Need tables to pick the planned overhead & labour cost

I need the tables form where I can pick the planned labour & overhead cost for a production order.
i want to calculate my planned labour cost for all operations in my production order. how can i retrive form the tables and how the actual planned cost gets calcualted. where can i see the overhed calcualtion of the material and labour.
please suggest.
venkatesh

Hi venkatesh,
There is a help transaction RKACSHOW, to display all the costs related information for a CO-Object, in your case the oder. The involved table name is listed indirectly too. For example COSSA for the table COSS, and COSPA for table COSP and so on.
Kind regards,
Zhenbo

Similar Messages

  • Table for Production order planned and Actual cost

    Hi Experts,
    Can anybody please tell me the name of table where Production order planned and Actual cost gets saved ?
    Thanks in advance.
    Regards,
    Bijay

    Table COEP
    don't forget the points

  • Comparing two tables and picking the records

    I have two tables A and B.  I have to compare a column ID in both table A and table B  A.ID=B.ID  And based on the above comparison if the match is found I need to pick the records from table A and if no match then need to pick the records from table B  My problem is if I join then I will have table A and table B as one record and will be difficult to separate out.  Please let me know how this can be acheived.  Thnx.

    I have two tables A and B.  I have to compare a column ID in both table A and table B  A.ID=B.ID  And based on the above comparison if the match is found I need to pick the records from table A and if no match then need to pick the records from table B  My problem is if I join then I will have table A and table B as one record and will be difficult to separate out.  Please let me know how this can be acheived.  Thnx.

  • Table to see the line items for cost center-ECC 6.0

    Hi,
    Which is the table to get the line items in controlling with cost center & WBS information.
    Regards,
    Vipin

    Check with below tables :
    COSS, COSPP, COSSP, COSL, COSR ,COSP.
    Check with below link
    http://www.sap-img.com/financial/important-tables-in-sap-co.htm
    Thanks
    Seshu

  • Need Table name for the structure

    hello guru's,
    I am using the tcode AW01N , In that i need to fetch a field that field contanis structure named
    AW01_DEP_PAR.  My field name is RSTNDJ,RSTNDP . can u tell me from which table its stored .
      AW01_DEP_PAR-RSTNDJ,   AW01_DEP_PAR-RSTNDP.
    Regards
      vinoth.v

    Vinoth,
    We can find it using ST05.
    Activate the trace in ST05
    Run the transaction in which you want to find the table for the corresponding structure.
    After completing the entire transaction Process go to ST05 decactivate the trace and display the trace.
    Now in the menu bar go to Trace List>>Summarise trace by tables or press Ctrl+F8.This you will get to know all the tables that are getting updated when a particular transaction is Executed.If you explore it then you will be able to find out the corresponding table for a structure.Hope this may give you some lead.
    K.Kiran.

  • Need Table Name for the Approval Flag in the Transaction IQS2

    In the Transaction IQS2 i  gave a notification number and press Enter, then I clicked the Approval Button  to Approve it.
    I want to Know in which Table the Approval Flag is set. Because I want to set the Flag in background when an action performed. I searched for  BAPI to do this, but I unable to found it.
    If any know the Table Name or BAPI or Function Module to set  the Approval Flag. Kindly tell me.
    Thank you,
    Regards,
    Surjith

    Hi,
    check this
    CRM_IC_SPH_CLEAR_BGFLAG        Set background-function-active flag
    i m not sure but hope u'll get some help.

  • I need tables for prepare the master data templates for PM

    Dear Experts,
    can we prepare the master data templates by using the tables? if its possible means how we can prepare and what we have to considered ? is it right way or wrong?
    please suggest me to prepare the masterdata templates for ever use. if any small corrections we can correct it at usage time.
    please help me
    thanks a lot in advance

    Dear Jalu,
    Master data Templates have to be prepared based on Client's requirement after understanding their Business.
    For example, in Equipment master there are ~ 60 to 70 feilds, no client requires all of them. Some are inherited.
    After client requirement freezing, record LSMW and based on that prepare the Template.
    Regards,
    MLN Prasad

  • Plan Overhead Calculation for Project Definition

    Hi All,
    I have a requirement to calculate the Plan Overhead for the Project Def. (CJ46, CJ47).
    I have tried using BDC for CJ46 and CJ47 but Overhead cost is not reflecting in COSS table.
    I also tried using program RKAZCJ47 ( using SUBMIT statement ), which executes successfully and overhead cost is also calculated and can be verified thru entries in COSS table, but it displays a log which I am not able to bypass in background.
    I do not want to show this log to user.
    Helpp..

    Hi,
    In my development I need to call this program to calculate the plan overhead. So I used SUBMIT statement to execute this program and overhead is calculated and stored in COSS table. but this program displays the log using ALV and SPLITTER control after calculation which is displayed to user. I want to supress this log.
    This processing should execute in background without displaying any log.
    this submit call is written in enhancement for CJ40 which executes after user saves the cost planning
    regards
    Edited by: Shaurabh Pandey on Feb 19, 2010 12:47 PM

  • How to Close Planned Overhead Rates after production order/ CK40N

    Hi,
    While creating production order,it will pick planned overheads from Costing Sheet.After closing the production Oder,how will we close the planned overheads?
    For example: We have maintained the planned overheads as 3% in the costing sheet.Over a period of time we have observed the actual overheads is only 2%.How to deal with this in the system.In this case how to close the planned overheads which we got from costing sheet?
    Kindly advice me
    thanks
    Sunitha

    Hi,
    If i understand you correctly,currently your planned overhead rate is 3% and you wants to change to 2%.
    if this is the case goto your Overhead rate in configuration and copy overhead rate key which is with plan overhead type(2). and change 3% end as of today and copied one with new rate (e.g 2%) as of tomorrow and till end of life(12/31/9999)....
    hope this helps you.
    Thanks,
    Rau

  • Missing Functionality: Dunning Wizard - We need table CRD1

    Hello,
    Missing Functionality: Dunning Wizard - We need table CRD1 in the dunning PLD templates!!!
    This Workaround is impossible.
    As a workaround I suggest to store this information in the UDFs that you would create on the OCRD table that is exposed in the dunning PLD templates.

    keine Antwort ist auch eine Antwort

  • Table & Field Name for Plan Data in CO

    Hi All,
    Can anyone tell me the table & field name where we can get the planned data in Cost Center Accounting and Profit Center Accounting.
    I checked out the COSP(which is Totals) and COEP tables for CCA but i could find the fields only for actual data and not planned data.
    Same for PCA...i checked out the GLPCT & GLPCA tables but in vain.
    Regards & Thanks
    Piyush Kothari.

    Hi,
    Thanks for the reply but COKL is only for Activity Type which contains Allocation Cost Elements.
    I would like to have the Table & Field name for Plan data of Primary Cost Element.
    Piyush

  • What is the effect of the planned order after it is converted to production

    Hello Gurus,
    1.There was a planned order with wrong date 2041 instead of 2011
    2. plannedorder is already converted to production order and is visble in assignment tab of the production order
    3.when I  am tryng to display the planned order it gives error planned order is not exists.
    4. Production order is already delivered
    Now will there be any  effect  on finanace or any other ,if the planned order was created with wrong date,
    can we now change the date of planned order , but it says does not exist as it is already converted to prod order.
    Please let me know the implications of wrong date and how we can correct the date from 2041 to 2011
    Thanks in Advance
    Himakar

    Dear Himakar,
    As explained by our forum member,once after the planned order is converted into production order,the entire planned order
    details gets deleted from table PLAF and the planned order dates can be changed in the production order and there is no
    business impact other than the planned/production/actual dates.
    However the planned order no deatils can be checked in the production order.
    Regards
    Mangalraj.S

  • Use 'SDPARTNERLIST' as a table for pick fields

    Hi Experts,
    can we use 'SDPARTNERLIST' as a table for pick the fields paertenr function, partner and name1 in scripts,
    or is any reference table for these fields,,, if any could u tell me fields and tables
    Edited by: Alvaro Tejada Galindo on Feb 25, 2008 5:46 PM

    Hi,
    You acn code your select in the following no>
    select single vorna nachn from PA0002 into
                       (gv_vorna , gv_nachn )
    where pernr = ......
              subty = ...... and
              OBJPS = ...... and
              SPRPS = ......and
              ENDDA = ......and
              BEGDA = ......and
              SEQNR = ........
    Whatever key fields data available you can pass it in the where clause of the select query.
    Then after the select query, you can pass in the same variables in the script gv_vorna , gv_nachn to print the data.
    Hope this helps.
    Regards,
    JLN

  • How to Close Planned Overhead Rates(KP26) after CK40N -cost estimate

    HI,
    How to close the planned overhead rates which we have maintained in the KP26 transaction after excuting Material Cost estimate?
    Kindly advice me regarding the same.
    Thanks
    Sunitha

    Hi,
    Goto OKP1, enter your controlling area,version and fiscal year.then click on "PLAN"(F6) icon at your left side top.you will see transaction and period in new window.
    here you can check the boxes under particular period.
    Thanks,
    Rau

  • Planned and Actual costs at the Activity level

    Hi all,
          Can you tell me if there is a R/3 report which lists out the planned and actual costs for a project and displays it for each network and activity? I want these values at the activity level.
          I found a report which lists out these values for each network, but I cannot drilldown to the activity level. Please help.
    Thanks,
    Satyajit.

    Hi,
    There is setting in network type. Please go through transaction OPUV  i.e.
    Change view- Network type paramaeters : overview " Overview.
    Uner Network type parameters there is one radio button in front of ActvtyAcctAssgn. Just activate it.
    Hope this helps.
    Regards
    Tushar

Maybe you are looking for

  • How do I install Adobe Reader 9.3 on a Windows Vista Toshiba Laptop?

    I have been trying to download Adobe Reader 9.3 onto my laptop without success.  I have a Toshiba A135 laptop. I have tried using Windows Internet Explorer 7 and Firefox 3.5.9.  I am currently getting a message "get Plus + (R)" "The process terminate

  • Manufacture defected screen

    How many others have had their nano screen defect? I was given a 4 GB Nano white for this chistmas and found in a single day it had easily recieved scratches over the screen by merely handling it while adding songs. Just today I reached into my pocke

  • Embedding Flash Player 9 on Linux

    Hi there. I wish to view some swf movies (i.e. adverts) in my C/C++ app. Is there any way to embed ONLY a flashplayer inside such application? I don't need to embed full featured web browser, and such thing on linux isn't possible in any "portable" w

  • How to add same text to several photos?

    I am using PSE5 and want to share them on the web with the text "copyright". Is there a "batch"-function to do this?

  • E4200v1 issue: resets approximately every 15 minutes

    After a recent power outage the E4200 router I use will restart itself after about every 15 minutes.  I've tried power cycling the router, as well as changing the outlet it is pluged into if ther is some issue with the power.  I'm at a loss at what e