Lock for changes in GR and GI & production order change

Hi all,
     We have MTO scenario. We do delivery after GR and then make invoice. My client's requirement is whenever the delivery is made, system should restrict the changes in production order and should not allow to change GR/GI documents. How we can map this? Kindly help at the earliest.
SmanS

Hi,
please find the procedure below to block changes to prodn order once it is created/ released. I am not sure how to control changes to GR/GI based on status of prodn order. But chenges to order itself can be blocked as follows.
You need to create a status profile in BS02
Double click the status profile.
Enter the user status as CRTD
Tick the initial status as enabled
Place the cursor on the status profile
Select the object type as PP ORDER HEADER
Now choose the user status
Double click the user status
Goto create mode
select change and set forbid radio button
save.
Assign this status profile to order type in OPJH TCode (Prodn order type). CORN (Process order type). For Prodn order type you can assign 2 status profiles, one at order header level and 2nd at operation level (OPJH).
Now once you have created the production order the system automatically forbids any change.
Regards,
Ashok

Similar Messages

  • PSE locked for changes during certificate deletion

    Hi all,
    SSO certificate is expired on our system. I have created the certificate using VA but when i went to tcode strustsso2 and tried to delete the old certificate. I am not able to delete it as its throwing error as PSE locked for changes. Kindly suggest on it.
    Regards,
    Karthik.R

    Hi,
    Please make sure there is no other person who is running STRUSTSSO2.
    Maybe you can restart your system and try again.
    Best regards,
    Shuai

  • Hi my account was locked for some security reasons and i forget the securicty questions and when i am trying to reset my password through email i am not gettig mail to my id can any one help

    hi my account was locked for some security reasons and i forget the securicty questions and when i am trying to reset my password through email i am not gettig mail to my id can any one help.
    <Edited by Host>

    Have you checked Spam? I have noticed recently in my Gmail that Google sends some mails from Apple to the Spam folder.
    <Edited by Host>

  • Disable\Remove "Check for Update" "Lightroom online" and "Adobe Product Improvement Program"

    Hi,
    I wanted to confirm if it is possible to remove\Disbale the options like  "Check for Update" "Lightroom online" and "Adobe Product Improvement Program"
    under help menu in adobe lightroom 5.3? I intend to deply this application and want these options to be unavailable for the User.
    Kindly suggest, Thanks.

    So far as I know, the only way to make these features non-functioning is to detach the computer from the internet.

  • HT1212 My iPod is locked for 22 Million minutes and i cannot use recovery mode! Please Help!

    My iPod is locked for 22 Million minutes and i cannot use recovery mode because my home button is broken and the screen doesn't respond to any touches or swipes. What should i do?

    Place the iPod in recovery mode using one of these programs and then restore via iTunes:
    For PC
    RecBoot: Easy Way to Put iPhone into Recovery Mode
    If necessary:
    Download QTMLClient.dll & iTunesMobileDevice.dll for RecBoot
    and                                           
    RecBoot tip
    RecBoot may have problems on 64X windows, then try:
    Tenorshare ReiBoot – Enter & Exit iPhone, iPad, iPod Recovery Mode with a Single Click
    For MAC or PC       
    The Firmware Umbrella - TinyUmbrella
    Installs blootware on PC too

  • Asking for purchasing reqistioner no. while making production order

    dear all
    asking for purchasing reqistioner no. while making production order.how do get rid of this reqisitioner no. option from production order.
    regards
    manish sharma

    Hi,
    Chcek the BOM copied to the order or the items that you are entering while creating the order, if item categories are N, purchse requisitions are automatically created and related info is queried from the user. Change item categories to L, stock items if external procurement is not relevant.

  • Costing affect with MRP at planned order level and after production order

    Dear all,
    How the costing affect with MRP at planned order level and after production order completion?
    Edited by: Maulik on Jun 24, 2009 1:59 PM

    Dear Maulik,
    check Mr. Vinod's inputs abt costing
    1. Maintain following master data:
    MM01 Material Master with Costing and accounting view. Make sure all the cost Std, Moving avg etc is maintained along with valuation class in Accounting view 1. In costing tab pls make sure "with qty structure" and "Material Origin" are ticked.
    CS01 BOM with components marked with costing relevance in Status/Long Text Tab. Also check all the qty are correct.
    CR01 Work Center in Basic data tab maintain standard value key sau SAP1 and in costing tab maintain the workcenter, activity type and formulas (Usually standard formulas like for Machine Hours SAP006, Labour SAP007, Setup Activity SAP005 is used).
    KL01 Cretae activity types, in basic data tab maintain ATyp Category AS "1" and cost element (as provided by your FI Guy).
    KP26 Activity pricing, here with the combination of Activity type and the cost center you assign price to the activity.
    2. SPRO Activity
    Maintain Costing sheet IMGControllingProd cost controllingProd Cost PlanningBasic settingoverheadsdefine costing sheet.
    OKKN Define costing variant, you define costing type (In the costing type, you define the purpose of a material cost estimate by specifying, for example, which field in the material master record the costing results can be transferred to like std price, moving avg etc), Valuation Variant (defines how the prices are prioratized), date control and transfer structure.
    3. Costing Process Flow:
    1. CK11N CREATE COSTING RUN
    2. CK24 CREATE PRICE UPDATE (You Mark and release the prce to be updated)
    4. COSTING VARIANT WRT PP
    1. OPL1 DEFINE COSTING VARIANT WRT PP
    2. OKK4 or OPN2 DEFINE VALUATION VARIANT
    3. OKK1 or OPM1 DEFINE COSTING TYPE
    4. OPL8 ORDERTYPE DEPENDENT PARAMETER (assign the above creted costing type for both planned and actual)
    Hope this will throw some light on product costing.
    Regards
    kumar

  • Difference between Configurable and varinant production order

    Hi All,
    1) What is difference between configurable material production order and variant  production order?
    2) What is difference between configurable material and variant material?

    Hi All,
    1) What is difference between configurable material production order and variant production order?
    Ans:
    the only difference i can see is the Account assighnment - the configurable material needs to have a sales order order or Customer independent requirment since the stock when gets produced has to be placed inanyone of the account assignment.Which in simple terms is a make to order producton order
    the Variant material production order can be a make to stock scenario also
    2) What is difference between configurable material and variant material?
    a.Configurable material - Inthis the characteristics can get any or specified values based on the requirement
    Ex: car - is configurable material
        colour is a charctertisc - red,white are the values
    b. Variant material - It will have ONLY one config material attached with it and the charatterstics would ahve the vallues prefixed
    ex: CAR_RED as a material - which means the colur of thecar is red -it is fixed
    does it clears your doubt are still require any more information..
    sap s very intresting part  is VC

  • Query for releasing and closing Production order ststus in bulk

    Hi
    Releasing planed to released
    1. i want to release all those production orders entered in system which are in planned status.I want to apply one query for that which should change the status of Prod orders to release in systems automatically by applying this query.Please give me that suitable query and how to use it for proper result.
    closing released to planned
    2. Same like above i want to close all those Production orders whose receipt quantity is equal to planned quantity. i.e i want one query which should change the status of production order from release to closed on condition that receipt quantity is equal to the planned quantity.Please give me that suitable query and how to use it for proper result.
    Thanks

    For point 1 and 2:  It should not be tried and using a Query does not comply with SAP Support policy.  Doing so would lead you to lose SAP Support.

  • When does the configuration get locked for changes in sales order?

    Hi Experts,
    I will really appreciate your help me in resolving this issue.
    Our client had sales order having BOM item with several sub items.
    Here we found that the user was not able to make changes to the Characterstic Value of one of the variant.
    The issue was the place where we change the characterstic  in sales order was greyed out, it was probably locked. Now even if they were unfrezing and trying to change the characteristic value the system did not allowed means greyed out.
    Can you please help me in understanding when do system locks the variants for a material in sales order, in what stage?
    Like maybe after the delivery document is created or PGI or some things else.
    since i see that the user here did delivered one of the item in the BOM subitem.
    Thanks
    Kaushik
    <Text removed by Moderator, please don't share your personal details on SCN post>
    Message was edited by: Jyoti Prakash

    Yes the characterstics were maintained for the main item.
    and the delivered item was a subitem for this main item.
    So characterstic were maintained for Item 10(Main item) but delivery was done for some of its sub item was item 100 / 120
    Also can i know where is this setting or configuration where we configure this to block the configuration if any of the subitem is delivered.
    Thanks
    Kaushik.

  • ANN: ANN: XDK 10.1.0.2.0 for HP-UX64, AIX and LINUX Production Release

    XDK 10.1.0.2.0 production for HP-UX64, AIX and LINUX is ready to download on OTN:
    http://otn.oracle.com/tech/xml/xdk/software/production10g/index.html

    The error indicates that the password (or wallet) files oidpwdldap1 and oidpwdr<ORACLE_SID> do NOT exist under $ORACLE_HOME/ldap/admin or your $ORACLE_HOME and $PATH are set incorrectly (a bit unlikely).
    Assuming that the $ORACLE_HOME and $PATH are indeed set to correct values, if the 2 files mentioned above do not exist under $ORACLE_HOME/ldap/admin, then perform the below action plan:
    1. Set the ORACLE_HOME to INFRASTRUCTURE ORACLE_HOME
    2. set the PATH to $ORACLE_HOME/bin:$ORACLE_HOME/ldap/bin:$ORACLE_HOME/opmn/bin:$PATH
    3. Ensure that you are able to login to sqlplus as "ods" user.
    4. If you do NOT know the password of ods user, then reset the password.
    5. Run the below command and enter the ods password when prompted for it.
    oidpasswd create_wallet=true
    6. Voila! The Wallet files are created under $ORACLE_HOME/ldap/admin.
    HTH,
    Regards,
    Praveen
    Edited by: Praveen B K on Aug 28, 2009 3:20 AM

  • Table for STO and his production order in manufacturing plant.

    Hello Experts,
    I would like to know in which table I can find a relation between STO and his related Production Order.
    Thanks in advance.
    Regards
    Mayur
    Edited by: mayur kshirsagar on Dec 19, 2007 1:48 PM

    Dear Mayur,
    For Production order related tables check in
    AFKO              Order Header
    AFPO               Order Item Detail
    AFVC               Order Operations Detail
    AFFL                Order Sequence Details
    AFFH               Order PRT Assignment
    AFBP               Order Batch Print Requests
    AFRU               Order Completion Confirmations
    AFFW              Confirmations -- Goods Movements with Errors
    AFRC               Confirmations -- Incorrect Cost Calculations
    AFRD               Confirmations -- Defaults for Collective Confirmation
    AFRH               Confirmations -- Header Info for Confirmation Pool
    AFRV               Confirmation Pool
    AFWI               Confirmations -- Subsequently Posted Goods Movements
    AUFK     Order master data
    AUFM     Goods Movements for Order
    VBAG                           Sales Document: Release Data by Schedule Line in Sch.Agrmt.
    VBAK                           Sales Document: Header Data                               
    VBAP                           Sales Document: Item Data                                 
    VBBE                           Sales Requirements: Individual Records                    
    VBBS                           Sales Requirement Totals Record                           
    are you meaning stock?
    then check in MARD.
    Regards
    Mangal

  • What are options for applying non-inventory costs to production orders?

    We have a non-inventory costs that need to be assigned to product produced on production orders.  There are two processes -make-to-order and make-to-stock.
    Currently we use activity rates to apply labor and burden costs to our production.  We use separate cost centers where needed to ensure that we have sufficient granularity to our activity rates applied.
    We have a few specific issues where we need to understand the options for applying costs -
    1) We have freight and duty costs related to inbound raw material that we want to assign to our final product.  The amount assigned may be either a specific amount (or a specific amount per model), or a % of the total cost on that production order.
    2) We have material on the production order bill of material that is called out by quantity and we are using discrete backflush, however we have found there are issues with the accuracy of the quantities.  We want to have this product ordered using KANBAN (bin ordering) and have the value relieved from inventory when the bin is issued to production.  The cost on the production order is envisioned to be an average amount for the product - or an average amount by model.
    3) We want to have a portion of cost for production scrap included in the cost of each product produced. (similar to freight and duty).
    In all cases- the amount can change depending on analysis from accounting regarding freight and duty costs (these fluctuate depending on the cost savings we achieve with combined loads and depending on the amount of out of country sourcing), the scrap amount may change periodically depending on the initiatives to reduce scrap on the production floor, etc.
    We currently use three activity types, labor, burden and tooling.  It is my understanding that there is a limitation in SAP that keeps us limited to 6 activity types.
    My questions are:
    Are we limited on activity types? these are an option to apply additional costs, but may not be the best option if we want to change the amount applied based on model or apply as a percentage.
    Are there other options for applying costs that we can explore? I want to be sure we take into account the various options available before we start down a specific path.
    Thank you in advance for your assistance.

    As clarification- we are using standard costing for our raw material.  We currently accumulate the incoming freight in a balance sheet account.  This is treated as part of our inventory.  We have considered using an activity type with a activity added to the BOM to apply the cost to the production order.  Then we could use the secondarly cost element data to book an entry to relieve the freight account on the balance sheet.
    Because we use standard costing- access to see production order variance is critical and must be maintained in any process we select. We also use COPA reporting- so the costing information must be able to flow to COPA for the specific orders/products/serial numbers.
    We are doing make to order (production order / sales order specific combination) but also looking at a make to stock process - so the method to apply costs must take both of these configurations into consideration.
    Rajneesh - you mentioned that I am limited to 6 activities in a work center- but does that mean I can have more than 6 activity types in SAP but only 6 activities in a work center/cost center combination?
    Thank you.

  • Availability check for Make to stock and Make to Order

    Dear All,
    Client is selling   Make to stock and make to Order material.
    How and what settings need to do for Avaialbility check.or we can use standard one.
    I hope in case of Make to Order availability check may not happen.
    Please correct me.
    Thanks in advance.
    Regards,
    Shrikant

    hi,
    yes for make to order we dont have AvChk.  for make to stock items u need to follow the
    below configuration.
    Availability check
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how u2013 confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) u2013 planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics u2013 sales & distribution u2013 sales u2013 environment u2013 availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP 2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks u2013
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups u2013
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above u2013 checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing u2013
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out u2013
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups u2013
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 u2013 summarized requirements and 02 u2013 individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users u2013 the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check u2013 in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. Defining the elements in the availability check entirely depends on the business needs, but a few tips are given under u2013
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order u2013 is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.
    regards
    anand

  • User Exit for the Settle rule of a Production Order

    Hello all
    i got a requirement to change the settlement rule of a production order to multiple receivers.
    suppose i have the following rule
    Categeory | Settlement Reciever | Receiver Short text |   %   | Settlement Type | No | Source Assignment
        MAT             ZMDT89                   ZMDT88              100        FUL                 1            left as blank
    now my requirement is that i have to default the source assignment as 200 (Materials) so as to allow the other reciever entered with the same settlement type as FUL and also the No should be 2
    i.e. my req is like this
    Categeory | Settlement Reciever | Receiver Short text |   %   | Settlement Type | No | Source Assignment
        MAT             ZMDT89                   ZMDT88              100        FUL                 1            200
        G/L             G/L A/C no                G/L shor text       100        FUL                 2            100
    the bold one is i have to ADD
    the T-Code is CO02.
    your help is highly appreciated...
    thanks in advance

    hi,
    check these exits in co02.
    Transaction Code - CO02                     Change Production Order
    Enhancement/ Business Add-in            Description
    Enhancement
    PPCO0010                                Enhancement in make-to-order production - Unit of measure
    PPCO0012                                Production Order: Display/Change Order Header Data
    PPCO0013                                Change priorities of selection crit. for batch determination
    PPCO0015                                Additional check for document links from BOMs
    PPCO0016                                Additional check for document links from master data
    PPCO0017                                Additional check for online processing of document links
    PPCO0018                                Check for changes to production order header
    PPCO0019                                Checks for changes to order operations
    PPCO0021                                Release Control for Automatic Batch Determination
    PPCO0022                                Determination of Production Memo
    PPCO0023                                Checks Changes to Order Components
    STATTEXT                                Modification exit for formatting status text lines
    PPCO0009                                Enhancement in goods movements for prod. process order
    CCOWB001                                Customer exit for modifying menu entries
    COIB0001                                Customer Exit for As-Built Assignment Tool
    COZF0001                                Change purchase req. for externally processed operation
    COZF0002                                Change purchase req. for externally procured component
    PPCO0001                                Application development: PP orders
    PPCO0002                                Check exit for setting delete mark / deletion indicator
    PPCO0003                                Check exit for order changes from sales order
    PPCO0004                                Sort and processing exit: Mass processing orders
    PPCO0005                                Storage location/backflushing when order is created
    PPCO0006                                Enhancement to specify defaults for fields in order header
    PPCO0007                                Exit when saving production order
    PPCO0008                                Enhancement in the adding and changing of components
    reward points if hlpful.

Maybe you are looking for

  • IPhone 5S, problem with blue screen

    I have big problem with my Iphone 5s: about a month ago it start to go in "screen of death". In other words began to appear blue screen and reboot Iphone. When restoring iTunes gives an error (9). Sorry for my English. Thanks in advanced for your hel

  • Directory selection in external table

    How do we select the directory path for external table files?.whether we can select any directory in any drive or we have to select particular drive and particular directory path?.how do we check for this?. example create or replace directory ext_dir

  • Line is not cancelled by system if PO is in approved status

    hi all, i have enter a PO with line-1 having two shipments. Then it is approved by top management. Now i realize that this line-1 is wrong and i have enter line-2 with correct information. Now i place cursor on line-1 and try to cancel but system sho

  • 6140 and Windows 2003

    Hi, We have a 6140 connected to a Windows 2003 Server EE SP1. After volume creation via CAM (version 6.4.1.5), it can be viewed on Device Manager, but cannot be managed (under Disk Management). Server was restarted without success. Different profiles

  • Remove "content-length" item from the header of httpServletResponse

    Hi all, tomcat6.0, JDK5.0. I use tomcat6.0 as the web container and JDK version is 1.5. I found tomcat connector will add "content-length" item in all httpServletResponse header. But now I need generate some chunked http response.according the RFC, t