Price change in material master

Hi,
When does the moving average price change, if the PO price or the invoice price is different from the one in material master. Is it after the creation of PO, GR or invoice?
Thanks and regards
Aparna

Hi,
Moving Average price = Total Value
                                   Total Stock
Moving average price updates once you make GR and IV
If you are making GR & IV for new po , then new moving average price of that material will be :
Total stock = stock already present in plant + GR made stock of that new po
Total Value = Total Value of the material in plant + Invoice amount for that new po
Thanks & Regards
Prashanth.venkategowda

Similar Messages

  • PuP price not changed in Material master

    Hello All experts
    I have one question about the material ledger related transaciton, I have a Material with 2+V (price deter. and price control) setting in Material master data in Accounting 1 TAB. And material ledger is active for this material, the Periodic Unit price is 1 USD in current period and stock is 0.
    One PO posted for this Material for purchase with actual price 100 USD, and 101 movement type with special stock indicator E was used in Goods receipt posting. I think these stock will be treated as valuated sales order stock. But GR posting didn't trigger any PuP price change in Material master. Is that situation normal? Pls kindly help.

    With price control V in activity-based material price determination (indicator2 in the material master), the moving average price is calculated. With price control S, the material is valuated with the standard price and the moving average price is calculated for information purposes.
    In single-/multi-level material price determination(indicator 3 in the material master), the valuation price (standard price) remains unchanged and a periodic unit price is calculated for the closed period.
    This option is only for materials with price control indicator S,and is only recommended if in addition to multiple currencies and/or valuations, you use single-/multi-level material price determination.
    In single-/multi-level material price determination, a periodic unit price is updated for information, but it can only be used for material valuation in the closed period.

  • Price updation in Material Master after confirmation

    Dear Gurus,
    When we create a production order for Semi finished which is maintained with Moving Average Price(MAP) in material master and we do confirmation of the order with "CO15'.
    My client wants after goods receipts against 101 movement type the price should be up date in Material; Master immediately.
    Regards
    RAM

    Hi,
    I think this cant be done.
    > My client wants after goods receipts against 101 movement type the price should be up date in Material; Master immediately.
    How much MAP should be after GR? From where this value will come?
    The accounting entries are passed on the basis of price maintained in the material master. The MAP is the input to the business activity. So as per my understanding the MAP cant be updated with GR against a production order.
    Also, the costing run would update the standard price, and wont be helpful as the indicator would be 'V' in material master.
    Hope it clears.
    Regards,
    Rohit.

  • CO88-Error :Perform the planned price change for material

    Hi Experts,
    While running CO88 i get this error. "Perform the planned price change for material ". My material is manage at S and it doesn't have any marked cost. The status is FR and no other status on cost etimate for the article are active. what i shoul do? why if i run the PP order with KO88 i don't have any error?
    Please help i'm facing the closing period.

    Hi,
    If dynamic price change is active in your system the first posting in the new period of this material tries to
    - release a future cost estimate of that period OR
    - change the price to the future price in accounting view
       (if the future price date is reached)
    Unfortunately this dynamic price change does not work in order settlement. Therefore you are asked to perform the price change first by t-code CKME (or CK24).
    If you are using price determination control 3, any price change or release should always be the first transaction in a new period to avoid any inconsistencies.
    The dynamic price release will only release the price with transactions which involve material movement and this is not the case by posting invoices and order settlements.
    if you are in period 12/2009 then a settlement in 12/2009 does not require the release cost estimate of 01/2010.
    But if you are already in 01/2010 therefore settlement in 12/2009 is a posting into the previous period. This will change also data of the current period. Therefore the cost estimate has to be released first.
    Another option, if you don't want to receive this message, would be to change this message from Error to Warning (check note 434752).
    Please follow the following steps:
    T-CD:OMRM
    Message M8 394
    =>you set the message type to '-' for error message M8394, that means no message is to be issued.
    regards
    Waman

  • Reg. price maintenance in material master and Costing

    Dear Experts
    I have maintained price for material in material master and costing,but when I create PO price didn't come from anywhere. Pls help me.
    Thanks
    Rajakumar.k

    Dear Rajakumar,
    The values that are maintained in the material master in costing view is considered only for costing
    purpose.
    Say while doing the cost estimate for a material using CK40N,a costing variant will be used and say For
    Eg,PPC1,for this a valuation variant will be linked ,as per this valuation variant for costing purpose the
    first priority would have been given to the planned price in the material master in costing 2 view.
    So this value will be considered only for costing purpose.
    For procurement related things you have to maintain a purchase info record for a material + vendor
    combination in ME11 and a source list in ME01.
    In the purchase info record you can maintain a price for buying the material from that vendor.
    I hope this will clear your doubts.
    Check and revert back.
    Regards
    Mangalraj.S

  • Changes in Material Master leading to issues in MRP

    Hi,
    For a particular material a user changed a lot of material master data (MRP1 and MRP2 view) within a couple of hours.
    As a result MRP is not working as we would expect:
    - some orders have no quantity in the "Available quantity" column in MD04 and as a result do not trigger any PO (Received/Required quantity = -1, but Av qty = blank)
    - whenever a shipment is foreseen it is consumed/reserved by/for the order which requested delivery date is closest after that shipment date
    These are the changes made to the master data in November 2009:
    Planning Strategy Group: from Make-To-Stock Production to No Planning to Strategy Group for Spares & Consumables to No Planning to Strategy Group for Spares & Consumables
    MRP Group: from Client Specific MRP Group for Period Mgmt to General to External Procurement to Client Specific MRP Group for Period Mgmt to General to Client Specific MRP Group for Period Mgmt
    Availabilty Check: from Indiv. Req. to Indiv. Req w/o PO. to Indiv. Req.
    Unplanned Consumption in period: from blank to 11.2009
    Fwd Consumption Period: from 0 to 999 to 0
    Consumption Mode: from blank to Forward Consumption Only to blank
    Unchanged MRP material master data:
    Bwd Consumption Period: 0
    MRP type: MRP
    Planning Time Fence: 1
    Lot size: WB (weekly lot size)
    Procurement type: External Procurement
    Backflush: always backflush
    What should we do to have MRP work correctly again for this material?
    Changes to material master MRP? Delete all schedule lines and start from scratch in SOs?
    All help is much appreciated!
    Best regards,
    Geert
    Edited by: Geert P on Dec 10, 2009 6:08 PM
    Edited by: Geert P on Dec 14, 2009 4:04 PM

    Solved internally by adjusting Strategy Group

  • Not able to transfer changes in material master (periodic)

    Hi Friends,
    Got an issue here. I am not able to transfer the changes I made in material master. I want this as periodic, Made the specific setting in CFC9. And for your information 'Activate ALE Change Pointers Generally' and for massege type are activated.
    But when I execute CFP1 I got massege: 'No appropriate master data changes: Transfer has not happen'.
    I made changes in material master (global level),..like gross weight changed. Material is in active IM, no duplication.
    Any help Please? We are on SCM 7.0.
    Thanks,
    Satyajit
    Edited by: Satyajit Patra on Mar 20, 2010 9:12 PM
    OK, Guys I think I need to raise an OOS... It was for SCM 7.0, but was basic config....thts why I edited the thread so many times expecting some responce.
    Edited by: Satyajit Patra on Mar 22, 2010 7:41 AM

    Hi Satyajit,
    Please look at OSS  Note 1069560 - Data inconsistencies: Activating integration. models in parallel, if this helps you.
    Since  Gross data of material is in the basic view, it is common across plants , whereas, IMs are normally designed to have material masters at plant level.
    We may have same material in different IMs with different  plants. Therefore changes of the basic view fields are then contained in multiple IMs.  SAP advises to have a larger IM or sequential activation of IMs.
    I hope this will  help you .
    Regards
    Datta

  • Price zero in material master:MM01

    When I create a material , system is asking moving avg price, std price (Accounting 1 view). It is mandatory. In some cases I want to maintain price as zero which system is not allowing. How to make system to accept proce as zero for a material.

    Dear,
    With a standard price S in Material master you can enter price as Zero but as soon as you enter Zero goes & SAP treat is as a blank field & issues a message "Enter a price" .However even if you don't enter price, you can save the material.
    Or You can manually maintain the price for Material in t-code MR21 as zero.
    Regards,
    R.Brahmankar

  • RMDATIND program - used for change the Material Master

    Hi Experts,
      Could please confirm whether using RMDATIND program can we change the Material master data?...
    Thanks
    R P R kumaar

    Execute this program and you can find an information icon in the toolbar. press that icon. you will complete documentation regarding this program

  • Change of price control in material master

    Hi, SAP experts,
    We have  business scenario where the procurement type in MRP-2 view of material master gets changed from F to  E that is an externally procured item will be manufactured inhouse.
    In such case in costing view the price control needs to be changed from V to S. If both MAP & std. price  are not identical, system is not allowing to change. Secondly since the item will be manufactured inhouse from now onwards, I have to run the cost estimate & update the master.
    How do I deal with the situation.
    Valuable advice is awaited.
    Regds
    T.S.Shankar

    Hi Shankar,
    When the price control indicator is "V", system will allow changing the Standard price manually through Transaction code MM02.
    Similarly when the price control indicator is "M", system will allow changing the Moving average price manually through Transaction code MM02.
    Hope this clarifies
    Regards,
    Som

  • *How to change the Valuation Category & Price control in material master*

    Hello SAP Gurus,
    I have a requirement to change the valuation category from 'X' to '  ' in accounting view of material master.
    -> I have cancelled all the open PO's & SO's for the material
    -> I have ensured that there is no stock for the material in that valuation area.
    But still I get an error message that batch already exists for the material. When I check entries in MCHB I find that there are previous entires in MCHB with zero stock.
    I have gone through the SAP note 155874 which recomends the archiving the effected objects.
    Please let me know is there any work around to change the valuation category from 'X' to '  ' & price control 'V' to 'S'. I also need to change from '  '  to 'X' for a few materials.
    Thanks for your advise.
    Best Regards,
    Narayan.

    Note 155874 cleary describes what has to be done to be able to change.
    There is no workaround, and if you change anything in the tables directly, then this will cause inconsitencies, as described in this note as well.

  • Moving avergae price updation in material master for project stock

    Dear All,
    My query is pertaining to updation of MAP( moving average price) for project specific procurement ( as project stock) for valuated project stock.
    As  definelty the cost of procurement gets consumed by project .but i want to know does the project stock procurement still updates the moving avergae price or not.
    Ex:-Suppose MAP in material master is 10 USD ( with qty 1)and i procure the same material ( qty 1)for project with account assignment Q for 9 USD . now will the MAP in material master becomes 9.5 USD or it remains 10 usd.?
    Please reply urgently
    Regards
    Amit

    Hi Amit,
    If your Project Stock is valuated, then, the valuation data for it is stored in a different table: QBEW.
    The normal, anonymus warehouse stock (the unrestricted use stock which is not assigned to any project or to any sales order) has its valuation data stored in MBEW.
    The "Accounting 1" view in the Material Master MM03 ONLY displays the data of MBEW.
    In the material master you will never see the valuation data of the valuated project stock (table QBEW) or the valuated sales order stock (valuation indicator "M" - table EBEW).
    The valuation data for the tables QBEW and EBEW can be seen in SE16 or in the transaction MBBS.
    Also note that these valuated special stocks are managed independently of the normal stock. If, for example, you change the Moving Average Price of your normal stock in MBEW, this will not have any influence on your project stock, as the data is under a totally diferent table QBEW.
    I hope this helps you,
    Esther.

  • Change in material master

    Dear all,
    I am trying to change the Price control of a material from V to S.
    It is showing me a system message as follows:
    Price control cannot be changed (cost component split exists)
    Message no. M3160
    Diagnosis
    Costing is active and has already been carried out for the current period. You can only change the price control to "Standard" if the moving average price and the standard price are identical
    Now when i am trying to make the standard and moving average price identical,system is throwing an error as follows:
    Standard cost estimate exists in period 04 2009
    Message no. M8155
    Diagnosis
    A standard cost estimate has been entered in the material master record for the specified period. This can be a current or future estimate.
    Note: This message category can be changed in Customizing for Invoice Verification. This means that you can receive an error message even though the message is defined in the standard system as a warning message.
    The following documentation only deals with the standard case.
    System response
    You cannot manually change prices.
    Procedure
    1. To update the price determined using a standard cost estimate in the material master and activate the price for material valuation, you have to mark and release the standard cost estimate.
    Mark and release standard cost estimate
    Procedure for System Administration
    2. If you have authorization for Customizing, in Customizing for Product Cost Planning, you can define this message as only a warning or information message for certain users. These users can then change the price manually.
    Pls try to throw some light in this issue about how to process the price control change?????????
    also pls let me know the spro path for message type M8 155??????
    also what is the menu path for M8 155 in product cost planning?
    regards,
    indranil

    http://help.sap.com/erp2005_ehp_03/helpdata/EN/47/60ff6249f011d1894c0000e829fbbd/frameset.htm
    For System path of M8 155 go to SPRO - MM - Purchasing - Logistic Invoice Verification - Define Attribute for System Message / OMRM
    Regards,
    Ashok

  • Price control in material master.

    Dear all,
    How can i change the Price control key(V to S) in material master.
    and what are the implication after change the price control.
    Please suggest.
    Regards,
    Vishal Garg

    Hello
    In the SAP System, there are two types of price control:
    Standard price & Moving average price.
    These two types of price control differ in how they handle price variances resulting from goods receipts or invoice receipts.
    Changing the Type of Price Control
    Under certain conditions, you can change the type of price control:
    From standard price to moving average price
    You can make this change at any time. The moving average price (which until now has been updated for informational purposes only) replaces the standard price and is used for valuation from now on.
    From moving average price to standard price
    You cannot make this change in the following two cases:
    If the material master record is set up as a valuation header record for a material subject to split valuation
    If the standard price comes from costing and is not equal to the moving average price
    If the change is possible, the moving average price becomes the standard price, which is then used for valuation.
    You change the type of price control by overwriting the price control indicator in the material master record with the new indicator.
    Changing the type of price control for a material does not change the value of the material stock, since in both cases the current price becomes the new price.
    An example is given below:
    Standard price to Moving average price
    Material A
    Price control: S
    Moving average Price: 8
    Standard Price: 10
    Total Stock: 100
    Total Stock value: 1000
    Now we change the material price control to 'V'. Then
    Material A
    Price control: M
    Moving average price:10
    Standard price: 10
    Total Stock: 100
    Total Stock value: 1000
    Moving average to standard price
    Material B
    Price control: V
    Moving average Price: 8
    Standard Price: 0
    Total Stock: 100
    Total Stock value: 800
    Now we change the material price control to 'S'. Then
    Material B
    Price control: S
    Moving average price:8
    Standard price: 8
    Total Stock: 100
    Total Stock value: 800
    Hope this will clear your doubts.

  • Price change for Material Maintained with Split valuation

    Hi Gurus,
    Scenario is like this :
    Material with Valuation type is : Rs.50.
    Material W/o Valuation type is : Rs. 0 ( This is done at the time creating material master).
    Now i want to correct Rs.0 to Rs.40.
    When i try to change price through MR21, system is asking to input valuation type.
    Is it not possible to change price for material W/o Valuation type (ie blank one), if material is Split Valuated ?
    Thanks

    Hi,
    if the materila is split valuated then u have to enter valuation type because inthe accouting view you hav edefined valuation type and at that level only it stores the price.
    I think you wants to change the price at valuation category level , if this is so then it gets updated automatically thru prices maintained at all the valauation type levels.
    Hope it clarifies ur doubt.
    reward if useful
    Rohit

Maybe you are looking for

  • Download from ALV are all in one column including the header

    Hello All, We are having problems with the download of excel from ALV grid. what happens is that instead of the data dispalying in different columns, it is all in one column, including the header. what could be the problem? this only occurs in the pr

  • BPEL validation failed in "SOA Order Booking" Applicaton sample

    Apache ant log error message as follows: ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ Buildfile: C:\Documents and Settings\wb

  • IPhone requires complete reset every time I update Apps

    I am about to pull my hair out! I am running the most current software on my iPhone 3G. I was replacing an older iPhone... so originally, I transferred all my old information over to my new phone. After about 3 complete resets, I decided maybe someth

  • Safari-won't let me place orders on shopping sites

    On a number of commerical sites and on many occasions, I haven't been able to place an order for goods after I've added an item to the "shopping cart" and after providing all the required personal and method of purchase information.  I can click on t

  • Need a report for track Advertisement status

    Hi , Please help me to provide a sql query to find out last used date of advertisement. The advertisement should be both package + TS.  or  separate  report. Thanks, Tushar