Multiple Production Versions in Subcontracting Inforecord

Hi Gurus - I have a question on how to assign multiple production versions in Sub-contracting Inforecord?
I heard this functionality is available in ECC 6.0 is that true? If so how can I assign multiple production versions? What happens after we CIF across to APO? Any help is highly appreciated.
Thanks and regards,
Murali.

Murali - Its possible to use multiple PV in sub contracting.
Settings in ERP :
1. In CFC9 activate the - Transfer multiple selection of PDS indicator. When you select this indicator, the system allows you to select several productions versions in the integration model; it also creates a Production Process Model (PPM) or Production Data Structure (PDS) for each production version in SAP SCM
2. Assign the PV's to the subcontracting info record through -  Logistics  - Central Functions  - Supply Chain Planning Interface - Core Interface - Advanced Planner and Optimizer - Environment  - Data Transfer  -Assign Multiple Production Versions
3. When you select the integration model parameters for PDS, you have selected PP/DS Subcontracting as the PDS Type value. Similarly, for PPM, you have selected Subcontracting PPM as the Type of PPM value.
Subcontracting with multiple production versions is supported. However, the integration with an SAP ERP system requires at least SAP ERP 2005 with Enhancement Pack 03.
Rgds
Valavan

Similar Messages

  • Costing - Multiple Production Versions and Recursive BoMs

    Hi All,
    We have a production and product costing scenario as follows:
    Production versions 10, 20 and 30. It takes all three versions to manufacture the finished material and there are no intermediate products in this scenario. 10 and 30 are to be costed and 30 is a recursive BoM with the input from version 10 also being the output. 10 is the main production step with components but 30 is a recursive BoM sometimes only with the output material as the input and sometimes with a more complete BoM but which includes the output material as an input component.
    The quantity input appears to be the same as quantity output for the recursive element.
    If anyone has come across this scenario and you can let me know what design principles you followed I would appreciate it.
    We are getting iteration error messages when costing production version 30 and even reducing the input quantity below 95% of the input as per the SAP documentation does not fix the error message.
    Any help you can give will be greatefully received.
    Thanks.
    Regards,
    Tim

    Murali - Its possible to use multiple PV in sub contracting.
    Settings in ERP :
    1. In CFC9 activate the - Transfer multiple selection of PDS indicator. When you select this indicator, the system allows you to select several productions versions in the integration model; it also creates a Production Process Model (PPM) or Production Data Structure (PDS) for each production version in SAP SCM
    2. Assign the PV's to the subcontracting info record through -  Logistics  - Central Functions  - Supply Chain Planning Interface - Core Interface - Advanced Planner and Optimizer - Environment  - Data Transfer  -Assign Multiple Production Versions
    3. When you select the integration model parameters for PDS, you have selected PP/DS Subcontracting as the PDS Type value. Similarly, for PPM, you have selected Subcontracting PPM as the Type of PPM value.
    Subcontracting with multiple production versions is supported. However, the integration with an SAP ERP system requires at least SAP ERP 2005 with Enhancement Pack 03.
    Rgds
    Valavan

  • Receiver Determination when multiple Product Versions / identical namespace

    Hi,
    How would the receiver determination be done when we have multiple product versions with identical namespaces and interface names ?
    During development, when we do a release transfer to another product version, the namespaces and interface names remain same as the current objects.
    How would XI resolve the correct interface in this case ?
    thanks,
    Manish

    The XI does not care about the application systems. When a message is received by the application, it knows, what to do with the messages.
    The receiver could be an RFC call, an IDOC, an Abap Proxy, here the correlation between interface and Abap code is unique.
    The receiver could be a File, or JMS adapter, here the correlation  between interface and communication channel is unique as well.
    You might reuse IDOCs or RFCs or in rare situations other interfaces in different software components and install them for the same application system. But you can only generate proxies from one interface.
    Regards
    Stefan

  • Can we get Multiple production versions in APO

    Hi,
    Is there  a way to get multiple production versions into APO, as the info record( we are using) is what drive the creation of the PDS in APO from ECC
    Is there a way to find out how we can have multiple production versions in APO.
    Thanks
    Maddy

    Maddy,
    Standard functionality in APO is to support multiple production versions.
    Production Versions are a standard object in ECC.  They consist of a combination of a Bill of Materials, a Routing, and a few other bits of data.  For a given material/plant combination in ECC, there can be many Production Versions.
    Production Version - Repetitive Manufacturing (PP-REM) - SAP Library
    These Production Versions are integrated in standard CIF via either Production Process Model or Production Data Structure.
    Integration of Production Process Models - Integration of Master Data - SAP Library
    Integration of Production Data Structures Generated from R/3 Mas - Integration of Master Data - SAP Library
    Best Regards,
    DB49

  • Different production Version in subcontraction process

    Dear SAP Experts,
    We have created two different scheduling agreements for manufacturing of same Finished goods, plant & vendor through subcontracting using two different BOM activated through different production Versions with different set of components, But the system is picking up the Version available in the current Inforecords for both the agreements.
    Kindly advise whether, any functionality available for picking up the right version designated for each scheduling agreement.
    Regards

    Dear Ravinder Kumar,
    1.In case if you want to split the requirement's equally for 2 different sources say 2 different production versions you can
    maintain the quota in MEQ1 for the % for 2 different production version.
    2.Normally the system picksup the production version which is assigned in the Purchase Info Record in ME11 for sub-
    contracting type.
    3.Production version can be controlled by lot size and validity date.Normally the first production version will be picked by the
    system in case if both the production version falls under same validity date and lot size.You can use the option of locking the
    production version and to check the results.
    4.Check this link to explore more,
    http://help.sap.com/saphelperp60_sp/helpdata/EN/b2/fa1ed4d51d11d1a69e0000e83235d4/content.htm_
    Regards
    Mangalraj.S

  • MRP Scheduling with a material with multiple production versions scrap rate

    Greetings all.
    I have a problem with MRP scheduling.  How do you account for different loss rates or scrap rates on a material because of multiple versions of a material that are in production.  For example, we have an item.  There are two differen ways to make that item and both have different loss rates or scrap rates.  How do we account for this.  And whatt happens when you have these with multiple routings.  Thanks.

    Dear,
    It can be handled in 3 ways.
    1st way - Create 2 versions to represent 2 ways of production. Create a 3rd version name it as total and make it as a first version so that MRP will take this version for scheduling. In total version give the most correct scrap qty and timming in routing. Hence when you run MRP system will consider the total version, then change the varsion in planned order as per your requirement.
    Second way - Create 2 version and if you are using Demand planning, in MD61 against the qty represent the version number so that when youn run MRP, the planned order will carry the version.
    3rd way - Create 2 Production version and create a quota arrangement and assihgn these two Production version as Quota items and give the % share. Hence when youn run MRP system will share the demand qty into two different version as per Quiota arrangement(setting in MRP2 is necessary fir planning).
    Please come back which one you are looking for so that we can give furthur information

  • Urgent :-PIR Saving w.r.t multiple Production version/Month wise

    Hi,
    1) Please let me know whether It is possible to enter  Planned independent requirement saving in MD61 Txn code month wise &  with respect to three Production version..
    i.e. in detail,
    I am having 3 alternative BOM’s of the same finish material. I want save the  Independent Requirement in a particular month with respect to 3 BOM’s /3 Production Version wise in the same month.
    After that I want to run MRP multilevel planning which will create planned orders of Finish Products & Dependent materials exploding corresponding BOM with respect to the particular Production Versions.
    2) Please let me know the best suitable strategy which will not consider present stock & Production/Planned orders in hand , will only create planned orders from the PIR saved in the Demand Management.
    Please sugggest the best way to do. I am in pressure from the client.
    Regards

    Hi
        PIRs cannot be created for 3 production versions.
    In MRP documentation, check for quota arrangement. Planned orders can be assigned to three different production versions in equal quantities by the quota arrangement.
    MRp run reads the quota file MEQ1 when it has to distribute planned orders across three production versions.
    Regards
    Pragnesh

  • Subcontracting and two Production Versions

    Dear Friends,
    I'm having captioned scenario with details like this:
    Product: P1,
    Subcontractor: V1,
    Distribution Center: DC1,
    Components: comp1 and comp2,
    I have maintained two production versions for P1 with different BOMs:
    Production Version 1 with comp1 is valid from past to 31.08.2008;
    Production Version 2 with comp2 is valid from 01.09.2008 to far in the future.
    In order to create PDS for product on subcontractor, I have to create subcontracting purchase info record for P1, V1, DC1. However, I found I could only create one info record with connection to one production version.
    Does anybody know how to solve this? Or if you have any suggestion for better setup?
    Thanks all!

    Hi,
    up to SCM 5.0 it is only possible to have one production version for subcontracting for each vendor.
    With SCM 5.1 you also can have one than one.
    So today the only solution is to use subcontracting PDS and have different validity dates for the components as already suggested.
    Regards.
    Hubert

  • Production Version in Material Master

    Hi,
    I am having problems with this.
    I need to either change date on a production version or
    delete the product version.
    I have tried using a batch input sequence from my program both for changing the date
    and for deleting the production version and this all works well.
    Now this isn't good enough since there can be multiple production versions on a material
    and I don't know which line to change or delete in the batch run.
    Is there a good FM or BAPI to handle this?
    I don't want to change the MKAL table directly since there is a history table
    connected to this also (MKAL_AEND).
    What is the best approach?
    Rgds,
    /Fredrik.

    How can I use this to achieve what I want to do, either
    change the production version date or delete the production version?
    I have tried C223, but this is not good enough, nor is batch run in MM02.
    I can have multiple production versions and can not pick the correct line
    in batch run to change or delete.

  • How to get production version in your contract?

    hi all,
    I have already maintain multiple production versions for one product, but how can I let it appear in the contract item?
    thanks

    Hi,
    I think I have already answered this one. You can get the curent version either from wwv_usr_menus$ or wwv_modules$
    select version from wwv_modules$
    where id = <module_id>
    and status = 'PRODUCTION'
    This gives the version of the current production version.
    Thanks
    Sharmila

  • MRP Run with production version.

    Hi Experts;
    I am working as a member of a SAP implementation supporting team. The client wants to run MRP with alternative BOM, not with the 1st BOM. As a solution for the requirement i created production versions and assigned to MD61 schedule line tab. It is working properly.
    But the user maintain some quantity as a safety stock for finished materials also. To cover the safety stock requirement, system create planned orders with the 1st BOM, not the production version.Already i have maintained the selection method "3" in material master.
    Is it possible to cover safety stock with alternative BOM.
    Please help..
    Thanks,
    Malka

    Hello Malka,
    For your issue,,
    As per other expert suggested you can block the first production version but if in future you want use first production then,,
    In these case you maintain production version in many way
    Ex.
    1.  Lot size .(if production version using for specific lot)
        Maintain the Lot for both production version, so Production version 1 lot completed system take       second production version.
    2. Production version validity date (If production version using for specific period )
        In this case after completion of 1. Production version period system take second one
    3. Manually selection of production version (If multiple production version and all have same condition)
        Whenever you convert the planned order to production order, one pop up come and ask for                manually selection for Production version, for this you go to OPL8 and select the Manually                production version
    I hope this information cover your all requirement, No need to go with quota arrangement
    Still you want know about the Quota arrangement, Please create new thread so other expert also provide their view
    Regards
    Umesh Mali

  • Quality plan as per production version

    Hi SAP gurus,
    My client has multiple Production versions and they want to use different Quality plan as per version , how  I can map this process in SAP.
    I tired using in production version by putting Qualiity plan instaed of routing,  Inpection lot is created but when it come for the production order it was asking for the routing / or operation generation.
    As few specfication of Quality plan is different , that is the reason Plan has to be specific to PV.
    Thanks in advance.

    Hi
    Even if you create a Inspection plan you might have observed in the production version you have to specify the Routing.
    Reason is syem will check the routing for cost collector in production order.
    what you can do is may be you can carry out inprocess inspection with routing & specify the char in the task list
    or
    You may have to go for userexit while selection of the task list you will select the appropriate task list with appropraite prod version
    Also if you creat two inspection plan with two gr counters & do not tick on "Auto Assign" in the QM view,
    System will create a lot of 04 with CRTD status.
    In QA02 you can go & manually attach the relevent task list.
    What you can do is create a Group with name of "prod version" itself.This will ease the attaching of the tak list to the the lot.
    I hope this will add some value.
    Regards
    Sujit

  • Use of different production versions for MRP and costing

    Dear PP Gurus ,
    We have a scenario in which there are multiple production versions for a particular product .The MRP run as welll as costing run considers only the production version 0001.
    We would like the system to consider different production versions for MRP and costing ..that is 0001 for MRP and 0005 for costing .
    Is this possible ... if yes ...Kindly suggest the config and master settings for this to happen .
    Ram ~

    Dear Ramakrishna,
    For doing the costing for a specific production version use CK11N,under quantity structure tab key you
    can assign the prod.version which is to be used for costing purpose.
    While taking MRP if you want to consider the particular Prod.version,assign the demand to the
    correct prod.version under schedule line tab in MD61.
    Otherwise the system always picksup the first prod.version for MRP.
    One more alternative is you have to lock the other prod.versions if you want the system to consider a
    particular prod.version.
    Check and revert back.
    Regards
    Mangalraj.S

  • Subcontracting (Multiple Vendors Involved) and Production Version's

    Hello all,
    I would like to know more about this stuff. So do share your valuable thoughts.
    I was trying out a sub contracting scenario with multiple Vendors and Production Versions involved. The production version is designated in such a way that lot size/quantity of the requirement determines which of the available version's to be taken into consideration whilst generating procurement proposal via MRP.
    #1. Production Version:
    5 Version's of the BOM are assigned to various lot sizes.
    #2. I had 5 different info records created for the material-Vendor combination. Each one of them were assigned with a Prod version to it.
    Sample:
    #3. Post these settings i had a MRP run executed. Well !!! the results were different off-course. I neither did see the procurement proposals classified based on the prod version nor the first prod version assigned to the procurement proposals ( i meant i had a different prod version(version 4) assigned to the procurement proposals generated).  
    Questions:
    #1. Well the first thing that did strike my mind was how could i get the source list work for such scenario's ? I guess i can't go with quota arrangement coz which would split the procurement proposals into many halves and assign's it accordingly to the vendor.
    #2. How come production version 4 given the top priority here ?
    Source List state:
                             a. I had an item (tried the others as well) checked with fixed vendor indicator but the info record of the material-vendor combination had a different Prod. Version in it (well not PR4, i can guarantee you on that)
                             b. I had nothing marked with fixed vendor indicator. Results post MRP still did pick the same prod version (Version 4).
    #3. Last but not the least how can i get this thing to work ?
    Please do help out.
    PS: MRP 4 selection Method: 2 - Selection by Prod.Version
    Regards,
    Rahul

    Hello Rajen,
    Well as per your comment "
    Regarding the splitting, Not Always.
    There are two types of quota arrangement - Allocation quota and splitting quota."
    so meaning that allocation quota doesn't split the procurement proposal is it ? If so how are they assigned to vendors ? any other criteria being used up here
    Anyhow i had a new lot size method created with the splitting quota field unchecked. So how do i proceed from here ? meaning that how should i manage my quota file to not have my procurement proposals split ?
    Please do help out.
    Regards,
    Rahul

  • ME51N subcontracting don't include the production version of info record

    Dear guru ,
    After assigning source of supply in a subcontracting purchase requisition the system donu2019t  read the production version of info record from the combination of vendor and material.
    Itu2019s right this behavior ?
    Thanks

    For a Purchase requisition it is not possible to determine the correct Product Version, even the Vendor is specified. It will just pick the first valid version it can find.                                   
    When creating the Purchase Order from this Requisition, you will get a pop-up which allows you to let the "correct" production version overwrite the one coming from the Requisition. This is the case, when you create a PO with a vendor that has a different production version assigned in its info record as it is included in the Requisition.

Maybe you are looking for

  • How to handle amr format in JMF?

    Is it possible to receive AMR audio format (in rtp) using JMF? If yes, then how. I am able to handle to wav format. I give LINEAR as encoding scheme along with other parameters. If I don't find proper parameters for AMR. Please help. Thanks in advanc

  • Is it possible to see the Import History???

    I am importing a lot of folders with photos from a hard drive but I lost track of what has been imported already. Can I find the import history somewhere in iphoto 11??

  • ACL / ACE - Copy folder structure including all rights

    Dear readers A question about the proper settings in ACL/ACE for to copy a given folder structure incl. all ACL/ACE rights. Situation: On a OS X server, the admin user did setup a sample structure of folders and files with the corresponding access ri

  • How to uninstall iPhoto 11

    how do I uninstall iphoto 11

  • How to highlight Search string in JTextArea??

    I have a Search utility which search for a string in JTextArea. Search utility is able to locate the search string but it does not highlight it. Please let me know if you know what could be wrong Thanks Amit