Material Ledger - Error in closing entry

Hi Gurus,
We have an issue running the Post Closing entry of CKMLCP.
The system shows the error M8 147 (Account determination for entry &  not possible) for one material, the only one pending material of the costing run.
We checked the material master and the problem was the valuation category. This was modified by the correct valuation category (with correct account determination in the OBYC) in the material master, but the system still shows the error message M8 147 refering the old valuation category.
Any suggestion???
Thanks in advance!!!!

Hi,
Thanks for the response.
The problem is that, for this material, the costing run shows now the correct valuation category ZE11 in the costing run result (but in pending status for the material), but the log shows the error message refering the old valuation category ZE09.
The obyc must not to be mantained because, for the valuation category ZE09, only operation PRY should be possible (this has the correct account determination), not operation PRV. The error refers old valuation category ZE09, operation PRV.
Thanks!

Similar Messages

  • Run CKMLCP (material ledger cockpit) for closed period in MMPV

    Hi,
    I would like to run CKMLCP for period 12.2008, however MMPV was run in 02.2009, and only january and fabruary 2009 are allowed for material postings.
    How can I settle material ledger in 12.2008? I know about note 361236 (CKMLCP: No period-end closing operations after period shift), but don't know if this will do all the proper postings or only close 12.2008 technically.
    Regards,
    Karol

    Hi Carol ,
    Please remeber costing Run i.e CKLMCP is a closing activity so it should be done only at the time of closing a particular period .A syou said two periods are open for MM but costing also post some Accounting enteries if FI period is closed the its not possible.
    And its not recommended to run costing any time in middle of the period.
    Thanks
    Deepa

  • Material ledger error while doing GR

    Hello,
    I am getting the error " Error reading material ledger header record while doing Gr for particular material.when double clicked the error,I see this message "Internal error in function module CKMS_HEADER_READ_WITH_ITAB"
    what may be the issue?
    Regards
    Goutham

    HI,
    I  assume, you got the problem after material ledger activation or Material split valuation
    please check the following two points;
    There may be one reason, i hope the material is split valuated after creation of PO.  Plese check the Material master in the accounting view  whether it is split valuation activated or not
    2. problem is other side, at the time PO creation, material is having split valuation after that materil was changed to non- split valuation.
    With regards
    Madhav

  • Material ledger period-end closing - material selection based period status

    Dear SAP Experts,
    The OSS note 980475 describes functionality of excluding materials without inventory and postings from the period-end closing of the material ledger. The system assigns a new period status for materials without inventory and postings (05 "Period opened without inventory"). This period status is set by the dynamic period-closing program for the new period (instead of "Period opened") if the material does not have any inventory.
    Could you clarify what is dynamic period-closing program for the new period?
    In my system this note is implemented but still during costing closing materials are being selected even though no postings have been done on them in that period and no inventory exists.
    Thankk you very much for advise.
    Best regards,
    Robert

    Hi Robert, have you find out what this dynamic period closing is?is this just the option Check and close period in TCode MMPV? or is het one the CKMLCP steps?
    thanx in advance,
    Said Dahmaza.

  • Material Ledger Error CKMLWIP099

    I have been working with Material LEdger (ML) for several years and was deeply involved in the configuration and testing prior to deployment. I have recently come across a problem I can find no resolution for. The message is CKMLWIP099. The text is as follows:
    "Internal error in FORM/FUNCTION CL_CKML_WIP_DBACCESS->QS_COMPLETE in position 5 with RC"
    The issue occurs when running the WIP Revaluation step within CKMLCP Costing Cockpit.
    Our version is 4.7. I tried wating until the material period was two periods old and using the "Must_WIP" tip, but the same error happened. Now, the few parts with this error have infected 10 times as many other parts. I have reviewed the materials as well as all movement types and can not find a logical problem.
    If anyone has any ideas or advice I would appreciate it greatly. I have logged an SAP help ticket, but that could take a long time and become very difficult.
    Edited by: Juggler2010 on Dec 15, 2010 6:11 PM
    We opened a ticket with SAP.  They found that some PP orders from 2007 popped up in Oct-2010 for which WIP had been run.  In my experience there was a time that PP orders RA was accidentally run for a period far into the future, which caused ML to break for every part involved.  They had given us a special program to cure that.  I ran that program before opening the ticket, but it found nothing to fix.  This time, SAP asked us to implement note 1497118, which installs the program WIP_HELPDESK.  That program should only be run by SAP.  After deleting the bad WIP qty records, I ran material ledger for the failed periods with full success.  Problem resolved.

    This may help others who experience this unusual issue.

  • Material Ledger error

    Hi
    While doing MIGO, I am getting the error as Material Ledger is not active. There is no requirement for material ledger activation. How does this error can be solved.
    Please suggest
    Thanks
    Sanjay

    Hi,
    Please check whether you have activated Material Ledger at specified Plant level  by t-code-OMX1-Activate Material Ledger.  But Material Ledger activation settings are not yet completed in your specified Material Master i.e., Material MasterAccounting1ML Active i.e. checking the box for activation of ML and defining Price Determination indicatoru20142 or 3. I guess  missing of these settings, you are getting this error in MIGO activity. Please check and confirm.
    Regards
    appalas
    Edited by: appalas on Mar 7, 2010 7:24 AM

  • Material ledger accounting entries

    Dear All,
    i need material ledger related all accounting entries. I am confused with some entries.please do the needful urgent.
    regards
    K S Rangarajan

    Hi
    Material ledger/Actual costing updates the MM master at actual costs at period end.
    Let us give an accounting entry by way of an example
    Beginning inventory= 10 KG at $10= $100
    Goods receipt=15 kg at $11          = $165
    Total value         25 KG at $265 (unit price =10.60)
    However Inventory is valued at $250 because of Price control indicator S, thus there is a price difference (Dr) of $15
    On revaluation at period end, Dr Inventory $15
                                               Cr Price difference $15
    This is a simple case. Add to that exchange fluctuations, Invoice value resulting in price difference, etc. Assume a Goods issue of 12KG in the same period, it will be initially valued at $10, however on material price determination, this price difference of  $0.60 per unit is assigned to consumption as well.
    Hope you understand better
    S Jayaram

  • Dump when execute MMPV (Material Ledger is actived)

    Hi experts,
    This is my scenario:
    - We are testing in a Development system (No productive system)
    - Material Ledger is actived since 12-2011
    - No Material Ledger period end closing made in 12-2011
    When we execute MMPV the system shows the dump:    SAPSQL_ARRAY_INSERT_DUPREC
    We applied the sap note: 1123034 - MMPV: SAPSQL_ARRAY_INSERT_DUPREC error in SAPLMLCCS, but the dump continues.
    I checked the table ckmlkev and I saw registers to Company Code 0200 Period 2 and Year 2012, however if I check OMSY transaction, I saw only Company Code 0200 Period 1 and Year 2012.
    There is something extra to do?
    Thanks in advance for  your help,
    José Luis

    Hi,
    This short dump is produced when the system tries to insert a new
    entry in table CKMLKEV but a duplicate entry already exists in the same
    table.
    CKMLKEV indicates in which period which cost component structure is
    used for the actual cost component split. CKMLKEV entries are created
    by MMPV. Their existance for these periods indicates that the period was
    shifted already by MMPV.
    What you can do now is the following: please check the period
    status in ML.
    If the status is undefined, then delete the CKMLKEV entry and re-run
    MMPV.
    If the status is period opened (or higher), then you have to reset
    the MM period.
    Best Regards,
    Arminda Jack

  • Material ledger activation in existing plant

    Hey all
    We have a plant in our Production client which was recently created. The materials in this plant have No released cost but we have PO's and movements in this plant.
    Now we are planning to activate Material ledger for this plant. Can anyone advise me on the things that i need to take over of before activating material ledger. Like Closing PO's, MM period, the time of cost run after ML activation and all the Cutover activities that I need to take care of.

    Hi,
    You should activate ML at the beginning of the period. All open orders should be closed.
    Please review note 596558. It contains all recommendations for activating Material Ledger.
    Best regards,
    Antje

  • Error in material ledger closing entry (message number KE396)

    Hi friend
    i met a problem in material ledger closing entry ,the message number is KE396
    after checked some transaction data and master data ,i find that some one change the division in material master during the period and change back to the the old division during the period ,the division is one of the characteristic in copa ,System will check the derivation via material master when we run the material ledger closing,so it went error and said the Inconsistency between a document field and the prof. segment number
    Then i use KE26 to repost the COPA line item ,but it also went error when i run the material ledger closing entry
    can you tell me how to solve this issue
    thanks

    Hi,
    Please raise an OSS message as this is a program error.
    Momentarily you can try the following:
    1. Do not select option "Set CO Account Assignment" in Post Closing.
    2. If the above action does not resolve the error, then force close the material and then run the Post Closing. Surely this is not an ideal situation and must be adopted if there are only very few materials.
    Regards
    Satya

  • Post closing entry in Material Ledger

    During running og Material ledger last night, in CKMLCP, we ran post closing entry before we release the cost through CKME. When I tried to release tcode CKME and CK40N, the system gave error message as below:
    Price changes for material 200001  is not possible
    Message no. C+811
    Diagnosis
    You want to change the price or release planned prices for material 200001 with valuation type  in valuation area 2100. You have, however, already entered actual data or performed a single-level price determination in the period concerned. The status of the material in the period is Quantities and Values Entered.
    Price determination indicator 3 assumes that the standard price remains constant throughout the period, so that all movements can be valuated preliminarily with the same standard price.  Therefore, you can only change the standard price at the beginning of a period (i.e. as long as no actual data was entered).
    System Response
    The system does not allow the price changes or the release of planned prices for this material in this period.
    Procedure for System Administration
    In the future, to automatically release your planned prices upon creation of new actual data you can allow dynamic price release in Customizing for Actual Costing/Material Ledger.
    How I can release my standard cost for period 01.05.2010 to 31.05.2010. Please help
    Edited by: Ahmed EL Zain on May 1, 2010 10:49 AM

    Hey,
    What you described is the standard system behaviour.
    The price change or release of a cost estimate should always be the
    first transaction in a new period, when Material Ledger is active.
    Once period status = 30, the standard price cannot be release or
    changed. For more details please see note 190707.
    The only possible workarounds are as below:
    - postponing the costing release to next month
    - reversing transactions and usage of note 574930
    - using the option LTPC from note 555176
    Best Regards
    Young

  • Material Ledger Closing Entry Missing

    Dear Experts,
    WE have implemented material ledger for Actual Costing.  During the material ledger activities (CKMLCP)for the month of March, system showed an error message that "Clsoging entries are not posted for Previous Month" and proces of march was also terminated.  AS the Material period for February and March are closed, the way out for closing of material ledger for the month of April without error (after posting the closing entries for March) may please be informed. 
    Thanking You
    with regards
    Muraleedharan MK

    Hi MK,
    ML is very rigid.. you have to complete the steps every month.. other wise ML documents have impact ...
    You have to open previous period and get it done.. no way out..
    Regards
    Sarada

  • How to reverse material ledger closing entries beyond  previous period?

    In a test system, the system does not permit reverse material ledger closing entries. The current period is 04/2008.
    Getting a message C+716 message
    You want to cancel closing entries in valuation area XXXX for period 008 in fiscal year 2007.
    You are allowed to cancel closing entries only in the previous period. Reversing closing entries for periods before the previous period is not possible.
    There are provision to run closing entries like  MUST_SETTLE in the ok code features, Are there,any such for reversal? Could there be any work-around?

    Hi David
    If you dont need to perform the close itself but would just like to get the periods in the correct status you can use the process outlined in note 645083.
    In the material ledger, it may be necessary for different reasons to manually set the period status of materials in former periods to 70 ("Closing Entry Completed") without actually carrying out the closing entry.
    It provides program Z_ML_SET_PP_STATUS_70 that will allow a manual update to the prior period status.
    There is a pre-requisite regarding revaluation amounts, but this is all described in the notes.
    /Elaine

  • Material Ledger Closing entries

    Hi Group
    I would like to know how SAP determines below text at the time of Material ledger closing. By example I could make it out but I want standard document or somewhere in system I can see how this determines.
    EBPRD: Single-level pr. diff. beginning inventory
    EBPRV: Multi-level pr. diff. beginning inventory
    VNPRD: Offset against single-level price diff.
    EBPRD: Write off single-level price differences
    EBPRV: Write off multi-level price differences
    VNPRV: Offset against multi-level price diff.
    ZUPRV: Price differences from previous levels
    Best regards,
    Amit

    Hey,
    Can you let me know when did you do the ML startup?
    At production start, the system automatically sets all materials to price determination control 2, which will not be included in ckmlcp processing.
    And when you change the price determination from 2 to 3 via CKMM, the period status will be automatically changed to "new object", for which there's no need to do the period end closing.
    Anyway, if your materials is with status 30 for the previous periods, the most convenient solution is to manually set it to 70 for the last period. You may achieve this via program MLHELP_SET_PP_STATUS_70. You only need to do it for the period before last period. Then you can go ahead with the normal period end closing process for the previous period.
    Best Regards
    Young

  • Material Ledger Closing

    Dear Gurus,
    While material ledger closing using CMKLCP,i need clarification for the following process.
    1. Single/level
    2. Multilevel.
    3. Revaluation of Consumption
    4. WIP Calculation
    5.Post closing
    6. Price update.
    can anyone explain about the above process outcome, what is the difference between material ledger WIP Calculation and Production  order WIP Calculation.
    While price update for price control material S, we need to re run cost estimate or it will update the new prices.
    Appriciated for valuable inputs.
    Ramesh.

    Hi Ramesh .
    Hope you understand clearly the purpose of standard costing and why we use Material Ledger .
    Standard Costing is based on a pre-determined /derived prices for a period/year and all costs are caputed on the basis of the standard Cost . Goods Issues/Receipt , consumption all are at standard cost.
    COGS GL Account is at standard and all the inventories are at standard ..
    Difference between standard and actual costs are captured as variances in different GL Account . Mainly we have two variances... price variances ( at the time of purchases ) and usage variances at the time of production ..
    Material Ledger is a seperate module.. where it calculates the actual costs . Variances are rolled back to the consumption accounts ( which is at standard )  to derive the actual cost . Actual Cost = Standard Cost + Variances .
    1. Now  Finished Material is made of Raw Material and  Semi-Finished Goods . ...When we calculate the actual costs of finished product .. we can find out the actual costs of raw materials and semi-finished goods. ML will find out the actual cost of raw material , semi-finished goods and finished goods. This concept is know as multi-level determination ... In Single level.. only one level of material cost is computed as actual.. not rolled back to the lowest level.
    2. Revaluation of consumption during ML run means .. the COGS ( which was at standard earlier) is now being revaluted and becomes actual..
    3. WIP Calculation calculates the WIP costs on actual.
    4. Post Closing Step will put the new GL entries.. where variances will be nullified and COGS and inventory will become actual.
    5. Price Update is optional.. you can make the actual costs computed as standard cost for the next month..
    Production Order WIp Calculation = Actual Qty X Standard Rate
    ML WIP Calculation =  Actual Qty x Actual Rate
    Please revert back for any further clarifications
    Regards
    Sarada

Maybe you are looking for

  • Will not boot after 10.10.2 security update

    I downloaded the security update as usual. computer starts to boot back up, gray screen with Apple logo & progress bar gets 2/3 & stops. I restarted, used the disc utility to check & repair errors. nothing found. Re-installed os, but nothing works. i

  • How to force initial stage of a portal page?

    Hello, We have here the following situation: We have one portal with a desktop containing two pages. Page 1 has a pageflow portlet with a list of items each one with a link to a form to contact us. Page 2 has the pageflow portlet with contact us port

  • How to find multiple keys in single cell using Numbers?

    I'm trying to add functionality to one of my Numbers tables where want to check a single cell for multiple keywords from a list. The hole thing works perfectly fine in Excel but it behaves differently in Numbers. The formula I am using is: =IF(ISERRO

  • Sending Request Mapping errors back to a consumer for a sync scenario

    Hello Experts, I have a sync scenario (JAVA Application <-> PI <-> CRM (service)) where i want to send back any mapping exception that occurs in PI on the request side of the call, back to the consumer. I also want to communicated back to the consume

  • CS1 to CS4 in a single leap

    Working on iMac 20" Leopard OS, 3GB RAM. From what I read, I should not have been able to install CS1 let alone work with it. At this point however, it's time to buy CS4. Some of the forums talk about difficulty working with legacy documents in CS4.