Minimum price of a material

16.10.2007
Hi friends,
Other than PMIN is there any other way by which I can enter  the minimum price of a material and check the same while creating sales documents.
Regards,
Udaynath.

Hi Uday,
If condition records are maintained for this price, a lower limit and an upper limit can be set in the condition record.
But if this price is entered manually, then one way to check is through a requirement / routine. Maintain the minimum price as a lower limit in a dummy condition record and in the custom requirement / routine compare the value entered by user (available during runtime) with the lower limit maintained in condition master. For an unacceptable value, deactivate the condition type by setting SY-SUBRC to 4 if its a requirement. If its a routine, simply overwrite the condition value with the lower limit so that everytime user changes it to a lower value, it gets overwritten by the minimum price.
Please award points if you find it useful.
Cheers,
KC

Similar Messages

  • Condition type PMIN Minimum Price for material

    Hello
    We have a requirement where we need to maintain minimum price of material in master.
    Whenever in sales order price is entered and is lower than minium price for material maintained it should automatically add the difference as surcharge. If the price maintained is more than the minimum price maintained it should not do anything.
    I guess we have to use Ctype PMIN for this. I amy using this condition type have created a condition record and maintained a minimum price for this material f09 as rs 1000
    Now when i am creating sales order price picked up from pricing condition record for that customer is 500 . Now it should automatically add Rs 500 in condition line item for condition type PMIN.
    What is happening is it is showing me my base price as 500 and it is adding PMIN as 1000 to the base price and showing total base price as 1500
    If price maintained in pricing condition record is more than 1000 for ex 1200 even then too it is adding PMIN as 1000 and showing total base price as 2200.
    Please let me know what am i missing...
    Regards
    SANJEEV

    -T code VK11 - Maintain condition records - You can use the upper and lower limits functionality in the condition records for those specific materials.
    -Also Make this condition type as mandatory then check it out.
    Regards

  • Minimum & maximum price paid for material

    hi gurus
    Can u tell me how to see max.& minimum purchase price paid for material with respect to vendor.
    Reg
    ROC

    try the reports
    ME80FN, ME2N, ME2M, ME2L
    Regards
    Sujoy

  • How frieght cost can be incorporated in the price of the material ?

    Hi Friends,
    Requirement is frieght cost should be incorporated in the price of the material .How this should be configured  'Sales Order value greater than equal to 15000,then frieght cost is free '.
    If it is less than 15000,frieght cost levied.How to calculate freight cost?
    One way we found is adding new requirement type or alternate calculation type in the pricing procedure.How far is it correct?My approach is correct or not.
    Some customers picks up the mateials from the warehouse itself.The sales commission caluculation will be different for this kind of orders. How to identify pick up orders without configuring new order type??How to calculate sales commission for these kind of orders?
    Our client is not interested to configure seperate order type.
    Can any body have ideas ,how best can be approached for  this?
    Thanks in advance...VM
    Edited by: vm on Mar 10, 2009 7:48 PM

    Hi VM,
    In the new conidition type created by you for frieght cost you need to make use of scales to maintain pricing based on the quantity.
    Firstly make sure that you have made Calculation Type as 'C' in control data for this condition type.
    Then in VK11 create a new condition record. Click on sclaes for this condition record and maintain the minimum frieght charge that you need to apply based on the order quantity.
    eg: Lets consider the example given by you. For all orders less than 15000 units you need to apply freight charge of 100 USD. So in sclaes you will enter values as follows
    Scale Quantity.........UOM........Rate.........Unit...........Per...........UoM
    .................................GA..........     10............USD.........1...............GA
    15,000.............................................................................................
    Now if an order is created for 15000 GA based on sclaes no rate will be applied. But if an order is created for qty less than 15000 GA a rate of 10 USD per GA will be applied.
    Hope this helps.
    Regards,
    Sajith.

  • Minimum price for purchase info record

    Hi
    For some supplier, we need to set up a minimum price in purchase info record condition as show in example.
    Price / pce : 50.00 CHF / 100 pce
    Minimum price : 200.00 CHF
    So price for PO should be for X quantity : Min(200, X * 50 / 100)
    Is it possible to do that? Our internal competence center says us that it's not possible, but i would like your opinion.
    Thanks for your help

    Hi,
    If you want to scale up your price as per quantity in PO, it can be done. for example for 60 quantity price is $100 and for 70 quantity it is $95.
    Go to Transaction M/06 and select the base condition PB00. Make sure the 'Group Condition' indicator and 'Rounding Difference Comparison' indicator should be activated and the 'Group Condition Routine' field should be entered with '1' (Overall Document).
    2) Maintain your purchasing info record for Material A where the Condition Group should be set (ABC, for instance). Select the base condition PB00 and then set up the scaled pricing value (Y, for instance).
    3) Maintain the PO for Material A . Upon completion of maintenance, click on 'Check' icon to activate the Pricing Determination. You will see that the pricing Y is applicable to Materials A.
    Regards,
    Ahmad Farhan Khalid

  • Report on Actual Price of Raw Material

    Dear Experts,
    There is any report on which I can see Actual Purchase Price of Raw material.
    Thanks in Advance
    regards...Kaushal

    Dear Kaushal,
    If so do you want the price that's maintained in the Purchase Info Record?
    If required the price mentioned in PIR can be overwritten while purchase order is created.
    If you want to take the values mentioned in Purchase Info record means,check these tables,
    EINA                           Purchasing Info Record: General Data
    EINE                           Purchasing Info Record: Purchasing Organization
    EKKO                         Purchasing Document Header
    EKPO                         Purchasing Document Item
    Regards
    Mangalraj.S

  • Moving average price of the material is negative

    Hi GUrus,
    Can anybody please expklain me why we get the moving average price of the material to be negative. PLz xplain with an example clearly. Thanks in advance
    Thanks
    Anusha

    Dear,
    Please rfer the OSS Note 753286 you will get the reason for it.
    The invoice price is constantly less than the goods receipt price.
    The invoice verification tries (in stock coverage) to subseqently debit resp. to credit the difference between value of goods received and invoice item value to the stock.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Two prices for one material in sales order according condition type

    Hi,
    I configure the condition type according to following condition record:
    Plant/ Sales Organization/ Distribution channel/ Material / Customer
    (because system should calculate two prices for one material in two plants)
    In the sales order screen, when user firstly select material , quantity, plant ,  system calculate the related price correctly but if user select the material and quantity and enter and after that select the plant, system will show the error message in pricing procedure and to have a price for material, user should update the price in the price condition in sales order.
    It is so difficult for user to update one by one, because there are several sales orders which need to update.
    Is it any way to solve this problem?
    Thanks,

    > In the sales order screen, when user firstly select material , quantity, plant ,  system calculate the related price correctly but if user select the material and quantity and enter and after that select the plant, system will show the error message in pricing
    Hi,
    Why to let the user press Enter button before entering plant value Obviously, system will give error, because it doesnt get all the required value based on which you have maintained condition records.
    Ask the user to enter all the value at item level otherwise you will have go for the option that you are doing currently.
    It is said prevention is better than cure
    Hope you get some inputs
    regards,
    Sagar

  • Price change in material master

    Hi,
    When does the moving average price change, if the PO price or the invoice price is different from the one in material master. Is it after the creation of PO, GR or invoice?
    Thanks and regards
    Aparna

    Hi,
    Moving Average price = Total Value
                                       Total Stock
    Moving average price updates once you make GR and IV
    If you are making GR & IV for new po , then new moving average price of that material will be :
    Total stock = stock already present in plant + GR made stock of that new po
    Total Value = Total Value of the material in plant + Invoice amount for that new po
    Thanks & Regards
    Prashanth.venkategowda

  • Material valuation with respect planned price 1 in material master

    Dear All,
         The costing variant PPC1 has been used for released cost estimate. In my scenario I want to create one more variant say ZPC1 where to calculate the value of the material from the planned price 1. In this case
    1.     What should be the validity date mentioned in the material master for valuation
    2.     The variant has been configured as
    a.     Costing Type – 12 Mod Std cost Est
    i.     Price Update – No Update
    ii.     Save Parameter – With Start of Period
    iii.     Misc – Cost Sheet
    b.     Valuation Variant – 001 Planned Valuation
    i.     Material Valuation - Planned Price
    ii.     Standard Price
    c.     Date control
    i.     From Date : Start of Current Posting Period
    ii.     To Date : End of Current Posting Period
    iii.     Qty Struc Date : Current Date
    iv.     Val Date : Current Date
    d.     Qty Structure Control (As PPC1)
    3.     When I run the standard cost estimate with variant ZPC1 the system calculates the standard price of the material even when the price is mentioned in the planned price1. 
    How the variant should be created to capture the planned price for calculation when using the variant ZPC1.
    Kindly help me in this regards
    Regards
    Vasantha

    HI,
    The requirement is to execute the cost estimate quaterly for planned price 1.
    So we are planning to create separate costing variant to pick the planned price 1 of RM.
    Clinet has the Excel file with the details of RM and Price combination but the prices are not available in SAP.
    We are looking for the Mass transaction to upload the prices in Planned price 1.
    Kindly help.
    Thanks,

  • To calculate sales price of a material

    Dear Experts
    We have a requirement to find the sales price of each material for a particular material.
    The purpose is to create the custom program that should propose the business to tell how many materials
    can be sold to a particular customer with the available credit limit.
    Hence if anyone worked on this kind of requirement earlier, kindly requesting you to advise me on the processing logic to find out the sales price for a particular material for particular customer.
    Eg:Base price(Cond type) :100
        Tax            (Cond type):10
            Sales price              :110
    As mentioned above, would like to know the processing logic to derive as 110 (Sales price) for a particular material for a customer.
    Thank you very much in anticipation.
    Moderator message : Cross-posting not allowed. Duplicate thread locked.
    Edited by: Vinod Kumar on Dec 1, 2011 3:10 PM

    Hi,
    Hope you know how to write the logic using tables and fields,
    Please use T-code u201CSE16Nu201D and feed the table for Conditions (Transaction data) table u201CKONVu201D and select your required fields of the material and write the logic.
    Regards
    DSR

  • Which table has Moving Average price for a material

    Can you let me know from which table I can get the Moving Average Price for a material
    Thanks

    Found MBEW table which has the necessary information

  • How to Maintain two different prices for same material in different qty?

    Dear all,
    How to maintain two different prices for same material in different batch quantities in purchase order(ie.,info record)?
    (Vendor is supplying quantities in 2 different batches & also in different prices)
    Expecting valuable reply.
    Jeyakanthan

    In a PO you can create 2 items, and each item can be maintained with a different price in the conditions.
    In info record it is not possible to have different prices for the same period, except for scales.
    so if you have a price of e.g. 2 USD for 1000 kg and 1,90 USD for 2000 kg then you can maintain this in scales, but you still have to have 2 items in the PO so that each one can individually find its price.
    Alternative you can create contracts (as well with more than one item) to reflect the different prices and batches.

  • Price updation in Material Master after confirmation

    Dear Gurus,
    When we create a production order for Semi finished which is maintained with Moving Average Price(MAP) in material master and we do confirmation of the order with "CO15'.
    My client wants after goods receipts against 101 movement type the price should be up date in Material; Master immediately.
    Regards
    RAM

    Hi,
    I think this cant be done.
    > My client wants after goods receipts against 101 movement type the price should be up date in Material; Master immediately.
    How much MAP should be after GR? From where this value will come?
    The accounting entries are passed on the basis of price maintained in the material master. The MAP is the input to the business activity. So as per my understanding the MAP cant be updated with GR against a production order.
    Also, the costing run would update the standard price, and wont be helpful as the indicator would be 'V' in material master.
    Hope it clears.
    Regards,
    Rohit.

  • What is the standard transaction code to see price for a material

    can anyone tell me what is the stadard t code to display price of a material for different customers the input contains sales organization distribution channel material valid on and end date
    Urgent
    thanks

    Use condition maintenance function (VK31) to meet your needs.
    Go to VK33 to display pricing reports, choose conditions > by customer, narrow down results by specifying org units, validity periods, customer and material range, condition type etc.
    Or at SE43, display area menu cond_av, where you can find out what pricing reports constitute this menu i.e your condition maintenance screen. If it is a routine task, creating an area menu may be needed.
    At V/LA, pricing reports can be easily created to suit specific requirements. Then newly created reports can be added to area menu via SE43.

Maybe you are looking for

  • Proxy issue in OpenScript Load Testing Protocol(Web/HTTP) during PlayBack

    Hi All, I am new to OATS and I recorded a sample script on OATS for Load Testing protocol(Web/HTTP) in OpenScript but when I Playback it then it is giving the following as the result: "*Invalid response received from proxy server: HTTP/1.1 502 Proxy

  • Can't boot from my C drive

    I tried BDAqua's method I was able to see my options to boot using the option key when starting up my computer but after selecting the options nothing happens after. HELPPP!!!!!

  • Urgent : Doubt in writing a code in start routine

    Hi all ,              I am BI 7.0 system , I have doubt in writing a code in start routine . 1) i have to extract the data first from a custom table based on one condition and then placing it into internal table . 2) Now i have to loop at source_pack

  • JBO-33035 "Row currency has changed..." and Failover feature

    Hi, I came across a problem (bug?) while playing with the failover feature (JDev9052). I have an AM pool with just one instance and two browsers. Failover is not set. My test: 1.: First browser moves through the Dept list. 2.: Second browser moves th

  • How do I format links? And where can I find easy help info?

    How do I override the blue color added when I add a hyperlink? (I found the modify page properties/links drop-down to remove the underline, but I can't figure out how to default to the original text color and only show link during rollover, or add my