Hi friends I need to Know how can I determine which level represents the items en Bill of Materials, is that accesible using a field or table in Business One.
The problem is that I need to designa a report but part of the complex is the I use many BoM with sub-layer such as 5 o 6 levels since father to the last layer in the BoM, but the problem is how can I know what level or layer represents.
The production report menu had it a "Bill of materials Report" and in that report exists a column "Depth", how the report determine this field??
Thanks in advance

Hi,
You may check this first: http://forums.sdn.sap.com/thread.jspa?messageID=10349706#10349706
Please close your old open thread.
Thanks,
Gordon

Similar Messages

  • MPs at second level of BOM

    Hi,
    I have a header material A-MRP type -PD. independent requirements maintined in MD61 for 25 qty.
    I have a bom compoennet B directly below A -MRP type -M1.
    Now when multilevel MRP is run for A using MD02 , i  see no dependent requirements are generated for B.
    when single level MPs is run for B using MD42, no requirements are genrated for B.
    How do we plan MPS items used as a BOM component. Is maintining separated PIR for B the only option to plan second level MPS bom items.

    Dear Santosh
    I v tested your scinario.My setup was like this : PIR -FG -M6-10, M7-200,M8-1000  (Monthly )
    FG : TEST234   MRP TYPE : PD  Planning Strategy : 10      Indi/Coll : Blank          Stock : 0
    ROH : TEST      MRP Type : M1    Planning Strategy : 40     Indi/Coll : 2                 PTF : 30    Stock : 0
    ROH: TEST6    MRP Type : PD        Plng St : 40                    Indi/Coll : 2   Stock : 0
    It is running perfectly with this set up .I am getting Two PR for TEST /TEST6 and Planned Order for FG.I run MRP with NETCH, 2,1,3,3,2 with diplay material before save marked .
    Observation : As PTF -30  days for TEST , I have seen a firmed PR  generated as per the BOM qty  with the PTF -Check in MD04.
    I hope this combination should work .Check if you are missing something .
    Regards
    JH
    Edited by: Jiaul Haque on Jun 23, 2010 9:28 AM

  • Loading All Levels of BOM data to BW

    Hi Experts,
    I am loading all BOM data that is all levels of BOM data to BW. can anyone suggest me the steps using what should i create generic exctractor FM or view on tables (MAST,STKO,STPO) ?? please give me the detailed steps for the loading data to BW from R/3. because i want to do reporting at any level. ?
    vikrant

    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/b0af489e-72b1-2b10-159d-abb8058fb88d?quicklink=index&overridelayout=true
    Just check if this helps
    Prathish

  • Query to showed all level of BOM details, sort by create/update date

    Hi expert,
    I need a query to display all the level of BOM and can be sort by create / update date.
    The display of query should be as below:
    A (1st level) Parent BOM
    B (2nd level) Child BOM 1
    B (2nd level) Child BOM 2
    C (3rd level)  Child BOM 2 - 1
    C (3rd level)  Child BOM 2 - 2
    B (2nd level) Child BOM 3
    B (2nd level) Child BOM 4
    Below is the BOM  query that can only display up to 2nd level and cannot sort by date.
    Can someone please help to modify or there is a better query?
    Thanks
    Declare @BOMDetails table(TreeType Nvarchar(MAX),PItem NVARCHAR(Max),PName NVARCHAR(MAX),CItem  NVARCHAR(Max),CName NVARCHAR(MAX),[Quantity] Numeric(18,2),[UoM] NVARCHAR(MAX),[WareHouse] NVARCHAR(MAX),[IssuMethod] NVARCHAR(MAX),[PriceList] NVARCHAR(MAX))
    INSERT Into @BOMDetails
    SELECT T1.TreeType ,T0.Father AS [Parent Code], T2.ItemName AS [Parent Description], T0.Code AS [Child Code],
    T1.ItemName AS [Child Description], T0.Quantity ,T0.Uom ,T0.Warehouse ,T0.IssueMthd,T0.PriceList  
    FROM ITT1 T0 INNER JOIN OITM T1 ON T0.Code = T1.ItemCode
                 INNER JOIN OITM T2 ON T0.Father = T2.ItemCode
    Union All
    SELECT ' ',T0.Father as [Parent Code], T2.ItemName AS [Parent Description], ' ', ' ', 0, ' ',' ',' ' , 0 FROM ITT1 T0 INNER JOIN OITM T1
    ON T0.Code = T1.ItemCode INNER JOIN OITM T2 ON T0.Father = T2.ItemCode
    Group By T0.Father,T2.ItemName
    ORDER BY T0.Father,t0.Code
    update @BOMDetails set PItem='' ,PName='' where TreeType='N' or TreeType='P'
    Select PItem as[Parent Code] ,PName as [Parent Description],CItem as [Child Code],CName as [Child Description],Quantity,UoM,IssuMethod ,PriceList    from @BOMDetails

    Hi,
    Try this query and modify as per your requirement:
    SELECT
    T0.[Father] as
    'Assembly',T0.[code] as 'Component1', t10.[ItemName]
    'Description1',T1.[Code] as 'Component2', t11.[ItemName]
    'Description2', T2.[Code] as 'Component3', t12.[ItemName]
    'Description3', T3.[Code] as 'Component4', t13.[ItemName]
    'Description4',T4.[Code] as 'Component5', t14.[ItemName]
    'Description5', T5.[Code] as 'Component6', t15.[ItemName]
    'Description6'
    FROM
    ITT1 T0 LEFT OUTER
    JOIN ITT1 T1 on T0.Code = T1.Father LEFT OUTER JOIN ITT1 T2 on
    T1.Code = T2.Father LEFT OUTER JOIN ITT1 T3 on T2.Code = T3.Father
    LEFT OUTER JOIN ITT1 T4 on T3.Code = T4.Father LEFT OUTER JOIN ITT1
    T5 on T4.Code = T5.Father LEFT OUTER JOIN ITT1 T6 on T5.Code =
    T6.Father left outer join oitm t20 on t0.father = t20.itemcode left
    outer join oitm t10 on t0.code = t10.itemcode left outer join oitm
    t11 on t1.code = t11.itemcode left outer join oitm t12 on t2.code =
    t12.itemcode left outer join oitm t13 on t3.code = t13.itemcode left
    outer join oitm t14 on t4.code = t14.itemcode left outer join oitm
    t15 on t5.code = t15.itemcode
    Thanks & Regards,
    Nagarajan

  • Mixed Manufacturing Strategies at Different Levels in BOM

    Dear colleagues,
    We have a situation where the BOM is about 5 levels deep. At the top level, the business needs a MTO type of solution.  At the semifinished level i.e the assemblies need to be made after the receipt of sales order.   Therefore, we can call the assembly level as either Assemble to order or Make to Order.  However at subassembly level, forecasts are likely to be keyed in. Therefore, this is a make to stock.
    We have some solutions that we have thought about so far.
    1)  I would like to hear if any of you have implemented multiple strategies within a single BOM structure and what challenges / issues you may have faced?
    2)  I would like to know if any you came across a situation where MTO production order in one level of BOM drives another MTO production order in another level?
    3)  What is the best way to manage and establish a hard pegging between different levels of BOM in R3?  ( I know that this is easier in APO)
    regards,
    Pavan

    We have implemented following scenario.
    1st level - FERT - MTO strategy - type 20
    2nd level - HALB - No strategy
    3rd level - ROH/VERP - No strategy

  • Why is my Noise Layer (with Levels Adjustment) not saving correctly?

    I'm hoping this is an easy fix, but this problem has me all twisted...
    I have an image built in Photoshop with a Noise layer playing the role of stars on a mainly black background with a Levels Adjustment cleaning up the lighting to dumb it down, but when I go to save the image (in either jpeg or png), that same noise layer bypasses the Adjustment and shines through, distorting the whole image... I simply just want it to save what I have on the screen, but as soon as I go to save, it merges the layers and the noise comes through extremely harsh out of nowhere...
    Attached are examples of the difference of before and after the save... (and the "after" save is a bit more harsh than its displayed here, but you get the point)

    The top larger image is the "after" I save (.png form), the screenshot within photoshop is the "before"...
    I've also tried to the merge layers beforehand as well, but it actually just displays the image as if it were the saved version, with the noise coming through extremely hard. I just didn't save it yet.
    I appreciate the suggestion!

  • How to get BOM compoents at the lowest level using BOM tables?

    I am doing a report based on CK13N wherein i hav material and plant as the selection parameters and based on that i get the product costing of the entire BOM.
    I pass material to MAST.get the BOM num and usage
    Pass it to STAS and get STLKN (ITEM NODE NUMBER)
    After that i pass STLKN and STLNR(BOM number) to STPO to get the BOM subitems based on UPSKZ(Sub items indicator). But that fails because UPSKZ is nt set for all the assemblies.
    So hw do i get the BOM components at the lowest level USING these TABLES

    Ashwin
    1) As Taj Said, Sub item is not actually a item or component.
    2) The sub item number what we are viewing the sub item sceen will be 001,002 like ,it not mean any item
    3) For Example a car has 4 wheels, so the item/component description is WHEEL
    4) The BOM Quantity of wheel is 4
    5) In BOM General item over view, you can select the wheel then click subitem
    6) This will lead to sub item screen
    7) There you can see subitem 001,002,003 then installation point,subitem text,qty etc
    8) Against installation point you can decalre Front Left,Front Right,Rear Left,Rear Left
    9) Against sub item text,qty you can declare Front Left wheel-1,Front Right wheel-1, Rear Left wheel-1, Rear Right wheel-1 no
    9) This does not mean there are addition Sub items for wheel (ie) additional BOM component)
    10) Just declaring the positions for fitting in the car to ease the Assembly Person for fixing the wheel
    11) So if you get the cost for WHEEL as assigned in BOM item then ok, don't worry about sub item cost
    Reward me if my answer is helpful
    K.Prabakaran

  • Layer mask levels, How to get to it?

    Im watching a photoshop video, and he tells me to go into levels for the layer mask, but doesnt tell me how to do it. Any one know how?

    Hello. make sure the layer mask is targeted (click on it if there is no corner outlines) then do CTRL+L for levels. Or Image>Adjustement>Levels.

  • Hello logic for level in BOM component explosure . like in CS11 , CS12

    Hello all,
    i have all the material and the components for the material in an internal table .
    Now i am not getting the logic for getting the level number of the component.
    Now i am having the data in an internal table as in CS11 ,with out the yellow record which represents the header of the components .
    Can any one please help me on this .
    Thanks and regards ,
    Prem

    better to use the fn module
    DATA : BEGIN OF I_BOM OCCURS 0.
            INCLUDE STRUCTURE STPOX.
    DATA : END OF I_BOM.
    CALL FUNCTION 'CS_BOM_EXPL_MAT_V2'
        EXPORTING
          CAPID                 = 'PP01' " application area
          DATUV                 = SY-DATUM
          MEHRS                 = 'X' " for multi level bom explosion
          MTNRV                 = P_MATNR "Header material
          WERKS                 = P_WERKS " Plant
        TABLES
          STB                   = I_BOM
        EXCEPTIONS
          ALT_NOT_FOUND         = 1
          CALL_INVALID          = 2
          MATERIAL_NOT_FOUND    = 3
          MISSING_AUTHORIZATION = 4
          NO_BOM_FOUND          = 5
          NO_PLANT_DATA         = 6
          NO_SUITABLE_BOM_FOUND = 7
          CONVERSION_ERROR      = 8
          OTHERS                = 9.
      IF SY-SUBRC <> 0.
        MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
                WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
      ENDIF.
    here in i_bom-stufe  is the level of the bom.
    regards
    shiba dutta

  • For level in BOM component explosure . like in CS11 , CS12  ( Urgent )

    Hello all,
    i have all the material and the components for the material in an internal table .
    Now i am not getting the logic for getting the level number of the component.
    Now i am having the data in an internal table as in CS11 ,with out the yellow record which represents the header of the components .
    And i am using the funtion module 'CSAP_MAT_BOM_READ'
    BOM Header Material 1111 has the components 1121 and 1122. These components are at level 1
    Component 1121 is a BOM Header as well and contains the components 1311, 1312 and 1313. These components are at level 2.
    Component 1313 is a BOM Header as well and contains the components 1141,
    i am getting out put as
    material   component
    1111              1121
    1111              1122
    1111              1311
    1111              1312
    1111              1313
    1111              1141
    along with this i want the level number ...
    Can any one please help me on this .
    Thanks and regards ,
    Prem

    Use function module CS_BOM_EXPL_MAT_V2, and in the import parameter set the MEHRS to 'X" 9 Set Multi level explosion to true.
    Like this -
      CALL FUNCTION 'CS_BOM_EXPL_MAT_V2'
           EXPORTING
                CAPID                 = C_CAPID 
                DATUV                 = P_DATUV
                MTNRV                 = T_MAST-MATNR
                STLAL                 = T_MAST-STLAL
                STLAN                 = T_MAST-STLAN
                WERKS                 = T_MAST-WERKS
                MEHRS              = 'X'
           TABLES
                STB                   = T_STB
           EXCEPTIONS
                ALT_NOT_FOUND         = 1
                CALL_INVALID          = 2
                MATERIAL_NOT_FOUND    = 3
                MISSING_AUTHORIZATION = 4
                NO_BOM_FOUND          = 5
                NO_PLANT_DATA         = 6
                NO_SUITABLE_BOM_FOUND = 7
                CONVERSION_ERROR      = 8
                OTHERS                = 9.

  • Revision level in BOM

    Dear All,
    I want to bring the column of the revision level in Bill of material display screen
    Regards,

    Going a little farther with this concept:
    If I have a material planned through MRP and there are multiple revision levels for the item, will the reservation for the material reflect the revision level at the time the reservation was made or the revision level at the time the material is required?  
    For example, material A has a change record which creates a new revision level a month from today.  Today, MRP creates a reservation for that item due for production in six weeks.  Does MRP create RESB with the revision level as of today or as of the new change record?  What does MRP use for the revision level determination date?

  • Add Extra Columns into Multi-Level Explode BOM (List Report)  - CS12

    Hi Experts,
    I wish to add extra columns into the list report generated from program RCS12001 (calling from t-code: CS12). The current layout will be AS-IS and the only way i wish is to add-in few new columns in the report.

    Hi
    declare select-options instead of parameters
    for converting a report to ALV
    create a field catalog.
    for this two option declare a itab with       
    fcat    TYPE slis_t_fieldcat_alv
    and pass the field name,descr etc to fcat and append the same.
    or create structur same as your itab and pass the same with FM
    'REUSE_ALV_FIELDCATALOG_MERGE'
    use either <b>reuse_alv_grid_display or reuse_alv_list_display</b> .
    and pass the itab.
    thanks
    Shiva

  • How to set levels values in adjustment layer via script?

    I try to make a script which generates a non destructive adjustment layer for levels which already sets values for shadow levels and highlight levels. I tried the scripting listener in order to record it. Unfortunately the scripting listener only records the creation of adjustment layers but not their settings like shadow or highlight levels.
    The first question here: Why can't the scripting listener do this?
    So I tried to do it on my own and came up with the following script which won't work. My second question therefore is, can you help me to make a script which achieves my goal? Thanks a lot. I use Photoshop CC 2014.
    var desc780 = new ActionDescriptor();
    desc780.putInteger( charIDToTypeID( "ShdL" ), 60 );
    desc780.putInteger( charIDToTypeID( "HghL" ), 190 );
    var list126 = new ActionList();
    list126.putObject( charIDToTypeID( "LvlA" ), desc780 );
    var desc779 = new ActionDescriptor();
    desc779.putList( charIDToTypeID( "Adjs" ), list126 );
    executeAction( charIDToTypeID( "Lvls" ), desc779, DialogModes.NO );
    Here is the script which has been recorded by the scripting listener. As you can see there is no setting of the adjustment layer.
    var idMk = charIDToTypeID( "Mk  " );
    var desc188 = new ActionDescriptor();
    var idnull = charIDToTypeID( "null" );
    var ref135 = new ActionReference();
    var idAdjL = charIDToTypeID( "AdjL" );
    ref135.putClass( idAdjL );
    desc188.putReference( idnull, ref135 );
    var idUsng = charIDToTypeID( "Usng" );
    var desc189 = new ActionDescriptor();
    var idType = charIDToTypeID( "Type" );
    var desc190 = new ActionDescriptor();
    var idpresetKind = stringIDToTypeID( "presetKind" );
    var idpresetKindType = stringIDToTypeID( "presetKindType" );
    var idpresetKindDefault = stringIDToTypeID( "presetKindDefault" );
    desc190.putEnumerated( idpresetKind, idpresetKindType, idpresetKindDefault );
    var idLvls = charIDToTypeID( "Lvls" );
    desc189.putObject( idType, idLvls, desc190 );
    var idAdjL = charIDToTypeID( "AdjL" );
    desc188.putObject( idUsng, idAdjL, desc189 );
    executeAction( idMk, desc188, DialogModes.NO );

    Photoshop Scripting

  • SG:50, Cannot convert planned orders to prod orders at BOM component level

    Test scenario for Strategy Group 50 (Planning without final Assembly)
    Product Structure
    Material-->  SG50.00 > FERT> (Strategy Group: 50)
    Material---> SG50.02 --> HALB --->(Strategy Group: 40)
    Material---> SG50.04 ---> ROH --->(Strategy Group: Blank)
    Maintained PIRs and Ran MRP at the header level, Planned orders are created
    with order type VP at levels of BOM structure. Thus cannot covert planned orders
    to production orders without having sales order.
    But my understanding of Strategy Group 50, is BOM components can be produced before hand (i.e.
    before sales orders are recieved ). Now planned orders with order type VP not able to convert
    planned orders to prod orders at BOM component level

    Stuti/Prasobh:
    Thanks for your inputs, it answers my question
    Intially maintained Individual/Collective indicator to "2" at header level (FERT), which is why all the planned orders are created with order type VP
    Changed the Individual/Collective indicator to "blank " at header level (FERT), and maintained Individual/Collective indicator  to "2" at component level
    Reran the MRP (MDO2), with the following settings --> Delete and Recreate planning data and Check mark on  Also plan on unchanged components
    Able to see planned orders at component level with order type LA
    Due points have been assigned

  • New Adjustment Layer - Levels/histogram GLITCH ?

    I use the non-destructive Adjustment Layers (Layers/New Adjustment Layer) all the time.  Today when I was playing around on the CS6 beta for Photoshop, I discovered that after selecting the New Adjustment Layer for Levels that I couldn't see the historgram graph when tried to re-access the Adjustment Layer by clicking on the Levels icon on the layer palette.  I shut photoshop off and reopened it, hoping it had a quick reset fix... but no luck.  When I first open up a Levels Adj. Layer, I can see the historgram and slide bar, but when I close it, and return to it to do additional work, I can no longer see the histogram graph. All I see is a smaller version of what looks like a small dark grey levels box, with the 3 levels arrows (left-dark, middle-mid tones, right-light) but no histogram to make adjustments with.
    Am I missing something here...? Is this super obvious and I just need another cup of coffee to make it all become clear?

    Hello, could you post a screen capture? http://forums.adobe.com/message/4209263#4209263
    And please post Photoshop's help>System info...
    Is there any content in the image? the levels histogram will look empty if the image is all black or white.

Maybe you are looking for