Mass meter reading result changes
Hi ,
Is there any functional module or bapi or user exits for the mass meter reading results changes.
Please let me know.
Thanks in advnace ...
Regards,
Santhosh.
Try BAPI 'BAPI_MTRREADDOC_UPLOAD'.
Or Idoc function 'IDOC_INPUT_ISU_MR_UPLOAD'
Similar Messages
-
Mass Meter reading results reversal.
Dear All,
For Reversal of meter reading we are using EL37 trasaction and these FM's (ISU_METERREAD_CANCEL or ISU_O_METERREAD_ACTION) will also help us for our enhancements.
Anyway, here my requirement is Need to reverse bulk meter reading results by giving the only multiple installations in a selection criteria.
At EL37 we does not have the multiple installation selection criteria...so please help me the way on this instead of (EL37)BDC development.
Regards,
Joshi
Edited by: Josh on Aug 20, 2010 10:25 AMHello Joshi,
Please see the following thread:
Meter Reading Reversal
The information here shoudl be helpful.
Please dont forget to search threads for answers.
Regards
Olivia -
Performance parameters of the meter reading result entry
Hi Guys,
Can any one explain me about the below parameter in the meter reading result entry.
1."No Entry of Tech. MRs at Installation Outside Installation"
If we enable this option,it should not allow to enter the meter readings in the technical installation.
But it is accepting. How? can any one explain.
2.Turbo booster also.
Thanks in advance.
Regards,
Oven
Edited by: Richard oven on Feb 18, 2009 11:41 AMHi Oven,
I hope the following information is useful:
No Entry of Tech. MRs at Installation Outside Installation ->
As a rule, technical meter readings at installation are entered using the appropriate transactions (Full Installation, Technical Installation).
In addition, it is possible to enter meter readings for technical installation before the installation occurs. This is done by uploading meter readings using IDoc ISU_MR_UPLOAD or BAPI. In exceptional cases you can also enter meter readings manually using single entry. The meter reading is then included once technical installation has been executed.
If you select this field, it is not possible to import meter readings at installation via upload or single entry.
Turbo Boosting->
Activates Accelerated Processing
Transactions and background jobs of the meter reading result
entry create a high database load. Excessive accesses to the
database tables EABL, EABLG, V_EGER_H, ETDZ, EASTS and others
affect the system performance this improves performance......
Kind Regards
Olivia -
EL32: Automatic monitoring of meter reading results
When we updated to ECC6 year ago, the transaction EL32 stopped functioning. We fill in the parameters and no report is generated - nada, zilch, null.
Is the transaction not supported in ECC6? If so, is there a replacement transaction and what is it? El32 had several parameters available. Is any functionality of EL32 available elsewhere in another transaction? What is/are it/they?
Are we now doomed to code our own programmes to replace EL32's functionalities?
Thank you to anyone who can help.
mkiHI,
EL32 still runs in ECC6.0 and we have not doomed to code our own programmes. So cheer up.
Please check your configurations
SAP Customizing Implementation Guide -> SAP Utilities -> Device Management -> Meter Reading -> Basic Settings -> Define Automatic Monitoring of Meter Reading Data
Or the table TE935
Hope this helps.
Regards,
Manish
Edited by: Manish Bisht on Jul 9, 2009 10:42 AM -
Previous Meter reading results
Hi Experts,
I need to get previous MR results based on current MR result. Is there any table or function module for the same. Please provide your valuable inputs. Thanks in advance.
Regards,
Laxman.PHi Laxman:
FM ISU_DB_EABL_LAST:
CALL FUNCTION 'ISU_DB_EABL_LAST'
EXPORTING
x_equnr = x_equnr
x_zwnummer = x_zwnummer
x_adat = l_adat "Current MR date
x_atim = l_atim
x_adaterz = x_adaterz
x_arbauf = x_arbauf
x_endbillper = x_endbillper
IMPORTING
y_eabl = y_eabl_prev
TABLES
yt_eablg = yt_eablg_prev
xt_eabl = xt_ieabl
xt_eablg = xt_ieablg
EXCEPTIONS
not_found = 1
system_error = 2
not_qualified = 3
adat_to_old = 4
others = 5.
Regards,
David -
EL 27 Correction of Implausible Meter Reads
Hi All,
I am trying to release impalusible Meter Readings via TCode EL27, by entering a Premise. Two things are happening:
1. Direct Release of MR occurs . (no idividual correction screen opens)
2. Individual Correction screen opens. (no direct release)
I debugged quite a few cases and have reached a few conclusions:
FOR INDIVIDUAL CORRECTION SCREEN TO OPEN:
Pre-requisite = Value of ORIGIN_ESTIM = 6
With this pre u2013 requisite, when there is 1 installation, with 1 register then in EL27, individual correction screen will open and MRu2019s can be edited.
FOR DIRECT RELEASE:
Apart from the above prerequisite & condition, FOR u201CANY OTHERu201D CONDITION, the correction screen will not open and MRu2019s cannot be edited.
Value of Origin_estim can be viewed on the individual correction screen "Execute Correct Implausible Meter Reading Results" screen; Forecast data tab--> Origin
Values of Origin:
1 - Past MR results
2 - Period Consumption
3 - Reference value
4 - Proration
5 - External Determination
6 - Estimation not Possible
Also, is this phenomenon of direct release/ correction screen display DEPENDENT on MR REASON???
Thanks in advance,
Prajakt Dhumal
Edited by: prajakt k dhumal on Oct 28, 2010 9:28 AMHello,
It should be possible to get to the correction screen by selecting the line you want to correct an click on 'correct'...
You could skip this and release directly but there should be always an option to go into the correction screen as long as the meter reading is "still implausible".
Only time this happens is if the meter reading is automatically plausible e.g. if no extrapolation was possilbe. You should get a
message about this.
It will only enter the correction screen if there is an "invalid meter reading result". If it is valid now (without doing changes) there is no need for correction anymore therefore it is released immediately.
The correction screen is not build to handle more than one meter reading at a time. Hence there is no way you correct more than one meter reading at the same time i.e. count_eabl >= 2.
Hope this is helpful ...
Regards
Olivia -
T-code el31(Meter Reading data) output modification
Hi all,
i am working in the sap isu industry. I just want to know whether the output screen of the standard transaction code el31 can be modified or not.
if yes how? I wanted to add one more field to the ALV output of the el31 Installation-Meter reading result.you can try with user exit
http://www.sap-img.com/abap/a-short-tutorial-on-user-exits.htm
http://www.sapgenie.com/abap/code/abap26.htm
http://www.sap-img.com/abap/what-is-user-exits.htm
http://wiki.ittoolbox.com/index.php/HOWTO:Implement_a_screen_exit_to_a_standard_SAP_transaction
http://www.easymarketplace.de/userexit.php
http://www.sap-img.com/abap/a-short-tutorial-on-user-exits.htm
http://www.sappoint.com/abap/userexit.pdfUser-Exit
Transaction Code - EL31 Manual Monitoring
Exit Name Description
EDMASSES IS-U: User-Defined Validation for Overestimation
EDMEL231 IS-U: Meter Reading Result - Incorporation of Subscreen
EDMFOLUP IS-U: Determine follow-up actions during MR result entry
EDMLELAE IS-U: User Exit Too Static. Evaluation of Evaluated Data.
EDMLELDE IS-U: Dependent validations based on user exit
EDMLELSV IS_U: User Exit After Saving Meter Reading Results
EDMMR002 IS-U: Change to Gas Date During Meter Reading Result Entry
EDMMRRES IS-U: Change readings during upload (before validation)
EDMMRSTR IS-U, Display Additional Fields for Street Route Maintenance
EDMSUPBI IS-U: Automatic Suppression of Billing/Deac. Meter Readings
No of Exits: 10
Rewards if useful.......................
Minal -
What is Meter reading validations (System defined & User defined)
Hi Experts,
1 )How to configure Meter Readings (Technical Control Parameters, MR Control, MR Notes etc)
2) what is Meter reading validations (System defined & User defined) and how to configure it.
3) What is Register Relationships,Device Groupings & Device Allocations and how to configure.
Kindly explain with examples.
Thanks in advance.
Regards,
Shabnumhi,
Meter Validation Steps:
1. The Validation Process begins with Meter Reading Order Creation when the expected consumption is determined for the meter reading to be recorded for each register. The meter reading status is u201C0u201D or un-entered at this time.
2. The meter reading is entered via an upload program as part of the batch processing or entered manually.
This result is validated or evaluated against the permitted range of allowable meter reads/consumption for that register. The expected consumption is the basis for determining the range of the minimum and maximum values for the meter reading.
If the result is plausible, or valid, for all registers of the meter, the billing order becomes billable and the contract/installation is passed to billing for further processing. The meter reading status is updated to u201C1u201D or billable.
If the meter reading is validated as implausible, the meter reading result is transferred to the List of Implausibles for further processing (EL70). The status of the meter reading is u201C2u201D or automatically blocked. One or more independent validations can be failed in this validation process.
3. During processing, the agent can release the meter reading for billing; the status is updated to u201C4u201D, released by clerk. The reading is accepted as measured. The agent can also process the implausible meter reading result using transaction code: EL27 Execute Correct Implausible Meter Reading Results. EL27 is recommended for individual processing.
SAP Easy Access Utility Industry Device Management Meter Reading Correction of Meter Reading Results Implausible Results (Transaction EL27)
EL70 is recommended for processing of implausibles for mass processing. It is not on the menu, however, one way to open the screen is:
SAP Easy Access Utilities Device Management Meter Reading Correction of Meter Reading Results Implausible Results
Once the screen opens, click on the List button on the application toolbar
4. The agent may also correct the meter reading. If this corrected read is validated as within range, the status is updated to u201C1u201D, billable.
5. Alternatively, the reading can be determined to require follow up action and a service order is executed from the IC for re-read. A read status has been configured to support this flagging of the account for follow-up service order processing.
6. When the service order is returned from the field, the CSR releases corrects, resets or possibly estimates the meter reading depending on the outcome of the service order processing.
7. The meter reading is then passed to the billing engine for billing execution when the reading is validated as plausible.
-Siva -
MRO and Meter Read report and reconciliation
Hi,
I am creating Meter read orders for all MRU's in a portion and need to reconcile the number of orders created and after the read results have been received, i again need to check for how many orders reads have been received and how many are still open.
What is the standard way of doing this. I am aware of using EABL and EABLG. Will again need to understand what is a better way.
Thanks,
Monis Shakeelwe have a custom report which counts the number of orders, & results every day. After a few days the orders are filled (mostly) & business processes monitor the outstanding open orders.
The report is based on the schedule records (TE417 & TE418) as well as the meter reading results tables (EABL/G)
Alternatively: transaction EL32 can be used to monitor meter reading data.
SAP Utilities --> Device Management --> Meter Reading --> Basic Settings --> Define Automatic Monitoring of Meter Reading Data
However we've never used this functionality so I have very limited experience with its subtleties.
user exit EDMLADUE is utilized here.
I'd be interested in any 'better way' you end up pursuing. -
Hello all,
After i confirm the BP and premise in web UI 2007 i go to Meter Reading then I get 2 messages one is error message Details: CRM_IU_IC_BI013
when i click on details I get the following info
Diagnosis
An error (communication error) occurred during the remote call of function module ISU_METERREAD_GET_REMOTE in meter reading data processing.
System Response
The system cannot execute the action.
Procedure
This is probably only a temporary disruption. Restart your application later.
If the problem is a permanent one, contact SAP.
and second message is a information message saying New Meter Reading Results will be created
any suggestions?
Thanks,
Raj.Hi,
in most of the cases, I'd expect an RFC or authority issue here. But for details debugging would be needed to check, which return code the function module provides. Before you could check the remote connection and if the rfc-user has sufficiant access rights.
KR
Uwe -
T-Codes/Steps for Meter Reading
Hi,
Can you pls send me the steps in creating a Meter Reading till its end.
I mean the t-codes in order.
thx
guruHi:
First step in the meter reading process is to create meter reading and billing orders.
Next there are a number of menu options available to enter and correct meter reading results.
The monitoring option allows you to follow the status of Meter Reading orders during the process from creation through entering results onto creating a billable billing order.
After collecting the meter reading results they need to be entered into the IS-U system. ISU offers several functions for this.
Hopefully it would be helpful to find out the way.
Regards
Shashi -
Primary & secondary installation meter reads
Hi,
Can anyone guide me how to link primary and secondary installation so that meter reading result of secondary installation is summed up with meter reading of primary installation and bill is created with summed up reads. e.g
Primary installation -
> Device - D1 -
MR 200 KWH
secondary Installation -
> device - D2----
> MR 225 KWH
When i am trying to bill the primary installation consumption of only 200 KWH is billed and consumption of 225 KWH is not added to the MR result of primary installation. I have set the indicator in device of secondary installation as not relevent for billing as when primary meters are billed, consumption from all registers is processed. Meter readings from secondary meters are therefore also processed during billing
Thanks
AmitHi
Please carry out Billing Related Installation (only) (T Code EG34) of Device D2 under Primary Installation. Billing related parameters viz Rate Type, Rate fact grp etc should be identical to the device D1. I guess device D2 is already technically/billing related installed under secondary installation; but this does not make any difference.
Regards,
Puru -
Check the reversed meter reading data
Hi All,
I wanted to know how we can check the meter reading results which are reversed by EL37.
What I observed is when the MR is reversed its entry is deleted from table EABL and EABLG.
SantoshSantosh,
The meter reading once it is reversed, it won't be kept anywhere in the system.
However, we can see who delete it and when they delete it from application log transaction SLG1, Object IU18.
The transaction does not allow you to search by meter number so you need to go through the log one-by-one except you create a custom program to read the log.
Chaiphon -
BAPI-Meter read uplaod which will pass all validations .
Hi ,
Is there any BAPI or FM available for Meter read uplaod which can pass all the validation and submit the meter read with status 01 (billable ) .
Thanks
rajeevHi Rajeev & William,
We can configure meter reader note at SAP Utilities --> Device Management --> Meter Reading --> Meter Reading Result --> Entry --> Define Notes from Meter Reader.
In this configuration we can set - 03 (Use unvalidated meter reading) as Control of follow-up action against configured meter reader note.
By doing this, No validations will be performed for the meter reading. It is set directly to plausible and can be billed.
We can pass meter reader note to BAPI function module.
Let me know if you need any further details.
Regards,
Avinash -
Change meter reading type during reading estimation (el30)
Hi,
I would change meter reading type during or after reading estimation process (el30 transaction), just before the meter reading upload.
Is there any user-exit to activate to do this?
ThanksHi,
You can use enhancement - EDMLELSV / EDMLELAA
Let me know if more information is required.
Thanks and Regards,
Ranjit Thakur.
Maybe you are looking for
-
Is there a way to change the order of the listing on Hub for Z 10?
Is there a way to move the order the listing is set for the Hub on Z 10?
-
Hey gang. I have an iMac running Mavericks OS. 2010 model running Intel i7 quad core, 16GB RAM with 1TB HHD and 128GB SSD. When opening Ai or Muse, the apps are running freakishly slow. Example; when moving an object I have to wait for the object to
-
Can't see and open a pdf in a mail with ipad
I there, working with ipad2 can't understand , got sometimes pictures of my house from an architecte . these're send as pdf often I can't see the attachement and so impossible to see anything ! BUT when opening the mail on a Mac OS everything is ok
-
Exchange rate rounding differences
Hi, when i am posting a document in FB01 transaction, there is a minor difference blw the document currency and local currency. the document currency balances to zero but the local currency gives a balance of 0.03 or 0.02 blw debit and credit lines.
-
ICal keeps crashing when trying to send to invitees
Every time I add an event to my calendar and try to send it to invitees, it crashes. Help!