Merging Video Clips

I'm putting together a DVD for my daughter's cheer leading team. Here's the issue I'm having and I'll break it down, to hopefully give you a good understanding of what's going on.
When I select "Games" from the main menu, it opens the next menu (no problems here), that has a break down of "October's Games", "November's Games", etc.
When I choose "October's Games" (no problems here either), it shows the four games they cheered at.
My problem starts here. When I play "Week 1" it runs through with no problem, but at the end, it goes back to the "October's Games" menu and I have to manually select "Week 2", to watch it.
While playing "Week One", if I try to skip to "Week 3", it takes me back to the "October's Games" menu again and I have to manually select it.
What I'd like it to do, is play straight through all four weeks and have the ability to toggle back and forth, without taking me back to the main menu each time.
Can somebody help me out here? Thanks for your time.
Message was edited by: emac800

Hi
What I'd like it to do, is play straight through all four weeks and have the ability to toggle back and forth, without taking me back to the main menu each time.
I would make one chronological movie
• add chapters in each partition (NO Chapter Mark at the very beginning
- iDVD don't like this - it will do it by it self)
Then when playing on a DVD-player - use the remote and the right and left arrow key - move
to next or previous Chapter.
If You want them to play individually and go back to menu - You have to add them as individual movies.
(and that minimize the amount that can be stored on the DVD to 50%)
Yours Bengt W

Similar Messages

  • Merge video clips?

    Is it possible to merge video clips before or while exporting?  Or is a separate program need?
    John

    Nope, that's still one for another program at the moment.
    As it may not make the final release, might I suggest adding it as a suggestion on the Feature Request forum http://feedback.photoshop.com/photoshop_family where it can easily be tracked?  If you post the link to your request here, others can also vote on your request. 

  • Merging video clip separated into two clips in camera

    Working with a Canon 5D mk3 and a single clip was separated into two clips by the camera. Trying to merge them back into a single clip so that I can then merge into a multiclip arrangment with footage from second camera and off camera audio. Have followed the following process from support:
    http://documentation.apple.com/en/finalcutpro/usermanual/index.html#chapter=29%2 6section=4%26tasks=true
    When dragging the selection back into the Browser, a single file is not created but rather the two separate files.
    Suggestions?
    Thank you.

    The only way for FCP to stitch separate shots is if it is shot in a format that is supported by the Log and Transfer function, and if the camera is designed to merge the clips into one shot via the metadata.  For example, P2 breaks up the footage into 4GB chunks, due to the P2 card format's 4GB file size limit. AVCHD will do the same thing, as will XDCAM.  But the metadata recorded by the camera informs the NLE that they are essentially one clip, so when you convert via Log and Transfer, FCP (And Avid, and Adobe) will stitch them together.
    But this only works with supported formats.  H.264 from DSLRs...not supported...by any NLE.  Even though you can L&T Canon 5D Mark 2 footage (Mark 3 is unsupported, as it is a newer camera, and FCP was discontinued before it came out), it still keeps the media separate.  Sorry...that's the drawback to shooting DSLRs.  The ones that shoot AVCHD...will be stitched, because they have advanced metadata support. 
    FCP-X will multiclip these separate files, however. Because it doesn't have issue with broken clips. It's the best multicam function of any NLE.

  • Merging video clips -- join through edit

    I was trying to solidify a video that is composed of numerous smaller parts by using the "Join through edit" feature. I am able to do it from time to time, but generally it is grayed out. Does this have anything to do with the way that the files are accessed, or the nature of the video itself?
    Not sure why I can do it sometimes and not others. Working with 20 short clips was fine when I wanted to edit them one by one, but now that I'm done I wanted to merge them into a single longer clip.

    Are you sure you want to "join through edit"? Perhaps you are wanting to nest your clips?
    A through edit is an edit added to a continuous piece of media. By default, FCP will display red triangles on either side of the edit. When you select the edit point (not the clip), you can select "join through edit" (KB shortcut = delete). If the option does not show up (is grayed out), then the two adjoining clips are not part of continuous timecode within the same master clip.
    But it sounds like you want to create one long "clip" in your timeline from all the little clips. Select all the clips you want to include and Sequence -> Nest Items (shortcut = opt-C)

  • How to merge video clips?

    I have a video that is broken into two files (the memory card had a 4gb file limit so it has two files under that size). I imported the two of them into FCPX no problem but I want to treat the both of them as one clip in the event browser. Is there a way to do this?

    Karsten Schlüter wrote:
    aapl.crox wrote:
    …  For example I can't mark a favourite that spans from the end of the first clip to the second.
    ... ehm? you can select two clips and hit F = both marked.
    or, if you want to mark just parts of both clips, in-to-end clip#1, begin-to-out on clip#2 ...
    ok, this is two clicks, instead of one ... big thing
    I would avoid compounds as much as possible.
    And esp.just for organizing, the 'data base tool' FCPX offers with its tags, keywords, favorites, meta-info, search filters, smart collections etc etc etc MUCH more 'powerful' tools than just bins of single solid clips.
    …Not meant as a personal offence, but I really recommend to get familiar with the NEW way, how FCPX handles 'sources'… just for organizing, compounds is really the wrong turn.... my 5¢.-
    No I can't mark from one clip into another because they have different time stamps. I guess the camera marks the clips based on the start time. And there are clips in between these two clips.
    Why is there no way to join clips?

  • FCP7; "unmerge" merged audio and video clips in the timeline?

    Our TC was way off in some areas due to a bad timecode lemo on set. My editor synched by slate then merged the video with an audio mixdown track using the in points. Now when I export an EDL the original TC from the audio clip is gone, so he has no reference for matching up the audio. Does anybody know of a way to un-merge these clips and restore the original filename (audio takes the name of merged video but reveals correctly in finder) and timecode? Thanks.

    what happens if you match frame the audio?  I would think it would match back to the source audio clip which you could then use to replace the audio in the timeline.

  • Merge Audio & Video Clips.

    Okay i have 2 clips.
    One is the Camera video + Audio
    the other is the Audio from a boom microphone.
    I have them both in a bin, but because they started at different times they are out of sync. I can place the video clip into the sequence, and then replace the audio of that with the audio from the boom mic. But then i want to edit them, and cut them up. Is there any way to 'merge' the boom mics audio with the video clip, all fully synced and place it back into a bin as a 3rd clip?
    Adam.

    Maybe I am missing something here, but would not plugging the boom
    into the XLR on the camera and disconnecting any other mic have been
    the better approach?
    Back
    in the cine days, we recorded all Audio with a separate Nagra, that was
    synced to the cameras, and then transfered to 16mm or 35mm tape, that
    was locked in sync, and cut with the film. Slates were not yet digital,
    but worked perfectly.
    I
    will assume that with a "feature film," you slated every take, right?
    You'll have no issues with the syning, as you have the slate to cue you.
    If I have missed something very important, then pardon my interruption,
    Hunt
    I assume the first sentence was for the creator of the thread, but I'll address it in regard to our project.  We didn't use this method for several reasons, the biggest being that we were running several audio sources (wireless lavs on the actors and two booms in the room) and ran them to a multitrack recorder.  I would also site wanting to minimize cables running to the camera (more mobility, less cable wrangling) as another major reason to not use the camera for the audio capture.
    In regard to the slate, of course we slated every take (digital slate).
    The issue isn't that we don't have something to "visually" cue us.  The issue (and it's a major one), is that Premiere doesn't allow you to sync video with audio using time code (which both Final Cut and AVID do)... In Premiere you have to do it manually by eye (syncing wav forms to video).  On top of that, the only way to save linked audio and video is in a timeline or nested clips (ridiculously ineffiecient when syncing thousands of files).
    You have to either export each linked clip as a new clip with audio and video, or create a nested clip with audio and video.
    You SHOULD (as all other professional video programs do) be able to sync audio and video using the time code, and then have the program "remember" where they are synced (the video would simply have the audio locked to it at that point).
    Having to lay out every clip in a tineline and either access it from said timeline (rather than a bin file) or create new nested clips for each and every clip (thus cluttering your bins and workspace) is incredibly ineffecient and time consuming.
    Again, Adobe REALLY needs to address this issue.

  • Personalised Named Video - Want to merge unique video clip with generic clip, hundreds of times to produce many video files. How do I automate this?

    Hi,
    I hope the community could advise me on the following challenge.
    So I'm looking to produce hundreds of personalised videos. Filming them all sounds daunting enough but editing them all sounds a nightmare so I'm wondering if there is any form of automation that can help me do the following:
    VIDEO CLIP #1a - "Dear John thank you for watching this video, I'd like to explain how our services can help John Ltd" - specific to individual so hundreds of these edited, only a few seconds in length.
    VIDEO CLIP #1b - "Dear Dave thank you for watching this video, I'd like to explain how our services can help Dave Ltd" - same again
    VIDEO CLIP #2 - "We have a range of options that suit...." and so forth - Generic video, not specific to individual.
    How do I merge #1a and #2 to make one file, then #1b and #2 to make another, hundreds of times. So the end result is hundreds of individual video files?
    Is this possible?
    Running Adobe After Effects CC v13.0.2.3
    Thanks
    Alistair.

    Let me start by saying that it is entirely possible that this is an editing job as Dave LaRonde and Szalam have said. But I have a thought I would like to pass along.
    It's possible to use expressions to read Comp and Layer names as well as arrays inside the expressions. This solution allows you to set up the Final Pitch Video and then have the text change dynamically as you duplicate it for what you described as 1a, 1b, 1c, etc . Create a folder for your final pitch videos and make a new comp named something like "Final Pitch Video 1".
    Create a precomposition with your Video #2 content in outside the Finals folder. Then layout your Final Pitch Video 1 comp as follows:
    1) Intro Text Layers with all the animation first (Make sure to have a separate layer for Name and Business)
    2) Then add the Video #2 Precomp (Leave this as a precomp so you can edit it at any point and not have to replace it in your hundreds of videos) If this is just a video clip, you don't necessarily need to us a precomp. I'm just guessing you'll want to be able to easily update it at some point in the future.
    After you have your text layout and your separate layers for Name and Business, put these expressions on your Name layer in the Source Text expression field:
    // NAMES LAYER
    try {
    compName = thisComp.name;
    compNum = compName.substr(compName.length -1, 1);
    theNames =  ["blank", "Bill Jones", "Tom Riddle", "Frank Frankenstein", "etc."]; // Add your names here
    theNames[compNum]
    } catch(err) {
    "No More Entries"
    And then on the Business Text Layer in the Source Text expression field:
    // BUSINESS LAYER
    try {
    compName = thisComp.name;
    compNum = compName.substr(compName.length -1, 1);
    theBusiness =  ["blank", "Jones Construction", "AA Plumbing", "Frank's Hot Dogs", "etc."]; // Add your businessess here
    theBusiness[compNum];
    } catch(err) {
    "No More Entries"
    At this point the name and business text layers use the comp number to read the arrays for each text layer. For example:
    The text layers would work this way each time you duplicate the Final Pitch Video. Either start with "Final Pitch Video 0" or leave the first place in the array "blank" since arrays start counting at zero.
    COMP NAME                         Name from Array                    Business from Array
    Final Pitch Video 1                    Bill Jones                              Jones Construction
    Final Pitch Video 2                    Tom Riddle                            AA Plumbing
    Final Pitch Video 3                    Frank Frankenstein                Frank's Hot Dogs
    Final Pitch Video 10                  No More Entries                    No More Entries
    Let me know if you have any questions on this! I don't know your exact situation, but I hope it helps.
    Cheers,
    Trent

  • Merge audio to video clips, end of clip loses audio

    This is driving me nuts. After merging audio and video clips, sync to slate using the in points, everything is in sync.
    The audio is longer than the video itself. But WAY before the scene ends, the audio mutes. The waveforms are visable but no audio plays. It drop out. It happens to every merged clip I create. I don't use the out points either.
    Anyone else have this issue??
    If I take an alternate method to sync them in the timeline and create a clip from there, it makes a new sequence clip losing the scene and take metadata. That's not good. Is there a workaround?

    It happens on every project and different formats. I do use FCP Rescue and that doesn't solve it. I did figure out a work around which involves a few more steps and is more time consuming. Maybe this can help find the problem. Here is the ridiculous workaround steps. We should send this to Apple.
    The "--" are the extra steps.
    To get a good merged subclip.
    Open the audio file and add the 'in point' to the slate.
    --Drag audio clip to the timeline.
    --Drag the audio clip from the timeline to the browser window.
    Merge with video.
    Viola. Audio won't drop out. But the waveforms are completely off with the sound.
    Next step is to open the merged clips and Make Subclip so you don't have that extra media in the beginning and end. And the waveform seem normal.

  • How can timelapse images be merged to create a video clip in elements premiere 12

    Can not find directions to complete this task

    jcomput
    Always good to give the computer operating system involved in case any computer specific details needed to be included. But here is your
    generalized yet specific answer for Premiere Elements 12 and increasing the volume of a video clip.
    If you are in the Expert workspace...
    a. click and drag upward the orange band that runs horizontally through the middle of the audio clip.
    or
    b. go to Adjust Tab/Adjustments Palette/ Volume Panel expanded on move the volume slide toward +6 dB.
    0 db does not represent no sound. It represents the volume of the sound when it was recorded. 0 to +6 dB increases the sound above the recording level; 0 to infinity symbol decreases the sound below the recording level, finally to muted sound.
    Please let us know if you are OK with the details above. My blog post on PE12: Audio Features may be useful to you.
    ATR Premiere Elements Troubleshooting: PE12: Audio Features
    Thank you.
    ATR

  • Merge Still Photos with Video Clips?

    I have an iMovie project containing only video clips in the timeline, arranged by capture date/time. I also have an iPhoto file containing still photos of similar material. How can I import all of the iPhoto stills into the iMovie project such that the photos are inserted within the timeline and combined with the video clips so that everything (photos and videos) is arranged by date/time? Is that possible? If not, can someone suggest a script that will do just that?

    iM is no 'scriptable' app, video editing is usually no process for any automatic tasks...
    I would...
    * give the photos some names which indicates where in timeline of the iM project they belong (numbers 1,2,...? a date...?)
    * place photos manually into time of project...
    ... yes, video-editing is sometimes a painstaking, time-consuming tasks ... ;))

  • MERGING AND SYNCING more then one audio and video clip?

    Is there are way to select a bin of video clips and a bin of audio clips (DSLR with separate audio) and have Premiere analyze and sync them in batches like Avid. I have a mountain of audio and video clips, but with no rhyme or reason to the file name, no timecode, no slates, just waveforms. But without knowing which audio files go with which video files, it’s impossible (or least time-consuming).
    Or do I have to use plural eyes or other synchronising program for doing that?
    THanks.

    Do the video clips have audio. That is, are you seeking to match A/V clips with audio-only clips? If so, then Premiere can do that. Select all the clips in both bins, right-click & select Create Multicam Source Sequence, and select Sync by Audio.
    Whenever Premiere finds that two or more clips match each other but no others in the batch, it creates a multicam source sequence of just those clips.

  • How do I move a video clip from one event folder to another?

    Today I imported a bunch of old VHS based analog videos. I imported them all into one event library folder.
    Now I want to move some of the clips into a new event folder so I can keep all the folders properly organized with what is in them.
    When I highlight the selected video clip (I put the yellow border around the video I want to move) and I drop and drag the clip into the new folder imovie 11 asks if I want to move the selected clip. I answer yes, it seems to move the clip BUT it moves the WHOLE CLIP NOT just the part I selected.
    I can't seem to make a cut in the video and separate it out.
    How do I get the video I selected into the new event folder?

    The short answer is that you can't.  Purchases are tied to the AppleID used to buy them.  AppleID's cannot be merged, and the content cannot be transferred.

  • Can you turn the photos in a slideshow into a video clip?

    I have a sequence of 80 or so photos that play very fast and create an animation.
    Can I select all the photos and merge them together into a video clip so I can apply video effects and do a fade in for more than 2 frames?

    Colin, will doing the method you described allow me to apply video effects to the photos as a whole group?
    That's correct. The nested sequence essentially functions as one clip, so you can edit it, transform it, add effects or transitions, or do any other operation that you'd do on a single clip unit. For example, if you need to move your series of photos somewhere else in your sequence, you'd have to select all of them; if they're nested, you just have to click one big target to move them.
    I think Craig (shooternz) misunderstood your question, and assumed you just wanted to fade up the first photo, but you're talking about fading up over a longer duration, and multiple images. He had the right answer to a different question

  • Combining Video Clips

    Hi. Is there anyway to merge several short video clips together into one video for posting on Youtube? Something similar to the Flip Video software perhaps? A simple interface that would merge the video clips together with a simple transition?
    Please let me know if this is possible - either on the iPhone itself or by off loading the videos somehow and then combining the videos with another program.
    Any help would be greatly appreciated!

    My first attempt would be to use
    cat
    in the terminal
    See if the output file works. If it does, it's the simplest way.

Maybe you are looking for

  • Aperture adjustments don't sync to iphone or ipad

    Any adjustments - color, crop, etc - made to previously synced albums or projects don't update on the iPhone or iPad. Why would iTunes intentionally sync just the master and never versions, especially while not making it an option? When streamed, lik

  • File Name Format

    I have a coldfusion app that allows users to upload images. The problem is that many of these users are not web savvy and upload hte wrong types of images with terrible names. I have error handling in place but would love to be able to disallow uploa

  • Preview Problem: PDF file:Adobe livecycle designer ES 10.0

    Hallo. How do I fix  preview problem of a .pdf file that was created with Adobe livecycle designer es 10.0.  version 1.7 ( show on the properties of the file). The file opens normally. No preview in explorer preview pane and change to printing proble

  • Best way to sort a Table

    Hi Gurus, I'm using a EJB to read Data from a DB and write it into a Context Node "SourceNode" in my Component Controller. In the View, I've got a Node "DisplayNode", which is not mapped to "SourceNode" and but is filled using a supplaymethod that us

  • SAP RE-FX and HBS solution can co-exist?

    Hi, anyone,         I have read 'SAP RE-FX and HBS solution for customer' ( by QuangDD) in this forum which addressed to implement SAP RE-FX and HBS solution for customer, but notes 870859 emphasize customer who use is-adec-hbs should not activate RE