Msg. error BK048 for manual cost allocation

Hi,
we got a warning message for manual cost allocation (KB15N), when posting this allocation just with a quantity and without an amount. We would like to post this allocation without amount and therefore need to change the message type from warning (W) to information (I), to do this posting.
When using transaction OBA5, there is just a fixed and not adjustable value for Standard with "W". Do you know any workarounds or how we can change this message type to do this posting?
Regards
Florian

Hi Florian,
HAve you assigned users in OBA5?.
Go to OBMSG, for this particular Message number in the allowed message types, specify IWE etc. In the standard column specify I. Also you could check on check box "Switch Off" if you want to have the option of not seeing the message at all.
Now goto OBA5, against the message number, in the "Online" column , specify I or - (Switch Off) and do the same in the BAtchl column also.
Now you need too specify a user only if you want this change for specific users , if you want all the users to be able to post manual cost allocation then do not specify any user name.
Do tell me if it works.
Regards
Susan

Similar Messages

  • Error 13109 for manual sync Ipod

    I manually sync my nano and I have read the unysnc and resync help. Since I manually drag my music, I cannot click sync or it will delete all my music. How can I get rid of this error without loosing all my music?

    Ive fixed this issue before. The steps are kinda long but they work.
    This is for windows computers with iPod nano that get the error 13019 during or after a sync with iTunes.
    -Open itunes
    --click, edit, click preferences
    --select advanced
    ---make a note of the iTunes media folder location on a notepad.
    ---put a check in organize files
    ---take the check out of copy files
    ---click ok
    --Click file, at the top of iTunes
    --move mouse over library, select organize, and consolidate files. ( This ensures all music in you iTunes will be in the iTunes media folder later.)
    At this point, if you have playlists you want to save:
    -Create a folder on your desktop, call it, playlists
    --Hover you mouse over your playlist in iTunes, should be at the bottom of the blue/grey column on the left.
    --right click the playlist, select export playlist
    --Navigate to your desktop and open the playlist folder and save.
    ---Do this for each playlist you want to save
    -Close itunes
    -Click your start button, and open computer or my computer
    --Using what you wrote down on your note pad, follow the path to the "iTunes folder", NOT the iTunes media folder
    --Open the iTunes folder.
    --Stop here
    -You will see icons that look like folders and you will see icons that look like files-
    -You will KEEP the FOLDERS
    -You will DELETE the FILES
    --If it makes you more comfortable you can cut the files out and paste on your desktop, but as of now we do not need the files any longer as we have the playlists backed up. Remember-Keep the folders.
    --That was the magic--
    -Disconnect your iPod if connected.
    -When you open your iTunes, it will be empty, that is OK. We are recreating the library. Everything will come back in a few seconds.
    -Click file at the top
    --Select, add FOLDER to library, not to be confused with add file.
    --In the window that pops up, locate and click on computer or my computer
    --From here follow the path to the iTunes media folder on your note pad, but do not open the iTunes media folder.
    --Click the iTunes music/media folder one time so it highlights.
    --On the bottom right you will have option to select folder, or choose folder or OK. Hit that button.
    All you music will start to import back into iTunes.
    -Plug in iPod after completed
    --a message pops up about being synced with a different library.
    --Click erase and sync
    --Watch all your songs go on your iPod with no error message.
    From here you may sync your iPod the way you want with out worrying about the persnickety error 13019!!!!!
    Hope this helps!!!
    Julian
    p.s. Follow the directions exactly.
    p.s.s. To add your playlists back to iTunes:
    -Click file at the top of the screen
    --move your mouse over library, selecte import playlist
    --on the new screen that pops up, navigate to your desktop
    --open the playlist folder, select the first playlist, hit ok
    --repeat for each playlist exported

  • No Error Log generated in 'Costing' step in Costing Run (CK40N)

    In the Costing Run, when the 'Costing' step is run (after 'Material selection'  and 'BOM Explosion' steps), it gives a hard stop when it encounters the 1st error, instead of completing the 'Costing ' step and giving an Error Log with material information and nature of errors. This makes it very cumbersome to resolve all the errors.
    In the Costing Variant setting in config, the u2018Save Error Log' indicator has been checked.
    Please let me know if I am missing something.
    Venkat

    Hi Vimal,
    Your proposal does not resolve the issue. I found OSS Note 375901, which addresses this issue - see below
    :In Customizing for the costing variant (Transaction OKKN) in the tab "Misc.", you chose "Messages online" for the Error Management option.
    Solution
    Change the error management for the costing variant to
    "Log and Save Messages..."
    Many thanks for your inputs.
    Venkat

  • Overhead Cost Allocation - with IFRS

    Hi Gurus,
    We have configured Leading Ledger for reporting in IFRS and a non-leading ledger for local (India) Reporting.
    As this implementation is being done by our Overseas parent company - we are using  template allocation for Overhead cost allocation.
    However, we want to allocate expenses based on actual consumptions rather than on Process Output quantity. ie. for  example - electricity charges we want to distribute based on actual no of units consumed by each department/machine/process.
    Kindly advise, If there a possibility for having both methods in the system (automatic) or manul process for achieving this.
    Thanks
    Sree.

    Hi Expert,
    There is no such feature to Allocate Overhead Cost with Ledgers.
    No need to Allocate Costs or Overhead Costs with respect to Leading Ledger - IFRS.
    By default, the Costs or Overhead Costs are allocated to Leading Ledgers.
    Regards,
    GK
    SAP

  • Cost allocations with business area info

    Hi Expert,
    Is there any way to allocate cost to cost centers, including business area ? i understand that the standard allocation process in SAP do not allocate to business area. How about manual cost allocation posting ?
    Thanks.
    Angel.

    Hi,
    I have the following scenarios.
    Scenario No. 1 (allocate cost within same cost center but different business area)
    Cost center A with Business area 01 - $1000
    to allocate the cost to :
    Cost Center A with Business area 02 - $500
    Cost Center A with Business area 03 - $300
    Cost Center A with Business area 04 - $200
    Scenario No.  2 (allocate cost in same business area to different cost center)
    Further allocation base on scenario no. 1
    Cost Center A with Business area 02 - $500
    to allocate the cost to :
    Cost Center B with Business area 02 - $300
    Cost Center C with Business area 02 - $100
    Cost Center D with Business area 02 - $100
    Please advise if there is a solution on the above.
    Thanks.
    Angel.

  • In VFX3,error is for GL requires an assignment to a cost object eventhough

    In VFX3, while releasing billing docu for Accounting  error is for GL40000000 requires an assignment to a cost object
    The below are Checked points :
    1.In OKB9 for this cost element  40000000 cost center assignments are there with Business area wise.
    2.Cost center Valid period is from 1.4.2007 to 31.12.9999
    in the begining  while releasing in VFX3, system throwed  error as that cost center  blocked for revenue postings,
    We deselected that check box(Actual Revenues in KS02)
    now the error is GL 4000000 requires  an assignment to a cost object
    Even though cost center assignments are there but why system is asking cost object  not able to understand.
    Please any one help me to solve this issue.
    Thanks

    Nope, no other ways.
    The cost center in question will receive a statistical posting - revenues aren't costs, and can't be carried in CCA as primary postings.  If they could, they'd be able to be included in rate calculation, allocations, etc, which is nonsensical.
    You'll have to have another receiver in CO that can receieve a real posting.  That's pretty much an internal order, WBS element, or profitability segment.  Profit center doesn't count; all postings to PCA are statisticial (PCA is a special-purpose special-purpose-ledger, if you get my meaning.)
    Two questions:
    1) Do you have costing-based CO-PA active in your system?
    2) Have you verified the business scenario?  Why do you want to record revenues in CCA in the first place?

  • Reg. Document type for cost allocation

    Hi,
    Please let me know where can maintain document type for cost allocation so documents get post in GL.
    With best regards
    Praveen Atmakuri

    Hi Praveen
    Can't recollect fully, but please check the FI/CO real time recon variant   Or may be the controlling area in okkp
    Simply activate the real time reconciliation and carry out a cross profit center allocation. Either system will trigger the posting in FI or give you error for missing doc type
    Br. Ajay M

  • Error while adding landed cost G/L account 5207010003      needs DR assignment for dimension 1;  fill in DR-related fields

    Error while adding landed cost G/L account 5207010003      needs DR assignment for dimension 1;  fill in DR-related fields

    Hi Rajesh
    Go to System Initilization =>  General Settings => Cost Accounting => Check the Dimension1 has Block Posting.
    Relase the Block and add the Document it will add.
    With Regards
    Balaji

  • Conversion error in company code currency for general costs activity

    PS Experts,
    Please guide me in the following , The below message appeared when i created a customer project in CJ20N in our new DEV server
    This is the scenario
    Create customer project with 3 WBSE, each one has 3 NTW and 3 activities, i maintained the cost with currency same as project curr and company code currency in the first two act.
    in the third activity (General act)  in cost tab i put a currency is different than project currency& company code currency and tried to save the project, the message appears.
    note: Company code curr same as projet curr & controlling area curr
    Is there any setting is missing in customizing
    Conversion error in company code currency for general costs activity 0010
    Message no. CK443
    Diagnosis
    For cost activity 0010, a conversion error occurred in the currency of the company code to which the material is assigned.
    Procedure
    Check the global settings in Customizing to be sure the exchange rate for conversion into the company code currency is correct
    Thanks

    Hi Yassin,
    I believe you have maintained exchange rates for rate type M as per your config in OPSB.
    Now do one thing, maintain the conversion rate for P for those currencies in OB08 and then save your project.
    This will solve your problem.
    Regards,
    Kabir

  • INST-08010: Error in validating the port range for auto port allocation

    Hello guys, I am using the installer to install OBIEE 11.1.7.0 on my machine. When I get to step 6, I receive the error messages below:
    INST-08010: Error in validating the port range for auto port allocation. At least 2 ports should be free within the range 7000-7500 for the Adminserver and Adminserver SSL.
    Ensure that a minimum of 2 ports are free within the range 7000-7500 for auto port allocation to work correctly for the Adminserver and Adminserver SSL.
    INST-08010: Error in validating the port range for auto port allocation. At least 3 ports should be free within the range 9500-9699 for the Weblogic Components for BI (WLS Managed Server, Managed Server SSL and NodeManager).
    Ensure that a minimum of 3 ports are free within the range 9500-9699 for auto port allocation to work correctly for the Weblogic Components for BI (WLS Managed Server, Managed Server SSL and NodeManager).
    INST-08012: Error in validating the port range for auto port allocation. At least 3 consecutive ports should be free within the range 9500-9699 for the OPMN, in addition to 3 free ports required for Weblogic Components for BI (WLS Managed Server, Managed Server SSL and NodeManager).
    Ensure that a minimum of 3 consecutive ports are free within the range 9500-9699 for auto port allocation to work correctly for the OPMN, in addition to 3 free ports required for Weblogic Components for BI (WLS Managed Server, Managed Server SSL and NodeManager).
    My Operating System  below:
    Linux Red Hat 5.9 X86 64bit
    My uname -a are below:
    Linux redhat59 2.6.18-348.el5 #1 SMP Wed Nov 28 21:22:00 EST 2012 x86_64 x86_64 x86_64 GNU/Linux
    My /etc/hosts file are  below:
    # Do not remove the following line, or various programs
    # that require network functionality will fail.
    127.0.0.1   localhost.localdomain localhost
    10.10.80.19 redhat59
    My /etc/sysconfig/network are below:
    NETWORKING=yes
    NETWORKING_IPV6=no
    HOSTNAME=redhat59
    GATEWAY=10.174.27.228
    My /etc/sysconfig/iptables are below:
    # Generated by iptables-save v1.3.5 on Tue Dec  3 17:01:17 2013
    *filter
    :INPUT ACCEPT [425:33860]
    :FORWARD ACCEPT [0:0]
    :OUTPUT ACCEPT [307:40164]
    COMMIT
    # Completed on Tue Dec  3 17:01:17 2013
    My ifconfig are below:
    eth0      Link encap:Ethernet  HWaddr 52:54:00:55:9B:C9
              inet addr:10.174.27.233  Bcast:10.174.27.255  Mask:255.255.255.0
              UP BROADCAST RUNNING MULTICAST  MTU:1500  Metric:1
              RX packets:200216 errors:0 dropped:0 overruns:0 frame:0
              TX packets:95849 errors:0 dropped:0 overruns:0 carrier:0
              collisions:0 txqueuelen:1000
              RX bytes:110668992 (105.5 MiB)  TX bytes:209784134 (200.0 MiB)
    lo        Link encap:Local Loopback
              inet addr:127.0.0.1  Mask:255.0.0.0
              UP LOOPBACK RUNNING  MTU:16436  Metric:1
              RX packets:109200 errors:0 dropped:0 overruns:0 frame:0
              TX packets:109200 errors:0 dropped:0 overruns:0 carrier:0
              collisions:0 txqueuelen:0
              RX bytes:257845896 (245.9 MiB)  TX bytes:257845896 (245.9 MiB)
    my /etc/sysconfig/network-scripts/ifcfg-eth0 are below:
    # Virtio Network Device
    DEVICE=eth0
    BOOTPROTO=static
    BROADCAST=10.174.27.255
    HWADDR=52:54:00:55:9B:C9
    IPADDR=10.174.27.233
    NETMASK=255.255.255.0
    NETWORK=10.174.27.0
    ONBOOT=yes
    Have any suggestion please?
    Many Thanks
    D

    In setDomainEnv.sh set debugFlag=false or you can just remove it.
    NodeManager is a charm after that. it can take any number of ports.
    Cheers !!

  • [ERROR]:INST-08010: Error in validating the port range for auto port allocation

    I am installing OBIEE 11.1.1.7.0 on a linux x86 version. I get the below error when running the installer: [VALIDATION] [ERROR]:INST-08010: Error in validating the port range for auto port allocation. At least 2 ports should be free within the range 7000-7500 for the Adminserver and Adminserver SSL. [VALIDATION] [SUGGESTION]:Ensure that a minimum of 2 ports are free within the range 7000-7500 for auto port allocation to work correctly for the Adminserver and Adminserver SSL. [VALIDATION] [ERROR]:INST-08010: Error in validating the port range for auto port allocation. At least 3 ports should be free within the range 9500-9699 for the Weblogic Components for BI (WLS Managed Server, Managed Server SSL and NodeManager). [VALIDATION] [SUGGESTION]:Ensure that a minimum of 3 ports are free within the range 9500-9699 for auto port allocation to work correctly for the Weblogic Components for BI (WLS Managed Server, Managed Server SSL and NodeManager). [VALIDATION] [ERROR]:INST-08012: Error in validating the port range for auto port allocation. At least 3 consecutive ports should be free within the range 9500-9699 for the OPMN, in addition to 3 free ports required for Weblogic Components for BI (WLS Managed Server, Managed Server SSL and NodeManager). [VALIDATION] [SUGGESTION]:Ensure that a minimum of 3 consecutive ports are free within the range 9500-9699 for auto port allocation to work correctly for the OPMN, in addition to 3 free ports required for Weblogic Components for BI (WLS Managed Server, Managed Server SSL and NodeManager). installation Failed. Exiting installation due to data validation failure. Solution suggested on other post is below: your hosts file have duplicate name that point to two different IP addresses.  10.37.29.1    test1.xyz.com 10.10.10.1    test1.xyz.com But in my case, My host file has different entiries as shown below: 169.36.71.228 usl20027808.am.hedani.net  usl20027808 169.36.72.9    usl2002788.am.hedani.net usl2002788 Please suggest!

    In setDomainEnv.sh set debugFlag=false or you can just remove it.
    NodeManager is a charm after that. it can take any number of ports.
    Cheers !!

  • Confirmation with errors in calc. actual costs for PM-order

    Hi,
    We have a PM-order with notifications and good movements that has tecnical completion status and is already settled. So we want to set it with bussines completion status, but an error arises: "Unprocessed future change recs for order 5009385 prevent del. flag/completion"
    We already checked for automatic goods receipt pending, backflushes, etc. and the only found is an error record in actual costs calculation (trn. COFC). Looking at this record the message says: "No prices could be determined for object Activity type CONA/900097/PM-100" (message KW 407).
    We checked price set for the activity type and cost center and is set for all the periods of actual fiscal year. Then looking at the details for above message, we found the following: "No price could be found for object Activity type CONA/900097/PM-100 with price indicator 7 and value type 4"
    The question is: why system is trying to get price for activity type PM-100 with price indicator 7 instead of 3 as usual for our PM-orders? How price indicator is defined from actual PM-order parameters? Any idea?
    Regards,
    mr.

    Hi
    Whats your activity type category? I believe it should be 1
    Your point is right, price indicator shud be 3 because while confirmation system uses the planned rate.. And price indicator pertains to actual activity price..
    Check whether you have calculated or maintaned actual activity price or not in KBK6
    Ajay M

  • Library Update rqstd on Aperture 3.2; now won't open get msg "error opening data base for the library "~/Pictures/Aperture Library.aplibrary"   TIme machine won't load backup "error code -8003"

    Aperture working on OS 10.6.8 then Library Update rqstd on Aperture 3.2; said yes;
    now Aperture won't open,  get msg "error opening data base for the library "~/Pictures/Aperture Library.aplibrary"  
    TIme machine won't load backup "error code -8003"
    Tried reloading Aperture 3.2 but get same result.

    You’re running an outdated copy of Safari on your Desktop. That won’t work.
    In the Finder, select
    Go ▹ Applications
    from the menu bar, or press the key combination shift-command-A to open the Applications folder. Check that the Safari application is in that folder. If it is, use it, and delete the copy on your Desktop. Never move or copy built-in applications.
    If you've deleted Safari from the Applications folder, back up all data, then reinstall OS X. If your Mac was upgraded from an older version of OS X, you’ll need the Apple ID and password you used to upgrade, so make a note of those before you begin.

  • Reason for Actual Cost Error in Production Order

    Hi,
    I have Convert the planned order to Production order but error message coming "Actual Cost Error".
    what procedure that error avoid.
    plz, Advise me.
    By,
    Jeevan.S

    Hi
    1.problem could be with the activity type costing.
    check KP26 data maintained or not (for activity and costcentre assigned to work cneter)
    2.IF order having CSER status then do the cost caliculation in the order, so that the status will go.(do thsi after correcting the KP26 data)
    if still facing check the error
    -ashok

  • Error in MIR7 - Different Material Vendor  planned for del. costs item in PO

    Dear All,
    We getting error during MIR7.
    We add two freight condtion ZFRO and ZFRT in purchase order  as below :
    ZFRO = we have add Rs. 350 against freight to Vendor(MATERIAL VENDOR)
    ZFRT =  We have add Rs. 100 for local freight which is paid to FREIGHT VENDOR directly (cash payment) i.e. paid for Transporter's Godown to our factory.
    Now during MIGO, store department has enter  as :
    1. ZFRT (Freight Vendor - FREIGHT VENDOR)
    2. ZFRO (Freight Vendor - MATERIAL VENDOR)
    Now during MIR7 we are getting following error :
    Different Material Vendor 300255 planned for del. costs item in PO 4500028018
    (300255 is FREIGHT VENDOR which is at Number 1 in freight tab of MIGO)
    Thanks and Regards,
    Nirav

    For good and service,
    In MIR7, select the option Goods/Service Item
    First do only for Good/Service item...
    After that, in MIR7 select only Planned Delivery cost and give the same PO number..
    Then you will receive a pop-up message to choose vendor..
    Here select one vendor and press continue..
    Then save you invoice..
    And again do the same and just select the other vendor..
    You can see 3 invoice number in PO history..
    One for goods charges and another two for freight charges..

Maybe you are looking for