I'm looking for the link between inspection plan/recipe header and operation at table lavel.
Reason: I have two inspection plan number with same group number but both has different counter and each has 4 operation and each operation has different work center.
Now I can get header info in PLKO and operation level info in PLPO table. From PLKO I can pass PLNTY and PLNNR in PLPO table but this gives me 8 entry in PLPO table (4 for 1st group counter and 4 for 2nd counter).
So my question is how to differentiate 4 operation of each inspection plan header. Even same issue facing at recipe level.
I can't find any table. Do we have any BAPI?

Detailing the above reply through SQVI.
The Join.
Selection Screen
The output
If you need you may have Header table (PLKO) also in the join to have more details.
Jogeswara Rao K

Similar Messages

  • How to change the main work center and  work center of each operation when generating work order by maintenance plan

    Dear experts,
    I face a problem that system get main work center from equipment master data as a default main work center in maintenance plan when creating maintenance plan. however, if main work center in equipment is changed later, the change will not synchronize to related maintenance plan. if work order is generated from maintenance plan, main work order in order is defaulted from maintenance plan instead of updated work center in equipment.
    another problem is that, for those orders generated by maintenance plan, the work centers in  operations is defaulted from task list in maintenance plan. in most case, work center in task list is dummy. Actually the work is done by work center in equipment master data.
    My expectation is how to auto replace the main work center and work center of operations in work order with the one in equipment master data if order is generated by maintenance plan? is there any standard configuration or enhancement/BADi that can help with this requirement?
    thanks!
    Wesley

    Wesley,
    Sorry - development is the only way.
    Another option is to create a batch program that runs before your IP30 run(s) and updates any maintenance items and task lists with the correct work centres.
    PeteA

  • PM Order - Change "Work Center" on operations to "Main Work Center"

    Hi Experts,
    We have prepared a tool for client, which create Maintenance Plan and order in the background.
    The order created is having "Main Work Center" defined at header and "Work Center" at the operations level. In the current scenario the "Main Work Center" and "Work Center" are different say 'ABC' & u2018XYZu2019.
    Client has the requirement that work center maintained at operations should be same as the main work center.
    We need to implement the solution to take care of work center to be same as main work center while creation of the order in the background.
    Has anyone worked on the similar requirement before?
    I checked for existing USER EXITS for IW31/32/33 and found only one IWO10012. This doesnu2019t seem to be much useful.
    Please suggest any possible solution.
    Thanks,
    Ankur Sharma

    Hi Tilak,
    Thanks for the response. The current situation is that we are creating the order in background using the Z-program. The scenario is creating order with operation entries having work center not equal to the main work center.
    I am not functional, so just talking in terms of technical terms.
    Is there a way the work center at operation level can be changed to main work center in background?
    Thanks,
    Ankur Sharma

  • Factory Calendar and Work Center

    Dear All
    I am confused between factory calendar and work center working.  Kindly guide me what factory calendar does and what work center does?

    Hello,
    Factory Calander :-- Factory calendar contain company specific dates such as alternate working Saturdays, Plant shutdown etc.
    You can create your company factory calendar via transaction code 'SCAL'.
    Assignment of the factory calendar by plant is done in transaction code 'SM30 - V_T001W'.
    An example of a SAP application that uses the factory calendar is the SAP MRP modules.
    Assuming that you have a specified an alternate working Saturday, MRP will postponed the planned orders to the next working day if it happened to falls on a non-working Saturday.
    Work Center :--
    Operations are carried out at a work center. In the R/3 System work centers are business objects that can represent the following real work centers, for example:
    Machines, machine groups
    Production lines
    Assembly work centers
    Employees, groups of employees
    t-code-- CNR1 - Create
    for more information go to this link
    http://help.sap.com/saphelp_smehp1/helpdata/en/40/8ac473d40943ddb23def12bdb33437/content.htm
    Thanks

  • Combination of G.L account number and Profit center

    Hi All,
           i want to know some tables where i can see the linkage b/w the G/L account number and Profit center.
    Like all the Profit centers coming under a particular G/L account.
    Thanks in advance,
    Shyam.

    i want some base table like thing ...not transaction details...
    FAGLEFLEXA - table is not present in our system,is it  a 3rd party soln.
    Edited by: Shyam Das on Jan 30, 2008 2:13 PM

  • Link for Cost Center And Work Center.

    Dear Experts,
    Can you Provide me the Link for Cost Center And Work Center.
    Regads,
    Jyoshna

    Dear Experts,
    I got the answer for the Link Between Cost Center And Work Center.
    By using CR03   T Code we can see the Display Work Center : Cost Center Assignment Screen will appear.
    we need to select the costing tab, We can find Cost Center .
    Thanks & Regards
    Jyoshna

  • Tables for Basic end date and work center for operation

    Hi!
    I need table name to fetch the basic end date of a maintenance order and maintenance work centers with respect to each operation in maintenance order.
    Regards,
    VM
    Edited by: V M on Jul 20, 2010 7:22 AM
    Edited by: V M on Jul 20, 2010 7:35 AM

    Hi VM,
    Input is Order Number (AUFNR).
    You can find the Basic End date of Order in Table AFKO, filed is GLTRP.
    For work center in Operations, you can use the Table AUFPL from AFKO.
    Pass this AUFPL in AFVC and get the ARBID.
    Then pass this ARBID to CRHD Table as OBJID, and get the work Center (ARBPL)
    Regards,
    MLN Prasad

  • How to Assign Person (Personnel Number) without work Center

    Dear All,
    How to setup personnel number in order not using general and internal work center in operation service order area?
    if i use work center, it make HRD site and payroll will be damage
    please help me if you have any solution?
    Thanks
    Rendra Rizki

    dear all,
    When i tried to use co11n , the earning appearence :
    You want to confirm a network/order of the order type FEN1. However, this order type is allocated to an order category whose confirmation is not intended in this transaction.
    You try to confirm a network using a transaction intended for confirming production orders. Since networks and production orders are assigned to different order categories, the system issues an error message.
    so i still can't use this tcode, do you have any?
    Thx

  • Confirmation costs and work center link

    Hi Experts
    Can we link the costs in CO document along with line item and to a work center after production order confirmations?

    Dear
    You need to utilise tabel :
    1.AFKO - this is for your basic production header info
    2.S022 - this is for your operation header details - operation number, Work centre etc if you are only after the header details such as activity cost based on the activity type assinged at work centre -cost centre ( refer : AFVC or AUFV)
    3.AUFK - this is for your order master data - Order released flag, order complete flag, technically complete date, you'll need this to filter out confirmed order with order staus based on JEST table.
    4.Work Centre : CRCO-Work centre /cost center relation , CRHD-Work Cenre Header .
    5.Discuss with your CO  for CO document number
    -COVBP
    COSS CO Object: Cost Totals for Internal Postin
    COSP CO Object: Cost Totals for External Postin
    COSB CO Object: Total Variances/Results Analyse
    COSL CO Object: Activity Type Totals
    Hope this will be useful
    Regards
    JH

  • Operation Number and workcenter

    Hi expert,
    I know the order number and the operation number ( transact IW33 ).
    With this information how is possible to know the relative work center ??
    Exist some BAPI or some table ?
    Tks a lot,
    bye.

    Hi,
    1)    Goto SE11, give the Table name : WCAAP(WCM: Application)
           Get the TPLNR(Function Loc) value for the given Order No(WAPINR).
    2)     Goto Table IFLOT(Functional Location (Table) ): Give the TPLNR value and get the LGWID(Workcenter no)
    3)     Goto Table CRHD (Work Center Header): Give the OBJTY = 'A' and OBJID = above fetched value and get the ARBPL this the Work center for the Given Order
    Regards
    Bala Krishna

  • Read Routing and work center details from transfer order

    Hello
    I am using transaction LT31 to print a form for the transfer order.
    The customer wants me to print a field that is in the work center details of the routing for this material and plant.
    I can see this data with transaction CA02 where i enter material and plant,and then the work centers are beeing displayed.From here i can double click on the work center and see the field Supply area that i have to print.
    My answer now is,how to read details on the work center starting from my transfer order number.Which is the table connection between transfer order table LTAK and the tables where i can find the work center details.
    Thank you

    I have found the solution:
    ltak-tanum = mseg-tbnum
    read aufnr from mseg and go to afko
    mseg-aufnr = afko-aufnr
    read plnnr from afko and go to plpo
    afko-plnnr = plpo-plnnr
    from plpo read arbid and go to crhd
    plpo-arbid = crhd-objid
    from here,we can find the arbpl and the field that i was looking for PRVBE

  • Routing and Work Center

    My Friend,
    What tables and fields I can user to create a report with link ( Work center X Routing X machine times X labor times) I need of list with this information to analysis.
    I need comparete the times SAP information(Routing) verses Real Operation ( production line) by list.
    Thank you for any help.
    Best regards
    Armando

    Hi,
    You should have searched or posted your question in production planning forum.
    For example, check the link [Labour time and Machine time - production order table   |Labour time and Machine time - production order table]
    Regards

  • What is the relation between object work area (EH&S) and Work Center (PP)

    Hi gurus,
    I have a conceptual doubt, about the relation when I clasify like work center an object WA of IHS and how this feature is asociated at object work center of module PP?
    Conceptually is the same?
    Thank and Best regards

    Hello Hernan
    the Work Area is defined as: take a look here
    http://help.sap.com/saphelp_47x200/helpdata/en/1f/ea8e69e09311d3b5700004ac160be0/content.htm
    Therefore there is a link available between work area, plant and cost center.
    Work Center is defined as: take a look here:
    http://help.sap.com/saphelp_46c/helpdata/en/b1/c03424439a11d189410000e829fbbd/content.htm
    Work centers are business objects that can represent the following real work centers, for example:
    Machines, machine groups
    Production lines
    Assembly work centers
    Employees, groups of employees
    To my knowledge there is no "direct" link between these objects.
    Further on on the level of the Work Area (to my knowledge) you define: which employee etc. is linked  to the work area ((is working in the work area).
    So to my knowledge there are a number of "indirect" links between both objects but no direct link
    With best regards
    C.B.
    PS: http://fuller.mit.edu/ehs/ind_hygiene_safety.htm provides a further small overview of the Work Area Topic (EHS IHS)
    Edited by: Christoph Bergemann on Nov 15, 2011 8:53 PM
    Edited by: Christoph Bergemann on Nov 15, 2011 8:55 PM

  • Link between HR data and Work center

    Dear experts,
    We have assigned operators in work center through HRMS. For the purpose of making a report we require the table into which the linking of work center data and the employee is made.
    In the table CRHD a field HROID is found.  This is an object id which links the work center with a table either in HR or in PP which provides the link between organisational unit/ employee. Can anybody tell us the name of the table with details?
    Please help us.
    Thanks
    Jaikishan

    Dear Vittalji,
    Thanks for your prompt response.
    Our requirement is as follows:
    We need to create a report on details of operations done by each operators / workers for a specified period. For this purpose following assignments are done.
    (HR module is not implemented yet.  But we have made attempt to maintain the employee master by customising HR module little bit)
    1.  Employee master created in HR. 
    2.  Went to work center maintainence (CR02).
    3. Selected HRMS button.
    4. Selected Work Center option.
    5. Clicked on HR work center
    6. Given same work center as production work center.
    7. Selected 'person' from ALV list data
    8. Clicked on create relationship button.
    9. Assigned the appropreate persons.
    By doing assume this we made assignment of persons to this work center since the name of persons are getting displayed.
    We have a report to list out the workcenter wise operation confirmations for analying the daily production.
    Now we want to incorporate the operators (persons) name into our report by whom the operation/production was performed.
    For this purpose, while refering the table CRHD, found a field HROID (an object id).  To fetch the details of persons / operators those we assigned to the work center we need the tables for linking this field HROID.
    Our questions are
    1.  Whether the process of assigning   operators above mentioned are correct?
    2. What are the table-links for completing our report. i.e. only for work center to concerned operators (HR).
    3. What does the HR Work Center mean?
    4. What are the difference between HR work center and production work center?
    Your help is requested. Points will be rewarded promptly.
    Thanks and Regards
    Jaikishan

  • How to link Cost center and Work center?

    Hi All,
    We have a list of Work centers and the corresponding Cost centers. We need to know which tables can be used to connect the Work center with its corresponding cost center?
    Thanks:
    Siddharth

    Hi Please use t-code OP42. Make sure all your configuration for work centre is there. You link cost centre in the costing tab of work centre basic data.
    Hope this helps.
    Thanks
    Sanjeev

Maybe you are looking for

  • PM7 problem with booklet plugin

    I am trying to build a booklet with 13 pages. When I go to build the booklet using 2-up saddle stitch selected Pagemaker 7 wants to inserts 3 blank pages. When the booklet is built the pages are not in the correct order and PM has added blank pages t

  • Document delete notification

    Dear all, I need your help with this requirement. We need to send email notification to the document author and administrator whenever a document is manually deleted from UCM. What should be the approach to accomplish this functionality? We explored

  • Where is the refresh button for my podcasts

    Got a new computer, downloaded iTunes, now my podcast page does not have a refresh button and my episodes are out of date

  • Sort Time Axis in Charts :

    Hello, I have a simple Lines Charts were i need to show value on X axis with Text of the month  But Data need to be sorted according to the month number. i created an Alert in the table but when converted on charts alert is not applied. How could i s

  • Domain issues with Flash Media Server

    I have a webcam streaming to Flash Media Server via the Media Encoder. I have published the .swf file with the flash player and rtmp://99.999.999.999:1935/live/livestream address to my website on a hosted webserver. When I am on another internet sour