Inter Plant Subcontracting (Subcontracting between 2 plants of same company

Hello Friends,
In my current project, there is a scenario of interplant subcontracting.I mean suppose to manufacture a product they have to perform say 8 operations on the raw material.FIrst 4 operations happens in the Plant 1were requirement for the finished material gets generated, than they transfer that intermediate material to plant 2 (of same company code), there they do one operation on it and again it come back to the Plant 1, were remaining operations gets performed on it and gets dispatched from there.
Now if you do the manual process i mean manually to created production order and rest of the process than its not difficult to map.
But with MRP Run, it seems difficult to map.
Guys do you have any idea related to this scenario, if yes than please share.
Thanks and Regards,
Jitendra Chauhan.

Hi,
If you want to map it through MRP, then I would suggest that you add 2 levels in the BOM, and break the original structure like this:
Original structure: BOM father FG1, components MAT(1...n), Routing for FG1 op 1 to 8, all this in plant 1.
New structure:
-BOM 1 in plant 1 for FG1 (father), SFG1 (son in this BOM). SFG1 has special procurement key "stock transfer from plant 2". Routing for FG1 only op 6 to 8.
-BOM in plant 2 for SFG1 father, SFG2 son. SFG2 has special procurement key "stock transfer from plant 1". Routing for SFG1 in plant 2, only op 5.
- BOM in plant 1 for SFG2 father, MAT(1..n) sons, routing for SFG2 only op. 1 to 4.
Run MRP with scope of planning that include both plants.
In this process you'll have 3 production orders, and 2 STOs.
Regards,
Mario

Similar Messages

  • Transfer of Inventory from One Plant to another with in the same company code

    Hello All,
    Can you please let us the possible option's for transfer of Inventory from one plant to another plant in different geographical location with in the same state.

    PLANT TO PLANT TRANSFER IN THE DIFFERENT GEOGRAPHICAL LOCATION UNDER THE SAME COMPANY CODE
    Assume - plant 1 - 1000 ; plant 2 - 2000.
    From 1000 - 2000 u shall transfer the parts using 641 movement By creating a Stock transfer order with the following conditions.
    1, Master & source list to be extended for both the plants vice versa. including accounting & excise view
    2. Create an Sto po in ME21n  for one time only /ME31N as scheduling agreement
    3. Generate pick list and do Post goods issue in va02.
    4. Create excise invoice & do the Gate entry in the other plant & stocks are up loaded.
    5. In India excise rules are becoming stingent & you have to inform both the Excise ranges before starting the transactions

  • PO for Plants belonging to different Country under same Company Code

    Hi,
    We have created a Company      1000 (Country u2013 India)
    We have created two Plants 1001 (Location - Delhi, India), 1002 (Location - United Kingdom).
    We have created a pricing Procedure      ZDOMES & ZIMPOR for Domestic & Imports Procurement.
    We have created a Tax Code V0, Country IN.
    We have tested the Procurement Cycle for Plant 1001 (Location - Delhi, India) and it is working fine.
    For Plant 1002 (Location - United Kingdom) what extra configuration do I need to do? Can we use the same pricing Procedure, Tax Code?
    Please advice.
    Regards,

    Thanks for the reply.
    Here in our scenario, we have created only one Company Code and one of our Branch is in UK.
    we need to create only One Company Code & Branches (Plants) in Delhi & UK
    Please suggest .
    Regards,

  • Transfer Price between plants belonging to same legal entities

    Hello,
    I have a scenarios. One plant is selling a part to other plant at a margin. Both plants belongs to the same legal entity.
    How can I map this scenario in SAP?
    What will be the cost of my part in these two plants?
    What mechanism I would use to transfer the stock from supplying plant to the buying plant?
    Your urgent reply is appreciated.
    Thanks,

    Hi
    This is known as Transfer pricing strategy in SAP. When you have two profit centers within a cotrolling area who are responsible for profitability of their products.
    Hence one profit center would like to sell at the different price than the actual cost price and hence you can derive profit between the profit center through inter plant sales / transfers.
    You need to activate Material Ledger / Actual costing, Multiple Valuations to implement Transfer Pricing.
    Material Ledger / Actual costing
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/d2/cb532d455611d189710000e8322d00/frameset.htm
    Multiple Valuations  / Transfer Pricing
    http://help.sap.com/saphelp_47x200/helpdata/en/eb/13811243c411d1896f0000e8322d00/frameset.htm
    Regards,
    Suraj

  • MM STO between Plants under the same company code

    Hi experts,
    Please guide on the configuration steps for doing STO between Plants unders the same company code.
    We have company code 100 in that Plants A B & C are theie. Each Plant can do STO to other Plant.
    How to configure this scenario?

    Dear,
    Please follow bellow path
    1. Create a vendor for the Company code of the receiving plant using account group 0007 via T-Code XK01.
    2. In the purchasing data view assign the supplying plant and the schema group
    3. Create customer with the sales area of the vendor.
    4. The shipping conditions, the delivering plant and the transportation zone determine the route in the STO.
    5. In the pricing procedure determination relevant to the STO assign document pricing procedure and customer pricing procedure to get the pricing in the invoice.
    6. Maintain condition records for pricing condition.
    7. Maintain carrier as a partner in the customer master.
    8. In OMGN select the supplying plant and assign the company code and sales area. Similarly select the receiving plant and assign the company code and sales area (The company code to which the plant is assigned to).
    9. Assign the delivery type and checking rule to the document type.
    10. And finally, assign the purchasing document type to the supplying plant and the receiving plant.
    11. Create the STO using T-Code ME 21N and save.
    12. Check for release strategy if any and release using T-Code ME 28.
    13. Create delivery in background using VL10G.
    14. If delivery is created, it is an indication of correct configuration and master data creation.
    Stock transfer between two plants in different company codes is known as inter company stock transfer.
    Material should be maintained in both supplying and receiving plant MM01
    Stock should maintain only in supplying plant MB1C
    Create receiving plant as a customer in supplying plants company code and sales area XD01
    Assign this customer number in receiving plant details OMGN
    Assign supplying sales area in supplying plant details OMGN
    Assign delivery type NB for in combination of supplying/ receiving plants.
    Create STO ME21N
    As it is normal there in the item details we should get shipping date i.e. customer number
    Go for Delivery VL10B
    Shipping point *****
    Select PO go for execute
    then select the delivery then go for delvy ............create delvy,,,, delvy number generated.
    Goods Issue VL02
    Delvy doc **********
    Click on picking
    enter the picking qty
    Click on PGI
    in the mean time check in the PO history you will get the details
    Goods receipt MIGO
    Stock transfers that include deliveries and billing documents/invoices are only possible between plants belonging to different company codes.
    If you want to carry out a cross-company-code stock transport order with delivery but without a billing document, you must set the Relevant for Billing (data element FKREL) indicator in Customizing of the item type to "blank" (Not relevant for billing).
    The following applications are involved in this type of stock transfer:
    ? Purchasing (MM-PUR) in entering the order
    ? Shipping (LE-SHP) in making the delivery from the issuing plant
    ? Billing (SD-BIL) in creating the billing document for the delivery
    ? Inventory Management (MM-IM) at goods receipt in the receiving plant
    Invoice Verification (MM-IV) at invoice receipt in the receiving
    Transfer of goods from one location to another location, it may be between plants within the same company code or in different company code's plants.
    within the company code, but plants,
    receiving plant will raise the STO in Supplying/issuing plant-ME21n,
    Supplying plant will deliver the goods to receiving plants ,
    then we need to pick n post the Goods Issue-VL02n,
    now when we can observe that the STO qty will be added into receiving plant and reduced in Delivering plant,
    To do this, we need do prior customization in SPRO-IMG,-
    material should be created in both plants( receiving & Supplying)
    -maintain the stock only in supplying plant
    -create a dummy customer in supplying plant's sales area(if u have one sales area, create in tat comp code n sales area)
    -assign this customer number to receiving plant's details along with the sales area,
    -Assign the STO doc type(UB) to Supplying plant, along with checking rule
    -Assign the Del type (NL/NLCC) to Supplying n receiving plant.
    Stock Transport Order:
    http://help.sap.com/saphelp_47x200/helpdata/en/4d/2b911d43ad11d189410000e829fbbd/content.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/4d/2b917843ad11d189410000e829fbbd/content.htm
    http://help.sap.com/saphelp_47x200/helpdata/en/4d/2b918543ad11d189410000e829fbbd/content.htm
    u can also use the SAP building block
    with delivery
    http://help.sap.com/bestpractices/BBLibrary/html/P36_IntStockTransDel_EN_IN.htm
    without delivery
    http://help.sap.com/bestpractices/BBLibrary/html/P38_IntStockTransWithoutDel_EN_IN.htm
    Regards,
    Mahesh Wagh

  • Stock transfer order between 2 plants in same company code

    Dear All,
    We have the requirement, where in the stock tranfer order (between 2 plants in same company code) instead of Material valuation price, MAP/Standard (depends on Price Control) gets picked up from supplying plant ,user should be able to enter its own price while creating stock transfer order.
    For fullfilling this requirement, I have created new condition type(where i have changed condition category from internal price "G" to "H" - Basic Price)
    Instead of using condition type- P101 in the stock transfer pricing,I have used above created new condition type, in pricing procedure then also while doing the post good issue against the outbound delivery( move type-"641", moving average is getting picked up.
    Can you please tell,where is the setting where we can make the system to consider manual given price while creating the stock transfer order instead of picking moving average price.
    Its very Important requirement ,please Provide valuable Inputs else provide some alternative.
    Thanks & Regards
    Nitin Chhabra

    Stock Transfer Order between Plants in the same Company Cpde are not relevant for pricing, as there is no billing. Billing only takes place between company codes. As same company code it would be like selling something to yourself - it doesn't make sense.  The stock value in the receiving Plant depends on the price contol there. If standard price, then you must enter the price when creating the material or use material revaluation to change it. When you transfer the material from the issuing plant, the value there will be transferred. In case of standard price any difference is posted to stock transfer differences. If using MAP then the value will be transferred from the issuing Plant in full.
    If you use costing with standard price in main plant, then it is possible that you can transfer the cost from the main plant to the second plant, by using special procurement key for costing.
    Rgds
    Richard

  • Stock Transfer Between two plants within same company code

    Hello,
    We are using scenario-'Stock transfer between two plants within same company code. Scenaro is like Plant A is receving plant and Plant B is delivering Plant.
    Plant A release PO for 100 nos to Plant B
    Plant B issues 100 nos (via delivery) to Plant A
    But Plant A receives only 50 nos physically so they do Goods receipt for 50 nos , but document got generated for 100 nos (when plant B issues material).
    Now Plant A do not want to receive remaining 50 nos physically, but wants to reduce material document which got created when goods issue posted by plant B
    Now stock in transis (mb5t) is 50 nos.
    How to reduce this material document. or any another alternative solution for this?
    Thanks,
    Shailesh

    Hi There
    Reversal of partial is not possible ,
    But you can use the Mov Type 557 and 558 to do the adjustments in Stock in transit qty
    Few more details on STO adjustments
    Hi There
    it can be settle in many ways,,,
    1. Receive the goods as 100 and Scrap the 50 nos from the received plant,,- If the receiving plant is responsible
    2.Revert the PGI/Transfer movement(Vl09) and send the 50 nos again from the supplying plant- of the Supplying plant is responsible,
    3.Also we have the movement type 557 and 558 without doing the above two steps you can correct the qty from stock in transit itself,,
    4. also you can check the below similar thread
    STO - material lost during tranfer from plant A to plant B
    5. If above are not ok, then receive the goods as 100, And raise the STO as your plant as supplying plant and receiving plant is (Supplied 50 nos less) plant,, Do the process without sending the material.. in this way that 50 nos can be adjusted,,
    6.Here is some more details
    557 Issue from stock in transit (adjustment posting)
    Only use this movement type (also the reversal movement type) under the following circumstances:
    Using movement type 557, you can correct purchase-order-independent stock in transit if
    - a good receipt cannot be posted to a purchase order without stock in transit, even though there is still stock in transit according to the purchase order history
    - stock in transit still exists, even though there are no open stock transfer orders for the particular material
    This movement type may ONLY be used in the cases mentioned above after careful analysis, to correct stock in transit that has rounding errors.
    This movement type may not be copied.
    Note!
    Before using this movement type, note the following:
    - 392205 Analysis stock in transit / Correction if split valuation
    Possible special stock indicators:
    E, Q
    7. As previous post says if you have the note for this issue you can use that also
    You can use any one of the way to solve the issue, Hope it helps
    Cheers
    Senthil P

  • STO between stores of same plant stock in transit

    Hi,
    How could I keep the stock in transit if I perform STO between stores of same plant?,I have configured it through sale route it is working fine ,now I want to track the goods in transit ,so i need to do a transfer posting to keep the stock in transit, How will I do ?,
    Any suugestions
    Regards
    Senthilnambi

    Hi,
    Use T-code MB5T to check what is in-transit.
    See below solutions :
    Create a Stock Transport Order and make your receiving Plant and suppyling plant identical, however your receiving Storage
    location should be different and in config make your sending storage location as number default.
    Or
    Use MIGO >Transfer Posting>Other and select movement type 411.

  • Stock transfer between two plants in same company code at price

    Hello,
    Hello,
    I have a scenarios. One plant is selling a part to other plant at a margin. Both plants belongs to the same legal entity.
    How can I map this scenario in SAP?
    What will be the cost of my part in these two plants?
    What mechanism I would use to transfer the stock from supplying plant to the buying plant?
    Your urgent reply is appreciated.
    Thanks,

    Prem,
    Yes, for this scenario, you will have to implement EC-PCA. This is different from CO-PA.
    Detailed information can be found in http://help.sap.com/saphelp_erp2005vp/helpdata/en/eb/13759643c411d1896f0000e8322d00/frameset.htm
    The Stock valuation is different from MM and PCA point of view. Stock Transfer within Co Code does not have any effect on the Stock value from MM point of view. The Stock value changes only from the PCA point of view. The solution works the same way with Standard Cost also. Your Standard Cost can remain the same in both the Plants.
    The PCA entries are triggered by the Profit Centre data in Material Master. The Profit Centres should be different for both the Plants.
    Hope this clarifies.
    Thanks

  • Stock transfer between two plants under the same company code at profit

    Hello,
    Hello,
    I have a scenarios. One plant is selling a part to other plant at a margin. Both plants belongs to the same legal entity.
    How can I map this scenario in SAP?
    What will be the cost of my part in these two plants?
    What mechanism I would use to transfer the stock from supplying plant to the buying plant?
    Your urgent reply is appreciated.
    Thanks,

    Hi
    To map this scenario, you should use Profit Centre Accounting.
    Example
    Matl XYZ is to be transferred from Plant 1000 to Plant 2000 at a profit.
    Value of Matl XYZ in Plant 1000 is $100
    Transfer Price: $120
    From FI view point, there would not be any Accounting document as both Plants belong to the same Company Code.
    From PCA view:
    Plant 1000:
    Internal Revenues Dr.  120
    Stock                  Cr.  100
    Profit Margin        Cr.    20
    Plant 2000:
    Stock                                 Dr. 120
    Delivery from Profit Centre    Cr. 120
    Effectively, the value of Matl XYZ in Plant 1000 remains at $100 and in Plant 2000, it is $120.
    Hope this clarifies.
    Thanks

  • Stock transfer between two plants within same company code at price

    Hello,
    Hello
    I have a scenarios. One plant is selling a part to other plant at a margin. Both plants belongs to the same legal entity.
    How can I map this scenario in SAP?
    What will be the cost of my part in these two plants?
    What mechanism I would use to transfer the stock from supplying plant to the buying plant?
    Your urgent reply is appreciated.
    Thanks,

    Hi Pream
    You can do it through Intra Company STO, but in this scnerio the libility never gets generated to the receiving plant because it is transfer from one pocket to other. but you can always transfer the goods on the assessable valu. you have to maintain the ***. value in J1ID, then while bill system picks the same ***. value in UTXJ condition.
    But if you want to salel at a margin then use SO-PO i.e. create PO from receiving plant and against sale order, do the delivery of the material to the respective plant.
    I think this will help you.
    In case of any qurty feel free to contact
    Girish

  • Intra company(same Co Cd)sale between plants w/different profit centers

    What is the correct process for the following:  Intra-company sale, within the same company code, from one plant/profit center to another plant/profit center?  I realize that pricing/billing is not used within the same company code, but how do I allow the selling plant to recognize a "profit" on intracompany sale just as they would recognize a profit on a 3rd party sale.  Appreciate experiences and responses.

    Management wants an intra-company "sale" seller to be able to book a markup or profit just as if it were a 3rd-party sale.  I don't see how SAP allows you to do this at the transaction level.  It is standard or common for companies to allow markup on I/C sale - just need to know what is leading practice in SAP.

  • Stock transport scheduling agreement between plants under same company code

    We created outbound delivery and post goods issue in the supplying plant.When I do GR for outbound delivery  for receiving plant" The message displayed is PL stock in transit is excceded by the quantity to be posted ". So I could not post GR using MIGO.
    The Master data created are
    1) Created customer master for receiving plant with account control vendor number for supplying plant ( Account control customer no for receiving plant)
    2) Created vendor master for supplying plant with additional purchasing data for supplying plant
    3) maintained sales views of the material for both the plants.
    4) in IMG shipping data shipping data for plants: receiving plant - customer no for the receiving plant ; sales org for supplying plant and distribution channel and division.
    After posted goods issue in outbound delivery I check plant stock for supplying plant I could see the stock in transfer of the amount issued.
    Can anyone could explain How I could resolve this issue.
    Thanks in advance,
    Nathan

    We created outbound delivery and post goods issue in the supplying plant.When I do GR for outbound delivery  for receiving plant" The message displayed is PL stock in transit is excceded by the quantity to be posted ". So I could not post GR using MIGO.
    The Master data created are
    1) Created customer master for receiving plant with account control vendor number for supplying plant ( Account control customer no for receiving plant)
    2) Created vendor master for supplying plant with additional purchasing data for supplying plant
    3) maintained sales views of the material for both the plants.
    4) in IMG shipping data shipping data for plants: receiving plant - customer no for the receiving plant ; sales org for supplying plant and distribution channel and division.
    After posted goods issue in outbound delivery I check plant stock for supplying plant I could see the stock in transfer of the amount issued.
    Can anyone could explain How I could resolve this issue.
    Thanks in advance,
    Nathan

  • STO ( In between Plants )

    Gud Morning Guru,
    1)STO between Plant
    2)Exicise are mainting in between the plant ( sto with exicise   invoice billing )
    pls sent the configer Guide. Step by Step
    ( if any screen short have forward me )
    Thanks
    Warm Regards
    Sankar

    Hi,
    -stock-transfer-order.htm
    and process is......
    Follow the below steps to to make STO between two plants ( different company company codes).It is also called as Inter Company STO.....
    1)Create one Customer Master in XD01 with respect to Supplying Plant Sales Area and assign this Customer no with Receiving Plant in OLME->PO-> set up STO->Define shipping data for plant and for the supplying Plant assign the above sales area.( Make sure,In Customer Master,sales Area Tab: you are maintaining shipping condition)
    2) For Receiving Plant Pur. Org and Co.Code Combination create Vendor master in XK01 and in this vendor master assign the Supplying plant in Pur.Org.Data screen->Extras--> Add.Pur.data
    3) OLME->PO-> Set up STO------>For your supplying plant assign document type NB, Delivery type NLCC and Checking Rule RP
    4)then For your supplying Plant and receiving Plant assign Document type NB
    5)Make sure you are maintaining Sales View for the material at supplying Plant and in Sales /Gen plant Data view maintain Availability check, Loading group and Transportation group.
    6) In SPRo-->Logistics execution> Shipping->Basic shipping functions->Shipping point Determination>assign shipping points-> For your Loading group,Shipping Condition and Supplying plant combination,Assign shipping point
    these are the configuration settings you have to do in background.
    Then Create STO from Receing Plant in ME21N with document type NB.
    Based on that STO, Create Delivery in VL10B from supplying Plant
    Do PGI in VL02N from Supplying plant
    Do GR in MIGO at Receiving Plant keeping Outbound delivery as a ref. document.
    Now your STO bet. two plants belongs to diff. Co.Codes will be completed.
    STO Bet Plants belongs to Same Company Code...It is also known as Intra-Company STO:
    1)Create one Customer for Supplying Plant Sales area and assign this Customer no with Receiving Plant in OLME---> PO -
    > Set up STO -
    > define Shipping Data for plants. and maintain the same sales area in your Supplying plant.
    2) In OLME---> PO -
    > Set up STO.....for your Document Type: UB and Suppying plant Combination assign Del. Type NL and Checking rule RP
    3) In OLME---> PO -
    > Set up STO...for your Supplying Plant and Receiving Plant combination Maintain Doc. Type : UB
    Make sure you are maintaining Sales View for your Material at Supplying Plant.
    4) Maintain Shipping point at, SPRO----> Logistics Execution -
    > Shipping -
    > Basic Shipping Functions -
    > Shipping Point Determination for Plants.....there for your Loading group,Shipping Condition, Shipping Plant combination maintain Shipping plant..
    Now Create STO in ME21N with Doc.type: UB at Receiving Plant.
    Then Create Delivery in VL10B from Supplying Plant...
    Then Do PGI in VL02N from supplying Plant.
    Then do GR at Receiving Plant based on Outbound Delivery at Receiving Plant...
    : IMG > Logistics - General > Tax on Goods Movement > India > Basic Settings > Maintain Excise Registrations
    Maintain Excise Registration
    Logistics tax on Goods MovementsIndia SPRO Basic settingSAP Ref. IMG Maintain Excise Registrationsgeneral
    APPLICABLE
    1.2 Maintain Company Code Settings
    SAP Ref. Logistics general tax on Goods MovementsIndia  Basic setting SPRO Maintain Company CodeIMG  Settings
    APPLICABLE
    1.3 Maintain Plant Settings
    SPRO SAP Ref. IMG Maintain Logistics general  tax on Goods MovementsIndia Basic setting  Plant Settings
    APPLICABLE
    1.4 Maintain Excise Groups
    SPRO  SAP Ref. IMG  Logistics general  tax on Goods MovementsIndia Basic settingMaintain Excise Groups
    APPLICABLE
    1.5 Maintain Series Groups
    SPRO SAP Ref. IMG  Logistics general  tax on Goods MovementsIndia  Basic settingMaintain Series Groups
    APPLICABLE
    1.6 Maintain Excise Duty Indicators
    SPRO Maintain SAP Ref. IMG  Logistics general tax on Goods Movements IndicatorsIndia  Basic setting Excise Duty
    APPLICABLE
    1.7 Maintain Sub transaction Type with Text
     tax on Goods MovementsIndia  SPRO Maintain Sub transaction Type with SAP Ref. IMG Logistics general  Basic settingText
    APPLICABLE
    1.8 Determination of Excise Duty
    SPRO Select Tax Calculation SAP Ref. IMG  Logistics general tax on Goods MovementsIndia Determination of Excise Duty Procedure
    APPLICABLE
    1.9 Maintain Excise Defaults
    SPROSAP Ref. IMG Logistics general  tax on Goods MovementsIndia Determination of Excise DutyMaintain Excise Defaults
    APPLICABLE
    1.10 Condition-Based Excise Determination
    SPRO Define Tax SAP Ref. IMG  Logistics general tax on Goods Movements PurchasingIndia  Condition-Based Excise DeterminationCode for Documents
    APPLICABLE
    1.11 Condition-Based Excise Determination
    tax SPRO Assign Tax Code to SAP Ref. IMG  Logistics general on Goods Movements CompanyIndia Condition-Based Excise Determination Codes
    APPLICABLE
    1.12 Classify Condition Types
    SPROSAP Ref. IMG Logistics general  tax on Goods MovementsIndia Condition-Based Excise DeterminationClassify Condition Types
    APPLICABLE
    1.13 Maintain Chapter IDs
    SPRO Maintain SAP Ref. IMG  Logistics general tax on Goods MovementsIndia  Master dataChapter ids
    APPLICABLE
    1.14 Assign Users to Material Master Screen Sequence for Excise Duty
    MasterSPRO  SAP Ref. IMG Assign Logistics general  tax on Goods MovementsIndia data Users to Material Master Screen Sequence for Excise Duty
    APPLICABLE
    1.15 Specify Excise Accounts per Excise Transaction
    SPRO Specify SAP Ref. IMG  Logistics general tax on Goods MovementsIndia  Account determinationExcise Accounts per Excise Transaction
    APPLICABLE
    1.16 Specify G/L Accounts per Excise Transaction
    SPRO Specify G/L SAP Ref. IMG  Logistics general tax on Goods MovementsIndia  Account determinationAccounts per Excise Transaction
    APPLICABLE
    1.17 Incoming Excise Invoices
    SPROSAP Ref. IMG Incoming Logistics general  tax on Goods MovementsIndia Business TransactionsExcise Invoices
    APPLICABLE
    1.18 Define Processing Modes Per Transaction
    SPRO Define Processing SAP Ref. IMG  Logistics general  tax on Goods Movements PerIndia  Business TransactionsModes Transaction
    APPLICABLE
    1.19 Define Reference Documents Per Transaction
    SPRO De SAP Ref. IMG  Logistics general tax on Goodsfine Reference MovementsIndia  Business TransactionsDocuments Per Transaction
    APPLICABLE
    1.20 Maintain Rejection Codes
    SPROSAP Ref. IMG Maintain Logistics general  tax on Goods MovementsIndia Business TransactionsRejection Codes
    APPLICABLE
    1.21 Specify Which Movement Types Involve Excise Invoices
    SPRO Specify Which SAP Ref. IMG Logistics general Movement Types tax on Goods MovementsIndia Business Transactions Involve Excise Invoices
    APPLICABLE
    1.22 Outgoing Excise Invoices
    Outgoing ExciseSPRO Assign SAP Ref. IMG  Logistics general tax on Goods Movements Billing Types to DeliveryIndia  Business TransactionsInvoices  Types
    APPLICABLE
    1.23 Maintain Default Excise Groups and Series Groups
     Outgoing Excise Invoices SPRO  SAP Ref. IMG  Logistics general  tax on Goods Movements Maintain Default ExciseIndia Business Transactions Groups and Series Groups
    APPLICABLE
    1.24 Subcontracting Attributes
    SPRO Subcontracting SAP Ref. IMG  Logistics general tax on Goods MovementsIndia  Business TransactionsSubcontracting Attributes
    APPLICABLE
    1.25 Maintain Movement Type Groups
    SPRO SAP Ref. IMG Logistics general  tax on Goods MovementsIndia Business Transactions Attributes SubcontractingSubcontracting
    APPLICABLE
    1.26 Utilization Determination
     tax on Goods MovementsIndia SPRO BusinessSAP Transactions UtilizationRef. IMG UtilizationLogistics general  Determination
    APPLICABLE
    1.27 Specify SAP script Forms
    tax on GoodsIndia SPRO Business  ExciseSAP Ref. IMG Specify SAP script Logistics general Movements Transactions FormsRegisters
    APPLICABLE
    1.28 Number Ranges
    SAP Logistics general tax on Goods MovementsIndia  ToolsSPRO NumberRef. IMG  Ranges
    APPLICABLE
    1.29 Message Control
    SPRO SAP Ref. IMG  Logistics general tax on Goods MovementsIndia  ToolsMessage Control
    APPLICABLE
    J1I2
    Prepare a sales tax register
    J1I3
    Create outgoing excise invoices in batches
    J1I5
    Update the RG 1 and Part I registers
    J1IEX
    Incoming Excise Invoices (central transaction)
    J1IEX_C
    Capture an incoming excise invoice (excise clerk)
    J1IEX_P
    Post an incoming excise invoice (excise supervisor)
    J1IF01
    Create a subcontracting challan
    J1IF11
    Change a subcontracting challan
    J1IF12
    Display a subcontracting challan
    J1IF13
    Complete, reverse, or recredit a subcontracting challan
    J1IFQ
    Reconcile quantities for subcontracting challan
    J1IFR
    List subcontracting challan
    J1IH
    Make a CENVAT adjustment posting
    J1IIN
    Create an outgoing excise invoice
    J1IJ
    Assign excise invoices to a delivery for sales from depots
    J1INJV
    Adjust withholding tax Item
    J1INREP
    Reprint a withholding tax certificate for a vendor
    J1IQ
    Year-End Income Tax Depreciation Report
    J1IR
    Download register data
    J1IS
    Process an excise invoice (outgoing) for other movements
    J1IU
    Process exemption forms
    J1IW
    Verify and post an incoming excise invoice
    J1IX
    Create an incoming excise invoice (without reference to purchase order)
    J2I8
    Transfer excise duty to CENVAT account
    J2IU
    Remit excise duty fortnightly
    J2I9
    Monthly CENVAT return
    J1IG
    Excise invoice entry at depot
    J1IGA
    Create additional excise entry at depot
    J2I5
    Extract data for excise registers
    J2I6
    Print excise registers
    Sail
    Basically CIN is divided in to two types:
    1. TAXINJ - Is a Routine Based that is used in the condition types. it will work on the logic what ever is there in the Routine.
    2. TAXINN: - Is a condition Record based. Means we have to create condition records for each and every condition type that you are going to use in the Pricing Procedure.
    Since Version 4.7 this TAXINN came into picture and start using this.
    Regards Welcome
    Thanks & Regards
    Swathi

  • Reg:SC between plants with new material

    Hi all,
    Iu2019ve a scenario as follows,
    SC process between plants
    Plant X &  Plant Y
    Plant X sent material C to get the material A which goes as normal SC purchase order
    After the material reaches the plant Y it adds new material B(excisable) to this material C and then sends back to plant X as material A
    Now my doubt is for the normal SC purchasing the operation cost could be captured as regular but for the new material B (which is excisable) which is added at plant Y the excise invoice is raised by plant Y
    How am to map this scenaio in SAP
    Reg
    VKK

    Hello Sanjoo,
    As mentioned I can do it as STO process but is it possible to address the same thru subcontracting process, ie from plant x the material is sent along with the excise invoice after receiving the material in plant y they add another material B which is excisable and make the material C, which they sent it back to plant A . The operation cost is added on the material and the excise is captured individually
    now for this process STO with excise is good or can i follow the SC process where i create SC po for the operation and normal PO with Tax code for the new material added,
    suggest me the better process
    regards,
    VKK

Maybe you are looking for

  • HTTP Call Service in 2013 Workflow

    How can you configure a workflow (Sharepoint 2013)  to call an HTTP Web Service request and evaluate the response headers to determine if the POST to an MVC Controller end-point was a success or failure

  • Backup for External Hard Drive

    Hello, I really love Time Capsule but it's limited in terms of backing up my external hard drive. Basically I have too much data on my 1GB External HD to back up to my time capsule. I'm going to get another external drive to basically act as a mirror

  • All of a sudden, when I start up Firefox, I get the 'opportunity' to go directly to such sites as Facebook, Twitter, Youtube.

    I would much rather be able to reload my previous session of tabs without having to waast over an hour laboriously reloading each tab piece by piece. How do I get round this

  • Short Inventory Report - BoM issue

    I am having a problem with the below query, I want to mutiply T0.OnHand with quantity in BoM but the problem is that Items in (106) use one item which i want to use but it varies in quantity per product in BoM. Is there anyway to map each code to its

  • Hardcoded colors in Workspace

    Frgive me if I am missing something obvious here - my Flex experience is minimal at best. I've been following the instructions in the doc on modifying Workspace to change the color scheme. Overall, it works well. Hwoever, there seem to be a number of