of problem that pops up late in the editing cycle when converting legacy files to CS5/5.5 by opening them directly and saving. This is a belt and suspenders insurance approach, and is far less labor intensive than starting over, which might end up being your other option down the road if something goes wrong.

  • How do you make the date change for every entry when inserting.

    Hello, I am making a daily vehicle inspection report for my truck and I would like to make a 7 day calendar but I would like to insert the date ie Monday Feb 22, 2010, Tuesday Feb 23, 2010 etc...and have it change for each day of the week. is there a way to do this? Also can you put an outline or a box around the 6 lines of text that you input.
    Thank you
    Ottoman

    Jerrold Green1 wrote:
    Ottoman,
    As Peter says, you can use a Table for this. You do not, however, need to enter two dates to fill with a series of dates. Dates are an exception to the general Fill rule. Just enter one, and fill down to get successive dates.
    Other exception available:
    a single cell is sufficient for every entries ending with a number :
    president1
    thief2
    king3
    behave this way.
    Durations behave like numbers : two cells are required.
    Yvan KOENIG (VALLAURIS, France) samedi 27 février 2010 18:20:29

  • "A new folder for every project file"

    Aha!!  Right, from now on ... (thanks Steve)
    From the Muvipix.com Guide to Adobe PE11 by Steve Grisetti
    (p 36) [on starting and saving a new project]
    2     Click the Browse button to choose a location to save your new
    project file.
    We at Muvipix recommend always selecting the Browse option and,
    wherever you choose to save your file, creating a new folder for every
    new project file.
    This little bit of housekeeping keeps all of your new project's files in
    one neat, little folder. And, when your project is done and you want to
    clear it from your computer, you can then remove not only the project
    file but all of the temp, render and scratch disk files Premiere Elements
    has created for that project simply by deleting that single folder!
    This makes post-project clean-up a much easier and neater process.
    OK, hope I've got it this time (at last)
    cheers
    Brian

    Oh no!  I thought I’ll re-work that Canal video again, but this time saved the project from the very start in a new folder on an ext HD (500 GB) connected USB3.0.  Tried all sorts of things on it, saved each time in the same folder.   Cleared all 14 clips from Project Assets (which of course emptied the timeline).   Shut down PE11.   Checked via Windows Explorer that the project files were all on the ext HD – and by the way, there are no other files on it, just the PE files.  My understanding is that Advanced System Care Pro (Iobit) regularly defrags all my drives if necessary (tho’ I haven’t done this manually for months with this drive).
    OK, opened PE, went to Open Recent Projects, it shows the above .prel file and the entire path, I click on it and – 
    Weird, just weird
    Nil desperandum
    Brian
    Edited --- and another weird thing, my email isn't sending the complete message I type to this forum.   I sent a whole message once and it never appeared, but this time it's cut off half a sentence above (it did this before, earlier today).
    That sentence should read,
    OK, opened PE, went to Open Recent Projects, it shows the above .prel file and the entire path, I click on it and – nothing happened!   (You'll have gathered that's what happened, but I wrote it in my Windows Live Mail, sent via BT-Yahoo ISP ......... )  Hey wait, there was a whole lot more.
    Here's a copy / paste from Windows Live Mail outbox
    It’s so odd, because as I said previously, most of the time it works so well, does all the things it’s supposed to do.   I followed Steve’s instructions here to the letter.   By the way, as you know, it’s not just the ext HD, this has been happening all along with allowing PE to save everything in its default Folder 11.
    I would be – now – very sorry indeed to have to abandon PE11 simply on this account, but it’s causing me to waste such a lot of time.   (Let alone the expense of buying it, plust one Lynda.com course, plus 2 books – not forgetting that I’d previously tried the Corel software and bought a book and DVD for that too!!)
    Might just use – what’s that simplicity-itself thingy everyone uses who just want to get any old kind of thing up on You Tube ..........   Oi vey!! <<more weary sigh>>
    Weird, just weird
    Nil desperandum

  • In Process Inspection for Repetitive Manufacturing

    Hi All,
    I'm trying to perform in-process inspection for repetitive manufacturing. I have a semi finished material which has the inspection type 13 activated in the material master. Rate routing for it has also been created. Characteristics have been assigned to its operation and the routing is attached to a production version. When I o to MFPR to create a lot, I specify the material, plant and production version with QM active (tried the other 2 options as well) but when I execute, nothing shows up in the list. When I click on create inspection lot, it says, "either select versions or place cursor on versions now" but there's nothing in the list?
    Regards,
    Bilal

    Hi,
    Please check whether the repetitive manufacturing check box and REM profile is defined in the MRP4 of material master.
    Please define that and try to run the transaction MFPR.
    It should solve your problem
    Regards,
    Sumit Gupta

Maybe you are looking for