LIV : Invoice price validation as per Info record

Dear All,
              Requirement : Invoice Verification (MIRO) should pick lowest price among Info-record or Purchase Order.
Normally client is maintaining Info-record as the lowest among both.
Pls Suggest .
Regards

There are no standard way to achieve this.
During MIRO, system will always fetch the PO price, it never see the info record price.
Its a chain, at the time of PO creation system will fetch the price from info record. At the time of GR, system will fetch the price from PO and also at the time of MIRO, system will fetch the price from PO.
Once PO is created, system will never check the info record again.
Might be any user exit or badi can help you. You can consult with your abap team.
It can compare the table - field value for info record = EINE-NETPR and for PO EKPO-NETPR.

Similar Messages

  • Price for Cost Estimation - Info Records

    Hi All,
    We need a clarification on how  system picks the price for COST ESTIMATION with following setting in Valuation Variant.
    1.Valuation Price from USER EXIT
    2.Price from Purchasing Info Records
    3.M A P
    4. Planned Price 1
    Sub Stratergy.
    1.Effective Price from Purchase Order
    2. Net Quotation Price
    3. Gross Quotation Price.
    If we have 3 info records  with the same validity date  and different price in each for three vendor, what price will  system pick for calculating the stand cost estimation.
    We have activated Material Ledger and we in ECC 6.0.
    Do suggest.
    Regards,

    Hi ajai,
    I agree with your point,we have 3 info record for a material and 2 are valid as such. The price maintained in  two info records are as 7.5 & 1.0 respectively(valid info records).
    The last price in the purchase order (of the info those records) are 0.41(dated on 09.04.2010)  & 0.2(dated on 19.04.2010) respectively, but when we execute the cost estimation the system picks the price of 7.5  not the least price of 0.2(as its the latest purchased price).
    Do let us know why and of what logic the system picks the highest price.
    Do revert.
    Regard,

  • Price changes in Consignment info records

    Hi
    Is there any standard transaction to change the prices in the purchasing info records site (plant) wise on daily basis? e.g. 5000 info records are there and i want to change the prices in the info records site wise.
    I don't know the rate of the material. I come to know daily morning e.g gold rates changes everyday.
    I can change the rates in one shot through MEKP with condition type PB00. But gold rates differs from place to place e.g. Delhi to Mumbai. So i need to change price site wise according to bombay stock exchange or national stock exchange rates. Basic idea is to change the prices site(plant) wise.
    Please suggest.
    Thanks & Regards
    Kapil

    Hi
    We can change the rate through Info record Mass Maintenance
    T.code : MEMASSIN
    Regards,
    Senmani.

  • Net Price Calculation for Purchase Info Record

    Hi
    New report is required which should display the Net Price changes in the Info record.(Fol Individual Condition record)
    I want to know, Is there any function module which will consider  the PIR condition record - Condition type's and calculate
    & output the Net price.
    Anybody can help me on this requirement.
    Thanks in advance,
    Shankar.

    Check the t- code ME1E for info record price history

  • Unable to enter "valid to" field info record

    I created an info record for sub-contrace then
    after done first screen, I press purc.org.data1, than
    enter standard qty and on enter Net price on conditions,
    but I am not able to enter the Valid to for this Net price
    (the screen display only).
    so, I am not able to save, error :
    Make an entry in all required fields
    anybody can help ?
    Thank you guru.
    robert

    Thank you Csaba,
    From screen Purch.org.data 1 and press condition screen I got the same error.
    but from pur screen Purch.org.data 2, it's fine.
    So what I did, from first screen I select menu "GOTO" and select purch.org.data 2
    and I got the condition button as well as purch.org.data 1.
    I don't know it's a program error or what ?
    Regards,
    Robert,

  • Net price not picking from info record

    I am creating a new PO, but net price is not picking from info record. Info record is getting copied in the line item for PO, but net price is not copied. Due to that I am unable to create PO. If I manually enter price PO can be created. Could someone tell me what might be the reason Price is not automatically taken from Info Record. Please guide me what all I need to check.
    The same data is working in one cleint, and in another client this data is facing problem.
    Thanks
    Vineeth

    Hi
    1) If there is condition record exit in system,then while creating po system will take condition record
    2) If In inforecord last po number is exist for material and vendor ,then system will take this into consideration
    3) if your creating po first time for material and vendor ,and we have maintain purchasing inforecord for purchasing organization and for plant,then system will take it into consideration
    40 If none is available we have to put condition manually in po
    Regards
    Kailas ugale

  • Warning message required in po to identify whether price is taking from info record or condition record

    Hi experts,
                        while  creating purchase order,If condition record and info record both are exists means how system will identify that which price need to pick for particular vendor.
                       Is it possible to set  warning or error message for above mentioned scenario.
    Thanks ,
    Deepika.

    If an info record has no  price conditions itself then the price is determined from the last PO.
    It is not always table A017, there are more tables for conditions to the info record, e.g. A018 and A025, this is dependent on the level of your info record which can be created at plant level or at purchasing organization level (no plant entered), with or without material number.
    For more detailed information see the docu in help.sap.com: Price Determination - Purchasing (MM-PUR) - SAP Library
    and the OSS note 456691 - FAQ: Price determination in purchasing
    and 569885 - About Info Record Update indicator (EKPO-SPINF)

  • Purchase order price limit checking against info record

    We would like to block the saving of a purchase order if the line item price differs by some X% of the purchasing information records price. Reviewing the pricing condition process seems to indicate it may be possible here. But it looks to primarily calculate the expected PO price. The real control we are after is to catch the manual PO price change, by the user, that is inconsistent with master data records. We already are using the tolerance limit warning for price variance, but that only links to the moving average price. If the stock is zero, then there is nothing to compare to.  We would really like a check to compare the info record to the entered price at time of save.
    Any assistance is appreciated.
    Thank you
    Brian

    Hi brain,
    You need to write a USER exit in such a way that while entering the PO net price syestem should go to chek the price in PIR price,

  • WHEN RECORDING LIVE I HAVE 2 NOTES PER KEY RECORDED? HOW CAN I STOP THIS?

    I'm using Axiom 25 and Motu UltraLite mk3,
    When i select an instrument within Logic for example Grand Piano then press record and play the piano live i for instance play c3 once only, then when i stop recording and check the Piano Roll edit mode i will c3 key recording twice in the exact same place, i will then have to individually delete each double recorded note.
    Can you please help, Do i have the wrong setting on my Axiom 25 keyboard? Do i need to change something within my Motu Ultralite or do i need to change something within Logic preferences???
    Please help guys its soooo annoying
    Cheers
    James
    Message was edited by: jamestaylor1012

    Right now I am a non-f**king legend, alas... &
    And another alas: next time might not be so simple...
    Anyway... you're welcome!
    regards, Erik.
    Message was smilied by: Eriksimon

  • Invoice block but no QM info record

    Dear All ,
    Our client does not want to maintain Q info reccord through QM procurement activation . However He just wants to ensure that the invoice is blocked if quality has not released the materials .is this posible in standard SAP ?
    Kindly let me know .
    Ram~

    Hi
    if you want to put Ennhancement during MIRO then it possible through block MIRO before UD posting is LMR1M001
    check this.....but remember this works only in MIRO tcode.
    for more details
    Re: miro for unrestricted use qty only
    Regards
    Sujit

  • Info record scales price bug

    Hi  all
       when i create a po and save, then change info record scales price (price is more than po price),  after change info record,
    user want to change the po Delivery Date, user use me22n change the po Delivery Date and save it. and find the po price is cath the changed info record price , so the po price is error. i send a messsage to sap, but sap said it is sap system behavior and not to change. i want to know any to have the same thing.
    james

    Thanks,
    In info record,close old price by setting to validity date as for ex.31.01.2010,
    new price by setting From validity date as 01.02.2010 to validity date 31.12.9999,
    purchase order is created on 02.02.2010,In po line item correct price(new) is flowing as per info record,
    but in conditions tab of purchase order both prices are flowing in condition type PB00,
    My question is What is reason for both prices will be flowing in condition type ?
    Jeyakanthan

  • Logic - Picking Up of Price for Costing purpose when 2 Pur. Info Records

    Hi,
    Having one Query related to Product Costing. If you can help out...
    2 Purchase Info Records are there for Same Material & Plant for 2 Different Vendors & Net Price is maintained in both Info Records
    1. Material M1 - Plant 1000 - Vendor A - Net Price Rs.4 (Validity of Inco Record - 28.04.2008 To 31.12.2008)
    2. Material M1 - Plant 1000 - Vendor B - Net Price Rs.3 (Validity of Info Record - 01.01.08 To 31.12.2008)
    Vendor A is Regular Vendor
    (Ticked as Regular Vendor is his Purchase Info Record)
    It is observed that Rs.3 is picked up for Costing Purposes
    Requirement is that - Net Price within Pur. Info Record of Regular Vendor i.e Rs. 4 must be picked up always for Costing Puposes.
    Is this possible???
    What Logic system uses while picking up the Price in case where there are 2 Pur. Info Records for same Material & Plant???
    Thanks & Regards...
    Ameya...

    Create procurement alternatives for the material for the vendor of choice using T.Code: CK91n
    Now assign a mixed costing proportion using CK94. In this screen, mark that vendor with 100%. Make sure you enter the correct Qty Structure Type and periods. If an entry exists for the other vendor, delete the tick to set it to 0%
    Now try costing your product.
    Cheers.

  • How to create a PO for a Material having Net Price but without Info Record?

    Hi,
    When I try to create a PO for a Material having Material Master and Vendor Master maintained but no Info Record, system does not accept the Net Price and the Price Condition also does not appear. Is there any way to create a PO for a Material having Net Price but without Info Record?
    Regards.

    Hi,
    The first time you create a PO for a material/vendor combination, then system will not prompt any price as info record or valid conditions have not been found.
    The next time you create a PO for the same material, then the price will be defaulted/found from the order price history from the info record(As info record would be reated after the first PO is created) and the latest PO price for the mat/ven combination would be found.
    Hope you are clear with this..Any doubts revert back.
    Regards,
    Deepak.

  • Net price in P-info record  for DIEN material type

    I am supporting a system ,
    The issue is as follows ,
    I have created a P-info record for material with material type as DIEN , and maintained Net price and system automatically updates the price in the condition type PBXX .
    The pricing procedure in this system doesnt have PB00 , but has PBXX with Access sequence .
    Now when I try to view the price in ME12 , I see the Net price as 0.00 , but the value for condition type PBXX exists when I click on conditions push button .
    Has any one come across this scenario , Pl help .
    Thanks in advance ,
    Amit

    Hi,
    The first time you create a PO for a material/vendor combination, then system will not prompt any price as info record or valid conditions have not been found.
    The next time you create a PO for the same material, then the price will be defaulted/found from the order price history from the info record(As info record would be reated after the first PO is created) and the latest PO price for the mat/ven combination would be found.
    Hope you are clear with this..Any doubts revert back.
    Regards,
    Deepak.

  • Costing issue-Why Info record price is not read ?

    Hi,
    We have an issue while costing a Material procured externally.
    Valuation Variant >>> Priority 1-Info record price. >>Priority 2-Material Master valuation price.
    However, system is picking the price matained in the Material master.
    I have verified the validity of the info record and the Blocks on the Vendor and seems ok.
    Are there any specific checks need to carry out to know if the info record is a valid one.
    Any idea why system is picking Price from Material Master?
    Your help is appreciated.
    Kind Regards
    Umapathi G

    HI Umapathi
    Does any scheduling agreement exists for this info record
    refer this link.. This issue is pretty common these days and has been discussed many times in the forum
    CK11N- Material cost estimate with & without agreement
    Regards
    Ajay M

Maybe you are looking for

  • Suppress Duplicates

    I am running a query in report builder with a union between two select statements to list machines and their AV product, but some machines do not have anything installed. The first statement brings back the results of the ones with a detected product

  • How to perform Text length more than 4000 bytes

    I want to read each row from txt file and used utl_file pacage to concat contents into a variable, the variable datatype is varchar2(4000), so text length can't more than 4000 bytes, but I wish get full text from txt file, How can I do?

  • Nested PowerShell script loads incorrect assembly

    I have a Powershell script that is being used to provision Azure resources. Let us call this script A. In this script I invoke another script called Script B. I use a statement like this: .\scriptb  param1 param2 param3 param4 Inside Script B I have

  • Export option grayed out for some "unknown" reason.

    I have several clips I've downloaded from the net (mostly music videos), and some of them I can export into any type of file I like (such as iPod video), but some of them I can't export at all. Is there some kind of copyright protection embedded into

  • Attach behavior to object

    I'm trying to clone a sprite using OOP and can't find a way to attach a behavior to the newly created sprite using lingo. Is this possible? What I want is to capture mouse clicks on the new sprite after it's created. What am I missing? Code below . .