Manual Cost tranfer to copa segment ?

I want to know is it possible to transfer the cost from one cost center to COPA Segment
without Allocation cycle (KEU5) ?
Thanks
Nilesh

Hi,
It is not possible
Siva

Similar Messages

  • Cost Centre and Account Segmentation

    Dear Experts,
    Our client's requirement is to take profitability branch wise, department wise. 
    Can we use Cost Center or we can enable account segmentation.  Which is the best way. 
    As per SAP notes, it is stated that account segmentation is used for branch wise, region wise, department wise arriving balance sheet, profitability.
    Which will be the appropriate way.  What is the advantage and disadvantages if we cost center or account segmentation.
    Thank You,
    Sundaram R

    Hi Senthil, this is what I have experienced.
    Segmentation may be mandatory in USA, for other countries they are optional.
    For some who are playing the role of accountant in the company, they find it hard to comprehend the segmentation rule. In which case it is best to convert their current single segment profit center oriented chart of account to map into SAP B1.
    Segmentation may be too complicated for smaller companies and one or two ware houses, mainly because to best use the segmentation, the accounts in G/L determination and warehouse determination and item determination need to be configured properly for segmented chart of account.  At times the customer will have to choose a segment for manual JE, and it is not that simple if they are not used to the idea of segments.
    There will be situations when certain segments do not make sense and yet you need to have them as zeros or something common while implementing it. You may end up creating too many segments or too few at the beginning. If too many it is not a good sight with useless accounts, if too few, they creating new accounts needs planning.
    I would leave the option to customer and as consultant it also depends upon your own experience.
    Hope that helps.

  • Inter company COGS and Cost Components in COPA

    Looked at so many threads but couldn't find a proper answer.
    Scenario: Company B in Canada books a sales order,  delivering from a Plant in Company A in US. US bills Canada at Cost + Mark up.
    In US:
    On Goods issue  COGS is booked based on std in US (say $10)
    On Inter company billing - (Cost + 20% mark up) Inter company receivable  is $12, this triggers a payable on Canada side.
    In Canada:
    We can have $12 booked as COGS when Payable entry is created in Canada through IDOC. so Accounting is OK.
    How can I have this COGS of $12 posted in COPA ? Somewhere I read to use two condition types for VPRS, but unfortunately we cant do that as we have revenue recognition activated. only VPRS condition values comes through revenue recognition lines.
    Since Delivering plant in US has a Standard cost of $10, VPRS is $10 in sales order and COPA gets the cost components from US plant, which is not correct. How can I have the mark up of $2 reflected in Cost components in COPA ?.
    Assuming that I create a standard Cost estimate in a virtual Plant in Canada for $12 with two cost components for $10 and $2. Is it possible to manipulate VPRS on sales order to point to standard cost from this virtual plant and create a costing key to bring the cost split from this virtual plant into COPA. Has anybody tried this ?
    Thanks in advance.
    Krishna

    Hi Krishna
    1. Does this material always necessitates a supply from US company??
    If yes, then your task is easy.. Create a Costing Key and assign to such materials in KE4H... In this Costing Key, do not tick the radio button "Use Line Item Plant as Cost estimate Plant".... Instead, You can specify the default PLANT to be used for reading the Cost Estimates in the field "Specify Cost estimate PLant"
    You can use the above solution in case you go with Virtual Plant also
    2. Are you saying that the VPRS in Sales order punched in Canadian comp code is 10 USD because the Delivery Plant is in US comp code?
    I dont know how does Revenue recog behave in your case and when does VPRS (COGS) flow to COPA.... As you said, VPRS gets the feed from RR, so will manually manipulating the VPRS in sales order help you??
    Anyways, the 2nd solution is as below... Few companies have used it
    There is an output type in SD called RD04... I may not be fully right here, you can take it as RD0*... Ask your SD guy to identify the right output type
    Using this, When you do the PGI in Canadian Comp code,
    ................. All this happens in background automatically...............
    you can create a Virtual STO on USA Comp code....
    USA does PGI and the stock virtually comes in Canadian Comp code
    Then PGI happens from Canadian Comp code
    ................. All this happens in background automatically...............
    This is a change in your process... The delivery plant for all practical purposes becomes Canadian Plant (only on paper)... Your Physical process can continnue as Delivery from USA...
    This solution was adopted when both the companies were in same country.... Check with your business how far is it possibie for you
    3. Last option would be to use valuation exit COPA0002.... I dont know how you would use it considering you have RR in place....
    Be very careful in doing this
    br // Ajay M

  • Allocation of Costs from Cost center to COPA

    Hi
    We are booking costs to a Cost Center with reference to a Primary Cost Element. However, in month end, the same cost has to be transferred to COPA. One of the Characteristics in COPA is also Profit Center.
    The issue is that we can allocate costs from Cost centers to COPA through Assesement Rule, system requirement is for Assesement Cost Element, which is a secondary Cost element. In such a case, the PCA Balances, after execution of Assesement cycle are shown with the Secondary Cost Elements.
    In a case, I have booked costs of INR 100000 in a cost center 103007 against a Primary Cost Element 423101. Since Profit Center 103007 is assigned in Cost Center 103007, the Profit Center Line Items will show a balance of INR 100000 against cost element 423101 for Profit Center 103007.
    After this at month end, we need to allocate costs from Cost Center to COPA. But the requirement is that after allocation also, the balances should be shown against Cost Element 423101 for Profit Center 103007
    Regards
    Sanil

    Hi Sanil
    That is not possible.. There is no "Distribution cycle" available for COPA.. In COPA you can have either an Assessment Cycle or an Indirect Act Allocation or a Template Allocation...
    I dont know about template allocation as I have never used that, but gut feel says even that wont serve the purpose...
    One work around is you allocate from Cost Center to an Internal Order using Distribution cycle... Then Allocate from IO to COPA using assessment... In order to use IO as sender in allocation cycle, use note 605281
    At best, what you can do is to use an Allocation Structure instead of one single assessment cost element per Segment... Using an Alloc Str, you can map, say, GL Accounts for Basic Salary, DA, HRA to one Secondary cost element... This way, create logical groupings of GL accounts and map to multiple secondary cost elements
    But bear in mind, The more you use Secondary cost elements, the more will be the line items in CE1XXXX table...
    Regards
    Ajay M

  • FIDCC2, filling COPA segment?

    Hello,
    I am working on a FIDCC2 interface from a SAP system to another. The account document is send to another SAP system when releasing the invoice. The interface works perfect and bookings are made in the other system.
    But in the receiving system also a COPA segment must be filled (The sending doesn't use COPA). This is not filled with FIDCC2.
    How can I fill the COPA segment in the receiving system? Using a user-exit from the FIDCC2-message type or a user-exit in FB01? And if yes how? Is there a function module to fill the COPA segment?
    With regards,
    Frank Roels

    Hi,
    No, I was referring more to the whole section titled "Data should be sent to all applications".  I have had a similar problem to you - using FIDCC2 and requiring posting of a Profit Center Doc and a Controlling Document.  And I've finally made it work!!
    Basically, you need to implement user exit EXIT_SAPLF050_008 and set both 'I_COMP' and 'I_COMP_CHECK' to blank.  I don't know what version of SAP you're on, but this will apparently work for versions less than 4.7 (I can't confirm this).
    For versions 4.7 onwards (I'm doing this on ECC 6.0) it gets a little more complicated.  For a start, you will need to make sure note 892366 is implemented in your system.  This adds changing parameter 'I_SUBSET' to the user exit. 
    Then, in the user exit, set 'I_COMP' and 'I_COMP_CHECK' to blank as before, and set value of 'I_SUBSET' to 'COPA' (this may need to be something different for you depending on what you're trying to achieve).  In addition, I have set field 'RESERVE' in IDoc segment E1FIKPF to the same value 'COPA' (although it appears to work without this).  I fill field KOSTL (cost centre) in segment E1FISEG and now I get both Profit Centre Doc. and Controlling Document generated.  Yay!! 
    (you might also need to fill PRCTR in the segment... might depend on config).
    The value COPA is not actually a SUBSET value found in table TRWPRC as specified in note 114814, it's actually a COMPONENT value as found in table TRWPR. 
    And all of this is achieved without copying the standard IDoc and without copying any standard SAP code! 
    Hope all this helps...
    Cheers,
    Willie

  • Split Valuation Material Cost Estimate into COPA

    Hi all,
    Is there any way how we can transfer the split valuation material cost estimate into COPA?
    I checked the actual line items, there is no "valuation type / batch" characteristics there.
    Is this the main cause?
    Please kindly suggest on the best way to solve this issue
    Thank you very much
    Regards, Erwin

    Hi, Ajay
    Does this mean that, even though i manage to create the valuation type as characteristic in COPA, i won't be able to get 2 different cost estimate based on valuation type into COPA?
    Hm, then, are there any solutions which can be done to solve this issue?
    The client needs a COPA report which can show the breakdown of the sold materials cost estimates
    As usual, thank you very much for your help
    Regards, Erwin

  • Client Cost Allocation to COPA Failed

    Hey guys... when we try to Client Cost Allocate to COPA using TR : keub..
    the test run is ok... but the actual run fails with the following error.. pls help
    Runtime Errors         PERFORM_TOO_MANY_PARAMETERS  
    Except.                CX_SY_DYN_CALL_PARAM_NOT_FOUND
    What happened?                                                              
        In a subroutine call, there were more parameters than in the            
        routine definition.                                                     
        Error in the ABAP Application Program                                                                               
    The current ABAP program "SAPLKEIB" had to be terminated because it has 
        come across a statement that unfortunately cannot be executed.          
    Error analysis                                                                     
        An exception occurred that is explained in detail below.                       
        The exception, which is assigned to class 'CX_SY_DYN_CALL_PARAM_NOT_FOUND', was
         not caught in                                                                 
        procedure "RKE_POST_CO_ITEM_PLANNING" "(FUNCTION)", nor was it propagated by a 
         RAISING clause.                                                               
        Since the caller of the procedure could not have anticipated that the          
        exception would occur, the current program is terminated.                      
        The reason for the exception is:                                               
        A PERFORM was used to call the routine "PREPARE_CO_PLANNING" of the program    
         "RK2OBPUS".                                                                   
        This routine contains 1 formal parameters, but the current call                
        contains 2 actual parameters.

    ECC 6
    SAP_BASIS     700     0012
    SAP_ABA     700     0012
    PI_BASIS     2006_1_700     0002
    ST-PI     2005_1_700     0005
    SAP_BW     700     0012
    SAP_AP     700     0008
    SAP_HR     600     0007
    SAP_APPL     600     0008
    EA-IPPE     400     0006
    EA-APPL     600     0006
    EA-DFPS     600     0006
    EA-HR     600     0007
    EA-FINSERV     600     0006
    FINBASIS     600     0006
    EA-PS     600     0006
    EA-RETAIL     600     0006
    EA-GLTRADE     600     0006
    ECC-DIMP     600     0006
    ERECRUIT     600     0006
    FI-CA     600     0006
    FI-CAX     600     0006
    INSURANCE     600     0006
    IS-CWM     600     0006
    IS-H     600     0006
    IS-M     600     0006
    IS-OIL     600     0006
    IS-PS-CA     600     0006
    IS-UT     600     0006
    SEM-BW     600     0006
    P3A     V600     0003
    LSOFE     600     0006

  • Msg. error BK048 for manual cost allocation

    Hi,
    we got a warning message for manual cost allocation (KB15N), when posting this allocation just with a quantity and without an amount. We would like to post this allocation without amount and therefore need to change the message type from warning (W) to information (I), to do this posting.
    When using transaction OBA5, there is just a fixed and not adjustable value for Standard with "W". Do you know any workarounds or how we can change this message type to do this posting?
    Regards
    Florian

    Hi Florian,
    HAve you assigned users in OBA5?.
    Go to OBMSG, for this particular Message number in the allowed message types, specify IWE etc. In the standard column specify I. Also you could check on check box "Switch Off" if you want to have the option of not seeing the message at all.
    Now goto OBA5, against the message number, in the "Online" column , specify I or - (Switch Off) and do the same in the BAtchl column also.
    Now you need too specify a user only if you want this change for specific users , if you want all the users to be able to post manual cost allocation then do not specify any user name.
    Do tell me if it works.
    Regards
    Susan

  • Transferring results of material cost estimates to COPA

    Hi,
    I heard that it is possible to transfer the standard prices of materials estimated in material cost estimate to COPA.
    Which transation is used for this purpose?
    Regards,
    Karol

    Karol,
    Incase of made to stock scenario, there is no specific transcation code to transfer the stanadrad price of a material to COPA it gets automatically transferred to COPA when the billing document are released to accounts.
    The variance in the production order if any will be transferred to COPA when theproducion order is finally settled.

  • Material cost estimation in COPA

    Hello  Everyone
    I have question regarding how details of cost Estimate will flow to COPA Report.
    Variance of Product cost will flow in COPA through PA Transfer Structure and its flowing on my report.  However, I want to flow COGM (break up of the cost components) on COPA reports.
    I have done below steps but itu2019s not flowing.
    I have maintained Define Costing Keys for Accessing Material Cost Estimates. ( I have maintained 3 key with different Period Indicators.
    A. Released Standard cost estimate matching goods issue
         B. Current standard cost estimate to entry in Mat
         C. Material cost estimate matching posting date.
    Assign costing  key in material ledger and i activate material ledger in actual costing/ material ledger.
    I have chosen table lookup with MBEW on source fields in u201COriginu201D tab with        MATNR, BWKEY and BWTAT as field and in  assignment I have take VPRSV.
    Maintain another with same field name in Source and selected KALAWI in Target fields.
                And assigned the costing keys to key for accessing material cost to step1
    I have assigned Cost Component structure to operating concern. ( I have created
    Value fields which shows the details for COGM in Cost sheet and maintained the same in it.)
    I have maintained external material group and assigned to Material master.
    After doing all the above steps Material Ledger TAB is getting populated on the Material Master but when I run the Standard Cost Estimate its not showing details for Cost of sales in COPA.
    Please do let me know if I need to do any additional steps with.
    Thanks in Advance.
    Srinivas

    Hi Srinu,
    By activating Material Ledger without knowing about it and without knowing it's relevancy to the client's business process....YOU DID A BLUNDER MISTAKE
    Materia Ledger along with Actual Costing need to be activated if you want to go for Actual Costing inaddition to Standard Costing.
    """Once activate Material Ledger for any Plant, you willl not be able to de-activate""".
    In which client are you doing this? It it in only Golden Master, just immediately deactivate ML. If you have already copied the customization request to Unit Testing Client, you cannot do anything there, but don'g transport it to Quality Server.
    When you activate ML, many things right from basics will change...for example Price Indicator in Material Master (S or V). Hell lot of descipline is required during Period-End closing etc.
    YOU SHOULD NOT ACTIVATE MATERIAL LEDGER UNLESS THE BUSINESS PROCESS REALLY NEEDS IT -- this only suggestion from my side...
    First you deactivate and come back to know about Costing Key...
    Srikanth Munnaluri

  • Assigning Manual Cost/Profit Center in Sales/Purchase Order

    I don't really know how to describe my problem, so I will instead describe my situation of what I need to do.
    We have all our G/L accounts associated with Cost elements with no Cost/Profit centers set as default.  The cost elements represent our services (ex: internet sale, hardware sale, software sale) and our cost/profit centers represent our employees.  My question is how/where do I assign a cost/profit center manually when creating the sales/purchase order?  Basically I would preferably like to assign the cost/profit center based on the corresponding sales person to the sales order.  For the purchase order we are acting as a middle man between vendor and customer, so how would we assign a manual cost/profit center that pertains to us?
    If you have a good solution to this, please provide detailed steps or instructions with t-codes and walkthroughs as I have very little knowledge about how the cost/profit centers work.  I do understand sales/purchase orders though.

    Hi Lee
    There is a transaction code OKB9 for automatic assignment of Cost Element, Cost Center, Profit Center for a Company Code. There you have to assign the Cost Center and Profit Center combination to a particular cost element.
    I hope this will work out for your problem
    Please let me know it is working or not
    Regards
    Surya

  • Cost Elements and COPA Value Fields

    Hi All,
    Should all the cost elements created in CO be assigned to value fields in Costing Based COPA?
    I am a bit confused . . .
    Regards,
    Ravi Kumar

    Hi ravi,
    Basically fist you understood, how the values are flowing into the CO-PA. ie When ever billing document generated co-pa document generates automatically. based on your condition type and account keys.
    While defining pricing procedure, they mapped the conditon type against releavant account key.
    Based on the releavant account key they assigned releavant cost element under VKOA.
    Against these condtion types they assgined value filed under KE4I in co-pa.
    This is the way system will capture cost elemetns under copa. KIndly revert in case any issue.
    Regards
    Maruthi.

  • Freight Cost transfferred to COPA

    Guys,
    Need a quick help with this. I have got a full blown Transport management system being implemented at my client site in ECC6.0. I need to know if anybody has worked on a variable costing report whereby I can pull the freight cost value into COPA.

    Hi ajay,
    Thanks for your pmompt reply
    i will maintain 12 cost element categary  but in copa it will show frieght  seperate and revenue seperate.
    ie - revenue 10 rs
         frieght     -2 rs
    system will not show revenue 8rs  deducted frieght from there.
    regards
    RR

  • Valuation strategy - costing keys in COPA

    Hello All,
    In Valuation using material cost estimate in COPA, I have defined a new costing key and I want to assign the new costing key to characteristics. Can anyone please let me know the procedure.
    Thank you
    Srinivas

    I got the procedure..
    Srinivas

  • Oracle Payroll Costing not picking the segment value.

    Dear ALL,
    I am facing an issue in my Organization that when we run costing of the payroll the cost allocation segment didn't get the correct Project Segment value.
    Our cost allocation key flex segments and qualifiers are given below:
    **AKS_HR_COMPANY Qualifiers Balancing,Payroll**
    **AKS_HR_PROJECT Qualifiers Assignment,Balancing,Organization,Payroll**
    **AKS_HR_DEPARTMENT Qualifiers Balancing,Organization,Payroll**
    **AKS_HR_ACCOUNT Qualifiers Balancing,Element,Element Entry,Organization**
    **AKS_HR_SUB_ACCOUNT Qualifiers Balancing,Element,Element Entry,Organization**
    **AKS_HR_EMPLOYEE Qualifiers Assignment,Balancing,Payroll**
    **AKS_COST_FUTURE_1 Qualifiers Balancing,Payroll**
    The costing didn't pick the AKS_HR_PROJECT segment value and some times it pick '00000' which is actually not the project code. Some times the other segment like AKS_HR_DEPARTMENT and AKS_HR_SUB_ACCOUNT pick the null value in costing.
    Kindly Help because its the issue of Live environment.
    Regards.

    Dear Vignesh,
    From where I check that the SLA is enabled? because I am new and not the part of implementation.
    When I check the assignment process of the employee its shows the costing data but the value of project segment not sowing properly.
    The qualifiers set for the project segment is as follows:
    Assignment,
    Balancing,
    Organization,
    Payroll
    I saw some employees has given 00000 in the project segment on employee level. when i delete the record from employee level, the costing has to pick project segment from organization level but when I run the costing and saw the costing from assignment process screen it again shows '00000' in the project segment.
    Please guide me if I am doing any thing wrong.

Maybe you are looking for

  • Trigger not working correctly

    Hello all. I am working on a project, Yes it is for a class. I am creating a simple Boat rental db. I am trying to construct a Trigger that will verify when a Reservation is made for a particular date and time in the future (current day and beyond) t

  • MAC OS 10.4 CRASHES AFTER HARD DRIVE UPGRADE

    I just bought a HITACHI hard drive for my iBook G4 1.33ghz. I installed the hard drive with no problems. After installing MAC OS X 10.4.2 & upgrading to 10.4.11, the OS keeps crashing, Ive done a APPLE HARDWARE TEST everything fine, Ive used disk uti

  • "Access denied" when opening the timeline

    I have FCP 6.0.6.  I dragged a picture into the timeline, and the browser shut down.  When I tried to reopen the timeline, it said "access denied."  How can I reopen the timeline?  I really don't want to have to start over.

  • How to use SSFCTRLOP-DEVICE   = 'MAIL'. in smartform to send mail

    There are parameter in smartform interface called   MAIL_RECIPIENT             = GWA_RECIPIENT   MAIL_SENDER                = GWA_SENDER I want to use them to send mail. I have set my device type = 'MAIL' But I am getting error email address, is not

  • Rounding by currency

    Dear Experts,     My B1 is 2007B PL08.     Document setting is  Rounding by currency.     My local currency is NTD. Amount decimal is 0, price is 2.     My  FC is USD, I would like the  price decimal  is 3, and amount is 2.     I know the system defi