Material document has no PO value

Hi,
I got problem when receiving goods. I created PO with items have values for fixed asset. I purchase 2 set of material with each one assigned to one asset. I use  distribute on qty basis and put 1 qty for one asset and the other for another asset.
The line item has 1200 value but when I receive good, no value shows in material doc. I have check account assignment to A. What could be missing or config problem caused this error? Please give me some insight.
Thanks a lot.

Hi,
If you had selected the Single Account assignment instead of Distr on qty Basis, you will not have face this problem. Actually its not the problem. Since you had selected the option of 'Distr. on Qty basis', system has treated it as multiple account assignment.
and its valuation will only be carried out Invoice Verification level.
Later on check the Material document also.
Pls Check as mentioned below:
If flag 'GR non-valuated' is set in the purchase order, the valuation is only executed through the invoice verification. This flag must be set if the purchase order has multiple account assignment.
A valuated goods receipt for a purchase order with account assignment generates a posting line for the consumption account 'Account-assigned purchase order' (KBS) and for the GR/IR clearing account WRX.
hope it address your issue.
Regards,
S Anand

Similar Messages

  • Delivery document archived and material document has zero quantity

    Hello Gurus,
    This is intracompany STO scenario with delivery. There is one STO for quantity say 1000 pc created in 2008. Delivery and PGI done for 1000 qty in 2008.  Goods are received in receiving plant for qty 1000 in 2008. Now this delivery document is archieved and user has reversed the GR material document in 2010. Now this reversal material docuemnt has zero material qty becasue the delivery was archieved(which is the probable reson)
    When I want to cancel this reversal material document it gives error that "Qty and / or "delivery completed" ind. or final issue ind. are missing" which is logical since material document has zero quantity.
    Is there any sap notes or any other way to fix this?
    Please guide.
    Regards
    Nilesh

    Niles Raut wrote:
    Hello Gurus,
    >
    > This is intracompany STO scenario with delivery. There is one STO for quantity say 1000 pc created in 2008. Delivery and PGI done for 1000 qty in 2008.  Goods are received in receiving plant for qty 1000 in 2008. Now this delivery document is archieved and user has reversed the GR material document in 2010. Now this reversal material docuemnt has zero material qty becasue the delivery was archieved(which is the probable reson)
    >
    > When I want to cancel this reversal material document it gives error that "Qty and / or "delivery completed" ind. or final issue ind. are missing" which is logical since material document has zero quantity.
    >
    > Is there any sap notes or any other way to fix this?
    >
    > Please guide.
    >
    > Regards
    > Nilesh
    Where is actually the problem, if one only reversed 0 quantity?
    Why do you think you need to reverse this reversal again?
    why with year 2010?
    Dont you do anual inventories?  Such stock counts have corrected your stock anyway. if you start cancelling older movements then you create stock inconsistencies again.

  • Return Delivery when the material document has been archived

    Hi There,
    We have a situation in which we need to return some consignment material to a vendor because we don't need it anymore. We have 74 units in unrestricted stock. The thing is that the PO's material documents have been archived. This causes we can't do the return delivery using MIGO transaction.  
    Could someone tell me what options do I have?
    Thanks for your help.
    Luis

    Hi,
    You can create a return purchase order to do that, just flag the checkbox "Return" in the PO item line.
    Good luck
    Tao

  • Please provide logic for schedule lines and material document Quantity.

    Hi ABAPers,
    Please help in the following context.
    Is there any connecting or refrence field for which a particular schedule line item are considerd for the goods reciept of a particular material document.
    Also provide the logic.
    19                    34
    15
    14                   35
    11
    10
    If 19 15 14 11 10 are schedule lines, and 34 35 are two recived quantities,
    Then how can be the possible permutations and combinations logic to find out that, 34 = 19 + 15 and
           35 = 141110.
    Thanks in advance...

    Niles Raut wrote:
    Hello Gurus,
    >
    > This is intracompany STO scenario with delivery. There is one STO for quantity say 1000 pc created in 2008. Delivery and PGI done for 1000 qty in 2008.  Goods are received in receiving plant for qty 1000 in 2008. Now this delivery document is archieved and user has reversed the GR material document in 2010. Now this reversal material docuemnt has zero material qty becasue the delivery was archieved(which is the probable reson)
    >
    > When I want to cancel this reversal material document it gives error that "Qty and / or "delivery completed" ind. or final issue ind. are missing" which is logical since material document has zero quantity.
    >
    > Is there any sap notes or any other way to fix this?
    >
    > Please guide.
    >
    > Regards
    > Nilesh
    Where is actually the problem, if one only reversed 0 quantity?
    Why do you think you need to reverse this reversal again?
    why with year 2010?
    Dont you do anual inventories?  Such stock counts have corrected your stock anyway. if you start cancelling older movements then you create stock inconsistencies again.

  • Error while cancelling the material document.

    HI,
    while cancellation of material document thru MIGO screen getting error
    Deficit of PU IR quantity 20.000 EA
    Message no. M7021
    Diagnosis
    Shortfall below the specified stock level or quantity amounting to 20.000 EA.
    Diagnosis
    Shortfall below the specified stock level or quantity amounting to 20.000 EA.
    The invoice of material document has been process thru ERS.....so no way we can cancel the invoice.
    waht is  the exact process to cancel this document which furher use ERS for invoice verification.
    thanks.....

    Hi Ayaan,
    You need to set the indicator against the movement type 102 under the following path :
    SPRO>Materials Management>Inventory Management and Physical Inventory>Goods Receipt>For GR-Based IV, Reversal of GR Despite Invoice
    Once set , try reversing the material document . This will work .
    Regards
    Ramesh Ch

  • Material Variant of a Config Material to take Charac. Values from Sales Ord

    Hello Guys,
    Is there any way to have a Material Variant for a Configurable Material to take the Characteristic values from a Sales Order instead of Material Master ?
    I understand by default Material Variant has fixed characteristic values and is taken from material master......
    however here is the situation am in.......
    I have a completely MTO scenario where we will making the product from scratch only after we know the characteristic values.......however our Costing Guys want to do standard cost estimate for the Configurable Material somehow......they were able to do Cost Rollup by making the Configurable Material itself as the Material variant of itself (assigning the same Configurable Material # in MRP3 view)............however this broke my design of taking characteristics from the Sales Order...because the Configurable Material is now behaving as Material Variant and taking the default characteristic values from the Material Master....
    Note: Our Costing guys donot want to cost settlement at Sales Order level.
    Regards,
    BRN.

    I had exactly the same problem. (configuration "blocked" in SO because the use of material variants for PC purposes...)
    SAP help says : To allow you to change the configuration of material variants in the sales order, the Configuration allowed or required indicator must be set in Customizing for Sales and Distribution. The requirements class is determined using the strategy group and requirements type defined in the material master.
    The req. class parameter, mentioned not very clearly by the SAP help, that allows changing the characteristic values of a material variant during the SO configuration is V_T459K-KONFI and value must be either * or +
    Hint: A quick check can be done In the SO entry: go to the procurement tab and replace your requirement type by KEL, you'll see that configuration is "open" 
    Hope this helps
    Iñaki
    Edited by: InakiGonzalez on May 11, 2009 8:08 PM
    Edited by: InakiGonzalez on May 11, 2009 8:15 PM

  • Link between Service Entry Sheet and Material Document

    Hi
    I am busy with developing a report where i am required to find the link between the Material Document and Service Entry Sheet. 
    I am aware that on the Purchase Order Data tab of the Material Document has the service entry sheet number and line item.  However the problem I have picked up here is in the event I create a Service Entry Sheet  with a service in line 1 and for some reason Delete that Line and then capture the service again, it is saved in table ESLL as line 2.  This is correct.  However when I have a look at the material document, it references it as line 1 of the service entry.  Is there any way to get this in sync?
    Thanks
    Vinesh

    Thanks
    This table does show the service entry sheet number and line item however the line item does not correspond with the line item on the service entry sheet.
    Eg.
    I create a service entry sheet where I capture a service in line 1.
    I delete Line 1
    I recapture on line 2.
    Post Service Entry
    The Material Doc reference document is the service entry however the line item for the reference is 1.
    I need to try and link the line items
    Thanks
    Vinesh

  • Change "Reason for Movement" on Material Document

    I've posted a Material Document.  I now need to change the Reason for Movement.  I've tried this via MB02 but only the Goods Recipient and Text appear to be updatable.  Is it possible to change the Reason for Movement after the Material Document has been posted?  If so, how?

    Hello David,
    Except "text field" & "unloading Point", you can not modify any other field in Material document change mode (MB02 t-code)
    Hope this helps.
    Regards,
    Arif Mansuri
    Reward if answer is helpful.

  • Trace Changes in Material Document

    Dear All,
    Is there any way to trace which material document has been changed manually by the user? Our situation is as follows:
         User use MB02 to update header text field in the old material documents. We need to extract all the changes information and
         what is the best option to do this? Is this from CDHDR/CDPOS tables? I tried to use the "Change On" field in the table MKPF, but
         nothing can be extracted because it seems that this field is always blank.
    Sorry, please correct me if I'm wrong.
    Thank you in advance for helps.
    Best Regards,
    Edwin

    To track changes :
    Try to check the setting in OPUV for change docs for material
    (or)
    Try to use AUT10 t.code , in that enter the t.code which you want track the chnages and execute.
    (or)
    Check in Txn CN60. Here you can view list of change documents for materials, networks and WBSE
    Edited by: m_n_novice on Aug 27, 2009 10:06 AM

  • How to cancel Material document for a Return PO

    Hi,
    I need to cancel a material documet for a retun PO. Can you please tell me how to do it?
    Regards,
    Prasanna.

    Hi,
    If the material document has been created through SD documents.
    For Ex: For an stock transfer between 2 plants using 2 step procedure, Goods Issue document is posted when you complete the shipment in VT02N. This material document can only be reversed using T-code VL09.
    Thanks and Regards,
    Maheshwari

  • Price change for material document

    Dear Sir,
    Supplying plant X and Receiving plant Y (company code is same)
    STO is created on Plant  X (supplying plant ) for New part B quantity 1. MAP in plant X is 0.10 INR for New part B.
    STO is created with 0.10 INR.
    Stock is inwarded in plant X and MAP is updated to actual price (500.00 INR)
    Delivery document is created for STO using VL10d.
    641 movement is done and material document is created with value 0.10 INR.
    Requirement: Material doc for 641 movement should be created with updated value of MAP(500 INR) of supplying plant on 641 movement. 
    Kindly suggest how it may be achieved.
    Thanking you

    Please reverse the PGI at VL09 and cancel the delivery and again start the processing.
    Regards,

  • Wrong value of MSEG-VKWRT in material document

    Dear all,
    A material document which has been created manually via Tcode MB1A has a wrong sales price for one of the articles (143.91 per piece while the price in VKP2 for that day is 3.99, there is also no promotion price). The field is not ready for input and it's even not visible during the manual creation of a material document. So this excludes any human error.
    Where did the wrong sales price come from?u
    Thank you in advance for your input!
    Regards,
    Miro

    Hi,
       Please check the note: 850025 - Updating sales value in material document and RIS/BW
    if you are in ECC 6.0
    Regards,
    AKPT

  • Material document value

    Hello everyone,
    In my case, value in the material document slightly differs from the billing document value. So we have decided to move the material document value to the billing document ( in VPRS).
    Now a new routine will be added in the price pocedure, which will have logic saying, "pull the value from material document".
    Does anyone know what logic to be written so as to pull the value from the material document.
    Thanks,

    Hi,
    If you had selected the Single Account assignment instead of Distr on qty Basis, you will not have face this problem. Actually its not the problem. Since you had selected the option of 'Distr. on Qty basis', system has treated it as multiple account assignment.
    and its valuation will only be carried out Invoice Verification level.
    Later on check the Material document also.
    Pls Check as mentioned below:
    If flag 'GR non-valuated' is set in the purchase order, the valuation is only executed through the invoice verification. This flag must be set if the purchase order has multiple account assignment.
    A valuated goods receipt for a purchase order with account assignment generates a posting line for the consumption account 'Account-assigned purchase order' (KBS) and for the GR/IR clearing account WRX.
    hope it address your issue.
    Regards,
    S Anand

  • CIN - Excise value posting for the material document

    Hi,
    We have assigned the routine 356(FV64A356) in the Pricing Procedure for Depot Sales where Service team issues components for the Service repair job through a Goods Issue(MIGO-261 Mvt Type) document.We are also able to create a excise invoice for the material document.
    The flow is Service Order - Goods Issue - through resource related billing a DMR is generated for the labour as well as the Goods Issued(MIGO-261), from DMR a debit memo is raised to invoice the Customer.
    The formula in the routing is, during the creation of Billing or Proforma document it picks up the excise value posted for the delivery if the excise has been posted,if the delivery is not found, then it continues with the excise value calculated in the sales order (DMR in this case)
    Is there any way or any other routine "to check for the excise value posted for the delivery ,if the delivery is not found, then check for the material documents if any linked to DMR(through Service Order)".
    Could anyone help in this regard.
    Thanks,
    Ramki.

    Hi,
    While creating the excise challan using J1IF01 you can see a excise invoice selection tab, Select the J1IF01 line item & click on this tab, here you can select the excise invoice from which the base amount will be determined.
    Thanks & Regards,

  • SRM confirmations result in zero value material documents

    We're on SRM 4.0 classic scenario.
    We currently have a situation where we create confirmations in SRM but some of them ended up with zero value material documents; therefore, no accounting documents are generated. It also means no accruals are booked for the receipts.
    I've compared several 'good' as well as 'bad' confirmations, and can't seem to tell the difference as to what may cause this issue. Does anyone know what may cause the confirmations to lose their price values in R/3?
    Your help is appreciated.
    SN

    Dear Sreekanth,
    Check following things
    In SPRO-->  PRDn --> rem --> cost object controlling --> Define Default Values for Cost Object Controlling
    check for your order type what is the costing variant
    and go to OPN2
    for that valuation variant  what is the  stratergy sequence?
    based on this setting only the cost for GR is calculating
    if the stratergy sequence is 7 valuation price according to price control of material
    then check the price contril is it V or S, If its V, whats the price maintained for V

Maybe you are looking for

  • Imported music not showing in list view

    I switched iMAC's and used "add to library" to bring in all my music from a DVD I burned for backup. It copied the files fine, but only about half of the song names showed up in the music list in the iTunes application? The file folders are in the iT

  • Hi my iphone 4 is disabled how can solve this problem? help me please

    hi my iphone 4 is disabled how can solve this problem? help me please

  • Message Mapping (Mail Adapter)

    Hi all, I'm building a specific message mapping to send e-mails through an E-MAIL communication channel. Right now I'm already able to test it and the e-mails are going out properly. My problem is that they are assuming the "times new roman" text fon

  • Combine checked item and update column

    Hi all, need to design a screen that allow user to update column (code) and also pick which statement to display for the next stage. My thought was to create a checkitem and LOV display. Once user has checked the box , the process should update the c

  • Upgradation of BW ....Impact in other systems R/3,SRM,APO,

    we want to upgrade BIW 3.1 to enhance performance Is there any impact on the other systems like R/3(4.6c), SRM(2.0), APO(3.0a)which are integrated along with the existing support packs Please advice me. Regards Arjun