Inventory by qty and value

Hi all,
I need to get a list of materials, whch displays :
<u>Mats which have not moved for a specified period of time (For all mvt types and storage locs)
Qty of above mats
Value of above mats
Last mvt type done</u>
Is there a single tcode for all this?
Thanks!
Sud

Hi,
  I am not sure about any specfic tcode which meets your requirements, but the following tcod's deals with inventory :
MMBE,MB52,MB53
regards,
a.fahrudeen

Similar Messages

  • Update Qty and Value in Quantity Contract

    Hi,
    With reference to Quantity Contract when we i create release order the status of quantity Contract should l be changed.
    Example
    Order Qty in Quantity Contract    100 pc             Value 10000
    One Release order is created  with Order qty 20   Value 2000
    Now in the contract where can i see open order qty and open order value.
    in VTAA item category KMN -
    TAN the setting has been checked for "Update Doc Flow"
    Regards
    Jyoti

    Hi,
    Just try this and let me know your expected result.
    1. Go to VA42 to VA43.
    2. Enter your contract number and press document flow button.
    3. See whether the Qty and value is getting displayed or not.
    4. If not getting displayed. Do execute the below steps.
    5. In document flow screen, select your contract document.
    6. In top menu : Documen flow->View-> Items.
    7. Now, the systme will display the Qty and value of delivered/not delivered information.
    Regards,
    Vijay

  • Qty and value in PO list are not updated (after a Service Entry)

    Hi Experts,
    Qty and value still to be delivered in the ME2L are not updated:
    I have performed a service entry (ML81N) but qty and value are not updated in the list of the PO in the ME2L.
    Could anyone explain?
    Many thanks in advance.
    Regards,
    Cesar

    Thanks for quick reply.
    I do not configure anything in SPRO (Define release strategy for SES) but I got a red light in the top of the screen near the field "No acceptance" so I presume that the SES should be accepted but as I do not configure anything regarding release startegy, I do not know how to accept the SES.
    Besides, I cannot perform MIRO: when I put the PO number, system indicates that there is no (suitable) item found for PO
    I should have miss something. Could you please guide me?
    Thanks,
    Cesar

  • Material type - maintainance by qty and value

    Dear All Guru,
    Yesterday I had copied the plant from the plant belong to same company and maintained the same val Gr Code.
    But i found that I am not able to make GR posting and the error was Plant and material type is not matching and then over SDN i got the soln to maintain qty and value for matl type and it resolved the problem.
    but can anybody tell me that why this can happen ?
    b'coz  still if the val/qty ticks are not maintained why system is showing the material type and plant combination error...though it can consider this as UNBW material and can still post the GR
    also can you suggest the right method for coping the plant so i won't face problem like this or any check methods after coping new plant
    Regards,
    Vimlesh

    Hi,
    For Preparation of New Plant, following steps to be adopted.
    1. Excute the India Specific Localize Sample Organizational Units using SPRO> Enterprise Structure> Localize Sample Organizational Units.
    In this IMG activity, you localize the sample organizational units by applying the appropriate country template like India to them.
    2. Then, in the next IMG activities (under Enterprise Structure Definition and Assignment), you copy these localized organizational units to create units of your own.
    Caution:
    Only execute this IMG activity if you have not changed any Customizing settings in SAP R/3.
    Do not execute this IMG activity in your production client, as it will overwrite the settings for any organizational units named 0001. Run it only in your production preparation client from where you will transport to Prodution Client.
    Note: Unless you adopt this procedure to create the new plant, till then you will encounter the same Error which you are facing.so these are the guide line for create of new/Additional country specific Organizational Units.
    hope it helps...
    manoj singh

  • Consumption and Production qty and value report

    Any one knows t-code for report that can give porduction order wise consumption in qty and value and production order wise production in qty and value.

    Use report KOB1, use the standard layouts that get you this information, normally positive quantities are consumptions and negative quantities are production output.
    Thanks
    Naveen

  • Qty and value update

    hi all sapians,
    Can any one give me a very clear idea or story behind the check boxes of quantity and value update in OMS2 and for some material there boxes are checked and for some materials boxes are not selected.
    Edited by: MANI ROOPA SD/MM on Apr 21, 2008 8:09 AM

    hi
    Quantity Updating Specifies that the material is managed on a quantity basis in the material master record for the relevant valuation area.
    Value Update: Specifies that the material is managed on a value basis in the material master record for the valuation area concerned.
    The values are updated in the respective G/L accounts at the same time.
    as you said at for some material there boxes are checked and for some materials boxes are not selected
    the Qty and Value are updated based on valuation area
    Valuation Area
    Organizational level at which the material is valuated. A valuation area can be one of the following:
    Plant: All plants belonging to a company code, in which case the valuation area is the company code
    1: Based on valuation area and as required some material types are selected and some are not
    2: Based on material Type we select Qty and Value updation: like for NORM for your valuation area (and also might be for plant valuation) all boxes are selected and for material type KMATConfigurable materials it is not selcted
    regards

  • Account Assignment - Qty and Value Update

    Hi,
    I need to have value and qty update for a a/c assignment po's.. ie in po i'm using a/c assignment as A, and in gr i need to have qty and value update . how to do?? is it possible? i knew that that a/c assingment won't generate qty update for a/c assignment catergores... is any way to create qty update for a/c assignmnt cateroires (K-cost center,A-Asset)

    Hi,
    when you are creating a PO with account assignments menas , the costs of this product need to get posted to the account assignment , and the material is being procured for consumption ( not for stock) to this account assignment.
    But however , qty and value updates depends upon the material type of the material.When you use  a stocked material type material is used for the PO, change the account assignment definition as said in above posting.
    Chek the material type of the material you used for the PO to your error message.
    Regards,

  • Batch wise stock report with qty and value as on date

    is there any report so that we can see the stock qty with value as on date,
    i have tried mb5b but it is showing only qty and batch combination not qty value and batch combination
    plz suggest me, it is very urgent.
    nitin

    MBEWH is the valuation history, this is only updated with the first movement after a period closure. And the period is a month.
    There is no table in SAP that holds the stock information on daily basis.
    You have to develope this yourself. Easiest method by copying a table like MBEW and MARD  daily to a Z-Table.
    A stock situation  at a certain date can be calculated with MB5B.
    Edited by: Jürgen L. on Aug 5, 2008 4:06 PM

  • Shelf ageing report with qty and value

    hi
    i want shelf ageing report with stock value and stock quantity together.
    or any other way to club together the reports which will having stock qty and stock value

    Hi,
        How about TRC:MB5M( Expiration Date List).   But the function is qty only.
       Maybe you have to make add on program.
    Regards,
       Gaito

  • PO qty and Value with Inbound Delivery qty

    Dear all
    i have a report requirement, client wants to have a report on the basis of Inbound delivery qty. for eg.
    If Po qty is 100 @ $10.00 each Total Po value = $1000
    if he makes a inbound delivery of 20 qty Report should display outstanding delivery qty as 80 and with reduced value .of $800
    Pl tell me how to get these details.
    Regards
    Manoj

    Hi Manoj,
    I think you should should copy ME2M and change the output.
    Sanjeev

  • Planned qty. and value for process order (components wise)

    Hi Experts,
    I need to capture the planned qty. (requirement qty.) and planned value of the components of a process order for some profit report. Please suggest me from which table i can get these values. (In RESB only req. qty. is there.)
    Thanks
    Nitin kapoor

    COSP or MBEW would help get that info. But take help from your FI/Co colleague to understand the table better

  • Invoice qty and value should not exceed po qty/value

    Is there a way where we can make tolerance zero in case of invoicing i.e i want to restrict the variance between PO qty/value and Invoicing qty/value.
    Gurus help me...
    Regards,
    Satyendra

    the problem still persists.
    When i make message 087 as error and try to post invoice for greater qty (than po), after GR, it allows me giving warning message (081) that Invoice qty is greater than GR qty. Because 087-error message will be effective for POs with out GR.
    So can we have a check for POs whose GR is done for PO qty, but doesnt allow me to post invoice greater than PO qty
    Regards,
    Satyendra

  • WIP QTY. AND VALUE IN SINGLE REPORT FOR A PARTICULAR PERIOD

    Is there any report for a particular period that we can get the WIP qty. and value in single report. If there what the fileds we have to select.
    Ex. We want what is the consumption qty. and value and what is the GR qty. and value for the period ending June 08.

    Hi,
    You can use the T-Code KKAS to get the WIP Qty against a given plant/material combination.
    some of the other supporting t-codes are:
    KKAO                 WIP Calc.: Collective Processing
    KKAQ                 Display WIP - Collective Processing
    KKAT                 WIP Display for Product Cost Coll.
    KKAV                 WIP Calculation for Cost Object Hier
    KKAW                 WIP Display Cost Object Hierarchy
    KKAX                 WIP Calculation for Order
    KKAY                 WIP Display for Order
    Regards,
    JLN

  • Accounting entry not posted but MBEW table shows total stock and value

    Hi
    My R/3 version 4.7
    I have a material which is stockable and valuated of material type ERSA(Spare parts)
    This material was created in may 2007 and material ledger activated,i dont see master records in accounting view  in material price analysis tab for the month may 07 till aug 07,and i see master recordsfor the month sep 07 till jan 08
    For this particular material in the report MB51 for all the 3 material documents posted,there are no accounting entries in accounting document.
    Also in the report output the field amount in local currency is zero for all the 3 material documents.
    1.1st material document with mvt 202 for qty 1 posted in the month of may 07,no entries in acc.doc
    In this case,MSEG-DMBTR(amount in local currency) was not updated
    Also i dont see master records for this period in accounting view in material price analysis tab,in material master.
    2.2nd material document with mvt 261 posted for qty 1 in the month of nov,no entries in acc.doc
    In this case,MSEG-DMBTR(amount in local currency)was not updated.
    I see master records for this period in accounting view in material price analysis tab with stock 1 qty and value zero
    3.3rd material document with mvt 101 posted qty 1 in the month of dec,in this case once GR is done MSEG-DMBTR(amount in local currency) was not updated,but mbew has the entries for stock and value.  
    Can any one let me know why the system is not updating the mseg-dmbtr and as well affecting MB51 report
    Regards
    Ratha

    The settings in Customizing which define that no negative stocks are allowed for the storage type, have only an effect on the transfer orders. In addition, you must also set message L9040 as an error message. For this, call up the Customizing and branch to: 'Logistics Execution -> Warehouse Management -> Interfaces -> Inventory Management -> Allow negative Stocks in Interim Storage Types'. There, execute point 'Control of System Messages in Warehouse Management' and enter message type 'E' for message number L9040

  • Difference between Inventory cube 0IC_C03 and 0CP_IC_C1

    Hi Gurus
    I'd like to ask what's the difference between this 2 cubes in inventory? 0IC_C03 and 0CP_IC_C1 ? Any help will be much appreciated. Thanks in advance
    - Kit

    Hi,
    Well I am not an expert on Inventory but this is what I know:
    0IC_C03 - LO Cockpit cube - Standard Inventory qty and values. This can be used for all purpose on a generic basis. This is not customized for any specific Industry sector. A standard ECC can use this as well as Retail can use this.
    0CP_IC_C1 - This is also an Inventory cube containing value and quantities but this is more specifically designed for CP industry sector (Consumer Products). Here the BW transaction keys are different meaning that events/movement types specific to CP industry transactions will generate these transaction keys which gets updated to BW.
    Also the cube 0CP_IC_C1 KPIs are average figures on the stock quantities and values (Exception Aggregation: Average Over Calendar Days). Whereas in 0IC_C03 the KPIs (NCKFs) are based on last value (Exception Aggregation: Last for Calendar Days)
    Therfore if you are not aiming at Consumer Products Industry specific implementation, I would recommend 0IC_C03 cube.

Maybe you are looking for

  • I want to dual boot windows 7 and Arch with an HDD caddy.

    I am thinking of two possiblities with this scenario.  I want to first leave my windows 7 install on the hard drive that came with my laptop, and leave that HDD where it is, but in a few days, i'm getting a caddy so i can switch my optical drive for

  • I'm really starting to hate my ipod touch and it's apps problem

    I have the 3rd gen Ipod Touch. I have the most up to date software. I have had it a little over 2 weeks and have had to wipe everything off at least 8 times because the apps stop working. It usually happens after a sync so I turn auto-sync off but it

  • LOB Storage definition in Designer

    Does somebody know how to specify a LOB Storage definition in Designer 6i? Thanks, Michael

  • Creating JCO Connection in CE 7.1 SR5?

    hi @, I have installed CE 7.1 and creating Java Web Dynpro Application .I imported the RFC from R/3 System as model and completed my design. Now When I am trying to create the JCO connection I am getting error and it is not able to create the same. I

  • Link in new window

    is there a way to open a link in a new window after creating a menu with project -> skin?