No range for GRN for 4 plants to be different

Dear Gurus
I am having one company code and in that there are 4 plants ,my client wants no range for GRN should be seperate for all the plants also the accounting  no range should be different as per the Plant.
Can anybody guide me how it can be configured in the system
Regards
shailesh M

Hi
this is not possible as document types (material document type and accounting document ) are at client level.
what you can do for MIGO is activate the GR/GI slip functionality. that will serve the purpose of tracking which GR/GI happened in which plant. assign the different number ranges for plant.
thanks and regards
Rajesh

Similar Messages

  • Error in Message determination for GRN

    Hi Friends,
         I have tried to configure message determination for GRN. As per the steps in the thread i did. The steps i did are :
    GR print out settings
    1. Maintain the Printer Name in SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Printer Setting
    Enter the local printer where you want to print your Goods posting document
    2. Ensure that in SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Item Print Indicator, 1 stands for Matl Doc print out
    3. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Print Version, maintain Print Version 2
    4. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Maintain Print Indicator for Goods Receipt/GI/Transfer Posting Documents
    Here for Particular mvt type 101,201,121,311 etcu2026 Maintain the Print item as 1--Material document printout
    5. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Output Determination->Maintain Output Types, for the Output types WE01, WE02 and WE03, ensure the following--
    Select the particular Output type then goto Details
    a. Default Values: Dispatch Time is 3 or 4 as per reqmt. and Tr medium is 1
    b. Print Parameter is 7
    6. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Output Determination->Printer Det->Printer Determination by Plant/Str Loc, Maintain the Output device for all your Plants
    7. Go to MN21, for Tr Type WE, Print Version 3, maintain Print Item as 1.
    Now the settings are ready for Printing Material doc
    8. While doing MIGO, ensure that in General Tab, you get "3 Collective Slip" beside the Print Indicator and you tick mark the field.
    9. Now depending on the setting in 5a, the Matl doc is printed. If it is 3, you have to print it using MB90. If it is 4, it is printed immediately.
    After doing this configuration, if i go and execute MB90 with output type WE03, it is telling " no messages for initial processing exist ".
    I want to see the GRN document before printing. what shall i do, kindly help me please.
    Regards,
    Prasath

    HI Manish,
       As u said, i have unchecked the tick mark in migo and i have posted it. Then i went to MB90 and tried with WE01. still it is showing the same message. Kindly resolve plz. Is there any change i have to do in above mentioned steps.
    Thanks&Regards,
    Prasath

  • Stock posting in block stock after grn for source inspection

    Hi All,
    I have following scenario
    I am doing source inspection at vendor site i have maintained control key 0005 in material master & necessary certificate with certificate check required at GRN & UD stage
    i am creating a source inspection lot for a release po through t.code qi07 & then processing that lot before GRN
    Now when i am doing GRN for same PO it is giving me the following message  stage
    <b>A category ZC01(user sp. category) inspected certificate is required</b>
    Message no. QA312
    Diagnosis
    An inspected certificate must exist at the first goods receipt for a purchase order item.
    Procedure
    Check whether a suitable certificate exists for the purchase order and delivery, and create a certificate record with the status "Certificate checked and stored".
    If there is no certificate or no suitable certificate, this does not comply with the requirements in the material master record. If there is no inspection lot for this goods movement, the system posts the quantity to blocked stock or does not post the goods receipt.
    If you have created an inspection lot, the system marks the certificate check with the status "In lot". You must confirm the availability of an inspected certificate by the time you make the usage decision.
    after doing the GRN stock is being posted to block stock
    if i do not process the source inspection lot then the stock is posted to quality stock but this does fulfill the requirement of source inspection
    plz suggest soultion
    It's urgent
    Regards
    Ashutosh Shende
    9860681314

    Hello Ashutosh,
    In the material master you have defined certificate type with the customizing setting indicator for  'Enhanced Certificate Processing' active.
    If you set this indicator, extended certificate processing is active for
    this certificate type. You can then manage the inbox for quality        
    certificates independent of the goods receipt.                          
    The electronic inbox of certificates for the purchase order is only     
    possible if this indicator is set.                                                                               
    This means you have to create a certificate in QM (Transaction QC51),   
    before you can update your PO with cert. enclosed.  
    If you do not want the enhanced certificate processing you have change  
    the indicator into inactive.    
    Another problem known here is if you have activated the 05 Inspection type in the material master, that it is not activated in all plants relevant although QM in Procurement is set in all plants.                                        
    I hope that this resolves the described issue.
    Regards,
    Isabelle

  • Maintain number range interval 01 for posting change notices

    Hi,
    I am doing transfer posting using movement type 321 (quality to unrestricted) for one material.While posting i am getting error"Maintain number range interval 01 for posting change notices" Message no. L0015
    WM is active for this material and doing this movement for one plant which is newly created in system.Wil you please advice for which document type i had to maintain number range.Please inform SPRO path / Transaction to be used to make required changes.
    Thanks & Regards
    Atharva

    Maintain number range for posting change in tcode  OMLW

  • Message Determination for GRN again

    Hello seniors,
       I had configured Output Determination for GRN, it was working fine for a GRN. When i try for next GRN, it is not working. Why is it so, do i need configure any more thing ?
    Regards,
    JanaMM

    Hello manish,
    I have done configuation of message determination for GRN by this
    1. Maintain the Printer Name in SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Printer Setting
    2. Ensured in SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Item Print Indicator, 1 stands for Matl Doc print out
    3. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Gen Settings->Print Version, maintain Print Version 2
    4. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Print Control->Maintain Print Indicator for GI/Transfer Posting Documents
    5. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Output Determination->Maintain Output Types, for the Output types WE01, WE02 and WE03, ensure the foll:
    a. Default Values: Dispatch Time is 3 or 4 as per reqmt. and Tr medium is 1
    b. Print Parameter is 7
    6. In SPRO->Matl Mgmt->Inv Mgmt and Phy Inv->Output Determination->Printer Det->Pr Det by Pl/StoLoc, maintain the Output device for all your Plants
    7. In MN21, for Tr Type WE, Print Version 3, maintain Print Item as 1.(Condition records)
    8. While doing MIGO, ensured that in General Tab, you get "3 Collective Slip" beside the Print Indicator and you tick mark the field.
    Now go to MB90 enter the output type as WE01, Tr m as 1, Sort or. 01, Pro.mode as 01, and executed. System outputted all the material documents that has to be taken print out.
    BUt after this i did a grn and tried to take prinout in MB90, it is not showing. It is just telling " No messages exist for intial processing". I tried with 2 in processing mode, but still it is showing tha same.  But it was workng fine for first time. Even now if i check for that grn it is showing the print preview. but for new grn it is not showing. what could be the reason.
    Regards,
    JanaMM

  • SAP Solution for Mini steel plant with DRI Process

    Dear all,
    I am a metallurgist who spent couple of years in steel and process Industry and then moved to IT Consulting as SAP consultant / business analyst mainly working in the area of solution designing.
    Here i will like to describe SAP solution for Mini steel plant with DRI proces.
    u201CManufacture Productsu201D Description
    The series of operations performed upon material to convert it from the raw material or a semifinished state to a state of further completion. This includes the establishment and maintenance of a CAPEX plan, the planning, scheduling and execution of production activities, the dispositioning of produced goods, the maintenance of production data, the monitoring of production performance and the implementation of engineering changes.
    u201CManufacture Productsu201D Objectives
    M-010
    Compile 3-year CAPEX Budget     Establish the overall manufacturing goals and metrics that the organization will use to measure performance and progress towards objectives. These goals should be consistent with overall organizational strategy/value propositions. Develop long-term goals for production capabilities and manufacturing. These goals should align with the overall goals and objectives of the organization.
    M-050
    Perform Long Range Production Planning     u201CBudgetingu201D. Long range planning of production quantities based on planned available capacities and known or estimated customer demands. This process may include planning for different capacity and/or demand scenarios. Approved capital expenditures from the 3-year CAPEX budget may influence the budget. Range and frequency for budgeting is yearly.
    M-060
    Perform Medium Range Production Planning     Medium range planning of production quantities based on planned available capacities and known or estimated customer demands. This process may include planning for different capacity and/or demand scenarios.  Range and frequency for planning is quarterly.
    M-070
    Perform Short Range Production Planning     Short term planning of production quantities based on capacities and demands as previously planned in the longer terms, actual customer demand and actual capacities. The result from short range production planning will run into the operational plan for the current and following days.  Range and frequency for planning is monthly.
    M-080
    Schedule Production     This sub-process enables detailed scheduling by resources over the planning horizon. Planned orders that fulfill demands (Stock Transfer Requisitions, Sales Forecasts and Customer Orders defined by due-dates and due-quantities) come from the short range plan. This results in a feasible schedule, optimizing utilization of the production resources. It is based on production process constraints as well as labor resources in order to minimize production costs and also taking into account constraining raw materials availability.
    M-090
    Execute MRP     The purpose of this sub-process is to generate a Materials Requirements Plan (MRP) for all materials, which are produced or purchased. The MRP process involves looking at current material inventory, planned inbound material deliveries, requirements, lead times and stock levels to generate a detailed plan for future material requirements. The materials requirements will be generated with respect to the three planning horizons, short-term, medium-term, and long term. If an over stock of raw materials occurs as a result of a planning change production and marketing personnel will be informed. This would allow for the cancellations of any unneeded shipments.
    M-100
    Perform Setup / Changeover     Perform set-up and changeover activities on production equipment as necessary, to prepare for the production of specific materials/grades. Set-up and changeover activities will enable the production equipment to perform operations on materials, as per the specifications called out on the production order. Ensure time is allocated for first off inspection requirements after changeover.
    M-110
    Execute Production     Insure that the production plan is met by converting raw materials and component supplies into finished and semi-finished products. Batch/lot documentation will be created for individual production orders to provide traceability throughout the process. Each step of the production process is continuously monitored to identify mechanical, quality, and productivity issues and suggest solutions when problems arise. Data collection for performance and financial reporting enables management to take immediate action on manufacturing processes as well as conduct historical analysis.
    M-120
    Perform Quality Management     Quality management refers to the entire supply chain process. Process activities are related to the evaluation and inspection of key characteristics of semi-finished and finished materials. These evaluations are recorded and acted on based on the results. Report/manage internal quality problems or issues. Install and manage quality control systems to insure product quality. For supplier or subcontractor based issues this data should be used as a performance measure during the vendor evaluation process.
    M-130
    Manage Product Disposition     This process ensures those semi-finished and finished products that do not meet quality requirements, are prevented from being used and distributed in good finished product to customer, or released for the next step of the production process. A semi finished product is any material that needs to have another operation on line before being shipped to the customer. Finished goods are defined as any material that can be shipped to a customer; in house produced finished goods, subcontracted materials and trading goods. The information required to make decisions regarding disposition comes from the Quality Management system of each production facility. The first step ensures that raw material and returnable goods are dealt with in another subprocess. The reason for the goods not meeting quality standards is recorded along with the results of any investigation to find the cause of the fault. Information is sent to all other parties who need to know: order fulfillment, inventory management and shipping. The process ensures that the most appropriate action is taken to either dispose of, or rework the goods. Disposal or rework may be either through the original materials supplier or subcontractor, or Mittal Steel Point Lisas.
    M-140
    Maintain Product Related Data     u201CMaterial Master Maintenanceu201D. The Sub-Process 'Maintain Product Related Data' is the list of activities that identify the steps and decision points related to the request for and performance of additions, changes, and deletions to the Material Master file or files. This sub-process begins when a need to create, change or delete a material is identified and ends when the request is either actioned or refused. The sub-process is intended to cover all material types, including finished goods, raw materials, bills of materials, equipment and service, POS, Sundry Items etc. In fact, any product which the company wishes to inventory or purchase. A number of key strategic decisions, including a clear definition of when we issue a new material, will affect this sub-process.
    M-150
    Maintain Production Related Data     u201CMaster Data Maintenanceu201D. This subprocess identifies the activities related to requesting changes or additions to production related master data. Once a need for master data maintenance is identified, a request is submitted for approval. Data defining production capacities and performance standards (e.g. line efficiencies, material yields, etc.) require Corporate level approval prior to maintenance. Other data that is more specific to internal planning functions are maintained at the plant level. Maintenance requests are returned to the originator whether the request is approved or not to improve communication throughout the system. This subprocess may be triggered by: annual operations budgeting process process/production equipment upgrade or replacement change in facility work schedule (i.e. planned hours or days) change in personnel required to operate process/production equipment new products, formulations, or packaging.
    M-160
    Operations Execution Reporting     Gather manufacturing information at various points in the production process. Prepare management reports both at the detailed level for plant management and summary level for senior operations management. Reports will be available on-demand and will include - volume, efficiencies (mechanical, line, and labor), yields, downtime, asset utilization, environmental, safety, quality, and financial data. A major goal of this sub-process is to define a consistent method of calculating operations metrics. Some plants will use line information systems and PCSs to collect information. Not all plants are equipped with these systems and the where they do exist, the level of sophistication varies.
    M-170
    Manage Process Reliability     Optimize capacity by reducing process downtime and ensuring compliance to quality expectations by the reduction of rejects. Install tracking systems to measure line time utilization, quality results, process settings. Conduct root cause analysis, and use the data to develop and implement improved operating procedures.

    Thank you for your prompt response. I'm assuming you are still proposing to use Sales order -> purchase order -> invoice verification -> Customer billing process flow. Is that correct?

  • GRN for NLAG typed material

    Hello experts,
    I am trying to post GRN for NLAG typed materials. While doing so i am getting error message as "Sales price for A250000000905 could not be found"
    Message no. M7158
    (A250000000905 is the material code)
    Please help.

    Thanx jurgen. M confused which way to go. The options in message details are as follows. Will u please suggest....
    Sales price for  A250000000905    could not be found
    Message no. M7158
    Diagnosis
    The sales price valuation is active in the valuation area.
    The system could not determine a sales price on the specified posting date for material A250000000905  in unit of entry  in plant .
    Sales price conditions may not be defined for the material in plant .
    Procedure
    1. If you have a goods receipt for a purchase order or an order, the sales price is taken from the purchase order or the order concerned.
    Check the sales price in the purchase order or the order.
    2. if you have goods movements without a reference, you can specify the sales value (sales price including sales tax) manually.
    3. If the screen does not have the field Sales price, then you have a Customizing error: the sales price valuation was activated in the valuation area, but the field selection of the movement type was not changed accordingly.  In this case, contact your system administrator.
    4. Check the definition of the sales price.
    Note that for distribution centers, the sales price of the consumer distribution chain maintained in the distribution center's master data is used.
    Proceed
    If you post this movement without the sales value, the movement will be valuated with value zero.  This can change the average sales price.

  • Print out in MB90 for GRN is not coming in English

    Dear Friends,
    While taking the print out in MB90 for GRN document, it is not coming in English.It is coming in some unreadableformat.
    In MN21 I have mentioned the language as EN.
    In the configuration of output type WE03 I have mentioned the language as EN intransaction code M706.
    A reply will be highly appreaciated.
    Regards
    Rutabhadra Panda

    hi
    check whether the printer you installed is having the proper driver.

  • Opening and closing balance for Excise duties for a particular plant

    Dear Experts,
                         Please suggest how I can get balance of excise duties for a particular plant at a given date in registers(RG23A & RG23C PartII).
    Thanks
    Lokesh

    Dear Lokesh,
    Just find the Google with "J33_BPP_32_CHEM_EN_IN" you will find the Word document  for standard SAP document
    With all the steps in details

  • Driver Program for GRN Smartform

    Hi,
    Please tell me the Driver Program for GRN Smartform

    Hi..
    Did you find any Smartform or Program with /SMB40/?
    I did this smartform using the above mentioned Prog only.
    Also try using SAPFM07P_SMART.
    Regards,
    Karthik

  • Problem during grn for scheduling agreement

    Dear Pals,
                    I have done scheduling agreement with doc.type LP. I have maintained schedule lines also. While doing GRN for that, it is throwing an error
                                 " PU ordered quntity exceeded by 300 ea: 3000000200 "
    How could i resolve this...
    Prasath

    Hi,
    How you had maintained schedule lines...month wise/week wise/ day wise.
    If suppose you maintained month wise like 11/2008 --- 300 qty and you are making GR in 12/2008 then system will allow but if you are making GR before the schedule line date/period then system will give you the above error.
    Please check your dates in schedule lines and GR date. Gr date must be on schedule line date or after the schedule line date.
    Please provide the dates maintained in schedule and GR date.
    Regards,
    Umesh
    Edited by: Umesh Agrawal on Dec 8, 2008 11:10 AM

  • User Exit for Updating Delivery Plant at Item Level in Sales Order

    Hello Experts
    There is a requirement to determine the delivery plant for each item level and than update the items with newly determined plant.  There is a user exit MV45AFZZ routine FORM USEREXIT_MOVE_FIELD_TO_VBAP. to update the item level entries in Sales Order in VA01 or VA02. Is this the right place to do this?, if yes , do i need to perform any other standard logic (like re determine Shipping points , schedule lines ) for newly determined plant? If not , can you please suggest any other place , BADI or user exit to change the delivery plant of sales order.
    Thanks a lot....
    -Harkamal

    Best place is MV45AFZZ-USEREXIT_SAVE_DOCUMENT_PREPARE. Populates the values just before saving the document. You can have your own deriving logic. Make sure that peice of code is trigger only for Sales Order create or change (VA01/VA02).
    Are you kidding???  You do realize that this is AFTER all validations against configuration, ATP, pricing, etc. have been performed??!!!  Never, ever change a critical value like plant in the SAVE user exits...

  • Table to see all screens for particular material, plant combination

    Hi,
    Anyone can help me to in which table i can find all screens(like basic data,purchasing..etc) for particular material, plant combination?
    Regards,
    Praba

    Look into field PSTAT in table MARA, this should tell you in general which views are created.
    Each characters represents a view.
    which character is for vwhich view can be obtained in MM50, hit F4 for the field maintenance status.
    A different view on the same kind of information is with SE16 for table MSTA

  • Excise duty not loaded onto inventory for non excisable plant

    Hello
    I am facing a problem in excise duty flow. I have two plants, one excisable and second non excisable. one vendor is supplying the material to both the plants, so vendor is sending the invoice having BED, ECess & SECess for both the plants.
    For excisable plant all the duty values are flowing correctly, but for non excisable plant BED is getting loaded onto inventory.
    For non excisable plant, I have maintained conditions records al plant level for JMIP (BED Inv %), JMX2 (A/P BED Inv), ZECN (IN:ECess Inv %), JEC2 (ECess Inv Total), JSEI (IN: A/P SECess Inv), JHX2 (IN: SECess Inv Total).
    During MIRO, BED is not getting loaded onto inventory, while ECess & SECess is getting loaded to material.
    Pl suggest, where to check the settings or any settings for condition types, tax procedure etc.
    Thanks & regards'
    Manoj Gupta

    Hi,
       The system behaviour of posting to stock account is controlled by account key NVV. Go to OBQ3, in your tax procedure TAXINN (or copy of that procedure) check for the condition types which account keys are assigned.
    System will never discriminate that BED is not getting inventorised but ECess and Hcess on BED get inventorised.
    Regards

  • How to use different  numbers ranges in LSMW for a material in 8plants

    Hi all,
    I have to upload data using MM01 in LSMW by using external numbers.
    the MATNR for materials are like this 17240,22818,82618,487218,7218,26418
    how can i take these numbers in LSMW.i have 61 material numbers to be extended to 8plants.can i upload these material numbers at a time in LSMW
    the above material number should be extended to 8plants.but the field values for some fields are varying.the material number should be same for 8plants
    For this issue, which method i should follow in LSMW.

    Just do one thing,
    while recording enter the material numer field by yourself(Not blank).This material is the material which you mention out of 61,
    and upload the same in your upload file, and just change plant.i mean 8 records are there for each material( all 61)
    reward if useful.
    Amit Singla

Maybe you are looking for

  • Lsmw with multiple line

    Hi, I need to change/edit  payment transaction at vendor master data (FK02). The vendor already have 1st row with bank ctry, bank key, bank number, now i need to add another row but I am unable to do it. When we record via lsmw, the recording is okay

  • How can i check my iPhone whether being international or not ?

    I have an iPhone4, but i don't know whether this device is international "unlocked for all networks" or it works only with a specific network. could you help me pls how to identify my device.

  • Can't find the MP3 Disc buring settings in iTunes 8.x

    I've just been searching for the settings in iTunes in which to change the burning of a disc to MP3 and it's not where it used to be. Can someone please explain this? When I go to click Edit > Preferences, Advanced tab the burning tab isn't there. I

  • ITunes not reading Ipod Touch

          ITunes is not recognizing my IPod Touch.  I have troubleshooted off the Apple website and even uninstalled and reinstalled ITunes.  Still not working.  Any suggestions?

  • Modifying default "Inspectors"/"HUD" tools?

    I always want sharpening, noise, and shadow highlight opened. Is there somewhere to modify the default appearance of the inspector and/or HUD? By the way, what does "^s" mean? I have tried every combination of keyboard modifiers I could think of and