Lot sizing rule (Fixed and Exact) - Field controls

Hi,
In MRP1 view of material master, I observed the following:
If Lot size rule: Fixed (FX), in the change mode of the material master, I am able to observe Min lot size, Max lot size, rounding profile and rounding value. Where as these fields are not visible in the display mode (Despite these fields having values in MARC table)
However this is not true for exact lot size (EX)
What is the business reason/logic for this?
Please suggest.
Thanks,
Ravi

In MM03 only the fields relevant to the lot size are being displayed, the other fields have no effect so are not displaying.  In MM02 all fields are displayed since if the change the lot size you may need to edit them.  In MM02 you will get a warning if you enter a field not relevant for the lot size.

Similar Messages

  • Fixed and sap field type

    Hi Gurus,
    Need your help.
    --In defining external web services ...i have given the URL and other parameters in the standard call structure.E.g we have defined the user name and password  as parameter values(fixed value).When a user clicks on the url from his/her browser,does the catalog ask for log-in details again or the above mentioned parameter values  will automatically give catalog access to the user?
    --I have read the 'help' on Fixed type and SAP field type.Can somebody explain me the diference clearly?
    If fixed...the parameter value remains the same/fixed.<b>Meaning?</b>
    If SAP field..."SAP fields are also permitted as single parameters during the catalog call. If, for example, a username has to be transferred, you can enter SY-UNAME in the Contents field. The system then automatically fills the parameter with the username."
    <b>What/where is a contents field?</b>I cannot see it anywhere.Does it mean, when a user clicks on the catalog,the UN will automatically populate in the field?
    Please let me know.
    Thanks
    Trey

    Hi Trey,
    -- you define user & password in the calling parameters to avoid logon when calling catalog, but also to control what he/she can see/order in the catalog, because this user ID is assigned some view IDs in the catalog
    -- fixed values are entered manually in the customizing (they are fixed, so for more complex needs, you can add parameters in a BADI just before calling the catalog). ex: the ~okcode is always ADDI; the user / password can be fixed.
    You can transfer additional parameters at runtime using BADI BBP_CAT_CALL_ENRICH.
    SAP fields are not fixed but are variables. ex: if you use SY-UNAME as the parameter value for , this will be valuated at the run time, with connected user ID.
    When you define the calling parameters for a catalog ID, (IMG Supplier Relationship Management --> SRM Server --> Master Data --> Define External Web Services  (Catalogs, Vendor Lists etc.) you enter the parameter name(ex: user) and its value (ex: SY-UNAME with type "SAP field" or THONNS with "Fixed value").
    Rgds
    Christophe

  • Lot sizing key DY and WI

    Can somebody explain me for which business process the DY and WI lot size is recommended in MRP>
    Also what is significance of eact one if it is used.
    Thanks
    Vaibhav

    Hi Sumeet,
    Using 2 lot sizing procedures in a single material master will not be possible.
    Also, creating 2 Valuation classes with different lot sizing for each valuated material data wont be acceptable by business.
    Here, you can create a customized lot size by copying a standard, and in to  the config of the lot size, please define Short Term and Long Term Planning details.
    IMG-> MM->Consumption Based Planning->Planning->Lot Size Calculation-> Define Lot Size Procedure->MRP Lot Size.
    Maintain Static for Short term and Dynamic lot size option for longer term and define the short term, long term intervals.
    Hope this would work.
    Thanks
    Raghavan

  • Fixed and dynamic field headings in field catalog

    i have to develop an ALV Report where certain column headings are fixed and other column heading will be changing from time to time.
    is there any method to do so.
    that is i have to show the report for 3 months and the names of months will be changing in due course.
    Waiting for a reply.
    A.Reshma

    hi,
    you have 4 texts
    SELTEXT_L
    SELTEXT_M
    SELTEXT_S
    and   DDIC_TEXT  (not sure about spelling)
    change this text dynamicly with month of your choice.
    Rgds

  • Offset in planned order with weekly lot sizing.

    Hi,
    After i run MRP with a weekly lot sizing procedure, avaiability date = start of the period, the MRP groups all planned orders of the week at the first requirements date of that week.
    But what i need is to put that group of the planned orders in the last working day of the week before.
    For example:
    Week
    Friday Week n
    Week n+1
    Ind. Requirements
    0
    1
    1
    1
    1
    1
    Planned order
    5
    Can you please help me how to solve this issue.
    Thanks in advance.
    Mike

    Hi,
    It is possible by configuring a version of the standart weekly lot sizing procedure. In customization for lot sizing procedures (tr. OMI4), copy the lot sizing procedure WB and name it. In the detail settings of the procedure set the scheduling field to 1. This makes the delivery date of the procurement proposal the period start (you requirement is the last day of the previous period, however this is the best next option). You may press F1 after clicking on this field and learn about other options. Please assign this new procedure to the material and test it.
    Regards.

  • Regarding lot sizing procedure in Pharma scenario.

    Hi PP Gurus,
    I have a scenario for lot sizing for small and big batches of a product.
    For example, let us say the order quantity is
    Case 1: 1000 kg of finished product
    then the fixed lot size will be 500 kg (which is small batch size) and 2 batches will be taken for production
    Case2: 3000 kg of finished product
    then fixed lot size will be 1000 kg (which is big lot size) and 3 batches will be taken for production
    Could anybody please help to propose solution for such scenarios?
    Thanks,
    Abu Arbab

    Hi
    You may use FS Fixed Lot Size with Splitting for that purpose.
    This link would help you;
    http://help.sap.com/saphelp_46c/helpdata/en/f4/7d281244af11d182b40000e829fbfe/content.htm
    Regards,
    Onat

  • Field control for Travel expense type

    Hi,
    How can we control "travel expense type"/"Trip type company code specific" field in PR05/employee portal?
    I want to make this as mandatory.
    This field you can see in "PD/FR reimbursement" header PR05 entry screen.
    I have checked in below configuration, but there is no effect if I make it as required input in below configuration.
    Define Schema and Individual Field Control
    Schema and Single Field Control for Web Dynpro
    Any solution will be highly appreciated.
    Regards
    SM

    Hi,
    This field control is not working in ESS portal. Working in PR05 (Travel expense manager).
    Could you please advice the configuration for making the field u201CTrip type, Co. specificu201D(PTP02-BEREI) as mandatory in
    ESS portal?
    If we have not entered any value in this field it is throwing below error.
    "Entry EN NZ does not exist, check your entry"
    Also please let me why this is mandatory to enter and why this is not a mandatory field in standard configuration?
    Note: NZ is Trip provision variant.
    Regards
    SM
    Edited by: shanumonu on Jan 27, 2012 5:37 AM

  • After Effects CS6 (11.0.2) update: bug fixes and added GPUs for ray-traced 3D renderer

    We just released the After Effects CS6 (11.0.2) update.
    There are a lot of bug fixes and additions in this update.
    See this page for details:
    http://adobe.ly/AE1102
    Let us know if you have any trouble with this update.

    I have this too, with ML 10.8.2 - pretty sure you can't install custom drivers. Did you find a solution?
    EDIT: Didn't realise I had to update the CUDA drivers manually on OS X! Downloaded from here: http://www.nvidia.com/object/cuda-mac-driver.html and all is OK

  • Dynamic lot sizing

    Hi all,
    Can some one through light on Dynamic lot size (DY) with quota split? How to maintain this quota split in dynamic lot sizing?
    Thanks and Regards,
    Raghu

    Dear,
    The Quota Split indicator is checked in the lot sizing\procedure SPRO --> Production --> Material Requirement Planning --> Planning --> Lot size Calculation --> Check Lot sizing procedure --> MRP Lot Size
    Select your required lot size & select icon 'Details'. Then mark tick at 'Splitting Quota'. Save the changes. Then run the MRP. System will now split the quantity based on your quota arrangement.
    In MEQ1 we define the quota.
    Regards,
    R.Brahmankar

  • New lot-sizing procedure (similar FX fixed order quantity)

    Dear All,
    I have to create a new lot sizing procedure for MRP run. This new procedure should be similar to FX - the material should be included in MRP run when the stock falls below reorder point - but the quantity ordered (proposed to be ordered in PReq) should be the fixed lot size no matter which is the difference between the reorder point and the stock.
    To clarify the request: the reorder point is 70, the stock level is 15 and the fixed lot size is 25. The MRP run should create 1 PReq for 25. (The standard functionality of FX lot sizing creates 3 PReq for 25 pieces each one - because the needed quantity is 55.)
    If there is no standard customization to be done, I think I should do some changes in the needed quantity (set the quantity 25 instead of 55) - but I need yours advice also about the best way to do this. Maybe you may indicate an exit/BADI or a place where I can do an enhancement to achieve this.
    I now it is not the best request - but I have to do it, unfortunately .
    Regards,
    Florina R.

    Hi Tomasz,
    1) The reorder point is 70 (greater than the needed quantity for a week) because the vendor has some delivery problems and also because this quantity covers the delivery lead time.
    2) The lot size is fixed because they do not want to order more than the needed quantity for a week even if the difference between the reorder point and the stock level is greater than 25.
    I'm able to fix the lot size but not to limit the quantity at this value (25).
    I have to do this because they will provide the needed quantity (if the stock falls to 0) from another vendor (but the tricky thing and wrong also is the fact that for the second vendor I have a second material....).
    It is hard for me to convince you that the request is correct because I know in this way SAP will work incorrectly - but the client knows the consequences and even so wants this kind of lot sizing procedure...
    Regards,
    Florina R.

  • How to fix the position of controls, so table expands into whitespace and doesn't push lower controls down (invoice report in SSRS 2005)

    I am designing an invoice report. There are some controls at the top of the report (company logo, date, invoice number etc), followed by a table listing the items in the invoice, followed by some controls at the bottom (subtotals, returns address etc). The report should always print onto a single page.
    I want the controls at the bottom to have a fixed position on the page. There is sufficient whitespace between these controls and the table above for the table to expand to list many items. However whenever it expands it pushes the lower controls down. This results in them spilling onto a second page.
    Is there a way to fix the position of controls and suppress the "gets pushed down when controls above expand" effect?

    Thanks for that. I found a good solution using rectangles here: SQL Server 2005: Report Design Best Practices and Guidelines
    Here's the relevant part (see underlining):
    Using Rectangles to Keep Objects Together
    Rectangles in Reporting Services can be used either as graphical elements or as containers of objects. As object containers, they keep objects together on a page and control how object move and push each other.
    To keep multiple objects together on a page, put the objects within a rectangle. You can then put a page break before or after the rectangle by using the PageBreakAtStart or PageBreakAtEnd properties for the rectangle.
    Using Rectangles to Control Item Growth and Displacement
    Items within a rectangle become peers of each other and are governed by the rules of how peer items are positioned on the page as they move or grow. For example:
    Items will push or displace each other within the rectangle.
    Items will not push or displace items outside the rectangle, because they are not their peers.
    If necessary, a rectangle will grow to accommodate the items it contains.
    You can use this logic to your advantage when dealing with objects that expand. For example:
    If you want to leave a blank space in your report for a table to expand into, group the blank space and the table in the same rectangle. When the table grows, it will push the blank space .
    If you want to prevent a matrix from pushing items off the right edge of the page, put the matrix within a rectangle with blank space to its right. Now, the matrix is no longer a peer to the other item on the page and will not be able to push it until the matrix can no longer be contained within its rectangle.

  • My kid dropped my iPad 2 and the volume control on the side got jammed in and now everytime my ipad is on the volume icon in the middle of the screen will not go away.  I can not move the switch on the side, it is jammed, is there a way to fix it?

    My kids dropped my iPad and the volume control on the side got jammed in and it will not move, how can I fix this?  Can it be pulled out to unstuck it.  The glass got chipped right next to it, but it is not that noticible.  Everything else works on the iPad, but the other problem is that I am past my 90 day warrenty and it will cost me $265.00 to have Apple fix it.  Is there anyway I can save my iPad?

    Your warranty is actually one year - the 90-days is only for free telephone support - but the warranty would not cover damage due to the iPad being dropped. I doubt there's anything you can do to fix the rocker, so you'll probably need to pay to get the iPad exchanged (by Apple) or repaired (by a third party repair service).
    Regards.

  • Even after turning ON Reduce motion the icons and the windows and the apps zoom motion in and out is still giving me a lot of head ache and dizziness and motion sickness... Please fix it!!

    Even after turning ON Reduce motion the icons and the windows and the apps zoom motion in and out is still giving me a lot of head ache and dizziness and motion sickness... Please fix it!!

    hi i had the same problem today when i updated my itunes to latest version. however, i have just found my songs in the 'itunes media' folder. this was accessed through 'my music'  then keep clicking through until you find itunes media and all my library songs were in there and i then just added these files to my library and all were restored however, i have lost all my playlists but at least my 700 songs are back. very dissapointed with apple that they have let this happen with their latest update, the previous version was miles better than this one . hope you find them. stevo

  • Exact field name and table name for Picking quantity

    Hi All,
    I need to know the field name for Picking quantity. If we go for VL02N transaction code and enter deliver number and go for picking tab, here in item details for picking quantity I need the exact field to catch it.
    Thanks in advance.
    Ramesh.

    Hi Ramesh,
    You can find Picked quantity in below way.
    table where picking quantity is
    Regards,
    Jai

  • FI-TV Scheme and Field control in Travel Manager

    Hello!
    Question:
    The question is - Is it possible to somehow customize field control for TRIP selective screen by means of SPRO IMG Scheme and field control or transaction FITVFELD (i.e. hide some fields or add new fields)? Or fields can be added or deleted only by ABAP modifications and User-exits?
    Prerequisite: I need to add an additional CHAR or TEXT field "Document number" in TRIP transaction which will allow a manager to manually enter a document number of a trip. Further this field has to be added in reports as well, so that manager could get all the trip details due to this new field "Document number".
    What am I doing wrong?
    Looking forward for your reply!
    Regards,
    Eldar

    Hi..
    how do you define trip provision variant at first?
    did copy standard variant?!
    if you copy from standard variant - such as 01, or 99, then you will find schema under your copy trip variant.
    hope it helps.

Maybe you are looking for

  • The best external hard drives for macs

    Can anyone recommend a good external hard drive for a mac computer; preferably the IMac OS 10.5.6 desktop. Thanks!

  • GPS EXIF Data

    Does anyone know how to get iPhoto to update its database after an image file has been updated outside iPhoto with GPS information? I can open the image file using Preview and see the data. "Show Photo Info" seems to only query the database, not refr

  • AC3 plays on DVD SP, not on DVD player

    I encoded an entire movie and trailer using maestro and took that m2v and ac3 file over to DVD SP. In simulation mode there were no issues with playback. The audio/video played properly. However, when we burned the disc to DVD, the audio wouldn't pla

  • About JWSDP1.0 JAXRPC  (WebService)

    How to use user defining object as WebService's paramater? I have successfully tested the example about JAXRPC in JWSDP1.0 tutorial. For more practical use, I changed the function parameter from String to A (defined by me) and modified some code acco

  • Printing more then one even Sites to one paper

    Hallo, I have some trouble with printing on Mac OS X 10.6.4: I want to print 16 pages from a Document (Number 1 till 16). I select uneven pages for the first run (I want to rotate the paper after this run to print the back side after that). So I prin