Hi
MIS report required from SAP for the following:
1. Profit & loss acct (consolidated , plant and segment wise)
2. Balance sheet
we havn't configured FSV at production yet, so without this is it possible?
Edited by: barnabasjh on Jul 7, 2010 12:50 PM

Hi,
It is NOT possible to get the financial statements without an FSV. You can only get the trial balance.
Regards,
Mike

Similar Messages

  • Adobe Premiere Pro CS5.5 Family- 'extracting' for 24 hours and I can't cancel it and start again

    Hi
    I've been trying to download the trial of Adobe Premiere Pro CS5.5 Family for 24 hours now. It downloaded in Adobe Download Assistant fine and the it started 'Extracting'. Its been extracting for 24 hours and the close or pause buttons next to it are not available to press so I can't stop it and try again.
    A message half way through did pop up saying 'opening premier pro, verifying...' but then a warning sign came up saying 'the following disk images couldn't be opended. Reason: Invalid Checksum' . Don't know if that has anything to do with it but on Adobe Download Assistant it is still 'Extracting'.
    I am working on a year old Macbook Pro with a fast connection to the internet.
    Thanks

    buenas dias, yo intentado descargar adobe CS5 standart, premium ... pero todos los ficheros se paran en 49°/° y no van mas, no se que hacer, intentado con todos los exploradores de internet . gracias

  • International SSRS report printing for both A4 and Letter

    I've been reading a few articles on the net about making reports either A4 or Letter and I am aware of how to change the layout of the page to be specific for either
    The problem we have is that we have some users that use A4 paper, and other users that use Letter size paper.
    We would ideally like the user to press the print button from the browser window (note not exported to PDF) and for the report to be printed off on their favourite printer
    We have modified the layout to be the lowerst common denominator size (210mm x 279mm).  When we print to our printer which uses A4 paper, it errors because the paper size is odd and needs confirmation to use A4 instead.  I am making the assumption
    that using a printer with Letter size has the same problem.
    We do not want our users to have to deal with errors on their printer every time they try to print a report, it doesn't look good.  We don't want to write 2 versions of each of our reports as that will be time consuming and a maintenance nightmare
    Has anyone managed to make SSRS reports printer agnostic or at least be able to print out on either A4 or Letter without additional intervention on the printer?
    Tony

    Hi Tony,
    What version of SSRS are you using? Are you seeing this from the Report Viewer control or Report Manager?
    In my Report Manager, when I try to print a report (SSRS 2008 R2), the Layout defaults to Letter. When I look at the report (RDL) property in BIDS, the PageSize property is set to 8.5in (Width), 11in (Height), which refers to PageWidth and PageHeight respectively.
    The following blog explains these properties:
    http://blogs.msdn.com/b/bwelcker/archive/2005/08/19/alien-lanes-_2800_logical-and-physical-pagination-rules_2900_.aspx
    In SSRS 2005, for the Report Viewer control, due to a VS 2005 issue, we had a situation where it would not allow custom paper size. By modifying the report page size to the exact Letter size (279.4mm = 11 inches), for example, we would be able to see the
    Letter size in that situation. This should be fixed on and after SSRS 2005 SP2.
    In general, after rendering a report, Reporting Services sends the height and width information to the printer driver when we try to print a report, which selects the appropriate paper type based on the report size.
    In my test, when I tried to print, it chose Letter with Portrait Orientation. I was able to change it to A5 from the Print Dialog and was able to print in both ways (A5/Letter) without any error message.
    Thanks,
    Cathy Miller
    Microsoft Online Community Support

  • What is proper way to report suggestions for app features And bugs to Apple

    What is the proper way to report suggestions for app features to Apple? Or, do they even want suggestions?
    And, how about reporting app bugs? Should I just assume the bug is already known, or is there a way for (quickly) reporting them?

    I'm not sure about bugs in non-Apple apps, but bugs in Apple apps can be reported via this form:
    http://www.apple.com/feedback/ipad.html

  • Report execution for different variant and Broadcast

    Hi experts,
    i had a situation where i need to broadcast the same report for 100 vendors, but the information in the report will be different and specific to the vendor.
    can i create different variant for each vendor and execute the report at the time in background and broadcast that to the vendors.
    Is it possible for broadcasting the reports at a time
    any idea will be appreciated
    regards

    Hi akshay
    Is it like i can execute the report same time for different variants and broadcast that reports based on  that variant to different vendor
    for eg User  A has to view report with Variant X.
             User B has to view same report with variant Y
    and so on is this possible for us to do at a time
    or need to create different reprots for 100 vendors and broadcast them
    Hope if u have any document for broadcasting that shows the steps to do this can you please share

  • Crystal Reports asking for Dbase username and id

    When I try to select a dBase file as my data source location in Crystal Reports, CR wants a user name and log in id for the dBase file...I do not have a user name or log in id for my dBase file...
    How can I get past this?
    Mitch

    I don't believe this is a DB2 z/OS question, perhaps it would be better to ask in another SDN forum?

  • Reporting tool for access.log and other files

    Any know of a good reporting tool to make useful reports out of the log files in
    Weblogic?

    I think you should verify this with Oracle Support.
    This is the perfect measure to have them drop the phone on you.
    Sybrand Bakker
    Senior Oracle DBA

  • Bought a GTX 970 in-store for Witcher 3 and Batman promo, no code on receipt

    So i bought a EVGA GeForce GTX 970 ACX2 today at my local Best Buy and my receipt has no code whatsoever for the redeptiom od Witcher 3 and Batman Arkham Knight, how can I obtain my Code? I still have my receipt, if I need to take a picture of it for proof.

    Hello LaughingOcelot,
    I apologize for the delay with our response and I'm sorry to hear that you haven't received your code.  Please send me a private message by clicking the blue box at the end of my signature including the "Customer Service Pin" from your purchase receipt.  Thank you for reaching out to us and I look forward to hearing from you.  
    Blake|Social Media Specialist | Best Buy® Corporate
     Private Message

  • I am trying to reinstall safari for windows 7 and I get "error code 2203" and the install will stop there, any solutions.

    I am trying to reinstall Safari on a windows 7 pc and I get an"error code 2203" messege and it won't complete the install. Please help because I like using Safari more than windows.

    You are better off using either IE or Chrome ...
    Apple apparently kills Windows PC support in Safari 6.0

  • When i install updates one update fails to update for the monitor and gives a error code 80070005.

    model a6637c desktop
    product FK549AA-ABA
    software build 84NAv6PrA1
    serial
    {Removed for privacy}
    How do I correct error 80070005 for update lcd monitor failure

    Hello chuck1955,
    The error you are getting is usually generated because of either you not being an administrator or having malware on your machine. Now if you can install other updates that makes it a little odd.
    Try the steps in this Microsoft KB just to rule them out as the problem.
    http://goo.gl/ECD17
    If I have helped you in any way click the Kudos button to say Thanks.
    The community works together, click Accept as Solution on the post that solves your issue for other members of the community to benefit from the solution.
    - Friendship is magical.

  • How to set a report culture for number and date

    Hi,
    Is there a way to change the report locale for the number and date?
    I've tried using both CrystalDecisions.Share.SharedUtils.RequestLCID and CrystalReportViewer.SetProductLocale and neither work
    The only one that work is to use the Thread.Culture. But that also change the application culture, not just the report.
    Anyone have a solution?
    Thank

    Hi Michel,
    I don't believe you can do this within just the report itself but I haven't played with this very much. Because the App hosts the Viewer it's based on it's culture.
    You should be able to mix if you create a separate thread for each report job that way they are in their own space.
    Search the Object browser on celocale and you'll find more info. Also the SDK help file should have examples.
    No API's to use the Engine, had to use RAS.
    Need to know what version you are using also and WEB or Windows app?
    Here are some samples using RAS:
    rpt1.ReportClientDocument.LocaleID = CrystalDecisions.ReportAppServer.DataDefModel.CeLocale.ceLocaleGerman;
    CrystalDecisions.ReportAppServer.DataDefModel.CrFieldDisplayNameTypeEnum.crFieldDisplayNameFormula, CrystalDecisions.ReportAppServer.DataDefModel.CeLocale.ceLocaleUserDefault);
    And using this way you may have to alter every object in the report.
    Thanks
    Don

  • Pls can any one suggest me the Existing Report Name for Active and InActive

    Hi all ,
               pls can any one suggest me the Existing report name for displaying Active and inactive vendors .
    Rgds
    Rafi .

    hi,
    my transaction is VL02N change outbound delivery.

  • Report Painter for B/S , P&L statements

    Hii gurus
    this is ramki...
    Plssss help me in the making of Report painter for Balance Sheet and Profit And Loss Statements , as of now i didn't did Report Painter .
    I have tried no.of times , i dont know the confg also...
    My client is asking DR & Cr columns for the statements..
    can any body plsssss forward to me  report painter confg documentation...( atleat for base level confg )
    helpers will b great appreciateble..
    thanks in advance
    regards
    ramki

    Hi
    i am sending you a sample of how to createa report in report painter follow it,
    Main Steps in Creating a Report Using Report Painter
    The illustration below shows the main steps in creating a report with Report Painter:
    In this section, you learn how to create a Profit Center Accounting (PCA) report with Report Painter.
    For these sample reports, you should focus on the tables that correspond to the SAP application areas with which you are working. The examples shown in this section have been created in Release 4.6C.
    Sample Report for Gross Profit Margin
    Bungee Corporation wants to use Report Painter to create a gross margin report. This Profit Center Accounting report uses data table GLPCT. The desired PCA report displays the gross margin for each profit center.
    Below is an illustration of the completed gross margin report.
    Prerequisites to Creating a Report with Report Painter
    Before you can create a report with Report Painter, you need to:
    •     Determine the table
    •     Find the library
    •     Create sets
    •     Create variables
    The following sections explain these prerequisites.
    Determine the Table
    Before you can start creating the report, you must decide on the table you need to use. In this example, we use table GLPCT in Profit Center Accounting.
    Find the Library
    Determine the library you want to use for the desired table.
    If you need to create a library, on the SAP Easy Access screen, either:
    •     From the navigation menu, choose SAP menu → Information systems → Ad hoc reports → Report painter → Report Writer → Library → Create.
    •     In the Command field, enter transaction GR21 and choose  .
    In our example, we use existing library 8A2 for creating a report.
    Create Sets
    Create the required sets for your report. To create a set, on the SAP Easy Access screen, either:
    •     From the navigation menu, choose SAP menu → Information systems → Ad hoc reports → Report painter → Report Writer → Set → Create.
    •     In the Command field, enter transaction GS01 and choose  .
    Note that this procedure is not necessary for creating the report given in the example that follows.
    Create Variables
    Create any variables for the fields that must be entered before the report is executed. To create a variable, on the SAP Easy Access screen, either:
    •     From the navigation menu, choose SAP menu → Information systems → Ad hoc reports → Report painter → Report Writer → Variable → Create.
    •     In the Command field, enter transaction GS11 and choose  .
    Note that this procedure is not necessary for the sample report in the next section.
    Creating a Report with Report Painter
    When you are ready to create the report using Report Painter, use the following steps.
    Example Task: Creating a report using Report Painter
    1.     On the SAP Easy Access screen, either:
    o     From the navigation menu, choose: SAP menu → Information systems → Ad hoc reports → Report painter → Report → Create.
    o     In the Command field, enter transaction GRR1 and choose  .
    2.     On the Report Painter: Create Report screen:
    a.     In Library, enter the name of the library to be used for the report (for this example, 8A2).
    b.     In the Report, enter a name for your report and a short text description.
    c.     Choose Create.
    1.     
    To help you better understand how to create a report in Report Painter, the next procedures explain the varying substeps. You can either:
    o     Define the rows (or rows with a formula)
    o     Define the columns (or columns with a formula)
    o     Define the general data selection
    Define Rows
    Example Task: Defining rows (including defining a row with a formula)
    To start defining the rows, on the Report Painter: Create Report screen, double click on Row
    On the Element definition: Row1 dialog box:
    a.     To include characteristics in the first row of the report, select the desired characteristics in the Available characteristics frame (for example, Account number)
    b.     Use  to transfer the chosen characteristic to the Selected characteristics frame.
    c.     In From, enter the account number(s) you want to include in the row definition. Either enter to and from values or a group set (for example, the value 800000).
    d.     To enter the row heading, choose
    On the Text maintenance dialog box:
    a.     In Short, enter the desired short text (for example, Revenue).
    b.     To copy the short text into the Medium and Long text fields, choose Copy short text.
    c.     To continue, choose
    On the Element definition: Row1 dialog box:
    a.     To check if the selection is correct, choose  Check.
    b.     To transfer the selection to the row 1 definition, choose Confirm.
    You have now defined the first row.
    To define the second row for costs, on the Report Painter: Create Report screen, double-click on Row 2.
    On the Select element type dialog box:
    a.     Select Characteristics.
    b.     Choose
    On the Element definition Row 2 dialog box:
    a.     To include characteristics in the second row of the report, select the desired characteristics in the Available characteristics frame (for example, Account number)
    b.     Use  to transfer the chosen characteristic to the Selected characteristics frame.
    c.     In From and To, enter the account number(s) you want to include in the row definition (for example, 400000 and 490000).
    d.     To enter the row heading, choose
    On the Text maintenance dialog box:
    a.     In Short, enter the desired short text (for example, Costs).
    b.     Choose Copy short text to copy the short text into the Medium and Long text fields.
    c.     To continue, choose
    On the Report Painter: Create Report screen:
    a.     You can now choose to add further rows with other required characteristics. In this example, you can create a formula in the third row.
    b.     Double-click on Row 3.
    On the Select element type screen:
                       a. Select Formula as the row element type.
                       b. Choose
    On the Enter Formula screen:
    a.     Enter the formula for Row 3. You can either type it in or use your mouse and the formula components buttons. If you type the formula, do not forget the spaces. In this example, Y001 and Y002 represent Revenue and Costs respectively.
    b.     To check the correctness of the formula, choose  Check.
    c.     Choose
    On the resulting Text maintenance dialog box:
    a.     In Short field, enter the text for the formula field (for example, Gross Marg).
    b.     In Medium and Long fields, enter the required text (for example, Gross Margin).
    c.     Choose  .
    You have now defined three rows (Revenue, Costs, and Gross Margin).
    Define Columns
    Example Task: Defining columns
    On the Report Painter: Create Report screen, double-click on the first column, Column 1.
    On the Select Element Type (not shown) dialog box:
    a.     Select Key Figure with characteristics.
    b.     Choose  .
    On the Element definition: Column 1 dialog box:
    c.     In the Basic Key figure field, use the dropdown to select Amount in company code curr.
    d.     In the Available Characteristics frame, select the desired characteristic for column 1 (for example, Fiscal Year).
    If you want to be prompted for the fiscal year at the time of running the report, you must make this a variable instead of a value.
    e.     Choose  to move the desired characteristic to the selected characteristics frame (for example, Fiscal year).
    f.     Place your cursor in the From value field and select the checkbox to the left under  (variable on/off).
    g.     To view the possible entries for the From field, choose  .
    h.     From the resulting selection dialog box:
         Select a variable from the list of available variables (for example, CYear).
         Choose  .
    i.     On the Element definition dialog box, choose  .
    j.     On the resulting Text maintenance dialog box:
         In Short, enter a text for the column header (for example, Curr Year).
         To copy the short text to Medium and Long text fields, choose the Copy short text button.
         Choose  .
    Now you have defined the column 1 for your report.
    k.     Back on the Element definition dialog box, choose Confirm.
    On the Report Painter: Create Report screen, define column 2 and all other columns you choose to define. You can define these columns either by:
    o     Repeating steps for column 1
    o     Copying columns
    o     Entering a formula that calculates the difference between columns (for example, between Current Year and Prior Year [variable is Pyear] in a column called Variance)
    Adding a column or formula is similar to adding a row formula. After defining the rows and the columns, the screen would appear as follows.
    General Data Selection
    After you define the rows and columns, define the general data selection screen for the report.
    Example Task: Defining the general data selection screen for the report
    1.     On the Report Painter: Create Report screen, from the menu bar, choose Edit → General data selection.
    2.     On the Element definition: General data selection screen:
    a.     From the Available characteristics frame, select the fields to add to the general data selection as shown.
    b.     Choose  to move the selections into the Selected characteristics frame.
    c.     Enter the values for each field. (For example, the standard ledger for PCA is 8A to 8E and the U.S. company code in IDES is 3000. This example is a year-to-date report, so all 12 periods are in the range. The standard Version in PCA is 0, the Record type for actual dollars is 0, and CO is 2000).
    d.     To check the selections, choose  Check.
    e.     To create the definition for the general data selection for the report, choose Confirm.
          3.   On the Report Painter: Change Report screen:
    a.     To save the report, choose 
    To include the report into a report group, choose Environment → Assign report group.
          1.     On the Insert Report in Report Group dialog box:
    a.     In Report group, enter a report group name (for example, ZTGR).
    b.     Choose  .
    2.     On the Create report group dialog box, choose Yes to create and assign to a new report group.
    Display and Execute the Report
    Example Task: Displaying the report you created in the previous steps
    1.     On the SAP Easy Access screen, either:
    o     From the navigation menu, choose: SAP menu → Information systems → Ad hoc reports → Report painter → Report → Display.
    o     In the Command field, enter transaction GRR3 and choose  .
    2.     On the Report Painter: Display Report screen:
    a.     Double-click on your report.
    b.     Review the report display.
    c.     To execute the report, from the application toolbar, choose execute.
    On the Selection screen:
    a.     Enter the variables used to execute the report (for example, Current Year 2000 and Last Fiscal Year as 1999).
    b.     On the application toolbar, choose execute.
    The report appears. You have successfully created a report in Report Painter.
    You can also execute the report through the report group (for example, ZTGR).
    1.     On the SAP Easy Access screen, choose SAP menu → Information systems → Ad hoc reports → Report Painter → Report Writer → Report group → Execute or in the Command field, enter transaction GR55 and choose 
    2.     On the Execute Report Group: Initial Screen:
    o     In Report Group, use  to select a report group.
    o     Choose  .
    3.     On the next screen, enter appropriate values and choose  .
    4.     On the next screen, from the menu bar, choose:
    o     Settings → Column attributes to change the column attributes such as changing the column width, setting the scaling factor, and setting decimal place numbering for number display.
    o     Settings → Summation levels to specify a range of summation levels for which totals will display.
    o     Settings → Print page format to change the layout of the report output.
    5.     To transfer the report to Microsoft Excel or Lotus 123, from the application toolbar, choose  .
    6.     On the Options dialog box, select the radio button of your choice and choose  . Note that for the report to open in Microsoft Excel or Lotus 123, you need to have these applications installed on your PC.
    7.     To get back to the original display of the report, select Inactive on the Options dialog box.
    Understanding the Report List
    After executing a Report Painter report, several additional functions can be applied to the output to make your reports as meaningful as possible. You can:
    •     Sort on each column.
    •     Highlight rows that meet the threshold criteria, for example any amount greater than 6,000.
    •     Drill down from any line item. Drilling down you can access ABAP programs, transaction codes, SAP Queries, drilldown reports, or other Report Painter and Report Writer reports.
    •     Launch SAP Graphics.
    •     Send the report through SAP mail.
    •     Save as an extract to be brought up later.
    •     Expand and collapse rows.
    •     Change the layout settings.
    •     Display the report in Microsoft Excel with office integration.
    hope this gives you an idea, and send me an email to [email protected] i will send you a doc on it,
    if this was helpful then assign points ..
    regards
    Jay

  • DART: creating extracts for company codes

    Hi,
    in light of an archiving project of financial documents, extracts needs to be build with DART. This has to  be done on the level of company code. We would like to have approval from the FI department for the DART extracts, but we have currently 22 different company codes. 
    Do you have experience with creating extracts for multinational companies, and what was your way of working for getting approval before archiving ? Were there any external tax auditors involved ?
    thanks for sharing,
    kind regards,
    Rolf

    Hi Rolf,
    For your project you have to make a table with document type's G/L accounts how long you want to let them them in your system. This form (table should be signed of by the bussines and  auditors.
    Note: When you archive data for FI you can archive the documents (BKPF/BSEG and line items. When you only archive the documents you can still see al the postings on line items. When the archive files are still available you can go direct from the line item to the achived document. Have a look to to the archive information system perhaps here you can store more information with linkes to the archive system?
    In some FI reports it is possible to get information out of SAP and the archive system.
    With the table make a proprosal by yourself and let sign that.
    Think about that a lot of information is stored on other places to, like controlling and PCA. Offen there is no reason to keep the FI documents the information is still somewhere els available
    Paul

  • Can I set up a Master-Detail Page with report regions for 2 Detail Tables?

    Hi there,
    I am just starting to use Application Express.
    I have a Table (A) with Master-Detail relationships to two Tables B & C.
    I can set up a Master-Detail Page between Table A and Table B, where the records displayed in Table B change when switching between records in Table A. I would like to add Table C to the page and for this to work in the same way.
    Is this possible in APEX? (I've tried adding a report region for Table C and making the Region Source dependent on the same ID field as is used by the report region for Table B but I keep getting "No Data Found" for Table C).
    Many thanks.

    Thanks, but the text needs to be on a single master page which every page is assigned to. This is so the text alternates correctly regardless of whether new pages are inserted or moved. If I assigned separate master pages to individual pages and then moved the pages to a different location, the alternating footer text would then fall out of sync. I hope that made sense!

Maybe you are looking for

  • Import Data Table from Different DB Schema in BI Administration

    Here is my scenario: Tables are imported from different DB schema in Administration. They are then joined together. When I select fields from more than one schema in BI Answer, incorrect result is returned. Below is the SQL it returns: --------------

  • Import/Export in Background submission

    Hi experts., I am passing two internal tables to another program using Submit statement via Job. Then i am importing those two tables in another program. However i think the tables are not populated. What could be the reason for this. Also how can yo

  • Oracle.apps.fnd.framework.OAException: oracle.jbo.NameClashException

    Hi All, The solution I am trying to implement is --> depending on value of a particular variable (field) I want to use a Custom VO for LOV query else it will use the seeded VO. So for that I have extended the "LovReassignToAM" to add new custom VO. I

  • ADFS saml tokens and Weblogic

    Hi, i have configured ADSF server (with Active Directry) and a Weblogic server configured to work with ADFS. Services on weblogic are protected with oracle/wss_sts_issued_saml_bearer_token_over_ssl_service_policy policy. Now i need to define a users,

  • Trouble loading shutterfly website & uploading from Iphoto

    All of a sudden my iMac can't load the website www.shutterfly.com.  It tries to load but eventually just times out. This has been going on for over 2 weeks. As a result, I can't evenget to the shutterfly landing page to log into my account and I can'