IPM 5.0 CRMXIF_PRODUCT_IP_SAVE Interface to create product

Hello,
I try to execute the function module CRMXIF_PRODUCT_IP_SAVE.
I believe that I fill the IMPORT structure with good values because there is no error message but the product is not created.
When I display the Bdoc's message, the message "No entry found in table SMOFQFIND for BDoc type PRODUCT_IP - Queue name used: CRM_PRODUCT_IP (see note 677800 for further inform)" is displayed .
I have the same message when I create the product via the transaction COMMPR01.
When I try to reprocess the Bdoc's message generated by the function module, the process fail. When I try to do it with the Bdoc generated by the transaction the process succed. The two message's bodys are similar.
Can you give me documentaion (how to fill the import structure) or advices to find a solution.

Hi Kishore,
Am calling the FM twice. First time for delete and second time for create.
if create fails, i want the work done by delete (step 1) to rollback.
Will the solution given by you work in this scenario also?
Regards,
Santosh

Similar Messages

  • How to package XI/PI Interfaces in a product ?

    Hi experts !
            I´m working at a company that have a project to integrate SAP ECC with a software that they sold, and they want to turn the interfaces developed in a product to be sold to their customers(that use SAP and the software that they sold), and I´m seeking for the way to achieve this, package interfaces in a product.
            I´m reading a lot about export XI interfaces in .tpz files and I think that this may be the way but I have some doubts like:
            - The XI/PI version installed on customer may be a problem ?(here I´m working on PI 7.0) - About this question, reading several questions in SDN, I understood that exports from PI 7.0 are accepted from XI 3.0, so, I think that the minimum configuration at the customer to support the product will be XI 3.0. Is this correct ?
            - The SAP ECC version installed on customer may be a problem ?(here we have ECC 6.0) - I think that the RFC functions(or proxy) can be imported inside the software component of the software sold by the company where I work, so in design(Integration Repository), I think that the version of ECC will not be a problem but, what about the configuration(Integration Directory) ? If I export the configuration of the interfaces, the tpz file(s) will be have data about Business System created on my working environment, that have a specific version. If I import this in a customer with another version of SAP ECC, this will work ? If not, there is a way to change the .tpz file to the ECC data inside it to be compliant to the ECC used in the customer ? Or the only way is to do the configuration of these interfaces by hand in each customer ?
            - If the question above solved without to make the configurations at customers by hand, there is a way to make the Business System in the configuration to be the same already used in a customer ? - I supposed to be installing this product in a customer that already have XI/PI installed and already have interfaces between ECC and another systems, in this case, ECC will be in configuration(ID) as a business system(for example, in customer, ECC is a business system named ECC_DEV, and here in my company, the business system name is MED, that is the system id of ECC). There is a way to make my export files(tpz), from my scenario, to use the same business system name already in use in the customer when I import the tpz ? About this, I´m thinking if there is some way to solve this using transport targets, what do you think ?
            At this moment these are my doubts, as you can see, major doubts are about the configuration(ID) exports and how to adhere them to the customer scenarios.
            Thank you in advance, and best regards,
            Wilson

    Hi,
    Some points to be noted are
    1. Check for service pack than version.  check the pi7.0 and xi3.0 SP .  There are some measurements which will tell u that this service pack is equivalent for this versio serice pack.
    2. The SLD must be configured again in the new system,once the business service can be exported as my my knowledge
    3. All the RFC's and IDOCs can be imported, but make sure to reflect the same in ECC system also.  Eg., Custom Idocs
    4.Also check the version compatiablity
    5.I would suggest you to check on interface to interface rather than dump everthing in single go.
    6. Export in different files and configure all the missing things accordingly. That will shorten ur problem solving time

  • Create Production order

    I am creating production ordrer by usinf bapi_prodord_create . It is succesfull when the material exist with compoents(sub material-BOM).
    If BOM not exists how can i create procduction order ? which FM /BAPI ?
    Note :This is the interface .Third party sending material ifo BOM so i have to pass to FM .

    Hi Deva,
    Check this link -
    [https://forums.sdn.sap.com/click.jspa?searchID=32004809&messageID=8089454|Create Production Order without Material no.]
    Hope it helps.
    Regards,
    Himanshu

  • PRA interfacing with legacy production accounting applications

    Can you share your experiences in interfacing PRA with production accounting systems like Tietonator's EC or P2ES tools?
    What is the business case for doing it?
    What are the gaps in PRA that are addressed in these tools?
    Edited by: Ramakrishna Avasarala on Dec 8, 2008 6:18 AM

    Thanks Larry, I just found some documentation on the connector and this does look
    promising. Unfortunately, I'm going to be constrained by what the customer has in
    place. I don't know yet if the customer is using WebLogic. They are in South Africa
    and I'm here in the east coast and just got this request this morning. I need to
    find out more information to make a better decision.
    Thanks again for the response.
    Brett
    Larry Presswood <[email protected]> wrote:
    Or you could use weblogic with the weblogic connector which would allow
    you to expose web services and directly invoke legacy tuxedo services
    Brett Bergquist wrote:
    I'm tasked with interfacing our XML/HTTP based network management systemwithin a
    Tuxedo framework for a large customer. I have not received many detailsas of yet
    of the customers infrastructure, all that I know is that it is Tuxedobased.
    Our network management system is accessible via a XML over HTTP interface.From
    what I gather, the customer wants to interact with our NMS via their clientapplications
    which use Tuxedo as their messaging architecture.
    From what I've read (only a little today), I will need to create a Tuxedocomponent
    that advertises services, accepts service requests, interacts with ourNMS via XML/HTTP,
    and packages up the response which is sent back to the client.
    Does this sound like the correct path to take?
    Any and all comments are appreciated.

  • Error while creating product group

    hi,
    i am getting error while creating Product group.
    Required parameters missing when calling up module
    Message no. M3749
    Please suggest me.. how to cop this
    Regards,
    amit

    Dear Brahmankar,
    I am using product groups in SOP as well as in the normal plannning scenario.In the normal planning scenario I am giving my PIR's in MD61 for the entire group.Then I am running MRP in MD02 for my product group.System is generating all the requirements normally for the entire group .
    Please suggest me , this process is correct or it will create any problem in any module .
    Thanks & Regards
    Prabhakar

  • Not able to Create Product Group.

    Hi All,
    Not able to Create Product Group. I has to be solved urgently. The below message form SAP.
    The field  is defined as a required field; it does not contain an entry
    Message no. MG144
    Procedure
    Transfer a suitable value.
    If the field is the material group or unit of weight, and the field is not ready for input, check whether the material is locked. If it is locked, you cannot extend the Purchasing view or the Sales view. If either of these views needs to be extended, the material must first be unlocked. This can be done only by a user with special authorization. Contact your system administrator.
    Note
    For information on locking and unlocking material master records, see the SAP library documentation Material Master (LO-MD-MM) -> Locking Material Master Records.
    Thanks in Advance,
    Pherasath.

    Hi,
    Use thie below path for creating Product group.
    Goto SPRO >Enterprise Controlling>Consolidation>Consolidation Functions>Automatic Posting>Elimination of IU Profit/Loss in Transferred Inventory>Define Product Groups
    Regards,
    JS

  • Update error while creating production order (TCODE CO01)

    Hello,
    We have created new plant into development server for testing. We have created production Order few days back at that time we have not faced any problem. But from last two days , when we create new production Order , system gives following error:
    ORA-00947: not enough values
    DBIF_RSQL_SQL_ERROR" "CX_SY_OPEN_SQL_DB
    SAPLCOVB" or "LCOVBF10"
    HEADER_POST"
    and
    Update was terminated
    System ID....   DEV
    Client.......   500
    User.....   HPLSU
    Transaction..   CO01
    Update key...   4B6E4F48C08D027FE1008000C0A802F3
    Generated....   08.02.2010, 10:35:48
    Completed....   08.02.2010, 10:35:49
    Error Info...   00 671: ABAP/4 processor: DBIF_RSQL_SQL_ERROR
    Our work is held up.
    Please also note that If we increase the QTY in the existing Order ( already created few days back) , System accept the same and Order is saved.
    We are looking for the solution for the above.
    Early reply will be highly appreciated.
    thanks
    harish

    Hi Rishi,
    You better check with your BASIS team.
    Check this link also
    Supervisor Error ADM0015
    Regards,
    Satyajit Kumar
    Edited by: Satyajit Kumar on Feb 8, 2010 7:47 AM

  • Error while creating product cost collector in REM ?

    HI, all SAP expert,
                 I have to run repetitive manufacturing .
    I create work center of category production line and use in rate routing of semifinished material.
    In mm02 -- mrp 4 view of semifinished material , i select rem profile , production version.
    Now I create product cost collector ( t-code kkf6n) for semi. material by giving order type (yrem), production version after enter it shows error
    Error in number management (notify your system administrator)
    in help it shows
    Error in number management (notify your system administrator)
    Message no. KO162
    Diagnosis
    A system error occurred in the number management.
    Procedure
    Please contact your systems analyst or the SAP hotline.
    Edited by: Nitin Nerkar on Sep 30, 2009 12:16 PM

    Dear Nitin,
    Check whether is the number range maintained properly for the order type RM01,check the config setting in T Code
    KOT2_PKOSA.
    This is related to CO Module.
    Check and revert back.
    Regards
    Mangalraj.S

  • Error while creating Production order without BOM

    Hi Guys,
    While creating production order without a BOM i am getting the following error in the error log.
    Error: BOM for material xxxxxx does not contain any valid items
    Message no. CO636
    Kindly help.
    Regards,
    Sid

    Dear customer,
    could you check in the master data screen of the order if one BOM has been selected?
    please coudl you check your customizing the following transactions:
    OPJM
    OPJI
    what do you have in 'BOM slection field' MRP4 view of the header material?
    Please check if with this info you can find the missing data to explode the BOM
    regards
    Maria

  • Error while creating Product Cost Collector

    Hi SAP Gurus,
    While creating Product Cost Collector I am getting the following Error:
    Enter a distribution rule for Order without a validity limit
    Message no. KD059
    Diagnosis
    The settlement profile used requires you to define a distribution rule for Order. For period 009 2008, however, you have not created a distribution rule for Order.
    Procedure
    Create a distribution rule for Order without a validity limit, because, if the distribution rule does have a validity limit, the system always issues this message in the period following the last valid period.
    You can also use a different settlement profile that does not require such a distribution rule, or change the settlement rule used.
    Can any one help where exactly i need to maintain this.
    The settlement profile settings are fine.
    I am getting this error only after i have changed the scenario to Reproting point back flushing

    Dear Suryanarayana
    Please check the corresponding settlement profile for product orders.
    In most of the cases message KD059 means that no distribution rule is assigned to your production order.
    This is not an error, but the system design. In order to avoid message KD059 you will either have to enter settlements parameters and a distribution, or change settlement profile for valid receivers in transaction OKO7 from 'settlement required' to 'Can be settled'.
    I hope this helps resolve the issue for you. I wish you the best in your endeavours.
    Kind Regards,
    Brendan

  • Error when creating Production Order

    Dear All,
    When i was trying to create Production Order using CO01, there was an error message that says "error when calculating cost, see log, log is deleted when saving"
    what is the problem from that error message? how can i solve this problem?
    best regard,
    MARUFAT

    Cost consist of material cost which are the direct cost, it is calculated from the component and the material itself for which the order is created. If the material is semifinished or finished check whether the accounting view for these material contains value. These material could be costed as per the method mentioned by our friend or you may enter value through MR21 (if the material is not costed atall since it is created). It is recommended to update cost through costing run and by CO member. Now if the material is Raw material you need to maintain PIR.
    The second part could be the activity cost. These follows from the routing/receipe. Mostly the costing error is due to the inappropriate defination of either cost center or activity types. You need to confirm whether activity price are define for the period.
    Appriciating you for taking a concern on the costing error and not overriding.

  • Error in creating Production order

    When I create production order thorugh planned order Iam getting error message "No objects selected inside production order."

    Hello,
    The planned order that you may have use has been deleted already.  It is most probably deleted during an MPS/MRP run.  The planned order number is deleted and recreated with a different number.  Please try to check in MD04 and check the planned orders there and you can convert it from there.
    Thanks,
    Ernesto

  • Can i create production order using process material ?

    Dear All.
    Please help me.
    I want to create production order using process material (material type is PROC).
    For may knowledge, process order is standard for the process material, but my customer want to use the PP module for the process material.
    But I cant convert the planned order of precess material to production order in MD05.
    The system message is "System does not support planned orders for process materials."
    The followings are my test steps.
      1. Master Creation
          - Material Master, BOM, ROUTING
    In standard, process material (Material Type : PROC) need creation of master recipe. But due to my clients need (Using production order
               for the process material), I create the work center and ROUTING
      2. DM Creation
          - In MD61, I create the planned independent requirement (Type : LSF)
      3. Planned order creation for the process material using MRP
          - In MD01, I run the total MRP, the the planned order is created.
            It's order type is "LA"
      4. Converting the planned order to Production Order
          - In this step, the system give the error "System does not support planned orders for process materials."
             and can not do anything.
    I want to know that the above case is possible, and how.
    Please Help meu2026..

    Hi
    First of if yur want to create production order or process order why do you go for material type :PROC.
    you can create the same material as FERT & go ahead.
    I do not understand the logic to select the material type as PROC.
    Pl. go through SAP library where PROC is used.
    Regards
    YMREDDY

  • Function Modules for creating production version.

    Hi,
    Is there any function module available in SAP to create Production version?
    I'm aware of CM_FV_PROD_VERS_MAINTAIN function module but this one works on dialog mode.
    Please let me know if there are any other function module/class available to create production version.
    Many Thanks!
    James....

    Dear,
    For  C223 production version,
    CM_FV_PROD_VERS_MAINTAIN
    CM_FV_PROD_VERS_SAVE
    Please refer this thread,
    Re: Create "Production version".
    Regards,
    R.Brahmankar

  • Usage of rounding profile in manual created production order

    Hi,
    We are making usage of various static rounding profiles.
    For each of the materials produced, the rounding qty can be different, depending on the workcenters used to produce the materials (but for one material, there is only 1 rounding profile possible)
    This works fine as long as we create planned orders via MRP runs (rounds up according the values set)
    However, this rounding value is not taken into account (proposal, warning, error,..) when a user creates a planned order manually via MD11 or a production order via CO01.
    Furthermore there is no warning message or whatever at the moment a user is converting a planned order (with a correct calculated rounded value) into a production order and manuaaly adapts the order qty.
    As were are talking about a few 1000 different materials, the production planner cannot know all by heart and the rounding proposal would be excellent.
    Anybody an idea how to implement this ?
    Thanks and regards?

    Hello again,
    thanks for you prompt answer.
    This would certainly solve our problem in case we would have always one and the same quantity to produce for a given material; but this is not always te case.
    Perhaps it was not clearly explained in my first mail, but we would like to work with one (1) ROUNDING PROFILE per material.
    Example, material A can be produced in multiples of 14; as such it should be possible for the production planner to create production orders for 14, 28, 42 , 56,..... pieces. When entering a order for eg. 25 pieces (= example the qty needed for a certain sales order), the system shpuld round to 28.
    Other materials (having another rounding profile) are produced in multiples 3, im mulitples of 5,...
    For this particular plant we have about 50 different rounding profiles in place.
    So it somewhat logic that a production planner does not know all these by heart.
    If you have a solution for this as well, please let me know.
    Anyway already my thanks for feedback.
    Regards.
    Danny

Maybe you are looking for

  • Help! How can i print a color document in black and white?

    I have tried some of the other solutions found on Google but i still can not figure out how to print a color document in black and white on my macbook pro...can someone help me?

  • Array of buttons return indexof?

    Hi, I have an array of buttons. How do I get the value of the array so i know which button the user clicks on. If they click on button 10 i need to get the value 10. I cant copy and past the code here because its too long.If someones interested i can

  • Help with divs

    Hi, I am looking for some help getting this layout using divs working correctly.  It will be going inside an existing spry tabbed panel.  At the moment the styles are inline but I will be moving them to my external style sheet once it is working.  Wh

  • Bridge CS6 Cache problem

    Have installed Photoshop CS6 and in using Bridge I get the message "Bridge encountered a problem and is unable to read the cache. Please try purging the central cache in Cache Preferences to correct the situation". If purge the central cache as instr

  • Trigger dialog screen with RFC

    Hi guys, Is there a way I can trigger a dialog screen to open in SAP GUI (showing a sales order) from an external system? Could I make an RFC call from my external system to a BAPI in SAP and put in some "call sreen" fucntionallity in the BAPI, so th