Licensing cost estimation for apex
We are in the process of developing a web app on apex and plan to deploy the same for our customer as a hosting service model.
In this regard, can someone guide us on the licensing costs and any related cost component ( fixed or variable components) for commercially deploying apex for a customer.
Thanks in advance
Hi,
APEX is 100% free (assuming you have a valid Oracle license), in other words you do not need to purchase any additional licenses for APEX.
Depending on your exact requirements you could even use Oracle XE, which is a free edition of the Oracle database, subject to some restrictions, which includes a preinstalled version of APEX.
There are also a number of hosting companies who specialise in hosting APEX applications, should you choose to not want to perform the hosting yourself.
There is a list of hosting companies available here -
http://wiki.shellprompt.net/bin/view/Apex/HostingExamples
In the interests of disclosure, I own one of those companies (Shellprompt Hosting), so feel free to contact me directly ([email protected]) if you wish to.
Similar Messages
-
License cost involved in HCM Process and Forms for Adobe Interactive Forms
Hello All,
We are planning to implement HRAS business package and use HCM Process and Forms.
There are lots of developments involved and before to start with, i would like to understand is their any license cost involved for using Adobe Interactive Forms and also if we are doing new enhancements to the forms.
Also send me some links about the license involvement if any ?
Thanks & Regards & Cheers
VjCheck the following link:
ADS Licence for SAP ESS MSS
Regards -
Error while doing Std.cost estimation.
Hallo gurus,
I am facing one problem while doing Std.Cost estimation.
Let me explain in detailed..
I am doing costing estimation for a Product. This product contains both Bought out Material and Customer Supplied Products.But both are coming as Material class as Raw material.
But Overheads to be calculated differently for those means for Bought out product - 1.5% and for Customer supplied Products-5%.
So i have created one Overhead Key and the same is attached to Overhead
Group and this overhead group is attached to a respective material.
In Costing sheet for overhead i have selected Dependency D010 and maintained the same along with Overhead key..
But while executing CK11N, system is not calculating the same.
Pls through some light on this....
Advance Thanks..
Regds,
Janardhan.Did you attached the costing sheet in costing variant?
-
Dear All,
While doing the Cost estimation for a Product i am getting the below mentioned error..
Cost estimate for material W275271299NEW / plant LEP1 is incorrect
Message no. CK168
Diagnosis
The system found errors in the cost estimate of material component W275271299NEW from plant LEP1.
System Response
The results of raw material cost estimates that have errors are not used in the product just costed. Only cost estimates that do not have errors or that were released are used in cost rollup.
All assemblies that contain material W275271299NEW from plant LEP1 in their structure are indicated as incorrect.
The message sets the costing status of the assembly to 'costed with errors'.
Procedure
Eliminate the error at the highest low-level code.
The Material W275271299NEW is Scrap material. That is generated at the time of Production. this material i have mentioned Negative in BOM.
Regds,
Janardhan.Check with your Practice for Matrices,Technical refererence models, Governance policies, standard templates for requirement gathering etc.
-
Changing Cost Estimation ( ML activated)
Hi All,
We have ML activated and we have Price Control as "S" for all ROH, HALB & FERT Materials.
The intention was to have one Cost Estimation per year and difference to be posted to variance.
The Material Valuation Strategy is
1. Valuation Price from User Exit
2. Price from Info Record
3.MAP
4.Planned Price 1
Now our issue, in June 2011 we have executed cost estimation for some new materials(say one Material ABC - Cost estimation must be $12000 but it is updated as $19000 due to wrong price maintenance) with wrong price and made goods movement.
Now when we want to correct the cost estimation by executing a new cost estimation( i.e. we want to overwrite the $19000 by $12000 for the ABC material) by this month( July 2011), but the system is picking the same old cost estimation price (old cost estimation price as $ 19000).
Can you suggest, how we can overwrite the existing cost estimation.
Do suggest.
Regards,
RexHi All
Costing valuation follows the priority you have define. If this is taking 19000 maybe this value is coming from the first option (user exit).
I suggest you to change the priority to take price from planned price 1. Go to OKKN and change the priority for Valuation variant.
...or you have to assure there is no prices from priority from 1 to 3.
Regards. -
Hi all,
How do we maintain standard cost estimation for the material master?
Its very urgent
i will assign the points
venuHI ashish,
Thanks for your information. already i given material number but system not entering price automatically.
from where system picks the price?
Itz very urgent
Once again thanks for your cooperation
I will assign the points
Thanks in advance
venu -
Hi,
Can anyone tell if there is any license cost associated for the consumption of Siebel Web Services? If yes then how Oracle governs the license cost for this.
Thanks,
RohitHi Guru,
I would really appreciate if someone could help me with my problem.
Currently, I am doing an upgrade 7.8 to ver 8.1 after executed the UPGPHYS I compiled all project to be able to extract newest SRF.
When I tested this new SRF via thin client, I noticed that all screens have gone missing in the GUI. But when checking it in Tools they are all present, all objects are migrated successfully to the new version of Siebel which 8.1. However, I am wondering why all views from certain screen have been set to INACTIVE. I have tried to modify it by setting the object locked to mine and then change the inactive to active view. Unfortunately, I could not able to change it despite from being a locked object.
I tried to re-picked the missing screen from the Application (Obj Explorer) in Siebel Tools. Then I recompiled it hoping that this will be shown in the GUI, still not showing up.
And also when logging into the application the home page was not displaying, the error says SADMIN does not allow accessing view “FINS Home Page View.(SBL-DAT-00329)” . I tried to search in supportweb but I could not find any relating to this.
FYI: These views are available to SADMIN responsibility.
The only reason I can think of at this point could be the views associated to each of the migrated screen are set to INACTIVE. For some reason I don’t know as to how they became Inative after the upgrade.
Can I know if there’s someone has experienced this issue during your upgrade project? Please help me I really appreciate your inputs and thoughts. -
Error: no product cost estimation possible, at the releasing for accounting
Hi Guru,
while releasing for account in billing document for the finished product.Shows Error as:"no product cost estimation not allowed". Thou I cheked configuration checking of costing key in COPA and costing variant of relevant one looks fine. Plz guide me further more configuration and basic settings needed in to solve this task.
Thanking u in advance
Murali.Pawan,
Thanks for your quick reply.
I have done those change also, still it is coming same as " No Product cost estimate was found". check you costing key 100 in COPA configuration. i have checked costing key configuration , in that costing varinat PPC1, Costing Version 1, Period/Indicator as "Current Standard cost estimate Acc. to entry in Material Master" .
How to fix this, guide me
Sateesh -
Licensing cost: For SAP R/3 4.7 to ECC 6.0 Upgrade
Hello,
I am planning to upgrade my SAP R/3 4.7 System to ECC 6.0.
I would like to know whether any additional Licensing cost is involved for this SAP software upgrade.
Also, I have three system landscape. Can you give me some pointers to SAP Upgrade Roadmap and Upgrade strategies for 3 system landscape upgrade?
Thanks.
-Nirav.Hi Nirav,
the maintenace cost will be the same as before.
the maintanance cost include the possibility
that if you pay the maintenace fee regularly you can always get the
newest software releadse and the support packages and kernel for it.
please also look at this link.
http://service.sap.com/maintenance
Kind regards
Imre Takácsi-Nagy
Senior Support Consultant II.
SAP Global Support Center Austria
Netweaver WEB Application Server ABAP / JAVA -
Price for Cost Estimation - Info Records
Hi All,
We need a clarification on how system picks the price for COST ESTIMATION with following setting in Valuation Variant.
1.Valuation Price from USER EXIT
2.Price from Purchasing Info Records
3.M A P
4. Planned Price 1
Sub Stratergy.
1.Effective Price from Purchase Order
2. Net Quotation Price
3. Gross Quotation Price.
If we have 3 info records with the same validity date and different price in each for three vendor, what price will system pick for calculating the stand cost estimation.
We have activated Material Ledger and we in ECC 6.0.
Do suggest.
Regards,Hi ajai,
I agree with your point,we have 3 info record for a material and 2 are valid as such. The price maintained in two info records are as 7.5 & 1.0 respectively(valid info records).
The last price in the purchase order (of the info those records) are 0.41(dated on 09.04.2010) & 0.2(dated on 19.04.2010) respectively, but when we execute the cost estimation the system picks the price of 7.5 not the least price of 0.2(as its the latest purchased price).
Do let us know why and of what logic the system picks the highest price.
Do revert.
Regard, -
Table for Valuation Price from USER EXIT - Cost Estimation
Hi All,
Can you let us know from where the system picks the price for VALUATION PRICE from USER EXIT when we have following setting in valuation variant
1.Valuation Price from USER EXIT
2.Price from Purchasing Info Records
3. Planned Price 1
Sub Stratergy.
1.Effective Price from Purchase Order
2. Net Quotation Price
3. Gross Quotation Price.
Now when we execute CK11N for a material, the system displays a cost price as 316 Euro/ unit.
But Standard price is 290 euros, info record price is 294 euros & planned price 304 euros.
Our previous cost estimation ( period 1, current period is 5) was 316 euro/unit (which was not correct), so deleted the cost estimation with CKR1 and try to rerun the cost estimation to update the value (new price), but still the system is picking the old price.
Can you let us know from where does(transaction code & table) the system is picking the old values.
In CK11N Material valuation (Valuation tab) its showing as Valuation Price from USER EXIT.
We have activated Material Ledger with price control "s"and we in ECC 6.0.
Do suggest.Hi,
Where & how can i find the exit.
Do suggest.
Regards, -
Choose the appropriate and cheapest license for Apex
Dear Experts,
If a customer likes Oracle Apex and want his system to be built with this technology on his private server but he has problems in expensive license of Oracle Database compared with MS SQL Server.
If the customer has:
- Planned No. of users: 25 user - max of 10 concurrent users.
- Server Processor: Intel Xeon(R) CPU X3440 @ 2.53GHz 2.53GHz - 64bit
- Server RAM: 4GB (I think it is too low for his number of users)
I have the following questions:
1) What is the cheapest and appropriate Oracle Database License to buy for this customer to build Oracle Apex system for his users?
2) What are the cheapest and recommended upgrades in the server processor and RAM in order to provide a good performance for the system with that number of users?
Best Regards
MahmoudDear Scott,
Thank you for reply. If we look at:
Comparison between Oracle Database 12c Editions
We will find the following features not available in Express Edition compared to Standard Edition One
1) High Availability - Fail Safe
2) High Availability - Server Managed Backup and Recovery
3) Performance and Scalability - Integrated Clusterware
4) Security Defense In Depth - Proxy Authentication
5) Application Development - Oracle Flashback Data Archive
6) Application Development - SQL Pattern Matching
7) Application Development - Temporal Database
8) Application Development - Java Support
9) Manageability - Oracle Enterprise Manager
10) Manageability - Oracle Automatic Storage Management
11) Integration - Based Replication
12) Unstructured Data Management - Multimedia
13) RAM - 1GB
- Do I need to plan for some of those features in the first or second release of system? especially those related to backup?
- Is RAM 1 GB too low for good performance according to the number of concurrent users?
- Do I need to upgrade or replace the Server HW specially processor to have a good performance or upgrading RAM only is enough?
Regards
Mahmoud -
Commercial Application - Licensing costs for J2ME
Folks,
Sorry for my ignorance. Are there any licensing costs , if I use J2ME environmnent in smartphone environment for commercially available application.
Thx
QMNo, there are no costs
See: http://www.sun.com/software/communitysource/j2me/
Come on.. one second of google, and you would have found that yourself -
Mixed costing for cost estimated WITHOUT quantity structure
Dear all experts
Anyone can help me for this question u201CCan we use mixed costing for cost estimated WITHOUT quantity structure?u201D. If u201CYesu201D, please give me a hint how.
Thank you for your help
NoyDear Ajay
Thank you for your quick answer. So I will try to use cost estimated WITH quantity structure instead.
Thank so much
Noy -
Hi
Could anyone help me to find licensing Cost for Owb11g R2.
Regards
Anurag SHi Anurag ,
OWB 11gR2 comes along with the database 11gR2 .
You can use the "Core ETL” functionality but Data Profiling, Enterprise ETL, etc requires a separate license .
Probably you cant get in touch with Oracle Sales to know more about the license cost .
https://shop.oracle.com/pls/ostore/f?p=ostore:home:0
Thanks,
Sutirtha
Maybe you are looking for
-
I was using safari to open multiple pages and now it is dark . Pages come up but I cannot interact with it . Help!
-
HiWe are looking to have a script (preferably MaxL) to determine which Apps/DBs are loaded and then (assuming 0 connections) stop them/archive them for backups.In batch, HOW do you capture a list of Apps (or DBs) so you can query their state?
-
LSMW Issue_Eliminate lines in Convert data step
Dear Gurus, I have a problem with LSWM. Imagine that we create price conditions -VK11- and have 1000 lines in text file. And some customers does not created in SAP yet. So LSMW gives error during its run. I want to know whether there is a way to e
-
Opening windows side by side in windows 8 installed using boot camp installer
I currently have windows 8 installed on my macbook pro (Mountain Lion) using boot camp 4 (updated boot camp drivers on windows 8 to boot camp 5). I wanted to keep skype and wordament app open at the same time side by side, but I was unable to keep th
-
57 F4 CHALLEN - 180 DAYS WRONG PRINTED
Hi, While preparation for 57F4 CHALLEN , system take wrong backward 180 days. i.e. If i prepare challen on 02.11.2009, system printed 02.04.2009 instead of 02.11.2010. Regards, Deven