Reg:SC between plants with new material

Hi all,
Iu2019ve a scenario as follows,
SC process between plants
Plant X &  Plant Y
Plant X sent material C to get the material A which goes as normal SC purchase order
After the material reaches the plant Y it adds new material B(excisable) to this material C and then sends back to plant X as material A
Now my doubt is for the normal SC purchasing the operation cost could be captured as regular but for the new material B (which is excisable) which is added at plant Y the excise invoice is raised by plant Y
How am to map this scenaio in SAP
Reg
VKK

Hello Sanjoo,
As mentioned I can do it as STO process but is it possible to address the same thru subcontracting process, ie from plant x the material is sent along with the excise invoice after receiving the material in plant y they add another material B which is excisable and make the material C, which they sent it back to plant A . The operation cost is added on the material and the excise is captured individually
now for this process STO with excise is good or can i follow the SC process where i create SC po for the operation and normal PO with Tax code for the new material added,
suggest me the better process
regards,
VKK

Similar Messages

  • Create/extend materials for new plant with new profit centers

    Hi.
    We have created a new plant and want to create/extend the materials from an existing plant to the new plant (with new profit center). Can this be done via MM17?
    Regards,
    Kjettern

    Hi Kjettern,
    To extend the existing material to a new Plant/Profit centre, pls follow the following steps: -
    1. Copy down the material number (i.e XYZ) you want to extend.
    2. Go to t-code MM01.
    3. Enter the material number (i.e. XYZ) you copied from (1) into the Material field and hit ENTER.
    4. You will get an information on the bottom that "the material type XXX and the industry sector YYY has been copied from master record".
    5. Pls note that Basic Data 1 & 2 is not changeable as the same set of material data will be used when a material is extended.
    6. Hit ENTER again. To change other details other than Basic Data 1 & 2, select the views that you want.
    7. You will be prompted to enter a Plant. Here you must enter the new Plant that you want to extend the material to and hit ENTER.
    8. You will get a confirmation stating that the material already existed and will be extended (to the desired Plant u entered in (7)).
    9. Ensure that all the data in all the important tabs are maintained, for the right Storage Location, Warehouse Num, Moving Average Price, Standard Price etc. before proceed further.
    10. Hit Save. You will get a msg that "Material XYZ created".
    Now you are able to use this material number in the new Plant you created.
    Hope this helps.
    Rgds.

  • Error when doing two step transfer between Plants with split valuation

    Hi expert,
    I´ve activated split valuation for Material X , it has three Valuation types ( NEW, REPAIR and DAMAGE ) . The problem arose when i tried to do a two step transfer between plants ( mov 303 ) and i got the following error msg :
    Use one-step procedure for transfer posting to mat. subj. to valuation
    Message no. M7048
    Diagnosis
    In the receiving plant, the material is subject to split valuation. For this material, a stock transfer cannot be carried out using the two-step procedure.
    Procedure
    Use the one-step procedure (movement type 301) or a stock transfer order for the stock transfer.
    The message is very clear itself , but... i just wonder if there`s actually any way to avoid this, I tried to change the error msg into a warning but couldn´t find it in customizing. Thanks for any comments on this !

    Hi,
    What do you mean with "inconcistent to my storage type definition?", is that mean i can process two step transfer without using PO/delivery process or one-step movement? coz according to business requirement, we must use two step transfer considering to the distance between plants is so far and we want to make it the simple way so that PO/Delivery process isn't better solution. I think, this is an standard procedure all company over the world can use but just the reason of split valuation the system can't execute the transaction.
    Is there any config i miss to? is there any user exit i can use for this requirement? please help me..
    thanks,
    AJ

  • STO between Plants with Billing

    Friends,
    Is it possible to have STO between Plants within the same Company Code ? ( Not STO between Two Company Codes )
    What are the configurations which are diffferent from the normal STO between plants ? Please guide with SD Config too...
    Thanks

    hi
    check following
    http://help.sap.com/bp_blv1600/V5600/BBLibrary/HTML/134_EN_IN.htm
    http://help.sap.com/bp_blv1600/V5600/BBLibrary/HTML/135_EN_IN.htm
    regards
    kunal

  • Service entry sheet error.with new material group for services

    Dear Experts
    We need to create material group for  roll shop spare parts service,we created a new material group.
    when we are creating PR/PO with item category as D and a/c assignment K( entered cost center here).its giving error message
    as RC= 3M8 47 Account determination for entry JSL KBS J001 not possible(while making service entry sheet)
    after that i changed PR/PO and gave cost center and G/l account.now the service entry sheet is accepted.
    is it necessary give G/L account manually,if user chose wrong G/L account how to avoid this problem.
    please clarify me,
    do we need to assign valuation class for material group for services?(where to assign)
    or
    should assign G/L account manually to cost center while creating PR/PO
    Please clarify me
    Regards,
    Varun
    Edited by: madhu varun tirupati on Sep 8, 2010 2:48 PM

    Hi,
    Option-1:-- >
    Without creating material group and you can use your other service material group(existing service material group) and  create a service master  in AC03 as spareservice. Create a Service PO with text as roll shop spare parts service with other details as required like quantity of service, cost center & G/L account etc. After service being completed you can do SES in t.code: ML81N
    Option-2:-- >
    If you want report at the end based on different material/service group level, you can create a material/service group in OMSF for roll shop spare parts service and then you can assign to valuation class to material group in OMQW t.code. Then carry out regular process service order, SES etc.
    Based on requirement, you can enter G/L account manually or can set default G/L account in purchasing document with help of t.codes: OMSK, OMQW, OME9, OMGO & OBYC
    For error u201CAccount determination for entry JSL KBS J001 not possibleu201D, you cannot assign KBS transaction/event key to an account in OBYC t.code. Only you can assign G/L account to cost center with your CompanyCode in OKB9 t.code. Check the SAP note: 364570 & 106981
    Regards,
    Biju K

  • Update delivery with new material

    <b>Requirement:</b> I need to add new materials to a delivery.  We create an outbound delivery in SAP and send to our warehouse.  They will ship substitute materials that were not originally on the delivery.  I need to update the delivery with the new "substitute" materials.  How can this be achieved?
    It doesn't seem that the BAPI_OUTB_DELIVERY_CHANGE will help.
    Thanks in advance!

    Hi Michael,
    Whenever you are creating a STO and then a delivery, system will carryout the availability check depending on the delivery date mentioned in the STO. If stock exists then system will create a delivery.
    In your case, it seems that there is no availability check carrying out by the system. The system has to be configured for this functionality.
    First you need to add the materials to the STO, then do the delivery. Then only you can do the PGI.
    Hope this helps.
    Thanks,
    Viswanath

  • IWeb with new material?

    Good morning all,
    I have bought a new iMac 22' yesterday and I can not find iWeb application.
    According to the Apple web site, I have normally bought iLife'11 with my new iMac (link)
    When I check content of iLife'11 on Apple Store Online, it is mentioned that iWeb and iDVD belong to iLife (link)
    That's why I don't understand why I iWeb (and iDVD) are not available. I have tried this software on MacBook Air of my wife and I need it !
    Since I'm quite new, I try to have answers by this forum but if it is not the best way, tell me
    Except this issue, I'm very pleased to enjoy from now on my iMac
    Thanks to all in advance for any help you can give me back
    Regards,
    David

    With Lion there is an invisible recover partition on your boot drive that is used to recover the system anytime you need to by booting in to the recovery partion by holding down the Command key and the R key (Command-R) durning boot: OS X Lion: About Lion Recovery.
    If you also plan on using iWeb at any time in the future this may be of some interest: It is now confirmed that iWeb, and iDVD, has been discontinued by Apple. This is evidenced by the fact that new Macs are shipping with iLife 11 installed but without iWeb and iDVD.
    On June 30, 2012 MobileMe will be shutdown. However, iWeb will still continue to work but without the following:
    Features No Longer Available Once MobileMe is Discontinued:
    ◼ Password protection
    ◼ Blog and photo comments
    ◼ Blog search
    ◼ Hit counter
    ◼ MobileMe Gallery
    All of these features can be replaced with 3rd party options.
    I found that if I published my site to a folder on my hard drive and then uploaded with a 3rd party FTP client subscriptions to slideshows and the RSS feed were broken.  If I published directly from iWeb to the FPT server those two features continued to work correctly.
    There's another problem and that's with iWeb's popup slideshows.  Once the MMe servers are no longer online the popup slideshow buttons will not display their images.
    Click to view full size
    However, Roddy McKay and I have figured out a way to modify existing sites with those slideshows and iWeb itself so that those images will display as expected once MobileMe servers are gone.  How to is described in this tutorial: #26 - How to Modify iWeb So Popup Slideshows Will Work After MobileMe is Discontinued.
    It now appears that the iLife suite of applications offered on disc is now a discontinued product and the remaining supported iApps will only be available thru the App Store from now on. However, the iLife 11 boxed version that is still available at the online Apple Store (Store button at the top of the page) and those still on the shelves of retailers will include iWeb and iDVD. Those two apps were listed in small, gray text on the iLife 11 box that I bought.
    Personally, if I didn't already have a copy I would purchase one to have it for reinstallation purposes if ever needed.
    This may be of some interest to you: Life After MobileMe.
    OT

  • Messages are being shared between phones with new ios6

    My messages are being shared with every phone that is using my apple id, how do I turn it off?

    You should sign out of iMessage on your other devices: "Settings > Messages > Send & Receive" then click on your Apple ID and sign out.

  • Purchase of Raw Mat by New Plant (CoCd New) from Old Plant (CoCd Old), STO?

    Dear all
    Our HQ which has an operating Plant A belonged to Company Code (CoCd) A,has acquired Plant B belonged to Company Code B.
    And due to the supply change management issue and strategic business location, HQ has decided to move both Plant A and Plant B into a new location (both Plant A and B are located quite far from each other) and these 2 plants are going to be consolidated into a new Plant C with new Company Code C. And CoCd A and B will then cease to operate.
    Now, due to the legal requirements, CoCd C will need to purchase all the raw materials from both CoCd A and CoCd B respectively at a different date due to the plant move.
    Previously, I have come out with the solutions
    1. Extend the material codes of Plant A & B to Plant C. Extend the SLOC as well.
    2. Plant C will create normal PO to buy from Plant A, with vendor = Plant A. Price will take from Supplying Plant A.
    3. Plant C will perform GR reference to this PO. Here the Stock Account of Plant C will be Debit.
    4. To reduce Stock Account of Plant A, perform GI to Scrap. Then FICO will do double entry to bring the value to Customer Account which is Plant C.
    5. Since we do not PGI or touch on SD, there is no billing doc and manual customer invoice has to be done.
    However, on 2nd thought, I think of to use Stock Transport Order. However, there are a few types of Stock Transport Order in SAP HELP:
    1. STO between Plants with 1 step
    2. STO between Plants with 2 steps
    3. STO with SD delivery
    4. STO without Delivery
    5. STO with SD delivery and billing.
    We are running against time and would prefer not to touch on anything in SD to do STO. And we do not need to monitor the Stock Transit as physical plant move will take place first, that make STO in PLant with 2 steps no applicable.
    Requirement:
    1. PO raised must take the standard price in Material Master of the supplying plant.
    2. It involves buying of stocks of 1 new plant C from the old plant A & B at the respective time. Accoutning document and relevant posting must be audited for legal purpose.
    3. If possible, we prefer not to touch on SD or the complicated solution to achieve this purpose.
    I have read a lot about the above 5 types of STO but I am unsure which one is best suit me. Please advise.
    Thanks.

    I just tested with Option 4: Create STO without SD Delivery.
    However, in the PO itself, it does not even have the INVOICE TAB at the item level. How am I going to perform Invoice Verfication to put the 17 % input tax which is very important?
    However, I have proceded with my testing for STO without Delivery
    1. Create PO with UB Doc Type and Item Category U, supply plant = Plant A. However, there is no Invoice Tab at the item.
    2. Perform GI reference PO, MVT 351. Here due to come missing config, I have done the following:
         a.Company Clearing Account
         b.Create customer master  CoCd CN10
         c.Create vendor master for CoCd CN50
         d.Account type D is not defined for document type WA. Go to OBA7 to tick Customer.
         e.Account type K is not defined for document type WA. Go to OBA7 to tick Vendor
        1 Material doc with 2 accounting doc generated, each for CoCd C and CoCd A
    4. Perform GR referenc ePO, MVT 101.
        1 Material doc generated with no accounting doc.
    5. MMBE Stock Overview, stock quantity of Plant A is now transferred to new plant C.
    There is no way I can do invoice as in MIRO, it said my PO contains no item.
    I desperately need my perform STO to have
    (a) Invoice Verification to capture input tax 17%
    (b) Delivery Cost maintained.
    I do not want to complicate the material master maintenance of the sales view of all my 16000 raw materials. That is why I prefer not to go for STO with SD DElivery.
    Can anyone please advise?
    Edited by: Daimos on Sep 4, 2009 12:49 PM

  • Stock transfer between plants for split valuated materials

    Hi,
    I'm doing a stock transfer between plants without STO.
    The FG's are split valuated,which are transferred from central warehouse to other warehouse at different states.
    I'm trying to use mvt type 303 and 305 to transfer the FG.
    But getting error "Use one-step procedure for transfer posting to mat. subj. to valuation".
    Please suggest how to achieve the requirement.
    Is it possible to make 303 mvt type document to be parked and posted.
    Regards,
    Venkatesh

    << Moderator message - Cut and paste response from Error when doing two step transfer between Plants with split valuation removed and points unassigned. Plagiarism is not allowed in SCN >>
    Refer below link with same issue discussed,
    [two step transfer with split valuation |Canu00B4t use two step transfer with split valuation ?]
    Edited by: Rob Burbank on Feb 3, 2012 11:30 AM

  • HT201274 once all content is erased how to reload new material

    I have a old ipod 2nd generation touch screen.  I went into settings to erase content thinking I could load with new material.  Now Itunes doesn't even recognize it. I didn't think I needed to back up. How to I load material on the old girl.

    Maybe this:
    Try:
    - iOS: Not responding or does not turn on
    - Also try DFU mode after try recovery mode
    How to put iPod touch / iPhone into DFU mode « Karthik's scribblings
    - If not successful and you can't fully turn the iOS device fully off, let the battery fully drain. After charging for an least an hour try the above again.
    - If still not successful that usually indicates a hardware problem and an appointment at the Genius Bar of an Apple store is in order.
    Apple Retail Store - Genius Bar       
    or
    iPhone, iPad, iPod touch: Device not recognized in iTunes for Mac OS X
    Also. many developers when they updated their apps to support iOS 5 and 6 dropped compatibility for iOS 4.2.1 and earlier.
    Your only way is if you have the version that was compatible on your computer such as in the recycle bin/trash or in a computer file backup. In that case delete the current version that is in your iTunes App library and replace it with the older version. Then sync.
    Also see:
    Recover Older Versions of iPhone Apps After Updating — Apple News, Tips and Reviews

  • Stock transfer between plants in a company with different price

    Hi, expert,
    i want to transfer materials between plants inside a company with different price which set by supply plant randomly, not the valuation price, how can i achieve this?
    Thxs & best wishes,
    David

    Hi,
    In short, you cannot.
    Within SAP you cannot make a profit or loss by transferring an item between two Plants within the same company code.
    This is not necessarily an SAP restriction as such, it is due to basic accounting rules.
    The company code is seen as the legal entity for accounting and so if a movement within that company resulted in a loss or profit then this would break the rules.
    I am not saying that it is impossible to set it up this way (nothing is impossible) but I personally recommend that you find another way of achieving this. Trying to modify the system to break such an important rule will definitely cause problems.
    In previous implementations I have used the following option.
    Simple use basic STOs that transfer the items at the material valuation price. But then at the end of each month produce a report that shows what materials have been transferred between the relevant plants and at THAT stage make a financial posting to reflect the "benefit" that has been realised (based on prices held in a new table, that represent the price that would have been charged).
    It does appear to be a failing of the SAP system but it really isn't. What it normally indicates is that somehow the wrong org structure may have been built and perhaps the two plant should really be attached to separate company codes (especially if you need to show "profits and loss" in this way)?
    Steve B

  • Error when I create the New material Master (MM01) for New Plant.

    Dear experts,
    I got the error when I create the New material Master (MM01) for New Plant.
    Error:  Valuation Area 2800 Not yet productive with Material Ledger.
    So Pl send me the solution asap.
    Venkata Raju Khottari

    Hi,
    Have u assinged Plant to Company code?
    If u say no, use T.code OX18.
    Regards,
    Murali
    Assign points if it is useful.

  • How insert a new material in between through me22n

    hi,
    I am not sure whether this is right forum or not to ask this question. But in quest of searching a solution to my problem I am putting my question:
    how to insert in between two material line-items a new material to keep sequence of ordering stock same with the purchase orders from client to keep cross-check easy and fast in transaction ME22N.
    thanx
    adnan

    Hi,
    Objective is to keep material stock in sequence in which are ordered.
    If you have line item
    10.......
    20......
    & now you can enter line item 30. Now receive goods and keep in ordering sequence.
    OR
    If you have line item
    10.......
    20......
    You can enter a new item as 15(if permitted) which is in between 10 and 20.
    stock same
    Regards,
    Biju K

  • Transfer stock of material between plants

    Is it possible to transfer the stock of material between plants?

    Yes, stock transfer between plants is possible.
    1. [One Step using Transfer Posting 301 movement type|http://help.sap.com/saphelp_470/helpdata/en/4d/2b90e943ad11d189410000e829fbbd/content.htm]
    2. [Two Steps using GI & GR|http://help.sap.com/saphelp_470/helpdata/en/4d/2b90f643ad11d189410000e829fbbd/content.htm]
    Removal from storage happens with movement type 303 from Plant 1. Then do the posting using movement type 305 to store in storage of Plant 2.
    Check the transaction code MB1B.