Issue on Ordinary Depreciation Start Date and Disposal of Asset

Hi All.
I am facing the following the issues.
Fiscal Year is from July - June
First Problem: Company acquired the asset Vehicle on 26.Dec.2008. System proposes Ordinary Depreciation Start Date as 01.Jan.2009 rather then proposing Ordinary Depreciation Start Date as 01.Dec.2008.
Since depreciation for previous year has been posted the client later found out that instead of calculating depreciation for 7 months depreciation was only calculated for 6 months. I tried to manually change the dep. start date but the system doesnot update the previous years values, it's still calculating depreciation for 6 months and not 7 months. Is there anyway in updating the previous fiscal years depreciation values.
2nd Problem: I created a test case scenario today i.e. 16.09.2009 by creating and capitalizing an asset vehicle. Once I capitalized the asset the system automatically proposed the start date as 01.10.2009 and not 01.09.2009 which is what i require. What setting do i need to check or maintain in order to solve this issue because the user does not want to manually change the date each time an asset is created.
3rd Problem: Similar to this now when client disposes of an asset suppose on 10.Feb.2009 (FY2009). The system calculates depreciation till the month in which disposal takes place (February), the client does not want this, their requirement is that depreciation should be calculated one month before disposal takes place i.e. in this case Dep should be calculated till Month of January.
Your assistance will be highly appreciated.
Mohammed Ali Khan.

Hello Khan,
The depreciation start date will get determined based on the period control method assigned to depreciation key,
Period control methods are defined in transaction code : OAVH
In period control method we will mention the depreciation start date for acquisition, additions and also depreciation end date for disposals, retirements.
SAP has given some default period control keys. If any of these are not suitable to your requirement you can create on your own period control methods.
THanks
Sai

Similar Messages

  • Error: "Depreciation start date required in old assets data (please enter)"

    When , I use transaction AS91 , for an asset , with book depreciation key  = 0000, the system shows this error:"Depreciation start date required in old assets data (please enter)",
    somebody could help me with this please?

    Check if the depreciation start date has got populated in the tab for depreciation areas in AS91.
    Usually this gets populated based on capitalization/creation date.If not then try to enter this manually.
    Thanks and regards
    Kedar

  • Calculate depreciation start date based on user defined field in asset

    Hi,
    I have a specific scenario where the start of depreciation date for asset needs to be calculated on user-specific logic.There is a additional field "installation date" in asset master screens.The requirement is that for depreciation areas 10 and 11 user wants that the depreciation start date to be calculated on the installation date rather than capitalization date.
    I tried using the exit AMAV0001 where we can change the asset value date which determines the depreciation date at the time of first acquistion to asset.But the problem is we can't change it as per depreciation area wise and thats why posting error was coming.
    Please suggest if any idea on this.
    Thanks in advance.

    Hi Adriano,
    in your example 2 issues influence the described behaviour:
    1) In your example the revaluation occurs in the capitalization year, in which all acquisitions (and revaluations) are managed under the period for the first acquisition. Only as of the year following the capitalization year the period control "pro rata" would really consider the revaluation or another acquistion as of period 4. In case you want the period control also being considered according to the posting period in the capitalization year, set the indicator XBZDAT with the correction report from note  92925.
    That should solve your issue.
    2) In case you use the new depreciation calculation engine you have the possibility to use individual period controls for revaluation also. This means you could specify period control for acquisitions as "pro rata" and for revaluations "next month". To realize this create a new transaction type for revalutions as described in note 1138166 . Unfortunately this feature is not possible with the old depreciation calculation engine.
    Regards,
    Markus

  • How to get the current month starting date and ending date by default ?

    Hello Creators,
    This is my requirement, kindly do the needful, Please dont gimme any links i've no access for other sites, gimme the right solution.
    My Requirement :
    Creation Date (VBAK-ERDAT) - Select Option. By default, the program should run for the current Month ie between the starting and ending date of the current month when the program is run. Today the date is 18th using sy-datum we can bring the current date by calling it in the initialization event, but the requirement is it should not give me the current date, it should only give me the month starting date and the end date. Kindly help.
    Thanks in advance ...

    DATA: gv_datum LIKE vbak-erdat.
    SELECT-OPTIONS: so_date FOR gv_datum.
    INITIALIZATION.
      CALL FUNCTION 'HR_JP_MONTH_BEGIN_END_DATE'
        EXPORTING
          iv_date             = sy-datum
        IMPORTING
          ev_month_begin_date = so_date-low
          ev_month_end_date   = so_date-high.
      so_date-option = 'BT'.
      APPEND so_date.
    START-OF-SELECTION.
    Hope this solves the issue. Don't forget to be generous
    Cheers,
    Sougata.

  • Modelling Time Dimension with Fact Table containing Start Date and End Date

    Hi Gurus,
    I have a time dimension with Year till Date. I have a fact table which consists of Start Date, End Date, Person ID, Department ID.
    How do i design Time dimension with fact table the below scenario
    In the dashboard i have start Month and End month as prompts.
    In the report i need to display Count(Person ID) > Start Date and < End Date along the trend.
    For instance, i have selected Jan-2009 as start date and Apr-2009 as End Date, then i need to display Count(Person ID) of Jan-2009, Feb2009, Mar-2009 andApr-2009.
    I Can not connect Time dimension with only Start Date or only with End Date to get the trend along the months.
    Please advice on the issue which i am having.

    Hi,
    Thanks for the response, Infact i tried using Complex join in physical layer. I have considered Time table joined with Fact table, and used >= and took and alias of the Time table and joined fact table using <=. When coming to BMM, i am not knowing how do i design this as if i merge the both the time dimensiona and its alias into single table, values will not be correct and if i make them as seperate columns. i can not show the trend as both are different columns.
    Can you please let know where i am going wrong.
    Thanks

  • Unable to found Bucket start date and bucket end date in OFSAA 6

    Hi,
    How to find the Bucket start date and bucket end date in OFSAA 6.
    I found following tables to mapped to Dim_Result_Bucket but  unable to found columns pointing to Bucket Start Date and Bucket End Date.
    Tables:
    fsi_income_simulation_buckets
    fsi_process_run_history
    fsi_time_bucket_master
    fsi_lr_irr_buckets_aux
    fsi_m_alm_process
    Kindly let me know the solution.

    Hi;
    Please check below link which could be helpful for your issue:
    https://blogs.oracle.com/ebs/entry/service_contracts_warranty_created_by
    Regard
    Helios

  • Manual creation of PPDS Planned Orders by start date and time

    Hi,
    When an order is manually created in any ppds standard transaction the start date is calculated according to the availability date entered, the order quantity and the master data 
    Is it possible to manually create an order based on the start date and then the availability date is calculated according to the order quantity and master data?
    Thanks
    CTF

    CTF,
    You can 'forward schedule' manually created orders.
    Scheduling direction is dependent on the Strategy profile.  During order creation, you can change this.
    When on the order create screen (/sapapo/rrp5), select the strategy button at the top.  This will bring up the default strategy for your userid.  You can alter the "planning direction" to be 'forward' or 'forward & reverse' depending on your business requirements.  Selecting Save will then make this scheduling strategy your default; otherwise just hit green checkbox.
    Now the order entry screen will have 'start date' entry box.  Avail date will then be calculated.
    Best Regards,
    DB49

  • Planned order creation with PDS valid on only order start date and not finish date

    Hi All,
    We have requirement to allow creation of planned order manually if production version is valid on order start date and not finish date.  This is because lead time of order is longer. I refered OSS notes 385602. I could find out solution for this is implementation of OSS note 694140 to change validity mode at activity level to consider start date of first produce activity  in validity interval. Problem is even If I create order in APO by implementiong this note planned order is not transfered to ECC and it gets stuck with error production version not valid.
    Is there any way in ECC to control this? Any config or customization?
    Regards,
    Santosh

    Nilesh,
    I think there is a simple procedural skip happening in your business process. You are right when a planned order is created after MRP it would default assign it to the first available production version. 2options available for us,
    1. First use transaction MF50 and do the line loading and assign the quantites to the production versions/Production lines, so that the actual capacity planning is getting completed. This way you can have planned orders with both the production versions and matching to your actual line capacity.
    2. Use Quota arrangement concept, to automatically split the Planned orders during MRP for a percentage based on individual production versions.
    Now when backflush is performed S225 table is updated and Planned order qty also gets reduced.
    Hope this helps....
    Regards,
    Prasobh

  • Scheduling start date and end dates

    Hello Gurus,
    I am trying to understand the schedule start date and schedule end date functionality in Plant Maintenance. I do understand the basic start and end dates. Currently I set up u201C3.Do not adjust basic dates, dep rqmts to order startu201D and set the scheduling type as u201CForwardsu201D . Please note we donu2019t do any capacity planning or leveling.
    So my question is, why the scheduling start date is defaults to the basic  start date  for forwards and scheduling finish date defaults to basic finish date for backwards ? I tried adding couple of operations and save the work order. It did not change anything in schedule dates.
    Do we really need to care about scheduling dates if we donu2019t use capacity planning ?
    Please advise
    Mahee

    Hi,
    As per priority, final dates would be calculated as we will define the duration based on the priprity. Either current date or basic date only applied to Scheduling start date.
    You can change the scheduling start date so that based on priority, final date would be calculated.
    Regards,
    Maheswaran.

  • Search on basis of start date and end date

    Hi,
    I have added two fields 'Start Date' and 'End Date' on a search page.
    I have done the VO extension also.
    Now, I have to implement search logic to get all the records created in between 'Start Date' and 'End Date' after pressing the 'GO' button on that page.
    Can anyone please provide guidance to extend the controller.
    Thanks in advance.
    Gaurav.

    Hi Anil,
    Thanks for ur reply.
    As per the link, I have written following code in the controller :
    package oracle.apps.irc.vacancy.webui;
    import oracle.apps.fnd.framework.OAApplicationModule;
    import oracle.apps.fnd.framework.OAViewObject;
    import oracle.apps.fnd.framework.webui.OAPageContext;
    import oracle.apps.fnd.framework.webui.beans.OAWebBean;
    import oracle.apps.fnd.framework.webui.beans.table.OAAdvancedTableBean;
    public class xxVacancyCriteriaCO extends VacancyCriteriaCO
    public xxVacancyCriteriaCO() {}
    public void processFormRequest(OAPageContext pageContext, OAWebBean webBean)
    super.processFormRequest(pageContext, webBean);
    // Pressing the Go button causes the search to be executed.
    OAApplicationModule am = (OAApplicationModule)pageContext.getApplicationModule(webBean);
    OAViewObject oaviewobject = (OAViewObject)am.findViewObject("XXIrcVacancySearchCriteriaVO");
    if (pageContext.getParameter("Go") != null)
    String created = pageContext.getParameter("ViewDate");
    oaviewobject.setWhereClauseParam(0, created);
    oaviewobject.executeQuery();
    OAAdvancedTableBean table = (OAAdvancedTableBean)webBean.findChildRecursive("ResultsTable");
    table.queryData(pageContext, false);
    But while compiling it, I am getting the error as :
    "Error(14,42): PerTransactionTopCOImpl not found in class oracle.apps.irc.common.webui.IrcOAControllerImpl in class oracle.apps.irc.vacancy.webui.VacancyCriteriaCO in class oracle.apps.irc.vacancy.webui.xxVacancyCriteriaCO"
    Can u please suggest where the mistake is?
    Thanks again.
    Gaurav.
    Edited by: Gaurav on Jan 14, 2011 12:51 AM

  • Function Module for getting Payroll start date and end date

    Hi Gurus,
      If I give one date then is there any function module to find the payroll period start date and enddate for that given date?
    Points will be awarded
    Thanks
    Ravi

    Hi,
      Try these FMs
    HR_PAYROLL_PERIODS_GET
    HR_BEN_PAY_GET_PAYROLL_PERIODS
    HR_PAYROLL_PERIOD_GET
    HR_P06I_GET_PAYROLL_PERIOD
    Regards,
    PRashant

  • How to display absence start date and end date in workflow notification?

    Hi,
    I would like to display the absence start date and end date at
    1) Subject of workflow email notification/worklist notification OR/AND
    2) Content of workflow email notification/worklist notification.
    Appreciate if anyone can advise on this as this information is very crucial to our client.
    Thank you.
    Regards,
    Shiau Chin, Teo

    1) Subject of workflow email notification/worklist notification OR/ANDyou have to customize the subject of notification message. You can find the message using following query.
    SELECT message_type, message_name
       FROM wf_notifications notif
      where notification_id = <your notification>;> 2) Content of workflow email notification/worklist notification.
    its already there I think.

  • Basic Start Date and Schedule Start date

    Dear All,
    In a Preventive Maintenance order generated through IP30, I am getting Basic Start Date and Schedule Start date as different dates. For all other orders those date as coming same.   I am using forward Scheduling. Can any one of you please tell me what would be the problem?
    Regards,
    Babu R

    [SAP Note on Scheduling - Note 45433|https://websmp230.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=45433]
    Regards,
    Maheswaran.

  • Basic start date and finish date changing in the past

    Hello Gurus,
    I set the scheduling parameters as " Do not adjust basic dates, dep rqmts to order start " and also assigned the priority to populate the basic finish date. System does calculate the finish date based on the priority and start date as current date but it does allow me to change both dates in past or future which should not happen.
    Please do note that I activated the defaulted date as current date as well. Even I removed this mark and did not work.
    Please let me know if there is any way to restrcit the changing it alteast in the past.
    Mahee

    This can be prevented using one the following ways depending upon your needs
    ---> Set the "start in past" field to appropriate value using transaction OPU7 for order type /Plant combination
    ---> Make the "Basic start date  and Basic end date" fields as "Display only" through the Field selection config for the order type.
    ---> Use the user exit on "SAVE" of the order to check for the same
    Regards
    Narasimhan

  • Basic start date and basic finish date in the maintenance sub-order

    Hi guys,
    when I create a maintenance sub-order by the transaction IW36 are the Basic start date and the Basic finish date taken,inherited from the principal Maintenance order?And if it is in this way,is there the possibility to put these two dates as a current day only on the  maintenance sub-order ?Thanks in advance...
    Maximilian

    Here is my code
      DATA : lv_date_diff TYPE i.
      lv_date_diff =  caufvd_imp-gltrp - caufvd_imp-gstrp.
      caufvd_exp-gstrp = sy-datum.
      caufvd_exp-gltrp = sy-datum + lv_date_diff.
    This is a 4 year old answered message. Please open a thread for your specific query.
    -Paul
    Moderator
    Edited by: Paul Meehan on Nov 24, 2011 8:42 AM

Maybe you are looking for

  • How to Get Opening Balance?

    Hello All, from our legacy system we inputed it to SBO... now i want to get the summary of all the opening balance. how can i get the data that i wanted to. is there a built in report in SBO for this? Please advice. FIDEL

  • How can I remove the battery from my IPhone

    my phone will not complete a call.

  • Loading Period 0 - Time Period

    Have a question in Hyperion Planning. We have a Time Period Dimension with two Children (Beg Balance and Year Total). Year Total has the usual childeren (Q1, Q2, etc) and the Q's have the usual children (Jan, Feb,...Dec). Where do people load Balance

  • Help in BADI

    Hi, I have created a BADI as the current BADIs for the package are not fulfulling my requirement. Now my doubt is how to attach the BADI that i have created to the transaction, so that the changes i have done in the BADI are reflected when running th

  • OWB Release 2 Download link not working

    When i try to download the new OWB Release 2 (10.2.0.1) for the windows platform i get 404-Error. http://www.oracle.com/technology/software/htdocs/devlic.html?http://download.oracle.com/otn/nt/warehouse/10201/OWB_10.2.0.1.win.zip Can you please fix t