Multiple person working on same planning area

Hello,
Can anyone please suggest how multiple people can work on same planning area at the same time. We are working on implementation project and our team has to work on different planning levels in the same planning area. But locking prevents us to achieve the same.
Any ideas?
Regards

Hello,
Regarding the change of the Area itself, it looks logic that two person cannot change its design at the same time.
If I remember well if somebody is changing the Area, then everything is locked. But it is not the case if two person are working on separate Levels.
A very important thing (correct me if I'm wrong) is that if you have been in change mode of an Area, Level, Package, etc... in your current BPS0 session, you will still lock it untill you get out of BPS0.
Then, if in your team everybody knows on wich level they have to work and then don't go in change mode of other elements it should work (but not for the area because it contains all the subelements...).
By the way, check also <a href="http://service.sap.com/~form/handler?_APP=01100107900000000342&_EVENT=REDIR&_NNUM=635244">Note 635244 - Locking transaction data in SEM-BPS</a>:
<i>Two parameters are only designed to facilitate the Customizing process, if users
carry out Customizing in transaction BPS0 within a project.
o SEM_BPS_NO_LOCK: This parameter has the effect that transaction
data is not locked at all. Never use this parameter in a production
system. As of Support Package 14 for Release 3.1B, parameter
SEM_BPS_NO_LOCK is released by an additional switch in table
upc_dark2: For this purpose you have to maintain a record with
param = ENABLE_NO_LOCK and value = X in table upc_dark2. Only then
the system includes parameter SEM_BPS_NO_LOCK. The parameter can
then be useful if you want to test functions or the manual planning
with 'test data' in Customizing.
o SEM_BPS_SAVE_UNLOCK: This parameter only works in transaction BPS0;
it has the effect that the system unlocks data (if possible) after
it has been saved. Therefore, the system only simulates an exit and
reentry in transaction BPS0 with the last active detail
application. Therefore, the above parameter can be helpful if many
people work on Customizing in transaction BPS0, because objects can
be unlocked earlier.</i>
You can add these parmeters to a user id in the "Parameter"tab in T-Code SU01.
Best Regards,
Jeoffrey

Similar Messages

  • Can 2 persons work on same DC or SC ?

    can 2 persons work on same dc or sc? please reply with brief description.

    Hi,
    Yes offcourse if you are not doing the development locally. If you are using DTR as your DC repository you can checkout files individually from DTR. 2 person can simultaneously work on two different WD Components/Views/CustomControllers of the same DC by checking it out.
    Hope it helps.
    Cheers,
    Manoj

  • Can 2 persons work on same DC ? can 2 persons work on same DC or SC ?

    can 2 persons work on same dc ? can 2 persons work on same sc?
    please reply me with brief description

    Hi Vimal,
    Yes, multiple people can work on the same DC and SC. For this you shoud have NWDI Landscape on your server.
    NWDI Landscape take care the version control for your DC's and SC's.
    Thanks
    Arun

  • Multiple people working on same instance

    Can two people work on same instance at the same time. If one user makes the change and resfreshes the page, he sees the changes made by other user?
    Edited by: JoshMachine on Jul 8, 2009 9:00 AM

    Hi,
    Are you sure you want to go the Split-N (now called "Multiple" in Oracle BPM 10g) route? From your earlier thread, here's what I think you're trying to do:
    Just to clarify again - (1) One guy has a task assigned to him
    - (2) He assigns same task ( creates duplicate copy ) and assigns to some else in different role.
    - (3) Now both should edit the task , meaning if one changes the tasks , other person should see it as well.>
    I'll typically use a Split-N when I have a dynamic number of copies I want to create that is determined at runtime. Examples include:
    a) you form an adhoc committee of people in a role and you want them to approve disapprove a proposal and you determine who's on the committee and the number of people on the committee at runtime.
    b) you have a request for quote from a variety of different suppliers and if it's a large order you send out x number of requests to suppliers and if it's a small order you send out y number of requests to suppliers
    c) you have a batch of things (e.g. healthcare claims) represented by one work item instance and you want to have workers treat the individual claims as single work items inside the same process (a single work item might have 100 claims that would spawn 100 work items).
    If you're still thinking you need to use a Split-N activity, this thread explains how to use it: Re: multiple-join: get value of each participant
    I could be wrong, but I think you might be better served if you use a Split activity and not a Split-N.
    For your use case it sounds like you'd have two transitions coming out of the Split activity.
    To meet your first criteria ("One guy has a task assigned to him"), one transition would go to an Automatic activity where the original person is assigned the copy of the original instance (use "next.participant" feature to assign it to him). Following this Automatic activity, it would flow to an Interactive activity where only the original participant could edit the work item instance.
    To meet your second criteria ("He assigns same task ... and assigns to some else in different role"), you need to add a second transition that would go to an Automatic activity where the second person is assigned the copy of the original instance. Following this Automatic activity, it would flow to an Interactive activity where only the second person could edit the work item instance.
    Both Interactive activities would have a transition to the Split's Join activity.
    To meet your third criteria ("Now both should edit the task , meaning if one changes the tasks , other person should see it as well"), right mouse click the Split activity -> click "Properties" -> click "Advanced" on the left side -> uncheck the checkbox beside the text "Generate independent Copies". Now if one edits their copy, the other will see the change reflected.
    The only concern I have with this approach is a bug I encountered last week when I turned off generate copies in a Split using Oracle BPM 10g. In 10g, I noticed that the instance remained locked occasionally after one of the participants "touched" the instance. Once locked, I could not invoke the copy again. It did not happen every time, but often enough where I decided to work around the new 10g bug by leaving the property set to generate copies and writing to an outside database table once one of the people edit it and reading from the same outside database table before someone edits it.
    Hope this helps,
    Dan

  • Book file & Dropbox: Multiple people working on same book file

    I am trying to use the book file and have run into multiple issues. We have saved the book file and all relevant InDesign files on dropbox. There are two of us who work on the book file at the same time. We have the book file open together but work on different files from the book, never working on the same file at the same time.
    A few of the issues we have run into are as follows:
    1. The book file does not show the InDesign files the other person added, when opening on a different computer.
    2. When saving the book file, from the panel, it will tell us someone else saved the file and if we want to overwrite their file.
    3. When working on of the files from the book and I try to save the file (ctrl+s) I get error messages telling me the network connection was modified by another process. InDesign then has en error message it needs to shut down and start back up to recover documents. After it starts back up it can't recover document due to error(11).
    Has anyone used the bookfile with a cloud service, while multiple people work on different files for the book? For example, we want one person to work on the files 1-5 and another on 6-10 for the book file at the same time.

    Only one person can work on a book file at the same time.
    You cannot work this way on the files.
    Person A adds a file to the book
    Saves
    Person B adds a file to the book
    Saves
    Persons B version overwrites Person A file.
    Consider giving 1 person the duty of updating the Book File.
    Only 1 person can work on a file at the same time - consider splitting files you're working on into folders
    Folder>Person A
    Folder>Person B
    Add files that person should be working on.
    Person in charge of updating the book file will update from both folders.
    The way you're working will not work.

  • Multiple people working on same iWeb domain.

    I am trying to rebuild my site after upgrading to iWeb'08 and would love to be able to have multiple people work on different areas of the site to speed up the process. How do I sync them back without loosing links. Can I ever have them exist in one file again. I believe that I can manually publish to folder then put them all in same folder.
    If there is any advice you guys can give would be greatly appreciated.

    Advice?
    Don't try it.
    You would need multiple versions of the Domain.sites folder created by iWeb and there is no way to merge them into just one file.

  • How to make multiple portals work in same domain (wlp 9.2)? IMPORTANT !!!

    We have domain where one portal application is in production now and other portal application have to deploy in the same domain.
    The first one is using global scoped DataSources and the new one is using application scoped because they have to use own schemas in the database.
    Also Group and User/role management have to work application scoped, meaning that in one's portal admin console shows only users/groups/roles to that portal.
    How do I do this and what is the optional/best practises to do this kind of configuration, configure and deploy multiple portals in the same domain ?
    I get so far that I make new SQLAuthenticator and XCAMLRoleMapper to the new portal but when the LDAP and database goes out of sync and I delete P13N -tables and LDAP, server start creates only to the first portal database the needed rows and delegated admin management doesn't work in the new one at all.
    I have read all bea's documents related to JDBC - application scoping, deploying, security P13N and I can't get enough information from it to make this work.
    Thanks !

    You may want to ask in the weblogic.developer.interest.portal forum.
    I don't believe that group and user/role management can be application
    scoped.
    <Tanja Puurula> wrote in message news:[email protected]..
    We have domain where one portal application is in production now and other
    portal application have to deploy in the same domain.
    The first one is using global scoped DataSources and the new one is using
    application scoped because they have to use own schemas in the database.
    Also Group and User/role management have to work application scoped, meaning
    that in one's portal admin console shows only users/groups/roles to that
    portal.
    How do I do this and what is the optional/best practises to do this kind of
    configuration, configure and deploy multiple portals in the same domain ?
    I get so far that I make new SQLAuthenticator and XCAMLRoleMapper to the new
    portal but when the LDAP and database goes out of sync and I delete
    P13N -tables and LDAP, server start creates only to the first portal
    database the needed rows and delegated admin management doesn't work in the
    new one at all.
    I have read all bea's documents related to JDBC - application scoping,
    deploying, security P13N and I can't get enough information from it to make
    this work.
    Thanks !

  • Multiple Designers Working on Same Site in DreamWeaver, HELP!

    Here are the specifics:
    Mac based design team
    Three designers using CS4
    Three designers using CS2
    Designers working on the same website
    Website is on a network drive (all working files are on the network drive, no users have website files on their local machines)
    Website is hosted on an external server (this is where we upload the files when they are ready to go live, we use DreamWeaver to upload)
    Here is the problem:
    The site we have is a medium sized site, there are a number of different pages and images in this site.
    When we start DreamWeaver, it takes forever.
    When we work in DreamWeaver on this site, it takes forever.
    There is a significant lag when opening a file or opening a folder within DreamWeaver.
    Two key problems:
    The number of delays is a problem, it adds up to a lot of wasted time.
    Starting up DreamWeaver takes forever.
    Other notes:
    If the solution works only for the CS4 users, that is okay.  Anything solution is better than the current situation.  The CS2 users will be upgraded soon enough.
    My guess is that our current setup is probably not the best method.
    The BIG question:
    What would be the best recommended way to have multiple users over a local network work on one website in DreamWeaver that is hosted on an external server?

    Well, this sounds more like an IT question, but it seems to me if 4 people are all using the same program sitting on your server, it is going to be slow.
    I dont think that some designers having CS4 and 2 has any effect, its all HTML/CSS or.... so that should not be a worry.  I would think if you purchased more DW licenses for the individual machines it would speed thinks up. They can all fish from the same server for files.
    HTH
    Gary

  • Multiple Users working on same Model

    Hi
    In a Multi user environment if a particular Modle is being worked by many user at the same time, what is the impact.
    Will it give a Problem or all changes can be saved?
    Thanks & Regds
    Ravi

    Hi Ravi,
    Although multiple users can access the same database and same group folder simultaneously, only one user can access a particular model at a time. The subsequent users who tries to open a model which is already opened by a user, they get a message that the model is in use by that user.
    Only the first user who has opened the model can make changes to the objects / properties of the model. The users who have subsequently opened the model, will have Read-only access to the model. They can however view the changes to the model, if the first user is making the changes simultaneously, by pressing the 'refresh' (F5) button regularly.
    In a few scenarios (like certain EPC type models), I have seen that the users who have opened the model already in use also are able to capture changes to the object properties. But, they are unable to save the changes.
    Regards,
    K.C.

  • CIF: When multiple regions work on same SCM and ECC box

    Hi All
    We have a situation where North America and Europe use the same SCM and ECC box.  Currently SNP/PPDS is live in Europe only. So ,before taking the network/deployment optimizer run,we stop the CIF using program RSTRFCI1. This stops the CIF for whole SCM box.  Now we plan to go live with SNP for North America. Hence we can not use RSTRFCI1 as it will stop CIF for both North America and Europe.
    Question is: How can we stop CIF for particular region/integration models etc ?
    We know, we can deactivate/activate the integration models every day but we do not have this kind of window available.
    I am sure some of you must be working on this kind of scenario.  Your suggestion and solution would be highly appreciated.
    Regards
    Pradeep

    Hi pradeep,
    You have different options to do that.
    1. Remove distribution difinitions for North America DC's and plants. Deactivate the intigration models ( Only activate Europe locations in the integration models).
    2. In  OLTP settings Deployment and heuristic orders set periodic transfer and when sending them to ECC through /SAPAPO/C5
    restrict as per source or destination locations.
    3. Run heuristcs through selection profile where only select the locations whichever relevent to Europe.
    Regards,
    Kishore K Reddy

  • Multiple Devices on the same plan?

    I always manage to leave my MiFi Mobile Hot Spot at home for use with equipment there and forget to bring it along when I leave home, travel etc.  Is it possible to add another device such as a USB modem to the same account/plan so I always have access?

    Keep your existing AppleID for the iTunes Store and AppStore on both devices, and then setup a new AppleID for iCloud, iMessage and FaceTime just for your wife's iPad so those services remain independent.

  • Bug with multiple swingworkers working at same time

    Dear Friends:
    First I have to request apologizes about my bad English. I will try to explain my problem, to see if someone has a tip.
    I want to show in my UI the result of multiple database querys. Each query (for example, 12 queries), return a count (for example "select count(*) from clients).
    The point is to show the results of the queries, to wait x seconds for each query, and repeat them. The wait period may vary between queries.
    I have a custom JPane class that extends Jpane (call it, "MyPersonalJPane), and has a JLabel for the query result, and a Jprogressbar, to show the countdown to the next iteration of the query.
    Inside "MyPersonalJPane, I have two swingworkers. One of them called "Timer", that receives a number of seconds, counts that amount of time, and then fires a "done" property:
    {code}
    public class MyTimer extends SwingWorker {
    private int duration= 100;
    private int elapsedTime= 0;
    public MyTimer(int SECONDS) {
    duration= SECONDS;
    @Override
    protected Object doInBackground() throws Exception {
    long start= System.currentTimeMillis();
    do {
    try {
    Thread.sleep(1000);
    } catch (InterruptedException ignore) {
    long end= System.currentTimeMillis();
    elapsedTime= (int) (end - start) / 1000;
    firePropertyChange("myprogres",null,duration - elapsedTime);
    } while (elapsedTime < duration);
    return null;
    @Override
    protected void done() {
    firePropertyChange("done", null, null);
    {code}
    Then I Have an "Executor" swingworker, that performs the database query, and returns the result:
    {code}
    public class Executor extends SwingWorker<String, Void> {
    private String sql;
    private JLabel myLabel;
    public Ejecutor(JLabel ET, String SQL) {
    sql = SQL;
    myLabel= ET;
    @Override
    protected String doInBackground() throws Exception {
    String cc = "????";
    try {
    ResultSet or = os.executeQuery(sql);
    if (or.next()) {
    cc = or.getString(1);
    } catch (Exception e) {
    System.out.println(e.toString());
    return cc;
    @Override
    protected void done() {
    try {
    myLabel.setText(get());
    } catch (Exception e) {
    System.out.println(e.toString());
    firePropertyChange("done", null, null);
    {code}
    Then, in MyPersonalJPane class, the class that has a label and a JprogressBar and the two singworkers all together, I do the following:
    {code}
    public MyPersonalJPane(){
    initComponents();
    launchMyTimer();
    private void launchMyTimer() {
    jProgressBar.setIndeterminate(false);
    MyTimer t = new MyTimer(100);
    PropertyChangeListener MyTimerListener= new PropertyChangeListener() {
    @Override
    public void propertyChange(PropertyChangeEvent evt) {
    String p = evt.getPropertyName();
    if (p.equalsIgnoreCase("myprogress")) {
    int progress = (Integer) evt.getNewValue();
    jProgressBar.setValue(progress);
    if (p.equalsIgnoreCase("done")) {
    //Countdown is finished. Time to query the db again
    launchExecutor();
    t.addPropertyChangeListener(MyTimerListener);
    try {
    jProgressBar.setIndeterminate(false);
    jProgressBar.setValue(duration);
    t.execute();
    } catch (Exception ee) {
    System.out.println(ee.toString());
    private void launchMyExecutor() {
    Executor e = new Executor(sql);
    PropertyChangeListener MyExecutorListener = new PropertyChangeListener() {
    @Override
    public void propertyChange(PropertyChangeEvent evt) {
    String p = evt.getPropertyName();
    if (p.equalsIgnoreCase("done")) {
                   //here, the Label with the query result is already updated by the Executor swingworker. Time to wait again for the next query
    launchMyTimer();
    e.addPropertyChangeListener(MyExecutorListener);
    try {
    jProgressBar.setIndeterminate(true);
    e.execute();
    } catch (Exception ee) {
    System.out.println(ee.toString());
    {code}
    My intention is: In my JPanel class constructor, to launch the timer. While my timer counts down, the progressbar is refreshed. When the timer reaches 0, then the MyTimerSwinworker launch the "done" property event, and dissapears. Then, I launch the Executor swingworker, who retrieves from the database some piece of information, refreshes a Jlabel, and when it is finished, it throws a "done" event, the Executor swingworker dissapears, I launch another MyTimer swingworker, and and and and and, etc.
    It works well... with one, perhaps two diferent Jpanels, with two different queries. But my problem is that when I use, for example, 25 Jpanels with 25 different queries, that is, 25 Jpanels with 25 jprogress bar and each JPanel with tho swingworkers (one executor, and one timer), strange thing happens.
    For example, when the Jpanel nº 3 countdown reaches 0, the Jpanel nº5 is refreshed, and when the Jpanel nº7 makes a query, the result is painted in the Jlabel of the Jpanel nº1, etc.
    I suppose I'm doing something very wrong, but I don't know what.
    Any ideas?

    roquec wrote:
    It works well... with one, perhaps two diferent Jpanels, with two different queries. But my problem is that when I use, for example, 25 Jpanels with 25 different queries, that is, 25 Jpanels with 25 jprogress bar and each JPanel with tho swingworkers (one executor, and one timer), strange thing happens.
    For example, when the Jpanel nº 3 countdown reaches 0, the Jpanel nº5 is refreshed, and when the Jpanel nº7 makes a query, the result is painted in the Jlabel of the Jpanel nº1, etc.
    I suppose I'm doing something very wrong, but I don't know what.
    Any ideas?Please look into javax.swing.Timer to do the work of your "MyTimer" class. The reason your implementation of a Timer class with SwingWorker won't work with 25 instances is because each SwingWorker executes on a thread from SwingWorker's thread pool which has a limited size (I believe it is 10). With javax.swing.Timer, you can use as many countdowns as you want with no problem because they will all use a shared Thread.

  • Multiple users working on same project

    Hi,
          I'm working on a project that will involve 2 (maybe more) engineers. Generally a single folder will contain a projects specific vi's and our standard vi's and a single engineer has all control. Our engineers are in different locations so I was wondering if anyone may suggest a way or point me to some information to manage this.
          We have LV 7.1,8.2 and 8.5 available
           Thanks,

    Search these forums & the NI site for Source Code Control  & Configuration Management tools in Google also.
    You can use MS VSS, Tortoise SVN, Clearccase, Perforce, etc., with LabVIEW.
    LabVIEW 7.x does integrate well with any of the SCC tools. But LV 8.x seamlessly does so; so, you can manage your project code well from within LV itself.
    - Partha
    LabVIEW - Wires that catch bugs!

  • Planning area data not updated in infocube in APO system

    Hi all,
    User is uploading a flat file using addon program to an infocube 1, from this infocube data for  sales forecast KF is getting transferred to a planning area KF using standard program RTS_INPUT_CUBE.  I can see the updated data in Planning book (which refer the same planning area) data views. In planning book the sales forecast data is also getting copyied to second KF 'Arrangement FC' and its correct.
    Now there is a infocube 2 (second) which is getting data directly from this planning area (infocube also contains both KFs). But When i checked this infocube 2 , the updated data is availabe in Sales forecast KF , but arrangement forecast KF is having old data only and user is running query on second KF , so he is getting wrong report.
    Since there is no data flow for this infocube 2, and it is getting data from planning area, I feel its remote infocube.
    I have also found the datasource for this planning area but don't know how to move further to find why data is not updating properly? Please help on this.
    I have information that 2 weeks before data was properly updated, but this time data is not updated,
    system version  is SAP SCM 4.0

    Hi Vivek
    it is advisable to run the background jobs when the planning books are not being accesses by the users to prevent such inconsistencis. Hence i would advise you to run the jobs durng non-working hours. and if you have a global system, then you may restrict to run the jobs based on regional levels.
    in addition, it is also a good practice to run consistency jobs before and after your have completed the background jobs. i hope you are using process chains to execute the sequeuce of jobs. if yes, then you can add consistency check jobs in the process chains.
    some of the consistency check reports are :
    /SAPAPO/OM17 - liveCache Consistency Check
    /SAPAPO/TSCONS - Consistency Check for Time Series Network
    /SAPAPO/CONSCHK - Model Consistency Check
    and so and so forth..
    you can find these conssistency jobs under APO Adiminstration --> Consistency checks in APO.
    let me know if this helps.
    Rgds, Sandeep

  • How to use Different Calendars in one DP Planning Area

    Hi Experts,
    I would like to know that whether it is possible to use different calendars in single planning area ? Will explain the scenario in details as under
    We have 3 plants having separate calendars (different weekly offs). Now using single planning area in DP, I have to plan the demand for all the 3 plants in weekly buckets.So I need to refer to 3 different calendars in single planning area. Is this possible in DP ? As far as I know, we can attach only one fiscal year variant to the planning area through storage bucket profile. Also in this case, the system do not refer to public holiday calendar there by assuming all day working except the weekly off.
    Thanks in advance
    Regards
    Sandeep

    Thanks Sujay for immediate reply. The time bucket profile will just help me see the data in different buckets say Daily, weekly or monthly. However this still doesn't solve my problem. As only 1 Fiscal Year Variant is attached to the storage bucket profile, the system still will read the same profile for all the plants & will assume the same weekly off for all the plants which is not true in reality.
    Any other suggestion for considering different weekly offs for different plants in the same planning area ?
    Thanks & Regards
    Sandeep

Maybe you are looking for

  • I have a PDF in russian origin how can I convert it correctly?

    I have a PDF in russian origin how can I convert it correctly into MS word?

  • File sizes increase in StarOffice 8

    I've got a letter I send out about once a month, just changing dates in the contents for each edition. It has a linked .jpg file as background. In StarOffice 7 the .sxw file size is 8 Kb. In StarOffice 8 the size has leapt to 44 Kb, whether I save it

  • Oracle Report and BPEL

    Hi, I had posted this question before and didn't get any response. Those BPEL experts out there, would you be able to help me out, please? I am a novice user. We are using Oracle BPEL PM 10.1.2.0.2. Is there a way to call an Oracle report from a BPEL

  • Input data on parent

    I'd like to input data on parent account and then allocate the amount on child account with allocation keys. Can I do that with hyperion planning? I'd like to do the same thing with parent and child entities. Best regards, Ludovic

  • How to dynamically find DNS server

    Is there any way to dynamically find out the address of the local DNS server strictly using java?? i.e. with out looking in etc/resolv.conf or using Runtime.exec and running some machine dependent command??