Operative indictors in WBS element

Hi Gurus,
The Operative indicator Account assignment has its check box by default flagged whereas other two boxes are unflagged. I want the Planning element to be flagged in all the WBS created and Acct. assignment box unflagged. How to achieve this ?
Regards,
Vinodh

Hi,
goto OPSA transaction for project profile.
click on control tab, in basic data subscreen
there is check box "All acct asst elem" i think that check box must have ticked, that's why all wbs elements are shown as account assignment element.
if you don't want that remove tick. & save.
now goto cj20n create project structure with wbs elements, now you will find wbs elements are w/o acct asst elem.
if you want to view all wbs element as planning element means all are ticked for planning element.This can be possible through substitution (tcode OPSN) by defining prerequisite & substitutions.
sandeep

Similar Messages

  • Copy std wbs element in operative project & copy material components to SO

    Dear Friend's
    As i know following things not possible in std. sap ps. Still i would like to know is there any possibility to acheive same in std. sap ps.
    1) I have created one std. project template, which is made for standardise Projects. Here we can copy same template for operative Projects. But my client having a requirement like they wanted to just copy a Single Std. WBS Element of any level from that std. project template to create operative project...can is it possible in std. sap ps.
    2) Can is it possible in std. sap ps to copy the material component (like fert, halb, roh, hibe, hawa etc.) which we have planned in Project Builder to Sales Order.
    3) In std. sap ps we can handle projects through multiple plants & multiple business area's. In my scenario cross plant & cross business area material's is supplied to any particular project. so same way can we create Sales Order for multiple plants & multiple busniess area's.
    Thanks & Regards,
    Sandeep

    closed.

  • Standard WBS Elements v Operative WBS elements as templates

    Hi
    I am considering the use of Standard WBS elements however one of the limitations that I have identified is that it is not possible to enter the any default settlement parameters into the WBS elements.
    As our Work Breakdown structures are a combination of both operative as well as capital WBS elements (for accounting purposes) it is not possible to enter the default Settlement Profile in the project profile.  ie: Mulitple settlement profiles are used across the WBS elements for a single project profile, depending on the required accounting treatment.
    Ensuring that users enter the correct settlement paramters for each WBS element cannot be gaurenteed and it does not appear possible to use sustitutions to populate these parameters.  Month end settlement is often problematic and the correct accounting treatment is essential so I am looking for alternatives.
    One alternative that comes to mind is to set aside a range of operative WBS elements for use as templates.  This would then ensure that all required fields in the operative structures are pre - populated including the settlement parameters.
    Has anyone used operative structures in this way and if so are there any potential issues?
    Thanks in advance.
    Ian

    Hi Hermant,
    Thanks for your ongoing input.  I am still not sure my original message was clear.
    The key point is that I am talking about using a range of operative structures as templates.  "lets just say the first 200 operative structures will be designated as templates."  These operative structures to be used as templates, contain different settlement parameters for each WBS element.
    In your first post you mentioned.
    "2. But this will not solve your purpose as copied projects will not have the settlement profile "as it is" in the std. operative WBS elements. Settlement profile gets defaulted from project profile... hence you will have to mainatin it manually again in the copied projects."
    and in your second post.
    "That is what I mentioned in my earlier post... although you maintain different settlement parametes in project which is to be copied.. it won't be inherited in new project. You will have to maintain it manually..."
    This is not the case, you actually do not need to maintain these settlement parameters manually when you copy an operative structure. (used as a template)  This is exactly why I am considering using operative structures and NOT standard structures as templates.  I agree, when using standard structures no settlement paramaters are inherited.
    As I mentioned in my first post the Project Profile will not contain a settlement profile.  Hence when the operative structure with pre populated settlement parameters is used as a "template" and copied to create a new operative structure all settlement parameters are copied / inherited to the new operative structure.  This is the result based on my prototype.  Try this, copy an operative structure that has pre populated settlement parameters and you will see that all these settlement parameters are copied.....at least in my system that is the way it works.
    I hope this helps clear up any misunderstanding.
    Regards
    Ian

  • Where the sub operation details of a activity of a WBS element are stored

    Hello experts,
                        Where can i find the suboperation details ( quantities , UOM .........)  of the activities of WBS element in CJ20N transaction. In which table it is being stored.

    Hi Kiran,
    These details are mainly stored in RESB table.
    But for your refereence if you want the table name of any
    of the value you just place your cursor over that field > Press F1>
    get a popup> get technical information throug a pushbutton on the popup>
    you would get the details of the table name field name etc. through this.
    Hope you may find it useful.
    Thanks
    Sumit

  • Function modules or BAPI for posting plan costs for WBS Element

    Hi all,
    Does anyone know, whether there exists a function module or BAPI for posting plan costs to a WBS Element? K_COSTS_PLAN_PS does not work, because RKP1 is not allowed.
    Greetings

    check
    BAPI_COSTACTPLN_POSTACTINPUT   Activity Input Planning: Posting                
    BAPI_COSTACTPLN_POSTACTOUTPUT  Activity/Price Planning: Posting                
    BAPI_COSTACTPLN_POSTKEYFIGURE  Stat. Key Figure Planning: Postings             
    BAPI_COSTACTPLN_POSTPRIMCOST   Primary Cost Planning: Postings                 
    BAPI_PDTRANSCO_POSTPRIMCOST    Transfer of Planning Data: Post Primary Costs   
    K40C                           CO Actual Postings, Manual                      
    BAPI_ACC_PRIMARY_COSTS_POST    Accounting: Post Primary Costs                  
    BAPI_COPAACTUALS_POSTCOSTDATA  BAPI Operating Concern: Post Costing-Based Actua
    BAPI_PRIM_COST_CHECK_AND_POST  Primary Costs: Formal Parameter Check           
    S@meer

  • WBS element- Sales Order

    Dear Gurus,
    In WBS element If dont tick on Billig element system will not allow assign this WBS element while creating a Sales Order.
    How it is happening,where can i find out these settings.
    Cheers,
    Sumith

    Hi
    Is it really a standard SAP behaviour which will allows only billing WBS element to be account assigned to a sales order line item? There must be some setting in sales item category or document type or requirement class. Anybody has any idea?
    All of a sudden in my case the sales order document is behaving differently. It is also accepting a non-billing WBS element to be account assigned.
    Some document says that even a non-blling (operative indicator) WBS element can be account assigned. However revenues can flow from sales order only if the WBS element is ticked as billing element.
    In that case, how to set a control in the sales document from not accepting a non-bllling WBS element to be account assigned?
    Regards
    Srikrishna

  • How to activate WBS Element in Sales Order

    Dear All,
    How to activate WBS element in sales order?
    Thanks & Regards,
    PM

    Basically in case of Repair and overhaul material is taking inside for repair purpose..for that we create service order in which we r creating component, operation(time. labor, machine) besides we create notification to allow overhead activity for this special activity..
    once this service order r created and notification is set.. we r estimating cost for this process and updating sales price(DP82) which further send to customer for approval.. once v receive approval v issue a goods along with parental serviceable material to Plant for Plant maintenance estimation..
    so all this procedure obey just like project , in this case we have to assign WBS element into sales order level..
    WBS elemet is nothing simply its hierarchy which shows what r the steps followed in project(CJ20N)..
    Correct me if i m wrong..
    thanks
    Mk

  • CJ20N : Settlement Rules Heritage on unique IeC WBS Element

    Hi Experts,
    I've customize PS for an investment project, who have a stategy for top down heritage of the settlement rules from the project definition, and an automatic generation of an only IeC (on first WBS element) when the entire project is launched from the project definition.
    All settlement rules are settled to the first WBS element (WBS project), who becomes the IeC.
    Heritage is OK on all WBS elements and  I can see them under "Edit -> Costs -> Settlement Rule".
    When I try to see my seetlement rules on the first WBS Element (WBS project), the system turn in loop and dump after 2 minutes (time over message).
    In my opinion, the error comes that the system permiss to affect the settlement rule (for exemple WBS -> I/0001) on his own object (WBS ID I/0001) . They have no error message when I save the project for the heritage.
    After this operation, impossible to go back under "Edit -> Costs -> Settlement Rule" to see the settlement rules of this WBS Element.
    For more information, I don't want the create the heritage to level 2 or 3 of my WBS elements structure, because I don't want to loose a level (coding mask I/XXXX.XXXX.XXX.XXXX).
    Does an expert have a solution to resolv my problem ?
    Thanks in advance for your assistance.

    Hi herieric ,
    The program should not enter into an endlos loop in such case. It is rather a program error than a consulting issue. You can copy the key words from the dumps and search the notes. If there is still no suitable notes, create a customer message and ask SAP for support.
    Kind regards,
    Zhenbo

  • Statistical WBS Element in Sales Order

    Hi,
    I tried to post a sales order with a statistical WBS element but the system shows me an error saying I can't open it because the WBS is statistical (Message CJ070).
    Could it be a problem of Controlling Area or Operating Cornern?
    Is there a setting that allow me to open a sales order on statistical WBS element?
    Thanks

    are u posting to some other cost object also. normally they wud have to be posted to a COPA also with the cost element being 11 category.
    the wbs will receive the statistical posting, so there needs to be a real object also.
    see whether the real object is getting derived.
    the system is nt finding the real object and trying to post with the WBS in real, but since its statistical, the error.
    any other calrifications. plz post.
    regards
    anantha

  • Open a Sales Order on statistical WBS element. How?

    Hi,
    I tried to open a sales order on a statistical WBS element but the system shows me an error saying I can't open it because the WBS is statistical.
    Could it be a problem of Controlling Area or Operating Cornern?
    Is there a setting that allow me to open a sales order on statistical WBS element?
    Thanks,
    Diego

    To best of my knowledge, WBS is only a search criteria if u wish u take a doc as ref. in sales order. this ref. will happen only if the previous doc is prepared with ref to WBS. may be at header or item level. but i wonder how will it track the doc if there are multiple WBS in previous doc. u can assign WBS in account assignment tab page.
    I wonder if i have helped u with my answer.

  • WBS Elements

    What are wbs elements in SAP. What is the different b/w internal orders and wbs elements.

    hi
    WBS is nothing but Work Breakdown Structure. It is mainly used in Project System (PS) module. Tcode : CJ20N
    For any project defined we must have atleast one WBS. Within this WBS we can have networks. Networks are nothing but the series of activities. Material are used to perform the activities.
    To explain in detail just consider one example:
    Govt of india wants to have Roads to be build through out the india. So Project can be defined in sap as "Connectivity".
    WBS can be roads within different states like Roads for Gujarat, Karnataka etc.. i.e. WBS Gujarat, WBS Karnataka etc.
    We can define different networks for these WBS  like Road Between Ahmedabad to Surat or Between Bangalore to Belgham.
    For this network we can have many activities like Land selection, Land Preparation, Road Building, Final finishing etc etc.
    Hemal's example was a good example. Project Systems comes into play only when the industry's business is based on projects like... Construction companies, Engineer to Order scenarios. You may not see anyone using PS module for retail business. As Hemal explained in that example, you have a main project which is broken down into WBS elements. You can use the TC CJ20N to create the project and the WBS elements. Each WBS may have mutiple Networks associated and each Network may have multiple Network Activities as explained in the example by Hemal.
    On the Sales Order, if your client is implementing PS module, you may have to attach the Sales Order to the WBS element it belongs to. WBS element is nothing but a bucket where all the activities belonging to that particular part of the project are captured. In the example, WBS Gujurat will tell you how many Sales Orders were created for the Gujurat sector, howmuch was spent on raw materials, what's the currect stock ([roject stock) available. How many Production Orders have been confirmed and howmany of them are getting confrmed in the future. How many invoices have been generated or how much revenue has been generated for that particular sector. How many deliveries have been made, what deliverables are still not accomplished. 
    So as you can see, PS is the center stage for all the modules that are being implemented like FI/CO, SD, MM, PP in this example. You can have cost centers and work centers defined. You can also have profit centers assigned at the plant level and get reports on varius selection criteria. 
    In a complete cycle of PS, like in reality, you initiate a project, you confirm/release the WBS/activities as per requirement, you execute the project and you close it. 
    One cannot initiate an activity unless it has been released by the project manager. Everything is accountable here and every dime is counted and at the end you know howmuch did you spend or make on each sector (WBS). Dont get confused with the term sector here... I am using it just for the explaination purposes.
    In one typical example, the company I was working with until not too long ago, had Deliveries from the Project (TC: CNS0). We never used VL01N. We used CNS0 to create a delivery and then used VL02N for confirming the picking quantity for the already created delivery document.
    I hope this should help you at least a bit. I'm not a PS consultant so I may not know a whole lot but trying going to CJ20N and you will see a lot yourself. 
    PS concultants are one of the highest paid consultants. Their supply is less and so is the demand. They are expected to understand real world business processes very well and they are generally the center stage of a project.
    for furthur notes
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/4c/225e1d46e611d189470000e829fbbd/frameset.htm
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/4c/225d5a46e611d189470000e829fbbd/frameset.htm
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/4c/225e2a46e611d189470000e829fbbd/frameset.htm
    for Internal oerder
    Purpose
    Internal orders are normally used to plan, collect, and settle the costs of internal jobs and tasks. The SAP system enables you to monitor your internal orders throughout their entire life-cycle; from initial creation, through the planning and posting of all the actual costs, to the final settlement and archiving:
    Implementation Considerations
    Order management within a company usually differentiates between sales-oriented orders, and internal orders. Sales-oriented orders (production or sales orders) are intended mainly for the logistical control of input factors and sales activities. Internal orders are categorized as either:
    Orders used only for monitoring objects in Cost Accounting (such as, advertising or trade fair orders)
    Productive orders that are value-added, that is, orders that can be capitalized (such as in-house construction of an assembly line).
    Internal order management is the most detailed operational level of cost and activity accounting. It can be used for:
    Cost monitoring, for example, where costs need to be looked at from object-related aspects, unlike in Cost Element Accounting or Cost Center Accounting
    Assisting decision-making, when you need to decide between in-house production and external procurement
    An enterprise’s internal orders can be used for different controlling purposes. For more information, see Classified by Controlling Objectives .
    Features
    You can use master data to assign certain characteristics to your internal orders, which enables you to control which business transactions can be used with the internal order.
    Internal order planning enables you to roughly estimate the costs of a job before the order starts and to make an exact calculation at a later date. You can choose between various planning approaches to compare the effectiveness of different methods.
    You can assign and manage budgets for internal orders.
    You apply the actual costs incurred by a job to your internal orders using actual postings. In Financial Accounting, you can assign primary cost postings (such as the procurement of external activities and external deliveries) directly to internal orders.
    In period-end closing you can use various different allocation methods (for example, overhead costing) to allocate costs between different areas of Cost Accounting.
    Order settlement enables you to transfer the costs incurred by an order to the appropriate receivers.
    The information system for internal orders enables you to track planned and assigned costs on your orders in each stage of the order life-cycle.
    You can archive internal orders that you no longer require. See Archiving.
    for furthur notes
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/COOMOPA/COOMOPA.pdf
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/cd/238f38661fca77e10000009b38f842/frameset.htm
    nagesh

  • WBS elements in Investment profiles

    Hi Experts,
    Is there any way we can check that to which all WBS element an investment profile is attached?
    Regards,
    Vijay

    Hi Vijay,
    If an inv. profile (or other customizing settings) is used somewhere, it must not be deleted in the customizing table, otherwise it cause database inconsistency.
    To forbid the user to maintain this field at wbs, you can use the
    customizing item
    'Define Field Selection for Work Breakdown Structures'  to hide\disable the filed. in the following path: Project System -> Structures -> Operative Structures -> Work Breakdown Structure (WBS) -> User Interface Settings.
    Please reward points, if it is helpful.
    Kind regards,
    Zhenbo

  • WBS element and Cost Center

    Hi Gurus,
    As far as I know, when the a/c assignment category is P in a PO, the costs are assessed on the cost object WBS element and when the a/c assignment category is K in a PO, the costs are assessed on the cost object cost center. But, as I drill down a WBS element, I find Requesting and responsible cost center.
    So, can I say that a WBS element is actually a child of the responsible cost center ?
          And all the costs assessed on a WBS element are eventually assessed on the responsible cost center?
    Please help in clearing my concepts.
    Thanks,
    Kumar

    hi,
    You assign the account assignment to WBS element based on the OPERATIVE INDICATOR...
    By this you specify the attributes of a WBS element and determine which tasks the WBS element can carry out in the project...
    Please check the LInk given for futher explainations:
    [WBS ELEMENT|http://help.sap.com/erp2005_ehp_04/helpdata/EN/4c/225e2a46e611d189470000e829fbbd/frameset.htm]
    check the table given at the bottom...
    Regards
    Priyanka.P

  • Statistical WBS elements-Budgeting and Use

    Hi Guys,
    Need some KT from you all regarding Statistical WBS Elements.My queries are
    1.Can a statistical WBS element be budgeted? If yes how are the Budget  distributed to those below.
    2..If a level 2 WBS is marked statistical and it has 3 WBS under it which are Acc asignment element then how is the budget distributed.
    3.can you provide some good example of the use of Statistical WBS element?
    Thanks in Advance
    ssk

    Hi Shourya,
    1. As mentioned above Statistical WBS can be budgeted like any operative project and the budget can further be divided into lower level WBS elements and Availaility Control can be activated on these.
    2. Again as stated above the budget distribution is normal. For ex- If a level 2 WBS is statistical and level 2's underneath that are real WBS.
    3. We can use the Statistical WBS for capital projects. For ex- We can assign a Statistical WBS in Master record of AUC for Availability control of budget for Capital spending. And then when we create a PO with Account Assignment category A with same AUC, budget control (Availability control) is activated through the statistical WBS.
    Someone might ask but why we want to use WBS for budget control why not I/O? It's because it provides more visibility over different departments (divided by structure). And via this process we can see all our PO's on AUC directly from Asset Explorer (AW01N).
    Hope it helps.
    Thanks,
    BS

  • Doing checks when closing a wbs element

    Hi all,
    i have to write a report that makes the same ckecks made by the transaction CJ02 on selecting the operation "Close" on the menu Edit --> Status for a specified WBS element.
    there is a function module, or a report, or a class, that makes those checks?
    Thanks.
    Lello

    Hi soumya prakash mishra,
    i have checked that standard code, but i can't find any helps.

Maybe you are looking for

  • How do i open just one file at a time

    i just got lightroom 4.  how do i open just ONE FILE??  i don't want to open catalongs, backup files, create smart collections auto import or any of that.  i just want to open one file at a time

  • Getting Error while creating multiple Orders using Sales order Create BAPI

    Hi, I am trying to create 2 orders thru the Sales order create BAPI before I commit and save the orders. The Orders are getting created and the BAPI is coming back with success, but it is not setting the system status on the line items of the 1st ord

  • Boot Camp Won't Load after adding Mavericks

    How things started 13" MacBook Air mid-2011 Mac OS X Lion 10.7.5 (11G63b) with 256gb SSD HDD partition between OS/X and a BOOTCAMP partition running Windows 7 SP1 x64 Ultimate I updated both OSes with the latest drivers. In Lion, I did (disabled now)

  • When "placing" a picture from Photoshop CS3

    When I "place" a picture from Adobe Photoshop in a document in InDesign CS5 it's blurry. The photo is not blurry in Photoshop. Why would this be happening? Appreciate any help! I've also tried placing the same photo in InDesign CS2 and it's blurry. D

  • Computer for gaming

    I am looking to buy a laptop that I can play the sims 3 on but I'm unsure of one that i can get. I really like the hp laptops These are the system requirements for the 2 options i can get FOR WINDOWS XP 2.0 GHz P4 processor or equivalent 1 GB RAM 128