Material cost estimation in COPA

Hello  Everyone
I have question regarding how details of cost Estimate will flow to COPA Report.
Variance of Product cost will flow in COPA through PA Transfer Structure and its flowing on my report.  However, I want to flow COGM (break up of the cost components) on COPA reports.
I have done below steps but itu2019s not flowing.
I have maintained Define Costing Keys for Accessing Material Cost Estimates. ( I have maintained 3 key with different Period Indicators.
A. Released Standard cost estimate matching goods issue
     B. Current standard cost estimate to entry in Mat
     C. Material cost estimate matching posting date.
Assign costing  key in material ledger and i activate material ledger in actual costing/ material ledger.
I have chosen table lookup with MBEW on source fields in u201COriginu201D tab with        MATNR, BWKEY and BWTAT as field and in  assignment I have take VPRSV.
Maintain another with same field name in Source and selected KALAWI in Target fields.
            And assigned the costing keys to key for accessing material cost to step1
I have assigned Cost Component structure to operating concern. ( I have created
Value fields which shows the details for COGM in Cost sheet and maintained the same in it.)
I have maintained external material group and assigned to Material master.
After doing all the above steps Material Ledger TAB is getting populated on the Material Master but when I run the Standard Cost Estimate its not showing details for Cost of sales in COPA.
Please do let me know if I need to do any additional steps with.
Thanks in Advance.
Srinivas

Hi Srinu,
By activating Material Ledger without knowing about it and without knowing it's relevancy to the client's business process....YOU DID A BLUNDER MISTAKE
Materia Ledger along with Actual Costing need to be activated if you want to go for Actual Costing inaddition to Standard Costing.
"""Once activate Material Ledger for any Plant, you willl not be able to de-activate""".
In which client are you doing this? It it in only Golden Master, just immediately deactivate ML. If you have already copied the customization request to Unit Testing Client, you cannot do anything there, but don'g transport it to Quality Server.
When you activate ML, many things right from basics will change...for example Price Indicator in Material Master (S or V). Hell lot of descipline is required during Period-End closing etc.
YOU SHOULD NOT ACTIVATE MATERIAL LEDGER UNLESS THE BUSINESS PROCESS REALLY NEEDS IT -- this only suggestion from my side...
First you deactivate and come back to know about Costing Key...
Srikanth Munnaluri

Similar Messages

  • Transferring results of material cost estimates to COPA

    Hi,
    I heard that it is possible to transfer the standard prices of materials estimated in material cost estimate to COPA.
    Which transation is used for this purpose?
    Regards,
    Karol

    Karol,
    Incase of made to stock scenario, there is no specific transcation code to transfer the stanadrad price of a material to COPA it gets automatically transferred to COPA when the billing document are released to accounts.
    The variance in the production order if any will be transferred to COPA when theproducion order is finally settled.

  • Split Valuation Material Cost Estimate into COPA

    Hi all,
    Is there any way how we can transfer the split valuation material cost estimate into COPA?
    I checked the actual line items, there is no "valuation type / batch" characteristics there.
    Is this the main cause?
    Please kindly suggest on the best way to solve this issue
    Thank you very much
    Regards, Erwin

    Hi, Ajay
    Does this mean that, even though i manage to create the valuation type as characteristic in COPA, i won't be able to get 2 different cost estimate based on valuation type into COPA?
    Hm, then, are there any solutions which can be done to solve this issue?
    The client needs a COPA report which can show the breakdown of the sold materials cost estimates
    As usual, thank you very much for your help
    Regards, Erwin

  • Material cost updating in COPA at the time of Billing and Delivery 2 Time.

    Hi All
    I had created sales order( MTO).
    Sales Order No 61224069 u2013 50
    Sales Order line item 40 created > PR & PO created (MD02) > MIGO > Delivery of Order (VL01N) > Settlement (VA88) >Billing( VF01) > Settlement (VA88).
    I have two COPA Document and Material Price updating 2 Time in COPA report.
    Please let me know Its Process error Or Configuration error.
    If Process -- Please let me know the correct process
    If Config -- Please let me know where to check
    Thanks In Advance.
    Alok Dixit

    Hi Ajay
    Thanks for the reply.
    The COPA Documents Generated 2 Times through settlement.
    *When document generated.*
    1 After Delivery Sales order is settled
    2 After Billing  Sales order is settled
    *What sort of value*
    There i maintain the PA Stracture as same as CCS. But in the COPA report system is updating Material Cost 2 times.
    *Record Type*
    Record Type for documents is C in both cases
    Settlement after Billing  & Delivery.

  • Which table to fetch cost center (KOSTL) from(material cost estimation )??

    Hi..
    i am going to create a report to display material cost estimate.
    it has two selection screen parametrs..(matnr and werks)..
    i need to display cost center as the output of the report..
    which tables shud i fetch from??
    and what is the logic??
    can sum1 plz provide the code??

    <b>now hw can i get cost elemnts of the cost center..</b>
       am not sure if this will work as all the key fields are not given in where condition, anyways chk our
      select single setname
               from setleaf
               where valfrom LE p_kostl and
                        valto GE p_kostl and
                        setclass eq '0101'.

  • Report for material cost estimation

    Dear All,
               my report spec is when I give the material no (finished goods) and plant it should show the sub-material that qty and price also...Could u tell me the table name for getting these sub-item and main-item ..<b></b><b></b><b></b><b></b><b></b>
    Regards,
    Thanuskodi T.

    Dear Jahziel,
    In standard SAP the following reports are available:
    T Code : CK84_99 : COST_ELEMENT - Cost Elements
                 CK80_99 - Cost Components
                 CK84_99 - Itemization
    These reports will provide you the information at individual material level.
    Regards,
    Pavan Kumar Arvapally

  • Table used in Material cost value

    Hi,
    In Material cost estimation Cost Components views are Material Cost, Material Overhead, Subcontracting Charges, Conversion Cost and Total Cost. Material Cost is calculated based on Material price, Bom Qty, value put in KP26 i.e, fixed and variable pirce with combination of Cost Center and Activity type and processing hours, Labout hours from Routing. Total Cost appears with the combination of Material Cost and Conversion Cost . This Total Cost appears in costing view tab of Material Master and CKIS table. which table stored in Material Cost value. Kindly need your suggestion.
    Regards,
    Anindita

    Hi A Roy
    The tables are KEKO and KEPH....
    In KEKO you will find prod costimation no against the combination of Plant/Material
    Against this Prod Cst Est no, you will find the cost break up in KEPH table
    Regards
    Ajay M

  • Valuation strategy - costing keys in COPA

    Hello All,
    In Valuation using material cost estimate in COPA, I have defined a new costing key and I want to assign the new costing key to characteristics. Can anyone please let me know the procedure.
    Thank you
    Srinivas

    I got the procedure..
    Srinivas

  • Assign direct material cost to value field in copa while issue to Prod orde

    Dear All,
    My requirement is like this:
    There are some 16 material groups from A to P each containing some materials(finished goods).
    I want to allocate overhead to different material groups(Charecteristic in copa) in COPA using the periodic assesment cycles. I am able to allocate overhead(admin & sales cost) to different value fields in copa from different cost centers.
    I want to analyse the product cost and also the profitability of each material group in COPA using Report painter. Iam able to pull all the costs which i assign to value fields using assessment. But, i am NOT able to get the direct material cost which is issued to production orders using BOM.
    My question is whether we can assign the direct material cost to any user defined value field(material cost value field) while the material is being issued to production orders. Is there any automated way where we can directly assign the direct material cost to value field in copa while issuing the material to Production orders.
    Pls explain me whether we can do it. if yes how?
    Thank you very much in advance.
    Regards,
    Vishnu
    VST-IT.

    PA is a Profitability analysis tool. That means it gets updated when a sale is made, not before. (Except for settlements and assessment of overheads.)
    Goods issues for production gets updated in CO-PC, and needs to be analysed there. If you don't, you loose all the inbuilt tools for variance analysis, cost estimate comparisons, Wip Calculation etc. To the best of my knowledge, a Profitability Segment cannot be used as a cost object in Production Planning, because amongst others, you need to be able to capitalise the produced materials to stock at the end of the production run, or to WIP at the end of the Financial period,which is not possible with PS.
    Similarly, overheads are recorded in CCA and needs to be analysed there.
    If one goes against these big groupings in SAP, you always run into problems.

  • Standard cost estimation after goods movement when material ledger is activ

    Hi!
    our client is activated material ledger, for some materials standard cost estimation is done till marking but not released.
    goods movements have been posted for those materials.
    Now system is not allowing to release the standar price for those material in the current period, as material ledger expects same price for entrie period.
    what is the alternative way to update the standard price for those materials ( with out reversing the goods movements).
    regs,
    ramesh

    Hi Ramesh,
    When you are using Material Ledger, after goods movemnets for materials, no need to change the standard cost estimate as Actual costing run will take care to derive the PUP price.
    If there is no standard cost estimation release for sold materials (e.g.FG), you will get an error message duirng the billing document release to accounting. To aviod this error, if you are using split valuation (valuation types) and mixing ratios (CK91N & CK94), try with the below steps:
    Create a new valuation type for the same material
    Crate CK11N & CK94,
    Run CK11N
    Run CK24.
    Then release the billing document.
    Let me know if you need more details.
    Thanks & Regards,
    ADI

  • COPA - Planned Material Cost not appearing in KE30 report

    Hi all
      In COPA planning, I manually planned the Material cost (Material External Price) along with the Sales Quantity and Revenue for two company codes (one plant in each co code). But in KE30 report, I could see the material cost (MEP) values only for one company codeplant. What could be the issue?
      I even tried valuation in KEPM. Valuation step is calculating and populating the material cost in KEPM, but the values are not flowing to KE30 reports. And this happens to only one of the two company codes.
    Thanks
    Vamsi

    Hi Vamsi
    Please check table CE2XXXX, where XXXX = Op Concern.... Here, can you see the plan line items??
    If yes, then the issue is with your report definition in KE30... May be you are restricting values display in KE30 report by virtue of your selection parameters
    br, Ajay M

  • Difference in the Material variant  BOM Qty during Standard Cost estimation

    Hi SAP Experts,
    We are trying to estimate the cost for the material variant, but the BOM exploded
    during the cost estimation, the quantity differs slightly with the BOM exploded
    during CU50.
    What might be the reasons for difference.
    Please give your valuable Inputs.
    Thanks
    Best Regards
    Siva

    Dear Mr.Kumar,
    <b>For any material in the material master , for Price
    Control indicator in Accounting 1 View we can either
    maintain S or V.</b>
    <i>For In House Manufactured materials we maintain S
    (Standard price) & for Sub contracted or bought out
    items we maintain V(Moving Average price).</i>
    <b>During cost roll up & release as far I know we cant
    split like 70 & 30% and we can do the costing.</b>
    So either you have to use the moving average price for
    both inhouse & bought out.
    <b>Because 1 material cant have both standard price &
    Moving Average price.
    Because bought out item's doesnot have standard price.</b>
    If your vendor is ready to give the material(Finished
    product) using the same amount which you spend for
    producing inhouse,then no issue,you can use
    standard price.But Practically it doesn't occur.
    I hope this will help to clear your doubt.
    <b>If useful reward points.</b>
    Regards
    Mangal
    Message was edited by:
            Mangalraj

  • Cannot bring material cost, labour, overhead to copa

    Dear Forum,
    Why it is saying that cannot bring material cost, labour, overhead to copa?
    "In all the system COGS clearing account exists.......but for COPA, condition type VPRS is attached to cost element Cost of Goods Sold because you can not bring all the cost like material, labour, overhead into COPA.....so all procuring cost flows to VPRS condition type and in turn COGS is deducted from the sales revenue to derive Gross Profit...."
    Thanks alot.

    Hi
    Please go throgh the below mentioned link
    Cost Component Structure in COPA
    Hope this will help you
    Regards
    Praveen P C

  • How the Material costs and Overheads flow from Logistics to COPA

    Hi,
    I know that Revenue will flow to COPA from SD Condition types which we assigned to value fields in KE4I.
    But i am not clear how the Material cost will flow to COPA?
    How the Overheads will flow to COPA?
    Kindly help me in understanding the flow...
    Thanks
    KB
    Moderator: Please, read available SAP material for basic questions

    Hi,
    check this link:
    http://help.sap.com/saphelp_erp60/helpdata/en/7a/4c48c64a0111d1894c0000e829fbbd/frameset.htm
    Go to: "Flows of actual values" to get the big picture of CO-PA value flow.
    best regards, Christian

  • Error reading material cost estimate for sales order (KE292)

    Dear All,
    I have an issue with billing. we are posting july month transactions, the material cost is maintained through MR21. When releasing billing document for accounting we are getting error message like"Error reading the material cost estimate for sales order "11"
    Message no. KE292
    Diagnosis
    In Profitability Analysis (CO-PA), the system tried to valuate item 000010 of sales order 11 by reading the corresponding product cost estimate.
    However, no product cost estimate could be found for this sales order item.
    The system accessed product costing for product AMLFP011011XX00P using costing key YB3 as defined in the
    CO-PA Customizing settings.
    System Response
    The system cannot process the document any further.
    Procedure
    Check your Customizing settings."
    We cross checked with other client as a current date and we ran cost estimate through CK40N with same material. and we posted entries. Here it is working fine. but in above process it is not working. Can you pls guide me where i missed.
    Regards,
    Nagaraju,

    Hi,
    When the Costing Key is assigned to the material types in the COPA customizing, then system expects Cost estimation when billing is released to Accounts.
    If you dont run cost estimation but update the material master through MR21, system will not accept as in the Costing key configuration you must have selected the Current Standard price field for the valuation.
    Hence, try to run cost estimation and then do releasing.
    Thanks & Regards
    Ravi Kumar

Maybe you are looking for

  • Why won't Firefox open a web page with an apostrophe in the URL?

    It has been more than a year since I asked the same question and the problem still exists. I can open these URLs in Safari and Chrome, but I prefer Firefox. Please see this discussion from May 2013. https://support.mozilla.org/en-US/questions/959895

  • Processing of file in XI

    Hello all, I have a file coming in from legacy into XI and is posted into R/3. So the scenario is like File>XI>R/3. I need to process the file in XI and check each record to see if they are completed or incomplete. If they are incomplete then I need

  • Hp pavilion g6 stuck on 23% during restoration of O/S

    Help I'm attempting to restore my Hp pavilion g6 notebook Windows 7 using the Hp recovery disc and it won't load past 23% copying required files. It's been on 23% copying required files for nearly 2 hrs now. I just purchased a brand new WD 1tb 7200rp

  • How get source page name

    how i get source page name? i am want to implement MVC 2 model. i made a Servlet controller.java, now i want to get source page name how i achieve?

  • HT5622 I share an email address but want a separate Apple ID.  Can I do this?

    I share an email address but want a separate Apple ID.  How do I do this??