Hi Gurus,
I am using strategy 50 for one of my materials and when i create sales order agains that material a firmed planned order is created automatically. As this is firmed planned order in case i stock in material for that sales order and fullfill its requirement and run MD50 MRP against sales order. The planned order still exists as it is firmed where as i need it to be deleted after running MD50, because required quantity has been fullfilled using transfer posting from another stock. Please suggest how can i achieve it. Is there any configuration available to create unfirmed planned orders instead of firmed planned orders against sales orders? as unfirmed planned orders get deleted after executing MD50 in such a scenario.
Best Regards,
Shah

Dear,
What is your MRP type for these material? Use PD and check
Check the planning time fence field for those materials. If the requirements are within the planning time fence, then it will create firmed planned orders.
Go to OPP1Master Data- > Check MRP Types--- here, on "Control parameters" tab you can find the desired field called "Firming type". Make it bank then system will not create the Firmed planned order.
Also refer this link,
Re: firmed planned orders
Regards,
R.Brahmankar

Similar Messages

  • How to cummulate sales orders for creating one planned order.

    Hello friends,
    My scenario is make to stock. I use sales orders for creating plan only. I want to cummulate all sales orders of one finish material and create one planned order  for that material when i run mrp. How can i do this?
    Thanks

    Kiran,
    What is the planning strategy you are using?
    Does all the sales order requirment same? If it is same then it is possible. Please explain more in details. If not you need to look at using some perodic lotsize procedure to combine requirments. Like "Daily", Weekly" "Month" etc..
    Regards,
    Prasobh

  • Automatic Firmed Planned Order / Mass Change Planned Order

    Hi PP Gurus,
    My requirement is I want to make all planned order created from planning run will be automatically firmed. I tried several option :
    1. MRP type : P1, automatic create firmed planned order within planning time fence but for new requirement, planned order will be created after planning time fence date. Example planning time fence date lies on 20/10/2011
    PIR
    09/2011     3 pc
    10/2011     4 pc
    end of planning time fence date
    11/2011     5 pc
    run MRP
    Planned order firmed for month 9 and 10. for 11 is not firmed. But the problem is if PIR on month 10 is change from 4 to 6. the other 2 planned order will be created at end of planning time fence date.
    Is it possible for planned order created at appropriate date as requirement date ???
    2. Mass Change of Planned Order
    I browse the help SAP there is function module : MD_SET_ACTION_PLAF for mass changes of planned orders.
    http://help.sap.com/saphelp_46c/helpdata/en/9e/e84226c1c311d3b54a0004ac160649/content.htm
    I execute it with SE37 but i don't know what should i do with this function module after the next screen.
    In my mind, there will be selection screen for choosing which planned order will be perform firmed action.
    Any other idea to solve my requirement is welcome.
    Regards,
    Arman Lie

    Dear Arman,
    Use T.Code MD19 for firming the planned orders,also check MDBA for firming the planned order.
    For your first question let me check and revert back.
    Regards
    Mangalraj.S

  • Firmed planned order creates a type of firmed horizon

    Hi Gurus,
    we had following system behavior the other day (actually a few months ago) that we weren't able to explain.
    It was beginning of November and a colleague of mine was creating his production schedule for the week before x-mas (i.e. another 7 weeks in the future). He was working at it and was called away for something and postponed the planning to another day in the week. The next morning he noticed that the MRP considered everything between today (must have been around the 5th of November) up until the 18th of December (the day he had firmed the planned order to) as a firmed horizon and didn't want to put any planned order inside.
    Even worse... all planned orders created by the MRP - now scheduled for after the 18th - had an exception message to schedule them in, as they came too late.
    Did anybody ever experience this behavior? If yes, please let me know, where I can manipulate this!
    Any help greatly appreciated!
    Thanks & regards,
    Bobby

    Hi Rupesh,
    first of all: thanks for joining!
    here are the answers to your questions:
    1.) lot-size = EX (i.e. not periodic)
    2.) no overlaps defined for EX in OMI4
    3.) no time fence and the rescheduling horizon is set to 100 days
    Looking at the rescheduling horizon and what is described in the OSS-note, I think I found it. The system actually works as designed. What we failed to do was to update the factory calendar with the downtime over x-mas back then. If we had done so, the demand would have been pulled forward, which means that the firmed order would have been consumed, instead the demand was distributed over the following for weeks.
    With the rescheduling horizon being so long, the system used the firmed order to cover all up-coming demands first using the firmed order before the MRP created other planned orders. It just happened that this one order was so big that it covered everything until then and that it looked like a "firm period".
    Thx for your help!
    Points will be awarded for pointing in the right direction...
    Regards,
    Bobby

  • "CLOSED": HOW TO LOAD FIRM PLANNED ORDERS OF ANOTHER PLAN INTO ASCP PLAN?

    Hi everybody,
    How to load firm planned orders of plan 1 into plan 2?
    Business Case:
    Customer uses a separate planning for order intake. During order intake the requested due date is validated based on ASCP Gantt Chart. Bottlenecks are resolved. For make items firm discrete jobs are created, if adjusted suggested due dates are manually changed. For buy items firm planned orders are created for manually changed suggested due dates.
    If the order is accepted the demand is transferred from the Order Intake MDS into the so called Operational MDS. The firm discrete job will be automatically visible in the operational ASCP Plan (after data collection/running ASCP Plan).
    But how is it possible to include ONLY firm planned orders of another plan into your current plan?
    PLAN1 asigned master demand schedules
    - O_MDS1
    - O_MDS2
    PLAN2 assigned master demand schedules
    - O_MDS1
    - O_MDS2
    - T_MDS
    I want to transfer the firm planned orders from plan2 to plan1.
    Thanks for all your inputs,
    Catalina
    Message was edited by:
    user447176

    Since you need to run a data collection to load the new discrete job, I suggest you to add a custom step in the data collection.
    This custom step will
    1) select all firmed planned order in plan 2
    2) put the firm planned order into a new schedule through staging tables (MST_ST_SUPPLIES) .
    3) collect the data
    Then run plan1 with this schedule defined as demand schedule for your new plan.

  • Planned orders are created when Production order is open

    Hi Everyone
    We have Make order and Make to stock scenarios in the system for various products. When Production order is still open ( Fully confirmed with C015 and partially delivered), system assuming that order is completed and created a new planned order for the undelivered quantity against Sales order.
    As per my knowledge MRP shouldn't create new planned orders when old production order is still incomplete. The old production order has status REL, PDLV and CNF.
    Any help is appreciate and it is our production issue
    Regards
    Prasad

    Hi,
    is the order marked as completely delivered on the Warehouse view? Have you reached the under delivery tolerance for this order with your partial delivery from production? If yes, this would be the reason why the system thinks that a new order is required
    Regards
    Thomas

  • How to make default account assignment category in planned order?

    Scneario Description:
    1. Sales order for a configurable parent item is created in ERP & order BOM is changed & transferred to APO. In APO MRP run takes place for that parent item, which creates a planned order with account assignment category "M" (M:Individual Customer w/o KD-CO.
    2. Now based on the dependant requirement generated for parent item, MRP takes place for one of the child item in ERP & purchase requisition gets created for child item.
    Question:
    1. Can anybody help me how i can make default account assignment as "F" (F:Order) in the planned order of parent item?
    2. PR created for child item also has default account assignment category as "M". we wish to change that to "F".
    Thanks & best regards
    Hemchandra & Sandeep Mandhana

    Hi V. Suresh,
    The account assignment category maintained in the requirement class for parent item is 'M'.
    No account assignment category maintained has been maintained in the requirement class Semi-finished component (this component is sent for subcontracting).
    The business process is as follows:
    1. Create Sales Order for Parent say ME_PARENT.
    2. Order BOM for ME_PARENT is created and subsequently cifed to APO.
    3. PP/DS heuristic is run for ME_PARENT.
    4. MRP for component ME_COMP is run in ERP.
    It can be seen that purchase requistion for ME_COMP has a/c assgn category as 'M'. It seems that the ME_COMP has inherited 'M' from ME_PARENT.
    We would like to have no a/c assgn category for ME_COMP.
    Any pointers?
    Regards,
    Sandeep

  • BAPI to create SNP planned order based on start date

    Hi,
    I am looking for a BAPI to create SNP planned order based on the order start date. There is BAPI BAPI_MOSRVAPS_CREATESNPORDER which can be used to create SNP planned order based on the end date but not based on the start date.
    Also would be great if some one can share how do they create SNP Planned orders using BAPI BAPI_MOSRVAPS_CREATESNPORDER in case if GR processing time is defined in the product master and workdays for GR to be respected according to the calendar.
    Regards,
    Venkat

    Hello Mr.Venkat,
    Hope you recognize me.
    Please check out the BAdi below.
    BAdi - APO_BAPI_BUS10503 (this is the BAdi for ManufactOrderAPS  BAPI which contains the SNPorder BAPI)
    Method - CHANGE_SAVEMULTIPLE2
    In this method parameter IT_ORDER_HEAD contains Order start date input option.
    For GR time please check this (not sure if it will help).
    Same BAdi/ same method
    Parameter IV_PLANNING_MODE_USAGE contains field PLANNING_MODE.
    Value 1 for PLANNING_MODE corresponds to "Observance of parameters from the product master".
    This may make it respect the GR time in product master
    Good luck with the above
    Regards,
    Ashok

  • After firming planned order, new planned order is generating in MRP run

    Hi Experts,
    I am using SAP AFS. Planning strategy is 21- MTO with Project settlement. MRP type is PD. Lte size is EX. Procurement type is X.
    We are using the production versions. Individual / collective reqmts is 1. Planning time fence is not maintained.
    In sap AFS T.Code for MRP run is /n/afs/md02. After receiving the Sales order, MD04 screen gets updated accordingly and I am running the MRP.Planned orders are generated accordingly. I am firming the planned order manually through MD04. The satr mark is also appearing.
    My problem starts now. If I am running  the MRP again for the same requirements another planned order of the same qty. is getting generated. That means after the second MRP run, I am having two planned orders (one firmed plnd order) and second is the new planned order. My requirement is that MRP should not generate any new Plnd. order / PR's if there is no new Sales order.
    The parameters for MRP run are "1" for "Create PR's", '1" for "Plng Mode" and '"1" for "scheduling ".
    I have tried in all the possible ways, but of no use. Still new plnd order is generated after firming the 1st plnd. order in MRP run.

    Thanks all for your feedback..
    @ Vishal
    1. Yes, Both Old firmed planned order and newly generated planned order have the same grid value
    2. For both the planned orders :
    Special Stock is E u2013 Orders on hand,
    Consumption is V,
    Sales order is the same (As we are using MTO , Strategy 21) and same WBS element.
    3. First planned order is not in the assigned tab of MD04. This means that has been allocated to some object. u2013 I didu2019nt got this point. Can u please elaborate?
    @ Nikhil
    1. Quantity of sales order is not reducing after firming the sales order
    2. Account assignment category for both the planned orders is u201CZu201D - Indiv.cust./project
    I have made some more observations and found the following differences between the two planned orders
    From  MD04 , keep the cursor on corresponding planned order
    & click on upward arrow ( available on bottom side of the report).
    It will show what will be the originating requirements i e. for which requirements this planned order generated.
    For Firmed planned order it is taking me to screen u201CPegged Requirements
    u201D*And the following data is present:
    Planned dates: 04.07.2010
    MRP element No. 3100001185 (Sales Order No.)
    MRP element item 100
    Scheduling No. is 1
    MRP element indicator - VC u2013 Order
    MRP element data- 3100001185/000100/0001
    Plng segment u2013 3100001185000100000
    P.O / Order Type u2013 ZX
    Rec/reqd Quantity 10
    MRP element u2013 Order
    For new planned order generated, I am going to Screen *u201CProcurement without Requirementsu201D
    *The following data is present
    Planned date 03.07.2010
    MRP element No. 0000123522 (Planned order No. of the newly generated after MRP Run)
    MRP element Ind. u2013 PA
    MRP element data 0000123522/SO
    MRP element item 1
    Scheduling No. 1
    MRP segment 20
    Plng segment u2013 3100001185000100000
    Rec/reqd Quantity 10
    P.O/Order type- KD
    MRP element u2013 Plnd Order

  • Firmed planned order and purchase requisition

    Hi gurus,
    could anyone explain firmed planned order and firmed purchase requisition, please based on the following detail questions.
    1.when planned order was converted into PR, we call it firmed PR, right?
    2.when manually change a PR and save it, we call it firmed PR, right?
    3.are these the only 2 ways to firm PR? if not, what else?
    4. how to firm planned order?
    5. in MRP, the on-order stock is defined as "composed of fixed and firm receipt elements (PO, firm planned orders, firm purchase requisitions), while in MD04, we always see all the PR created by MRP running, are these newly created PR firmed automatically?
    Thanks,
    cookie

    HI,
    Check the link
    http://help.sap.com/saphelp_45B/helpdata/en/f4/7d2ca444af11d182b40000e829fbfe/frameset.htm
    Regards
    KK

  • Planned order is creating before planning bucket for a specific material.

    Planned order is creating before planning bucket for a specific material.
    Eg: Planning Bucket future: 12 months & Start date- 01/02/2012, but Planned order Availability/Requirement date is 12/23/2011.
    What causes this, how to fix it? Please suggest u2026
    Thanks
    Ravi

    Since your planning bucket start date is in the future, so this is normal that the system is trying to satisfy the demand in jan2012 bucket by creating a receipt on Dec23, 2011.
    Reasons for RECEIPT to be generated earlier is
    (1) There might be a FIRM HORIZON( SNP PROD HOR)
    OR
    (2) There might be a GR time and the system is considering that time
    In Customizing for Advanced Planning and Optimization -> Supply Chain Planning -> Supply Network Planning (SNP) -> Basic Settings -> Maintain Global SNP Settings, in the SNP:GR for Plnd Ords field, you have selected Processing Time.
    Blank out these times and see if it works, else do one of the following:
    (1) Set Period Factor(LOT SIZE TAB of PRODUCT MASTER) to 1, so that the receipts get created at the end of the bucket.
    OR
    (2) Create your demand at the end of the planning bucket period
    Thanks
    Kumar

  • Change firmed planned order to Unfirm Planned order

    Hi ,
    if we change firmed planned order to unfirm planned order ,is there any effect on WIP and routing changes?
    please respond with an answer.
    Regards
    Rekha
    Edited by: REKHA MAHAJAN on Mar 31, 2008 1:34 PM

    Hi Rekha ,
    planned order Unfirmed -
      will allow automatic changes with respect to requirement
    planned order firmed  -
      Any manual change in the planned order is called firmed
                                                          and will not allow any automatic changes with respect to requirement
    Planned order is just the requirement only there will no change in the WIP .
    for example : you have some requirement say PIR is 50 on 31st march you perform MRP
    by selecting the MRP type so that you will get firmed planned order for 50
    on  1st you have another requirement ( PIR )  for 100  and if you perform MRP again system will create another planned order if this is also firmed . you need to convert manually into production order.
    once planned order is converted into production order and there is no link with either routing or
    workin process with planned order and is meant for only open production orders . You can convert all the planned orders collectively also
    if any doubt come back
    regards,
    Vimalbalaji.J

  • REM Back flush using firmed planned orders

    Dear Gurus,
        We are using REM manufacturing process in SAP , we are doing backflush for stage wise confirmation and final confirmation.while doing this we are not referring any planned orders as reference.
    if we update new part numbers in BOM the system asking for the availbilty of that particular new part numbers but physically we are having old materials .
    we want to consume that old materials how it possible in the MFBF t.code.
    if any one please help me ,  if I firmed a planned order with quatity or date then sytem will ask the old materials instead of new one.
    pls explain what is planned orders and their impact on MRP ?
    how we can firmed that planned, if i firmed what is the impact duirng backflushing?.
    Thanks & Regards
    Suresh babu.s
    WIN - IS.
    Suresh

    Hi
    please compare the process when you create the production order manually in Co01 instead of creating the production order by converting the planned order.
    Here you are carrying out back flush with out refering the planned order.
    It is like creating the production order manually.
    In such case system will always look the BOM as of now.
    It will not refer any of the planned order & the components there in.
    If you want to consume the old parts instead of new parts , you can delete the new part numbers & add the old ones in MFBF. this will be allowed by system.
    In this case you are back flushing with out reference to planned orders.System will not ask for old components at all whether planned order is firmed or not.
    Once if planned order is firmed a star (*) mark will appear in MD04 near the planned order number.
    Once if the planned order is firmed, it will not be changed in subsequent MRP Run.
    Hope it is clear.
    Pl. award if it is clear else pl. update.
    Regards
    YMREDDY

  • Scheduling firmed planned order

    Hi all,
    I have follwoing situation:
    In the MF50-planning table firmed (as customized in REM-profile with parameter "Allways Firm")
    planned orders are created manually also in the past/backlogs.
    The MRP/program RMMRP000 is updating the production dates of these FIRMED orders to the actual date/today. Because of this the planned order is shown on the actual date in the MF50 instead of the original planned production date in the past..
    Usually the MRP doesn't consider firmed orders regarding their quantities and basic-/production-dates. In our case the MRP is changing production dates what is not expected.
    Do you have ideas about this ?!
    Thanks,
    markus

    Hi,
    MRP-type is customized with firming-type '2-Automatic firming and order proposals rescheduled out'.
    Firming indicator has not been changed after creating the planned order in the MF50/Planning table; this has been already checked in MD04/MD13.
    Further ideas ??
    Regards,
    markus
    Edited by: Markus Krauss on Aug 5, 2010 8:55 AM
    Edited by: Markus Krauss on Aug 5, 2010 9:37 AM

  • Planning time Fence and  Firmed Planned Orders

    Hi,
    Withing our 30 days planning time Fence, MD04 is showing * mark against the planned order, but when we drill inside the planned order, Firming indicator is missing.
    Using M1/ P1 MRP type.
    1) Is this a correct oservation?
    2) How does it affect the availability check, if we are considering Firmed Planned order to be included in the Av Chk. Will this planned order be considered with the Availability check?
    Thnx!
    Abhi.

    Dear,
    Let us understand with an example
    MRP type = P1
    Time fence = 30 days
    Let say you have created 3 requirements
    01.12.2007 - 100 TO
    01.01.2008 - 100 TO
    01.02.2008 - 100 TO
    Let me know what are you expecting the syatme to do if you run MRP  today?

Maybe you are looking for

  • Itunes won't copy over some of my podcasts and purchases since I have moved it to an external hardrive

    So I Have moved over all my purchases and everything to an external hardrive. I did everything right and my itunes story works perfectly fine. However one of my podcasts (yugioh the abridged series) won't copy over along to the ipod saying its file t

  • Pixi Plus-Can't Delete PDF or Doc View Items

    I have a long list of items on my PDF list that I can't delete.  I also have a few items on my Doc View which won't delete.  I've tried going the USB route, but nothing shows up for the PDF and I can't find a place for the Doc View.  I've also tried

  • What is the max distance recommended between xServe RAID and the host?

    I'm looking to relocate my rack to quieter spot, but I would like to keep my xServe RAID in the rack.  How far away can I keep my xServe RAID from it's host system?  I have it hooked up to my MacPro right now. Thanks

  • Oracle 10G client Install on Windows

    We recently had our Oracle client upgraded from Oracle 9i to Oracle 10G. Now when we sign into the Oracle Enterprise Manager Console, select a user schema and right click on a table to View/Edit Contents, the records display but when i select a recor

  • Self-Assigned IP with my Ethernet

    I have been having problems while on the internet at school. I will be logged in and on the internet perfectly fine(the Ethernet says connected). Then around 15 minutes later I disconnect from the internet and it says "Self-Assigned IP", where it use