Making sub clips from tracks

Hi. I am unfamiliar with the Soundtrack interface. I have been editing a lot of sound for a short film in final cut pro. We recorded a large amount of audio for monsters and people, ect. I have the file of all that audio in an OMF file which I can only open in Soundtrack Pro. I've used Soundtrack on a limited level before, but my question is. When I open the OMF file in Soundtrack Pro I 22 tracks of sound not labeled well at all for editing purposes. Also, some tracks are longer ect. Anyways, I need to label all of these tracks and create seperate clips from long takes and such. What's the best way to go about doing this? Hopefully this is clear. Thanks!

1. Don't cut the subclips too tight. Make them include all the media for each shot, and then edit the pieces of the subclips you want into the timeline.
2. Do not recapture in iMovie as it captures in the wrong format.
1. Yes.
2. Yes. Maybe if you can get a separate monitor if your computer supports that and use that to hold your browser.
3. No, but you could make 10-15 minutes sequences and put them together in FCE, which may be easier to work with than a one hour timeline.
4. No.

Similar Messages

  • Make sub clip from a sequence?

    I am a recent convert from FCP and am used to placing multiple clips on a sequence and making sub clips from the sequence.  I shoot a lot of 20 -30 minute interviews and this sub clipping from the time line in FCP was my workflow to select the best sound bites.
    What am I missing?
    It appears you can only make sub clips from the source window?
    Help
    Thank you

    Thank you, that is so easy - now that you showed me.
    Yes as I have several clips from each segment of interviews (especially if they take breaks, or I to need shut off the camera) then I scurb through them all, by subject, which may cross over multiple clips to make sub clips and rate them based on a star system to do final assembly in a new sequence.  If do this in the source monitor I would have to load dozens and dozens of clips, one at a time to preview.
    Can you suggest a better workflow?
    Maybe with Prelude?  I have not even opened this app yet

  • Moving video clip from track to track

    I need to move a video clip from track to track precisely.  How do I do that?
    Also, is there a way to combine 2 tracks?

    For the "combination" of two Tracks, when you Export, all Tracks will be "combined." The upper will overprint all below. Can you be a little more specific on exactly what you wish to accomplish with the "combining?"
    Now, one can Nest Sequences into one, if that is what you need.
    Good luck,
    Hunt

  • Problems with footage after making Sub clips

    Hey there
    Today I woke up to view all the subclips I had made out of my most recent project. Only today, all the footage looked more pixelated and blurry.
    What might of happened? When I pause the footage the quality is exactly as it was before. But when played it's more pixelated.
    Some of the footage was shot at a lower resolution, but when I set the size of the screen to the appropriate resolution the quality still looks bad.
    Could this have anything to do with making subclips? Even going back and seeing the clips that the sub clips came from: the footage is still more "pixely"
    Any help appreciated

    Update to FCP 7.0.3...run the software updater. That solves a lot of NX5 issues.
    Shane

  • Making sub-clips in a multicam sequence

    Hi,
    I used two cameras conducting while conducting an interview, and I'd like to be able to make sub-clips of the parts I want to use of my multicam sequence.  Is that possible?
    Warm regards,
    Bob Fischer

    I have a similar issue. I have a two camera shoot that I have synched up. I haven't done the multicam edit yet.
    It is of a museum exhibit opening gala. So, there is a linear timeline of singers, speakers, singers, speakers.
    < Clip One --singers -- singers -- speaker -- speaker -- speaker -- singers -- singers -->
    < Clip Two --singers -- singers -- speaker -- speaker -- speaker -- singers -- singers -->
    What I need to do is to take the footage - 35 Minutes - and trim it down to 3 minutes. What I need to do is show singers doing one song (multicam) then fade out the audio, bring up b-roll footage and audio, bring back in singers, fade out singers and bring in speakers (singers as backround audio while speaker speaks) and - this important - speakers are part of the two clips that make up the entire multicam sequence.
    So, I could multicam everything first and then use that footage as my basis for cutting, adding b-roll and cutting entire speeches, songs, etc.
    Or, I could set markers in the original multiclip synched sequence marking the beginnings of each "event" I could use the razor tool and start hacking it up and sliding it around. Then resynch all cut clips from the two sequences and multicam from there.
    Is this clear at all?
    Thanks.

  • Need suggestions on making sub-clips

    Okay, so here's the situation:
    I did an interview for a documentary I'm making, and want to split up the large file into sub-clips for individual topics. However, when I was reviewing it, I noticed that somehow the sound/visuals had been desynched in capturing. It would be very inconvenient for me to have to recapture at this time, so I found a work around by making a new sequence, putting in the desynched file, and trimming some of the video off to sync it up. However, now I can't make sub-clips, I can only use the blade tool on the large sequence. Can anybody think of a workaround?

    Okay thanks that might be helpful but I actually figured it out. I just exported the synched sequence to a Quicktime movie and then re-imported it. It's a little cumbersome and has to be rendered all the time, but it works.

  • Making individual clips from the timeline.

    So here's what I'm trying to do: put a mess of clips in a row on the timeline, use the blade tool to pick out the bits I want, then take those bits and get the individual clips to export through compressor, and to do this by making as few duplicates as possible (I would like to media manage the project or save space in any way possible). Again, I don't want the timeline as an edited sequence, I am trying to pull individual clips. Also, I need to be able to name them differently (which I can't seem to do by simply pulling the clips into a bin-I rename one and all the ones like it get renamed as well). What is the best way to do this?

    1.) Then don't use sequences for this type of work.
    2.) Then adjust your In & Out points to create handles.
    From the Manual, what is a subclip:
    A clip created to represent a limited portion of a media file. By artificially
    limiting the duration of a media file, a subclip allows you to work with smaller
    sections of a media file. These subclip limits can be removed at any time so you can
    work with the whole clip. For example, if an original media file is 10 minutes long, the
    Browser clip is also 10 minutes long. You can make a 1-minute subclip and work with
    the subclip as if the media were only 1 minute long. For more information, see
    Chapter 2, “Creating Subclips,” on page 35.

  • In FCP, holding Shift when moving a clip from track to track would lock it in position vertically.  Can you do this in Premiere Pro?

    That was pretty much the question right there.

    First reset position and scale. If you insist on doing this in the inspector then in the crop function in the inspector use the Type pop to select Crop. There are three options: Trim, Crop, and Ken Burns. It's easiest to do this in the viewer. After you reset position and scale, the transform function, press Shift-C. You'll see three buttons at the top as well as a keyframe button. Select the middle button and press the keyframe button when the playhead is at the start position. It'll look like this.
    Go to the end position and change the crop value. It'll look like this or something like it.
    Click Done.
    Can you do this step-by-step and see what happens?

  • Audio "sub-clips" won't play in source monitor, but will play when cut into a sequence.

    I'm cutting an "audio only" project in Premiere and I came across a strange problem while making sub-clips. The first 6 sub clips made from the same master audio clip were normal, but then something changed, and the rest of them won't play any sound while in the "Source" window, even though while in the window the sub-clip displays a waveform.
    Once edited into a sequence they play normally, but not being able to listen to the sub clips in the source monitor is annoying, and louses up my whole editing routine for this kind of project.
    Any ideas as to why this is happening, or what I might do to fix it?

    Number of issues here:
    1. Your system does not meet minimum requirements.
    2. Your CPU, disks, memory are not enough for anything other than DV.
    3. What video camera was used with what codec on what OS with which version of PR. etc.
    Some suggestions... and answer at least the 16 questions at the end of the Wiki article.

  • In Prelude is it possible to export my sub clips as complete files?

    I work at a youth sports camp, and have a massive amount of footage to work with each week to create a highlight video. The video used is collected by multiple employees with different skill levels. Is it possible with Prelude to save just the sub clips from the ingested footage? Or do I need to save the original file that the subclip is linked to? I would like to cut out any bad footage from the weekly bin before editing begins.
    Thanks

    Hi –
    In Prelude CS6 there isn’t any method for exporting just subclips as new media files. However, you can select your subclips and send them into Premiere Pro from Prelude using the “Send to Premiere Pro…” menu command under the FILE menu. This will package your subclips and create items in Premiere Pro’s project panel which you can then easily export into new files on disk.
    Thanks for making the post and the request. We have heard this request from others as well and are looking into this workflow for Prelude.
    Thanks!
    Michael

  • Move clips from timeline to event sub folder?

    Aloha,
    Is there a way to move clips in the timeline that I have cleaned into a sub folder in an event library?
    I come from a non FCP background and still trying to wrap my mind/workflow around the FCP formula.  Generally I clean clips and drop "some" into a "to be used later" folder. 
    Example - While on location I might shoot some location shots while im waiting around.  The locations shots will use in the last 3 mintues of a 25 minute finished project.  When I get to post I edit and clean all clips in the order they are received.  When I find the location clips I simply move them to a folder labled "to be used later".  When I get to the section of the project/timeline were the clips are needed I drag them or the entire folder into the timeline.  
    I see how to make a folder inside an event but I am not able to drag a clips from the timeline to this created folder.  I have tryied to hold down Shift, CMD, OPT, CTRL and have no sucess.
    Thanks you for your time and help.
    Frederick
    Marbelle

    Aloha Fox,
    Thanks for taking the time to answer my questions.  I feel you really understood my concern and gave me some good viable options.
    There is a lot for me to learn and unlearn. I have been editing for over 16 years and most of that time I was using Edius. This is big paradigm shift coming to the Mac and FCPX. 
    The idea for me is to edit the video and move the "to be used later clips" into a bin/folder instead of moving them to the location in the timeline were they will be used at that very moment.  Its just a preference, I know plenty folks would just move the clip to the location.  Edit software is just a tool I have to decide if FCPX is the right tool for me. 
    Thank you again Fox for your time and understanding of my question. 
    Be blessed,
    Frederick
    Marbelle

  • How can I stop iMovie from making thumbnails of clips from past projects when opening the program to digitize new clips for new project. i have looked in the preferences and couldn't figure out what to disable.

    How can I stop iMovie from making thumbnails of clips from past projects when first opening the program to digitize new clips for a new project. It takes forever for it and is very annoying. I have looked in the preferences and couldn't figure out what would disable this problem.

    You do not need to move your cursor much when pressing the mouse button to cause the tab to tear-off/tear-away into a new tab. No "sensitivity" setting that I am aware of. The tab in the new window can be dragged back to the original window.
    To disable the feature, install this: https://addons.mozilla.org/en-US/firefox/addon/bug489729-disable-detach-and-t/
    *Read the information on the above page
    *Set options for the add-on: Add-ons > Extensions, click Options next to the specific Extension (the 2 options are defined/explained in the above page).
    '''If this reply solves your problem, please click "Solved It" next to this reply when <u>signed-in</u> to the forum.'''

  • I am making a reel. How do I take clips from past DVDs Ive made and place them into Final Cut 4.0?

    Anyone answering,
    I am making a reel to show businesses what kind of work I can do. I am trying to take clips from past projects I have finished and place those clips in FCXpress 4.0. How do I go about doing this? Any advice on how I can do this will be a tremendous help for me.
    Thank you for your time!!

    Hi Jeremy,
    You will have to convert the DVD video to QuickTime using either Apple DV or Apple Intermediate Codec.
    Most people in this forum seem to use MPEG Streamclip to do this.  I have used it a lot it and it works great.
    Note that in addition to MPEG Streamclip (which is free), you will need the QuickTime MPEG2 Playback Component if you do not already have it on your Mac.  It is available from the Apple Online Store for $19.  This needs to be on your Mac in order for MPEG Streamclip to be able to convert the MPEG2 video that is on your DVDs.
    If it were me, and the video is standard 4:3 aspect ratio, I would probably convert it to QuickTime/DV; if widescreen 16:9  then I would probably convert it to QuickTime/Apple Intermediate Codec instead.
    After converting the video, select  an appropriate FCE Easy Setup to match how you converted the video in MPEG Streamclip.  Then import the converted file(s) and edit them into a new sequence.

  • Making simple Cross desolves at the end of still photo clips from my library. Not making a clean disolve beteen. Single frames from the previous clip are flashing half way through the desolve. Did both a drag and drop and insert disolve.

    Making simple cross desolves at the end of still photo clips from my library.
    Not making a clean disolve between clips.
    Single frames from the previous clip are flashing half way through the desolve.
    Did both a drag and drop and insert disolve.

    Making simple cross desolves at the end of still photo clips from my library.
    Not making a clean disolve between clips.
    Single frames from the previous clip are flashing half way through the desolve.
    Did both a drag and drop and insert disolve.

  • Losing the audio track when moving a clip from the browser to the timeline

    Today we were trying to add two clips from the browser in Final Cut Express HD to the timeline that was created yesterday. The problem is, the clips we were adding today are not moving with the audio tracks. All other clips from when we created the movie are fine but the two we added today have no sound. The audio works when viewing the clip in "viewer" but not once it is moved to the timeline. Any thoughts?

    Hi(Bonjour)!
    Look at the left side of the time line, there is a device (the patch panel) to set the current video and audio target tracks. (little V1 and a1 a2 icons). Swith them to desired tracks to select the target audio tracks (that's where the video and audio-or just one of them-will be inserted in timeline upon editing). There is also a contextual menu (control click) with reset panel command.
    Michel Boissonneault

Maybe you are looking for

  • IMovie - Inspector options not enough for a bad camera angle

    I've created a clip path (yellow line) on several seconds of a really bad camera angle. There is a music track so deleting cannot be done. When I go to the Inspector, the options just modify the color/clarity of the image which is not what I need. I

  • Migrate settings - developer edition to standard?

    We have MX 6.1 developer edition (in "standard" mode) set up with some datasources, custom tags, scheduled tasks, verity collections, etc. We'd like to install MX 7 Standard on top of it and have all of those settings port over without any manual lab

  • [SOLVED]Create .service file to load powertop settings at startup.

    Hi I installed powertop and ran it sudo powertop -html and the recommendations I got, i pasted them in a file, and saved it as startup.sh, and made it executable. Now with init, i could write it in /etc/rc.local so that it would be called automatical

  • Some apps won't launch? (lion)

    I bought my Macbook Pro 3 days ago and installed FaceTab for Facebook. It worked fine until today and the problem is that when I want to launch it, it just won't launch. Other Apple built-in apps work fine like iMovie, iPhoto etc. I looked for some a

  • Updating EBAN table with custom field values for BAPI_PR_CREATE

    Hi all, My requirement is PR creation by BAPI_PR_CREATE Function Module . for pr item level customer added 10 fields in the EBAN table append structure CI_EBANDB. . i am creating PR by using Funcation module BAPI_PR_CREATE. In this Function Module I