MRP and Materials provided to Vendor

Can you please help with the following:
SAP 4.7, where a material component is issued to a vendor as part of the subcontracting process, MRP will re-order additional stock, if levels drop below the re-order point, the system does not take materials provided to vendor into consideration.  Is there a configuration setting that will take into consideration the quantity provided to the vendor as available stock when running MRP and therefore not generate an order until the material componenents are consumed and the goods receipt for the subcontract item carried out.
Thank you

Hi,
Please look at this SAP note: 170597
Regards,
Mario

Similar Messages

  • MRP and MPS

    Hi,
    what is the main difference between MRP and MPS ?
    Regards

    Hi,
    The task of material requirements planning is to guarantee material availability. The system calculates which materials must be procured or produced at what time and in what amounts so as to provide the quantities required.
    Using MPS you can carefully plan important parts or bottleneck parts in a separate planning run at the highest BOM level before the planning results have an effect on all of the production levels.
    Lead time scheduling and the calculation of capacity requirements in MRP and MPS provide the basis for the creation of a master plan that corresponds to capacity planning. This way the MRP controller obtains information about possible bottlenecks and overloads. Before the master plan becomes effective and the planning results affect subordinate BOM levels, the MRP controller can make changes that affect capacity for chosen materials.
    Scheduling:
    Before capacity planning can take place you must create capacity requirements within lead time scheduling, that is, determine the production dates. The system only generates capacity requirements if it executes lead time scheduling using the times specified in the routing.
    Scheduling in MRP and MPS determines the basic dates and the production dates for the planned order. The basic dates define the earliest and latest dates for production. The production dates use the times in the routing to determine the start and finish of production as well as of the individual operations.
    For more details pls refer the following link:
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/3f/e8f3340cdb8c44e10000009b38f844/frameset.htm
    Hope it helps...
    Regards,
    Priyanka.P
    AWARD  IF HELPFULL

  • Ways to consider the stocks provided to vendor on the MRP output

    Hi Gurus,
    I have a requirement where the business want the stocks provided to vendor to be considered when running the MRP in plant.
    This is a subcontracting vendor and when checking the MD04, the stocks was displayed as special stocks. Is there any way that we can consider subcrontract stocks for MRP?
    I have checked already the MRP areas, but I since we have a lot of existing plants in our system. I intend to not use the MRP area as it might cause issues to planning in our existing plants. Is there any other way?
    Please let me know your thoughts on this.
    Edited by: ellen gatchalian on Jan 30, 2012 1:08 PM

    Hi Elen,
    I believe by having BAdI- MD_SUBCONT_LOGIC implemented in your system, you can consider Subcontracting Stock in MRP.
    Check with technical team to do the needful coding.
    Hope it will help.
    Regards,
    Anup

  • Kanban With MRP and with External vendors

    We are implementing SAP 4.7 for one of clients and here is the requirement:
    They want to use Kanban with external vendors where  once  KANBAN is empty, it should create a schedule line for the defined scheduling agreement. Problem is , we have to exclude the material  from MRP in order to work with "External Purchase Orders" or "Scheduling Agreement" replenishryment category.
    They   do not want to exclude the KANBAN materials from MRP but want to use KANBAN for procurement with vendors.
    Is this possible?
    Because when we try replenishment strategy " Working with MRP" , SAP does not create any PO or Schedule line desite of maintaining all the data. Instead, SAP allows replenishment elements created in MRP run to flow thru and create PO/ Schedule lines.
    Is it possible to include the material in plant MRP and still use external procurement kanban?

    Hi Vikas
    Ia m not familiar with  asynchronous MRP.  Can you elaborate on that? What specific settings  we need to make for that?
    Thanks for your help.
    Regards.
    Mankai

  • UWL config file for Customer, Vendors and Materials

    Hello All,
    We are trying to integrated uwl to connect to a MDM system for objects Vendors, Customer and Materials. I have looked at the MDM UWL config file, it is configured only for Business partners and products.. does anybody have the config file for Customer, Vendor and Material using business content..
    Thanks in advance
    Som

    Hey Som,
    If you are talking about Portal UWL, then you have to go for System Admin, there you should see UWL related iviews. There you have the ability to download the uwl xml. in that you have to do some modifications.
    All that matters for your problem is the MDM System you have created. when you chanage the respository informatin at this system. then your problem should be solved.
    Thanks,
    Raghavendra

  • MRP4 view exclude storage location & material provided by vendor/customer..

    Hi
    Could anyone please tell me in MRP4 view for a material,where is the option so that i can exclude or include the storage location stock from MRP?
    and also in which T code i should indicate the material is provided by vendor/material provided by customer?In CS01wher's this option?
    Please help me
    Thanks & regards
    Raj

    Hi Karthik,
    MRP area is nothing to do with storage locations settings in MRP4 view. If you want to activate MRP area and use the MRP run at MRP area level then you have to customized MRP area either at storage location level or sub-contractor level (in MRP master data settings )... then you need to assign this MRP1 view of the material and with valid MRP type.  Now when you run the MRP then planning will be carried out at this MRP area for this part.
    With storage location indicators in MRP4 view (must enter with putting the stoarge location values from MM02/MM03) you can exclude the stock of this storage location (indicator 1) in the palnning run or you can plan seperately with indicator2 with using re-order level. Here no need of MRP area.
    If helps rewards points.
    Regards
    TAJUDDIN

  • GR/IR Account - one for internal vendor and another for external vendors

    Hi Experts,
    Can I have two GR/IR accounts - one for internal vendors and another for external vendors?  Please let me know.
    Thank you.
    with regards,
    Muthu Ganapathy.

    Hi Muthu,
    GR/IR accounts are not dependent on Vendors, they are dependent on Materials, to be precise on Plant/Valclass.
    You can post to 2 different GR/IR accounts if you set up 2 different classes. then it is possible.
    For setting up the same. Go to T.code : OBYC, Transaction : WRX.
    Here Setup different GR/IR accounts per val.class.
    Letme know if you need further info
    Thanks
    Kalyan

  • How to clear the stock of material provided to vendor(subcontracting stock)

    Hi SAP Gurus,
    Please let me know how to clear the stock of material provided to vendor(subcontracting stock) and need your help in what senario this stock will show in " Matl prov. to vendor "
    Thanks and Regards,
    SHARAN.

    Hi Sharan,
    Matl Povided to Vendor stock will appear in Subcontracting scenario.
    If at all you have given some material to a subcontractor , this will be consumed automaticaly when you will recieve the ordered material from subcontractor.that is 543 movement will take place in the backgroung when u do the GR.
    In case if u need to clear the stock u can do 542 and take the stock back to unrestricted.
    Edited by: Donsandy on Jan 21, 2009 6:19 PM

  • Materials Return to Vendor

    Hi All,
    How do I return Non valuated materials to a Vendor? (Without reference to a Purchase Order)
    Which movement type do I use and what transaction do i use?
    Thanks
    Adeel

    Hi Rahul,
    For booking in NVM (Free Materials)  i will be using movement type 511 as no financial postings are made using this movemnt type. For Returns, I will be creating a returns PO with Returns and Free Item Ticked. This again doesn't give any financial postings as doesn't expect an invoice and is perfect for what I am looking for.
    This has all been tested and works.
    Regards
    Adeel

  • Receipts PO and stock keeps in vendor side

    Dear All,
       I have a PO or Subcon. PO which vendor confirm ready to deliver to us, but don't want to do the GR first, beacuse this will mislead user we have stock in our warehouse .For these PO stock, we want to wait for customer confirm the order, then we can directly ship the stock to customer. In the mean time, vendor ask for payment, how can we deal with this problem which we do the GR and keeps the stock in vendor side, on the other hand, account dept can do the LIV process.
    How can we deal with this?
    Thanks!
    Hen. T

    hi
    you can deal it with  third party scenario.
                                                   THIRD PARTY SCENARIO
    In third-party order processing, your company does not deliver the items requested by a customer. Instead, you pass the order along to a third-party vendor who then ships the goods directly to the customer and bills you. A sales order may consist partly or wholly of third-party items. Occasionally, you may need to let a vendor deliver items you would normally deliver yourself.
    Process Flow
    The processing of third-party orders is controlled via material types. Material types define whether a material is produced only internally, can be ordered only from third-party vendors, or whether both are possible. For example, a material that is defined as a trading good can only be ordered from a third-party vendor. However, if you manufacture your own finished products, you may also want, from time to time, to be able to order the same type of product from other vendors.
    Processing Third-Party Orders in Sales
    Third-party items can be created automatically by the system, depending on how your system is set. However, you can also change a standard item to a third-party item during sales processing manually.
    Automatic third-party order processing
    If a material is always delivered from one or more third-party vendors, you can specify in the material master that the material is a third-party item. During subsequent sales order processing, the system automatically determines the appropriate item category for a third-party item: TAS. To specify a material as a third-party item, enter BANS in the Item category group field in the Sales 2 screen of the material master record.
    Manual third-party order processing
    In the case of a material that you normally deliver yourself but occasionally need to order from a third-party vendor, you can overwrite the item category during sales order processing. For a material that you normally deliver yourself, you specify the item category group NORM in the material master.
    If, as an exception, you use a third-party material, change the entry TAN to TAS in the ItCa field when processing the sales document. The item is then processed as third-party item.
    If address data for the ship-to party is changed in the sales order in third-party business transactions, the changed data will automatically be passed on to purchase requisition and also to the purchase order ,if one already exists. In the purchase order, you can display the address data for the ship-to party in the attributes for the item.
    You can only change the address data for the ship-to party in the sales order for third-party business transactions, and not in the purchase order.
    Processing Third-Party Orders in Purchasing
    When you save a sales order that contains one or more third-party items, the system automatically creates a purchase requisition in Purchasing. Each third-party item in a sales order automatically generates a corresponding purchase requisition item. During creation of the requisition, the system automatically determines a vendor for each requisition item. If a sales order item has more than one schedule line, the system creates a purchase requisition item for each schedule line.
    Purchase orders are created from purchase requisitions in the usual way. For more information about creating purchase orders, see the Purchasing documentation. During creation of the purchase order, the system automatically copies the delivery address of your customer from the corresponding sales order. In a sales order, you can enter purchase order texts for each third-party item. When you create the corresponding purchase order, the texts are automatically copied into the purchase order. The number of the purchase order appears in the document flow information of the sales order.
    All changes made in the purchase order are automatically made in the sales order as well. For example, if the vendor confirms quantities and delivery dates different from those you request and enters them in the purchase order, the revised data is automatically copied into the sales order
    You process third-party items by creating a normal sales order. In overview for the order, you can then overwrite the default item category (TAN in the standard system) with the special item category for third-party items: TAS
    Billing Third-Party Orders
    If relevance for billing indicator for the item category has been set to B (relevant for order-related billing on the basis of the order quantity) in Customizing, the system includes the order in the billing due list immediately. If, however, the indicator has been set to F (relevant to order-related billing on the basis of the invoice quantity), the system does not include the order in the billing due list until an invoice from the vendor has been received and processed by the purchasing department. In the standard system, item category TAS (third-party order processing) has been given billing-relevance indicator F.
    In the first case, the third-party order is considered to be completely billed only when the invoiced quantity equals the order quantity of the sales order item. In the second case, each time a vendor invoice is received, a customer invoice is created for the quantity in the vendor invoice and the order is considered to be fully invoiced until the next vendor invoice is received.
    If you have activated billing-relevance indicator F for item categories in Customizing, billing can refer to the goods receipt quantity instead of the incoming invoice quantity.
    You can control whether the invoice receipt quantity or the quantity of goods received is relevant for billing in Customizing for copying control for billing at item level.
    FOR YOUR PROCESS Individual Purchase Orders WELL GIVE THE RIGHT SOLUTION
    Individual purchase orders are used when your customer orders goods from you that are not in stock and must be ordered from one or more external vendors.
    Process Flow
    During sales order entry, the system automatically creates a purchase requisition item. The purchasing department creates a purchase order based on the requisition and the vendor ships the goods directly to you (unlike third party order processing, where the vendor ships directly to your customer). You then ship the goods to your customer. While the goods are part of your inventory, you manage them as part of the sales order stock. Sales order stock consists of stock that is assigned to specific sales orders and cannot be used for other purposes.
    Goods receipt will be posted when ever the vendor ships the goods to our customer.
    We will do this transaction in SAP using MIGO.
    Invoice receipt is done when the Vendor sends us the invoice.. ( I.e Billing ).
    It can be done using MIRO.
    THe above two steps are standard and manual. There are many other ways that the actual process can happen. If the client follows EDI standards then the Goods receipt and Invoice receipt can be done through IDOCs automatically.
    Process Flow for 3rd Party Sales
    Customize the third party sales in summary:
    Prerequisites for 3rd party sales,
    Purchasing org,
    purchasing group,
    assign the Purchase org to company code
    assign Purchase org to plant,
    should not maintain the stock in material, it should be trading goods,
    1. Create Vendor XK01
    2. Create Material u2013 Material Type as "Trading Goods". Item category group as "BANS".
    3. Assign Item Category TAS to Order type that you are going to use.
    4. A sale order is created and when saved a PR is generated at the background
    5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
    6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO
    7. Goods receipt MIGO
    8. Goods issue
    9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and, therefore, there is no delivery process attached in the whole process of Third party sales.
    10. Billing *--
    SD - 3rd party sales order Create Sales Order
    VA01
    Order Type
    Sales org, distr chnl, div
    Enter
    Sold to
    PO #
    Material
    Quantity
    Enter
    Save
    SD - 3rd party sales order View the PR that is created with a third party sales order
    VA01
    Order Number
    Goto Item Overview
    Item ->Schedule Item
    SD - 3rd party sales order View the PR that is created
    ME52N
    Key in the PR number
    Save
    SD - 3rd party sales order Assign the PR to the vendor and create PO
    ME57
    Key in the PR number
    Toggle the "Assigned Purchase Requisition"
    Execute
    Check the box next to the material
    Assign Automatically button
    Click on "Assignments" button
    Click on "Process assignment"
    The "Process Assignment Create PO" box , enter
    Drag the PR and drop in the shopping basket
    Save
    SD - 3rd party sales order Receive Goods
    MIGO_GR
    PO Number
    DN Number
    Batch tab , click on classification
    Serial Numbers tab
    Date of Production
    Flag Item OK
    Check, just in case
    Post
    Save
    SD - 3rd party sales order Create Invoice
    MIRO
    Invoice Date
    Look for the PO , state the vendor and the Material
    Check the box
    Click on "Copy"
    Purchase Order Number (bottom half of the screen)
    Amount
    State the baseline date
    Simulate & Post
    Invoice Number
    *Invoice blocked due to date variance
    SD - 3rd party sales order Create a delivery order
    VL01N
    In the order screen , go to the menu Sales Document , select "Deliver"
    Go to "picking" tab
    State the qty and save
    SD - 3rd party sales order Create a billing document
    VF01
    Ensure that the delivery document is correct in the
    Enter
    Go to edit -> Log
    Save
    Third party order processing is as follows:
    Assume three companies X, Y and Z
    X - The company,
    y - The customer
    Z - Vendor
    When ever X gets a PO from Y to supply some goods, X has an option of either manufacturing those goods or procuring those goods.
    If he is procuring the goods, there are two methods that are generally followed:
    Method 1) After receiving the PO from Y, X creates a sales order against Y.
    Now at the same time he also creates a PO to a vendor Z to produce the goods
    Z produces the goods and supplies to X
    X receives the goods from Z
    Then X delivers the same goods to Y.
    After that X invoices Y and Z invoices X.
    Note : Here there is no direct/ Indirect relation between Z and Y.
    This process is known as Trading Process. and the Material here is created with Material type HAWA.
    The other method is a Third party order processing method:
    Here the glaring difference is that instead of Z supplying the material to X and X in turn supplying the same material to Y.
    X authorizes Z to supply the material to Y on his behalf and notify him once the delivery is complete.
    Now Z supplies the material to Y and acknowledges the same to X.
    Z will send a copy of delivery acknowledgement and invoice to X.
    After receiving the delivery confirmation and invoice from Z, X has to verify the invoice and this process is known as invoice verification and is done in SAP through Tcode MIRO.
    The next step for X is to create an invoice and submit to Y
    Only after the invoice verification document is posted then only X can create an invoice for Y.
    This is the business flow that is followed for third party order configuration.
    There are few steps that have to be configured to enable the system to function as mentioned above.
    Step1)
    If you are always following a third party process for a material then you have to create the material using item category group BANS.
    The procurement type should be marked as External procurement (F) in MRP 2 view of the material master record.
    if you are not always allowing third party order processing then u can create a material master record with item category group as NORM and the procurement type should be marked as ( X) meaning both types of procurement ( in house manufacturing and external procurement).
    Step 2)
    the item category in the order should be manually changed as TAS.
    For that you need to configure the item category determination
    Order type + item cat Group + Usage + High level = Item cat + Manual item cat
    OR + NORM + + = TAN + TAS
    OR + BANS + + = TAS
    Step 3)
    make sure that during the item category configuration for TAS you need to mark relevant for billing indicator as F
    step 4)
    The schedule line category for this type should be CS.
    make sure that you mark subsequent type as NB - purchase requisition in this schedule line category as this will trigger the purchase requisition order immediately after the creation of the sales order and the PO to vendor is created against this purchase requisition.
    Regards,
    Vijay

  • GR to "Material provided to vendor" stock from PO

    Hi
    I need to Post stock directly to "Material provided to vendor"
    Stock while doing GR with reference to Purchase order and
    I activated QM view for the material. So, I entered vendor no in the PO and select SC indicator also. While doing GR with
    reference to PO, stock also increased in Quality inspection stock of Material provided to vendor. Now my problem is
    there is no inspection lot was generated. I want to create
    inspection lot. Is it Possible ? if no, pl clarify.
    Thanx in advance,
    Regards,
    RRS.

    Hi,
    Try with following,
    Assign QM Active to movenent Type 101- O, then maintain Quality infor record- Insp. Control- Source inspection Key ( Take help frm u r QM Consultant)
    Rgds,
    Vikas

  • Write Off Stock Provided To Vendor

    Hi all
    Could anyone please tell me what movement type to use to write off stock that is showing as provided to vendor.
    Thanks

    If you are using Physical Inventory route you can create an PI document using T Code MI01 do the rest of process as usual and then post difference with Mvt Type 702.
    Amit

  • Stock provided to vendor in outsourcing WM

    Hi,
    I need any clue to "link" WM environment with the IM related to the supplier stock in the outsourcing (subcontracting).
    In IM once you "Post Goods Issue" appears differentiated the stock provided to vendor from the stock in the warehouse.
    I'm not sure about the best way to reflect this situation in WM.
    Thanks in advance

    Hi,
    Warehosue Management has nothing to do with subcontracting.
    I mean the stock provided to sc-vendor leaves your SLoc via mvt 541 and gets to vendor's special stock, that is identified by 'O'+vendorID.
    It leaves the Sloc and that's why it 'paralelly' leaves the WH as well.
    No stock physically at you > no stock in SLoc, no stock in WH - since the stock is no more in the SLoc, it is no more in the WH as well.
    I'm not sure about the best way to reflect this situation in WM.
    The stock will be stored in the sc-vendor's WH that's why I don't understand your doubts about this.
    Csaba
    Edited by: Csaba Szommer on Aug 27, 2008 10:02 PM
    Edited by: Csaba Szommer on Aug 27, 2008 10:03 PM

  • Output Message to stocks provided to vendor

    Hi
    After posting the Goods issue to subcontract P.O through the ME2O, the material document couldn't be printed.
    Involved movement type 541 - O (parts provided to vendor).
    Material documents has movement type 541 & 541 - O
    Does both documents (Debit & Credit) to be printed out ?
    Thanks
    MM

    Hi,
    To print the material document, please check whether the output determeination is properly set up. Some times the separate out type for sucontracting process might be configured. Please check in that aspect and select that output type. Still not able to print means ask ABAPer to debug the program.
    When an additional invoice or credit memo is received for a transaction that has already been invoiced, this is known as a subsequent debit/credit. This can be done only after invoice verification.
    subsequent debit/credit can be done in MIRO.
    . Subsequent Debit :-You must enter an invoice as a subsequent debit if a purchase order item has already been invoiced and further costs are now incurred. (Example: A vendor has inadvertently invoiced you at too low a price and then sends a
    second invoice for the difference.)
    2. Subsequent Credit :- You must enter a credit memo as a subsequent credit if a purchase order item was invoiced at too high a price and you have now received a credit memo. (Example: A vendor has inadvertently invoiced you at too high a price and then sends a credit memo for the difference.)
    If you enter a subsequent debit/credit, the system suggests the entire invoiced quantity, but no value. The maximum quantity that you can subsequently debit or credit is the quantity that has already been invoiced. You can only enter a subsequent debit/credit for a purchase order item if an invoice has already been posted for this item.
    A subsequent debit/credit cannot refer to a particular invoice.Subsequent debits and credits are listed separately in the PO history. I hope this will resolve your issue .Thanking you.

  • Batch determ. in Process Order doesn't consider Stock Provided to Vendor

    Dear Forum,
    We have a problem with the following scenario:
    We use Process Orders to manage our Subcontracting process. This is standard SAP, where the Operation is defined as 'external', and this works fine.
    The scenario which we can not seem to be able to work is the following:
    When executing batch determination for the component(s) which are batch relevant, the system does not show the batch stocks which are already at the subcontractor, i.e. Special Stock 'O' stock provided to vendor.
    This is strange, because:
    - In the availability check the flag 'W/o subcontracting' is not set.
    - The batches in the subcontracting location fulfil the selection criteria which have been defined in the batch determination Selection Class.
    Does somebody have experience with this? Any hints are welcome.
    Thanks, Mark Voet

    Hi Mark,
    As I understand you determine the batches in the process order.
    From SAP point of view it means that you determine the stock which is to be provided to the vendor. Components with batches are copied into the PO when it is created from the PurReq and system will use this stock (batches) automatically when you execute MB1B541PO reference.
    Later, when you do the GR against this PO, the same batch(es) will appear automatically for components-to-be-consumed (by mvt 543).
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/8b/55a026995011d195a2080009c17b92/frameset.htm
    So, SAP's concept is that the batches which are determined in the order are those batches which are to be sent to the vendor - these batches will be posted from your storage location to the subcontractor. Stock in special stock segement "O" ar at the sc-vendor.
    As per my best knowledge there's no solution in standard system for that if you want to determine such batches in the order which are located at the subcontractor...
    Regards,
    Csaba
    Edited by: Csaba Szommer on Sep 1, 2010 11:43 AM