Is it possible to change an item's create date manually?

When we upload some documents to PORTAL Content Area, Items' create Date is automatically set to sysdate. But our customer wants to preserve documents real creation date (in other system). Can we change this field manually after uploading documents or is there any other way to somehow give documents other date property? Many thanks...

The online help is a good place to start. Search the help for "custom attribute" or "custom item type". I also strongly recommend that you upgrade to Portal 3.0.9. There have been many bug fixes and enhancements between 3.0.6 and 3.0.9, and you'll need to be at 3.0.9 to upgrade to Release 2, when the R2 upgrade scripts are available.
Regards,
Jerry
PortalPM

Similar Messages

  • Is it possible to change PO item that is flagged for Deletion or Blocked ?

    other than to unflag the item.
    What I'm trying to determine is:  if the deletion flag is set or an item is blocked, is it correct to say that the date last changed (EKPO-AEDAT) is the date that the item was flagged for deletion or blocked ?  (I'm assuming only manual setting of the indicators and not update via a program method).
    Is there any way to effect EKPO-AEDAT after an item is flagged for deletion or blocked, without unflagging/unblocking ?
    (ECC 5.0 system)

    Hi,
    Once the PO line item is deleted, no changes other than reseting the delition indicator can be done. So EKPO-AEDAT will not be affected if a PO line item is deleted.

  • User exit which changes po (item level) delievery date (eket-eindt)

    Hi,
    Can you please suggest EXIT which triggers while changing delivery date (LIKP-LFDAT)  of outbound delivery through TCODE VL02N should reflect in its corresponding purchase order delivery date ( ME22N at item level field (EKET-EINDT)..
    I tried in USEREXIT_SAVE_DOCUMENT_PREPARE include MV50AFZ1. but changes are not reflected in PO.
    code:
    XEKET-EINDT= LIKP-LFDAT.
    but it is not working .there is no field as update indicator (updkz) in table xeket..Please let me know if I am doing something wrong.
    Thanks in advance.

    Have you checked the BADI 'ME_PROCESS_PO_CUST' ? This has a method PROCESS_ITEM, this may solve your problem.

  • Search for list items by Created Date using caml

    Hi all,
    I'm trying to find list items with specific attributes using caml.
    I created a caml query that uses Last_x0020_Modified and File_x0020_Size for searching items.
    then i tried adding Created and Created_x0020_Date both either as Lookup or as DateTime to the caml.
    But since i added Created/Created_x0020_Date my query fails with 500 Internal Server Error.
    Can someone tell me what I'm doing wrong?
    here is my complete Entity I'm sending to SharePoint 2013:
    {'query' : { '__metadata': { 'type': 'SP.CamlQuery' }, 'ViewXml': '<View Scope="Recursive">
    <Query>
    <Where>
    <And>
    <Leq>
    <FieldRef Name="Last_x0020_Modified" />
    <Value Type="Lookup">2015-02-25T10:10:03</Value>
    </Leq>
    <Geq>
    <FieldRef Name="File_x0020_Size" />
    <Value Type="Lookup">1</Value>
    </Geq>
    <Leq>
    <FieldRef Name="Created" />
    <Value Type="DateTime">2015-02-25T10:10:03</Value>
    </Leq>
    <Eq>
    <FieldRef Name="FileDirRef" />
    <Value Type="Text">/sites/DennisDevSite/alib/Ordner1</Value>
    </Eq>
    </And>
    </Where>
    </Query>
    </View>' } }
    Thx in advance
    Dennis

    Try appending "Z" to DateTime. Change 
    <Value Type="DateTime">2015-02-25T10:10:03</Value>to <Value Type="DateTime">2015-02-25T10:10:03Z</Value>
    Blog | SharePoint Learnings CodePlex Tools |
    Export Version History To Excel |
    Autocomplete Lookup Field

  • How to change a item type dynamically?

    Is it possible to change a item type dynamically?
    For example.
    I've got a page with 2 items. The first is a select list and the second is a date picker. The select list contains two values, 1 and 2.
    If value 1 is selected the second item needs to remain a date picker. If value 2 is selected the second item needs to become a Text Field (disabled saves state).
    Anyone got an idea?
    Thx. Frank.

    Frank,
    It's not possible to change the item type dynamically as you describe it below. However, to achieve a similar effect you could do the following:
    1) Make the Select List a Select List With Submit.
    2) Have a Date Picker AND a Text Field on the page.
    3) Make the display of the Date Picker item conditional on the relevant value having been chosen from the Select List.
    4) Make the display of the Text Item conditional on the other value having been chosen from the Select List.
    Andy
    http://atulley.wordpress.com/

  • Sharepoint Workflow to change another item in the same library

    Is it possible to change another item in the current library using a sharepoint workflow
    I currently has a customised approval workflow that approves procedures. I would like this workflow to set the status of the previous version to archive when the current procedure is approved.
    Jack

    Hi Jack,
    If the documents in your library are all word files and the names of the documents are named as"A001_Rev_+number", you take follow the steps below to update the status column.
    Create a 2013 workflow associated with the library, and start the workflow when an item is created.
    Select Start a task process.
    Select If any value equals value and set it to be: If Variable: Outcome equals Approved.
    Select Extract Substring of String from Index with Length, and set it to be:Copy from Current Item:Name, starting at 0 for 9 characters(Output to Variable: substring).
    Select Set Workflow Variable and set it to be:Set Variable: string to Current Item:Name.
    Select Replace Substring in String and set it to be:Replace Variable: substring with (space) in Variable: string(Output to Variable: output).
    Select Do Calculation and set it to be:Calculate Variable: output to minus 1(Output to Variable: calc).
    Select Update List Item to update the status column(refer to the picture below).
    Select Go to a stage and set it to be:Go to End of Workflow.
    Best regards.
    Thanks
    Victoria Xia
    TechNet Community Support

  • Bom massive change of item category

    dear
    can you suggest a valid tool for a massive change of item category.
    I need to change the item category of many bom component.
    The old value is L , the new value is N.
    In transaction CS02 is very difficult to change the item category of a component.
    Thanks.

    Hi,
    It is not possible to change the Item Category. You would need to delete the line & re-create back with the new item category.
    You may use CEWB as suggested above, or you may go for a Z program.
    Regards,
    Vivek

  • Possible to change date format when importing files into Aperture 3

    Just wondering if it is possible to change the format of the date from YYYY-MM-DD to YYYYMMDD when you rename files as they are imported into Aperture 3? I typically rename my files and insert my initials, date the photo was taken, sequence number, camera used and original file name. When I do this in Aperture 3, the date format used includes dashes. I would like to have the file renamed without the dashes in the date. Is this possible?

    You should be able to edit the format in the import presets. I have done this for folder stucture of imports, I believe you can do the same for the file renaming. At the bottom of the drop down box for file naming at improt should be an edit option which brings up the import naming presets, select the "YYYY-MM-DD" and remove the dashes.
    Matt

  • AppleScript: Use EXIF to change "created date"

    Here's the deal. I have a bunch of photos that I have imported and exported out of iPhoto which changed their "created date" in the Finder. However, their "capture date" is still the same in the EXIF data. I would like a quick AppleScript application that will update all of the "created dates" to match the "capture date".
    I have found all of the AppleScript pieces, I just don't know any AppleScript to put them together.
    For example, I found this piece of code that will change a file's "created date", so I know it can be done in AppleScript:
    on open files_
    display dialog "enter the new creation date in format YYYYMMDDhhmm ex: 200112251730:" default answer "" buttons {"Cancel", "Continue"}
    copy the result as list to {the newcreationdate, the button_pressed}
    repeat with file_ in files_
    tell application "Finder"
    set file_ to POSIX path of file_
    do shell script "touch -t " & newcreationdate & " " & quoted form of file_
    end tell
    end repeat
    end open
    I also have iMagine Photo installed, which can read EXIF data into AppleScript. (Here is their first help page, which is I am sure all you will need.)
    I can tell AppleScript to read the EXIF data, and I can tell AppleScript to change a file's "creation date", I just don't know how to translate the information from one to the other. Can anyone help? Thanks a bunch!
    Matthew

    You may have better luck if you post directly to the Applescript forum. I know just enough Applescript to be dangerous, so when I really want to get something right, I go to the forum and have always gotten wonderful help there:
    http://discussions.apple.com/forum.jspa?forumID=724
    Very helpful and very clever folks there.
    Francine
    Francine
    Schwieder

  • Possible to change appearance in iCal, particularly the To Do Items?

    Is it possible to change the appearance in iCal? I'm speaking about mostly the background? (I know you can change the "calendar" colors, but I'm looking for something else.)
    1. For example, it is extremely difficult, almost impossible for me to determine in week view or month view which day is "selected" unless I look at the mini calendar in the bottom left (which I don't necessarily have open all the time). The day which is selected, is nearly imperceptibly slightly darker, but I can't tell. Is there a way to change the background color to provide more contrast?
    2 And, is there a way to change the color, contrast, readability of the To Do Items in the list on the right? The dates are very clearly labeled with the colors, but the actual item of what I need to be doing (the whole point of it) is in gray font and my eyes are not drawn to such a pale layout for reading. Are there customizable options?
    3. Lastly, when I go to "Today" in day view or week view, it always starts the view of each day at 12/1AM and I can only see from 12AM to noon (I have preferences set at show 12 hours) and then have to scroll down to see my appointments in the afternoon. I never have anything scheduled from 12AM to say, 6AM, so its annoying to have to scroll down every time I go to the afternoon. Is there a way to set it to start the view at an hour other than 12 AM?
    Thanks for all and any suggestions/answers.

    Update on (3) - I have just noticed that John Maisey has a wee script for doing it.
    AK

  • Change in  item category  and  settlement of  old sales order not possible

    Hi
    I   have to settle   sales orders  in VA88 and  transfer data to COPA.   I  want to do   directly  without  result  analysis. So, in the  item category, I  removed the result analysis key.   And  the  settlement  goes thru.
    My issue is that  there are  orders in  July 2010  which  have to be settled,  but  it  does not work since the  changes in  item category has  happened  this month in Aug 2010 and  the  July  sales order are also  invoiced.
    Pl  suggest a  solution  to  settle  the  July  sales order  to COPA.
    Thanks
    kamala

    Hi Kamala
    I see only one possibility... The old sales order consists of some GL accounts posted in it which is not mapped in the allocation structure...
    Alloc Str has 2 parts - i.e. One, it consists of a group of cost elements it has to handle and Two, it consists of the valid settlement receivers like PSG, CTR, etc
    You say, this alloc str works well with new sales orders.... The 2nd part of alloc structure (i.e. valid receivers) applies equally to all sales orders.. But what can really differentiate the 2 sales orders is the cost elements posted on it...
    I dont foresee any other posslbe reason
    Regards
    Ajay M

  • Is it possible to change Item Category of BOM component

    Hi,
    We are in the process of implementing Guided Structure Synchronization (GSS).  GSS helps in Syncing Source BOM (Engineering BOM) to Target BOM(Manufacturing BOM).
    During the creation of EBOM, designer may not have complete information about the Item category, So by default it is set as "L"(Stock Item). When MBOM is created, It should have correct Item category. Using GSS, while synching operation from EBOM to MBOM, Item category is also copied and it is not allowed to change.
    Is there any way to change the Item category before Sync operation in GSS.
    Thanks in advance.
    Regards,
    OmPrakash

    Hi Omprakash ,
    BADI used is  /PLMB/GSS_FIELDCONTROL .
        Conflict is created based on Postion type. SAP recognizes this conflict and gives conflict in Reconsliation workbench.
        When user solves this conflict , BADI /PLMB/GSS_ACTION for our customer defined Action.
         In this Implementation , Target Vertex would be deleted and New Vertex is created.
        Key Mappings has to be adjusted with new Vertex.
       I have seen some side effects of this Solution. I am trying to solve them.
    Thanking you,
    Regards,
      Satya

  • How to control Changing of item category in sales order Manually

    Hello Gurus,
    How to restrict manual changing of item category in sales order?
    Reason for it:
    When ever they want to give some free goods to customer , they are changing Item category in  Standard Sales order at item level  then deliverying free goods to  customer
    looking for your inputs
    Thanks in advance
    Regards
    Venkat

    Hello,
    There are two possible ways:
    1. In Item Caterogy Determination remove the Manual Item Categories so that system will determine the Item Category only from defined options.
    2. Use T-SHDO - create Screen Variant & make the item Category Feild as Display only.
    Hope this helps..
    Thanks,
    Jignesh Mehta

  • Unable to change the item category in existing Scheduling Agreement

    HI,
    I have a schedule agreement where there are already list of line items but saved without the appropriate item category field in all of the line items. Now I see that the Item category column is greyed out & unable to edit or change thru ME32 T.code.
    I am already aware that deleting the item codes & adding again with resolve the issue. But when try to delete, those codes shows that they have GR & PO not completed one.
    My question is :
    Is there a way to edit/change the Item category field without deleting the item?
    Whethere is it possible to do it in bulk update for group of items in SA?
    If it is possible, pls provide how to do it with steps.
    Kindly advice.
    Thanks. in advance!
    -Umesh

    Please try using MASS tcode with object BUS2013
    or MEMASSSA
    Its a direct table update where you can select the Table Item and Field Item category and input the document number to change the value os item category and try with one sample data then do it in mass.
    Before cahngin the item categry Please make sure all the dependancies are met then nly the system will allow you to save.
    Refer for Mass upload function it is common for all
    [Mass update|http://www.sapkshare.com/user/image/mass-maintenance---mm17.pdf]
    Edited by: Karthik on Jul 29, 2011 2:44 PM

  • Is it possible to change the message of the automated validations?

    Hi,
    In APEX 4.0, depending of the type of item you create and the settings you put, certain validations are automatically made like a check on the date when using a Date Picker.
    My question is, is it possible to change this message? Because what happens is, if I have a certain format in the way I formulate the message then those validations will be formulated in a different way.

    Hi,
    Yes, it's possible to translate/replace those messages.
    You can find all the Internal Messages Requiring Translation in the offical documentation.
    Here's a link: http://apex.oracle.com/i/doc/global_mess_reports.htm#CHDEDHBJ
    To translate messages:
    -1. Navigate to the Translate Application page:
    1.On the Workspace home page, click the Application Builder icon.
    2.Select an application.
    3.Click Shared Components.
    4.Under Globalization, click Text Messages.
    -2.On the Translate Messages page, click Create.
    -3.On Identify Text Message, specify the following:
    1.Name - Enter the name of each message that needs to be translated. See Table: Internal Messages Requiring Translation.
    2. Language - Select the language for which the message would be used.
    3.Text - Enter the text to be returned when the text message is called. If the English text message contains positional substitution values (for example, %0, %1), ensure that your defined message also contains the same named and number of positional substitution values.
    -4.Click Create.
    Louis-Guillaume Carrier-Bédard
    http://www.lgcarrier.com
    http://www.apexframework.com

Maybe you are looking for

  • External hard drive gone kaput

    I have an old Mac mini (1.42 GH PowerPC G4, Mac OS X 10.4.11) with an 80 gig internal startup HD, and an external 250 gig Firewire HD. For the last couple of days, the external HD has not been getting recognized by the Mac. When I run Disk First Aid,

  • External display no longer working - stuck at blue screen

    Hi everyone. I just don't know what in the bloody **** happened here. Everything was working fine, I even had my macbook 13 upgraded to 10.5.6 and it always worked fine with my external DELL 2007WFP screen thru DVI cable and miniDVI adapter. Suddenly

  • Database restore  from a particular backup set using rman

    Hi all, My OS: UNIX DB : 10.2.0.1 As i checked the database it will indicate datafile 5 is header corruption. yesterday i take complete online backup of the database using RMAN but now when i run restore database command it will show as ORA-19870: er

  • Selecting all hierarchy nodes in the report

    Hi Friends, In my report I have a Hierarchy 0ORGUNIT,  there are a few sub nodes under this hierarchy. When the user runs the report if they want to see all the  nodes under a top node, they have to  expand each node till the last node and select the

  • Editing options

    I have a new MacBook and have imported a few photos from CDs. I want to edit them. But the buttons on the bottom of the screen do not show what is in the iLife book or the manual, just a rotate, constrain and crop. No enhance, etc. My info says I hav