Materail for different plants.
Hi Experts,
One material is having different plants . if I create or change of material , I want to fetch the plant based on material.
Example :
Matnr 10043 plant UK01
Matnr 10043 plant UK02
Matnr 10043 plant UK03 ......If i make changes to Material 10043 for plant UK02 . I want to fetch UK02 value based on material 10043. Is there any key field to identifychanges to material-plant based on material from marc or any table ?
Thanks - Vinay
Hi ,
Actually I am writing a program to fetch plant value based on material.
Thanks - Vinay.
Similar Messages
-
Import PO for different plants having diff. excise group
Dear All ,
How to capture & post the Excise Duty for an Import PO ,
Where the PO is created for different plants .The plants have
different excise groups.
Regards
R B PandaThe only way to do it is to assign a small notional value (like 0.01 USD) to the item, so that the conditions tab does not disappear.
The only problem will be that the GR/IR clearing account will have an open entry, which can be cleared via MR11 with minimum accounting impact.
Regards,
Aroop -
Number range userexit same type of PR but for different Plant
I would like to have the same type of PR but for different Plant, I would like to have different Number range.
The exit MM06E003 M06B0003 Mo=06B0004 not work for ME51N.
Any other exits help for thisHI
Put this code in EXIT_SAPLMEREQ_009
DATA pr_header TYPE mereq_header.
DATA pr_items TYPE mmpur_requisition_items.
DATA pr_item TYPE mmpur_requisition_item.
DATA: l_item TYPE mereq_item.
DATA: l_zmm_numrange TYPE zmm_numrange.
MOVE-CORRESPONDING eban TO l_item.
CALL METHOD im_req_header->get_items
RECEIVING
re_items = pr_items.
READ TABLE pr_items INTO pr_item INDEX 1.
CALL METHOD pr_item-item->get_data
RECEIVING
re_data = l_item.
CHECK l_item-werks = '6301'.
CALL METHOD im_req_header->get_data
RECEIVING
re_data = pr_header.
SELECT SINGLE * INTO l_zmm_numrange
FROM zmm_numrange
WHERE werks EQ l_item-werks
AND doc_type EQ 'PR'
AND bsart EQ pr_header-bsart.
IF sy-subrc EQ 0.
ex_range = l_zmm_numrange-numki.
ENDIF. -
Change the issue quantity for different plants
We are facing a problem in the following issue.
A material is being used in two plants. The material is procured from vendors in packets. The pack quantity varies for each plant for the same material since it is procured from different vendor. The base unit of measure for the material in the material master is maintained as NOS and the unit of issue is PAC. The alternative unit of measure in the material master can be maintained for only one PAC. If the pack quantity varies for different plant, how to maintain in the material master.
For example : -
Plant I u2013 Vendor A u2013 Pack quantity u2013 200nos.
Plant II u2013 Vendor B u2013 Pack quantity u2013 300 nos.
While creating reservation in plant II for one pack, the stock keeping quantity is 200 nos. On issue the issue quantity is 200 nos, but our requirement is the system should issue 300 nos. Kindly give solution to the problem.Hy afzal,
I don't think it is possible to maintain different Conversion factor for 2 different plant for a single material.
Acording to me there is 3 way to comeout of this problem.
1) Create different Material codes for both plants.
2) Insted of using alternate unit of measure use Batch specific unit of measure.But for this Materials are Batch Managed.
[Batch Specific Unit of measure|http://help.sap.com/bestpractices/BBLibrary/Documentation/Q24_BB_ConfigGuide_EN_US.doc]
3) Try to convince one of the vendor to change its packing qty/Packet.
Regards,
Dhaval
Edited by: Dhaval Choksi on Jul 31, 2008 11:25 AM
Edited by: Dhaval Choksi on Jul 31, 2008 1:26 PM -
Number range of accounting document for different plants
whenever a billing document is created in SD (using the T-code VF01); an accounting document will be simultaneously created in the FI module. one document type(TS,number range---60:1 to 9999 ) have four plants .different plants have own number range and sequential document number .
eg: doc. type num.range fr to plant cty co code
TS 61 1 1000 PLANT_1 3100
62 1001 2000 PLANT_2 3100
63 2001 3000 PLANT_3 3100
64 3001 4000 PLANT_4 3100
How can that carry out this function ?
thank you for your help !Hi leung,
As Mr.Rohit has mentioned it has to be done with the z table and the available user exit.
Wht we have done is.we have created no ranges in obj rv_beleg.Eg
AA 0000000001 to 0000099999
AB 0000100000 to 0000199999
AC 0000200000 to 0000 299999.
Using the user exit we have created a Z table.And assignd for this ombination in the Ztable.
Plant X Billing type A AA
Plant Y Billing Type A AB
Plant Z Billing type A AC
Once this combination matches the appropriate invoice no range gets picked up.
Regards,
K.Vivek -
InfoPackage to load multiple flat file for different plant
Hi
There is a requirements to load the data from multiple flat files by different plant into BI which source data is coming from other system. Each flat file has it own naming convention.
As data has to load via infopackage into the targeted cube. Then I have to create multiple infopackage in order to load the data according to the number of flat files that provided. However, new plant will be created due to expansion of bussiness. If that is the case, additional infopackage is required to create as and when there is a new plant.
Is there a way to create a infopackage to load the data from flat file by plant? Your advice is much appreciated.
Thanks and regards
Kang RingHi,
The best way I can suggest is....
1. Create a folder in AL11 for your requirements.
2. In InfoPackage under Extraxction Tab you can have File Name , just side of this you can fine ABAP Routines ICon there you click on that and asks Name give some and then it will takes to your into ABAP Code there you can access the AL11 and then write code in such way that to take file irrespective of the File name, whatever the file is there in that Folder it ahoud take from that AL11 Folder path.
3. Load the Data using PC.
4.At the end of the PC Delete the File in AL11 folder , becasue we don't need it for next load.
Else
See the thread
Re: Automation of load from application server
Thanks
Reddy
Edited by: Surendra Reddy on Jun 4, 2010 11:03 AM -
Material group in material master for different plants
Warm greetings Masters of Material Management
We have one material master for three different plants example 1000, 2000 &3000 with same material group with different valuation class
If we change material group in plant 2000 it is reflected in 1000 & in 3000
My question is this the standard practice that material group changed in one plant will be reflected in other plants
Regards
shamul heqThank u Amola
The current situation, if user change material group for plant 2000, it is effected in plant 1000 & in 3000
the impact of this is in purchase requisition
As the release statergy is triggered from material group to different department
How can we solve this issue
regards
shamul heq -
Different order unit for different plant
Hi,
I ahve a material whose base unot of measure is kgs. Its purchase order unit for plant 1000 is Tonnes, and I want to have a different purchase order unit say LBS for plant 1100. Is it possible?
Please advice.
Regards,
Vengal Rao.Hi,
You can maintain different order units for the different plants, since purchase view is at plant level.
Order unit field is available in the purchase view.
If required, you can maintain different order unit in the PO/Contracts other then the order unit in the material master record for that material and plant by activating variable order unit in the material master record - purchase view. In this way, you can maintain different order units in the PO for the same material and plant.
Regrads
KRK -
Purchasing Info Record- Different Regular Vendor for different Plant
Dear Guru,
I'm encounter a problem with PIR.
I have this PIR 9001 (Vendor A) and 9002 (Vendor B) for material A, which i have extended to 2 different Pur.Org 0001 under company code 0001 and Pur.Org 0002 uner Company code 0002.
For Pur.Org 0001, i set the Regular Vendor as Vendor A, but when i trying to set the regular vendor for Pur.Org 0002 to be as Vendor B, i receved the message as "Up to now, vendor A has been regular vendor for this material".
And After i changed this Regular vendor to vendor B, this changed have also affected the PIR for Pur. Org 0001.
Can i know if there is a way to change the PIR Regular vendor at Pur.Org or Plant level?
Thank you very much,
Regards,
Chee WeeHi,
Regular vendor is at client level.
That's why, you cann't maintain more then one vendor (Source of supply) for the same material.
If you want to maintin separate vendor for the each plant and same material combination, then don't activate / select regular vendor option in the info record. You have to maintain source list.
Sour list is nothing but a list of source of supplies for the specific plant and material combination with in the validity period of time. If there are more then one vendor for the specific plant and material combination for the same validity period of time, then you can activate fixed vendor option in the source list. Then at the time of creating PO, SAP will pick fixed vendor for the Plant and Material combination.
So first, system will check whether regular vendor is there for this material in the info record. If is there,system will pick regular vendor in the PO. If not, then system will check fixed vendor in the source list for the material and plant combination. If yes, then system will pick fixed vendor from the source list. If not system will propose all the vendors in the source list. If the source list it self not created, then user has to give vendor number manually.
Regards
KRK -
Stock Posting for Different Plants
Hi MM Gurus,
Is it possible to post directly to a Work Order reservation from a different plant?
Example: A WO is raised and a reservation created for plant A and we want to move stock
from plant B and post it directly against the reservation. Is there a one step process?
Thank you,
JogradHi,
If you wish to do that, then open the production order, go to components tab, change the plant & sloc details in the component tab & save. Now you can post from the other plant directly via MB1A or MIGO or co27 with 261 mvt. If
Hope it answers your query.
Regards,
Vivek -
Single Purchase Order for different Plants of Different Company Codes
Hi Experts,
I have a scenario, My Client has 3 Company Codes (1000, 2000, 3000 )
Company Code 1000 has 2-Plants ( A001 and A002 )
Company Code 2000 has 1-Plant ( B001 )
Comapny Code 3000 has 3-Plants ( C001, C002, C003 )
All these 3-Company codes has centralised purchase organisation.
My Client requirement is to raise a single purchase order for external vendor, for all the plants A001, A002 which is in one company code and similarly in same Purchase Order for B001 plant which belongs to 2000 Company Code and Similarly for same purchase order for C001, C002, C003 plant which belongs to 3000 Company Code.
1)Is it possible to raise a Single Purchase to External Vendor for plants of Different Company Codes ?
2)Does it affect the accounting document ?
3)How to inward and where to inward these goods ? with respect to plant wise ?
Please Guide with Valuable inputs.
Thanks in Advance
Best Regards
Javeed
Best regards
Javeed Ahamed1) How about Profit Centre ? We have Framed each Profit Centre with respect to Plant
Why should there be a problem?
2)In Case of Migo does we have to be careful and do stepwise MIGO with respect to different Plants ?
of course people have to be careful when performing transactions.
if you have multiple items in a PO then you can easily receive all items in one go. So people have to careful and need to check if they really received each of the PO items. Especially if people have authorization for many plants, then the user who is usually performing the receipts for plant A can easily post the receipts of plant B too.
3) How to Process MIRO ? Can we process Partial MIRO"S with respect to Line-items of those particular Plants ?
MIRO allows to post the invoice like it is send to you from your vendor. If it is just for a part of your PO then this is just a fact and MIRO allows to post this kind of invoices too. -
Vbak link with cdhdr, cdpos for different plants
Hi Experts
I think I have ask this questions in many forum but unable to get the proper answer
I want to link VBAK-VKBUR with cdhdr, cdpos ......which contain all the plants code
VBAK-VBELN..........document no
udate
ddtext
value old
value new
username
vbak-vkbur
I wrote the report but how do I know for which plants the document no was selected
I have already selected cdhdr and cdpos tables only want to fetch those records
from cdhdr,cdpos belongs to plants , I would be thankful if someone can send me code.
regardsfrom VBAK-VKBUR you have to search for all relevant sales orders in VBAK.
From the list of sales orders (VBAK-VBELN) you have to read the CDHDR table for the relevant changes (Headers).
Then look into CDPOS for the change items (with old and new values etc).
regards,
Hans -
Creating a Standard Info Record for multiple plants
We did some clean up in info records the other day and marked some old/incomplete info records for deletion down at the PO organizational data level (EINE). This went fine; however, now when we go to create another info record using the same info record number (because material and vendor is the same), but for a different plant (will be a separate entry in the EINE table), SAP automatically marks it for deletion because the previous entry is marked for deletion.
The one consistent thing I have noticed is that the old incomplete info record originally marked for deletion had a purchasing document attached to it. The document along with document date carried through the additional info records we tried to create for different plants.
Can someone tell me the reason this happens? Also, what can we do to prevent this? I would think you could have an info record marked for deletion in plant 1, and have a valid one for plant 2??This is a program bug, please see OSS Note 742405 - Creating purchasing info record with deletion indicator
-
How to allocate new g/l acouts for each plant
hai gurus
i am new to mm
here is a scenario
our client has 4 plants at different locations.he wants to maintain different g/l accounts for each plant.valuation area is plant and valuation grouping code is different for all plants.how can we assign different g/l accounts for each plant with same chart of account
pl clarify my doubtHi Ranjith,
Not advice to create different G/L accounts for different plant for same chart of account fo same transaction.Its Ok you are having different valuation areas plantwise,its also not even adviceable to go for different valuation grouping Code.So when you are mataining only one G/L account, the value will be recorded in that G/L account only but it will valuate the goods for diffrent valuation areas(Plantwise)
But if you want to go as u have explained,then in that case you have to create four G/L accounts for each tranaction event key.With different valuation grouping Code,same transaction event key assign different G/L acccount in automatic account assignment OBYC.
If helpful answer then reward with points.
Regards,
Biju K -
Workflow for approval Plant/Company code wise
Dear Gurus,
I am new to work-flow I want to change my work-flow according to company/plant wise .
Right now we have made a workflow with two release levels one for purchase and second for Finance.
We have got two companies under one client and same controlling area. But both companies have different company codes.
When Po is sent for approval the alert mail is given in SAP-inbox of approving authorities according to category like Spare,Raw material etc.
But due to same workflow the mail goes to both companies authorized persons so what happens person from one company is giving approvals for another company. So we want to sent mails to SAP inbox according to their company codes or if this is not possible than plant wise.
Thanks in advance
HimanshuHi,
As per requirement i think your workflow is working fine in particular plant, if yes means in your workflow container is there any company code is available please confirm the company code in workflow container
if company code is available means then you all just want to do is you need to bind the company code to your business rules and your open sql query should be based on company code also, then your agent assignment will automatically work for different plant.
Hope this helps,
Srinivasan.R
Maybe you are looking for
-
What should I do to upgrade my PowerBook G4 15" to use Ipad
heyo! I'm currently using PowerBook G4 15" run on version 10.4.11 CPU Speed:1.5 GHz L2 Cache (per CPU):512 KB Memory:768 MB Hard drive:80gb Recently,i just won an ipad and i cant use it at all.the moment i connect it prompt, need an higher version 10
-
Generally facilities for Smartforms
I am facing problem in Smart Forms. I have all the required data in my internal tables. i need to go to new page for every new customer: Generally how to implement such basic requirements. Are there no facilities given. I think This a common requirem
-
ARGH. I would've hoped they'd've fixed this by now. In the component inspector, if I make the "Name" column wider, and if I've got an array item in there with several items, when I click on the Value column for anything, it scrolls the whole table of
-
How to download driver HP Pavilion 15-P229AX pleasee..
i have buy this laptop, but it usesless, because the driver cannot be download, when i click check update only spining hour,is there no 'rambo' guy in hp center to fix this error convenientor at leat give another solution like direct ftp sighh.. it
-
i need help in finding the solution for getting a runtime error