Oracle Demand Planning or Demantra?

It seems fairly obvious that if you are starting out an implementation (or even part way through), you would cease implementing Oracle Demand Planning (ODP) and implement Demantra. I have read that all development work was ceased on ODP (even though some new features have been implemented in ODP R12). Further, I have read that there is no simple migration path from ODP to Demantra (due to the very different data structures).
My questions:
1. Do you agree with my comment about ceasing the implementation of ODP and resuming with ODP, and if not, why not?
2. Is there any known migration path between the two products that is supported by Oracle or is a completely new implementation needed?
3. What are the comparative costs of the two products?
4. What are the technology stack requirements of the two products? (particulary of Demantra).
Thanks, as always.

with regards to point 1... demantra is a better tool; it will create better forecast numbers and will provide a much more sophisticated end user experience. however the answer to your question is not always an obvious one.
firstly lets talk about finance and schedule. ceasing an implementation that is costing a large sum of money in favour of a newer product may not be the right course of action. budget alarm bells will start ringing since the delivery schedule will now be off the chart and the costs will only go up. is the implementation required to fix legacy system and data problems? if so there will be groans from the people that need the forecast numbers when they hear that the current inaccuracy will continue because some fabled "even better numbers" will be available somewhat later than promised.
what about stability? odp has it's fair share of problems but it is still much more robust than oracle demantra and depending on factors such as company size, structure, product life-cycle, forecast horizon and methodology demantra may not even provide a better solution. an r12 implementation of odp would survive for a number of years before requiring an upgrade and by then newer and better versions of oracle demantra will be available. there are a lot of customers still using odp and oracle will continue to support them.
don't forget the bigger picture and plan for the future. planning and forecasting solutions need to be flexible - whatever solution you use you should expect that it will need to evolve and part of that evolution should be a product migration. if the planners that are expected to use the new tools and process are not yet skilled at forecasting (maybe they just manipulate numbers in excel based upon weekly meetings?) then the basic approach to skills development might be as follows: start simple, then develop a more sophisticated approach and finally create a sophisticated forecasting solution (this pathway could take years). if you don't yet know the medium or advanced strategy then how can you possibly know which tool is best suited? start simple with odp knowing that in two years when you will want to move to a more advanced forecasting approach your users will understand what they want. at that point you can decide whether to stick or twist.
as for the other questions: 2 is a no. 3 & 4: don't know (sorry)
good luck and let us know what you decide.

Similar Messages

  • Can i access the Oracle Demand Planning Cubes using the AWM?

    Hi All,
    Is it possible to access the Oracle Demand planning data which is stored as Express server using the Analytic workspace manager?
    Any information regarding this is really appreciated.

    Abdul Hafeez,
    Is ODP using Express Server or Oracle OLAP Analytical workspaces?
    If Express Server is being used by ODP, then you cannot create sql views for OBIEE.
    If Oracle database is being used for ODP data, then it is storing the data in Analytical workspaces. In that case, you can manually create OLAP views using OLAP_TABLE function. To do that, you will first have to know all the required structures inside the Analytical workspaces. Without that knowledge, you will not know what olap structures to "expose" in the OLAP views.
    You can read about OLAP_TABLE function from Oracle 10g documentation http://download.oracle.com/docs/cd/B19306_01/olap.102/b14350/olap_table.htm
    If you are using 9i database for ODP, then read about OLAP_TABLE function from 9i documentation http://download.oracle.com/docs/cd/B10501_01/olap.920/a95295/olap_tab.htm
    - Nasar

  • Oracle Demand Planning

    Hi,
    Please let me know, If anybody knows how to customize the Demand Planning pages.
    Thanks,
    Robert

    Hi.
    Apologies for the delay in responding. The documentation for Oracle Applications 11.5.10 can be found on OTN, documentation URL: http://www.oracle.com/technology/documentation/index.html
    Applications / E-Business Suite > Applications 11.5.10 > Applications 11.5.10.2+ Online Documentation CD >B10238-01 (Oracle Demand Planning Implementation and User's Guide (zipped) )
    If this is not what you were referring to and it does not deal with documentations, please try the Members Feedback Forum at: Community Feedback (No Product Questions)
    Regards,
    Chao

  • Oracle Demand Planning Documentation

    Dear colleges
    Can any one knows the link to Oracle Demand Planning 11.5.10 Documentation
    [I mean updated document not one with the Documentation CD] or any info. regarding Oracle Demand planning istallation and implementation in Oracle Applications 11.5.10.
    Regards,
    A.S.Salem

    Hi.
    Apologies for the delay in responding. The documentation for Oracle Applications 11.5.10 can be found on OTN, documentation URL: http://www.oracle.com/technology/documentation/index.html
    Applications / E-Business Suite > Applications 11.5.10 > Applications 11.5.10.2+ Online Documentation CD >B10238-01 (Oracle Demand Planning Implementation and User's Guide (zipped) )
    If this is not what you were referring to and it does not deal with documentations, please try the Members Feedback Forum at: Community Feedback (No Product Questions)
    Regards,
    Chao

  • Oracle Demand Planning - No data available to view in worksheets sheets.

    Hi,
    We are facing issues with demand planning, the data is not coming into the worksheets,
    Do we have to do certain setups in the worksheets so that the data will appear?
    Here is the demand plan log.
    02/19/2009-16:08:23 -> ODP Version 1.15500
    02/19/2009-16:08:23 -> Begin Downloading Data from Planning Server.
    02/19/2009-16:08:23 -> Cleaning up shared databases and deleting planner databases.
    02/19/2009-16:08:24 -> Connecting to Planning Server.
    02/19/2009-16:08:24 -> Loading specified Demand Plan information.
    WARNING:
    02/19/2009-16:08:25 -> The dimension GEO was added to the plan definition since the last download process. This dimension will be ignored. Continuing with download process...
    Process resuming...
    02/19/2009-16:08:25 -> Loading Hierarchy and Level information.
    02/19/2009-16:08:26 -> Generating DP Hierarchy and Level metadata.
    02/19/2009-16:08:26 -> Processing Attributes.
    02/19/2009-16:08:26 -> Loading Time dimension values.
    02/19/2009-16:08:27 -> Cleaning up DP dimension values.
    02/19/2009-16:08:42 -> Loading dimension values.
    02/19/2009-16:10:09 -> Verify that all dimensions have values.
    02/19/2009-16:10:09 -> Setting backend hierarchy information.
    02/19/2009-16:16:14 -> Loading Input Parameters and Scenarios.
    02/19/2009-16:16:16 -> Loading Item Unit of Measure information.
    02/19/2009-16:17:49 -> Loading events.
    02/19/2009-16:17:51 -> Loading data for specified Input Parameters.
    02/19/2009-16:17:51 -> Loading data for the following Input Parameter: Panasonic Avionics Backlog:End Date.
    02/19/2009-16:54:30 -> Loading Unit of Measure conversion information.
    02/19/2009-16:54:47 -> Calculating conversion coefficients for Product dimension.
    02/19/2009-16:55:00 -> Loading variable Product pricing information.
    02/19/2009-16:55:20 -> Converting for Express Objects.
    02/19/2009-16:55:21 -> Converting to application metadata.
    02/19/2009-16:57:42 -> Synchronizing variable names.
    02/19/2009-16:57:43 -> Creating required worksheet objects.
    02/19/2009-16:57:43 -> Aggregating input parameters needed for allocation.
    02/19/2009-16:59:53 -> Allocating input parameters.
    02/19/2009-16:59:53 -> Aggregating other input parameters.
    02/19/2009-19:38:28 -> Setting DP system flags.
    02/19/2009-19:38:28 -> Disconnecting from Planning Server.
    02/19/2009-19:38:37 -> Completed Downloading Data from Planning Server.
    02/20/2009-14:38:32 -> Begin Populating Measures.
    02/20/2009-14:38:32 -> Confirming database attach logic.
    02/20/2009-14:38:32 -> Calling driver for Measure population.
    02/20/2009-14:38:32 -> Populating Measures according to Measure definitions.
    02/20/2009-14:38:32 -> Performing measure copy for the following measure: Tactical Forecast.
    02/20/2009-14:40:47 -> Completed Populating Measures.
    02/20/2009-15:08:26 -> Begin Distributing Data to Planners.
    02/20/2009-15:11:00 -> Building personal database A1 for assignment Keith Elliott.
    02/20/2009-15:16:43 -> Build of personal database A1 was successful.
    02/20/2009-15:17:35 -> Building personal database A11 for assignment Quincy Perry.
    02/20/2009-15:22:48 -> Build of personal database A11 was successful.
    02/20/2009-15:23:02 -> Creating Submissions Measures.
    02/20/2009-15:23:02 -> Performing measure copy for the following measure: Submissions, ASTRONICS (20-FEB-2009).
    02/20/2009-15:23:07 -> Completed Distributing Data to Planners.
    ***************************************************************

    Hi user602232,
    the batch logfile does not reveal any issues. It would be helpful to get more details:
    1. what kind of data does not appear in the worksheets? Level values etc?
    2. some more details about the demand plan setup and demand plan assignments would help.
    The first things I would check:
    a) was data collection successful
    b) check the demand planner assignments
    regards,
    David.

  • Demand Planning: How to create a forecast in ODP

    Our client is using Oracle Financials OM etc however it currently uses a separate tool for forecasting. We are planning to start forecasting in Oracle Demand Planning.
    Following is the simplified calculation for forecasting, how can this be done in ODP:
    Calculation is done for item type, 2 calculations are done for every month (X and Y changes every month):
    JAN:
    1. A= X% of Jan sales
    2. B= Y% of last year sales
    The forecast should pick greatest number among A and B (it should not pick A+B).
    Is this possible in ODP, how to setup the forecast and its calculations.
    Thanks in advance.

    You could do this in ODP using the absolute value function and some formula measures.
    I assume you are familiar with formula measures in ODP and hence I will focus only on the math behind the formula measures. I am ignoring the percentage aspect that can be easily achieved using formula measure capabilities.
    The result set that you want is the following:
    if X > Y return X else Y
    Formula measure 1 = FM1 = X + Y
    Formula measure 2 = FM2 = = |X - Y| (absolute value)
    Formula measure 3 = (FM1 + FM2) / 2
    How does this work?
    |X - Y|
    returns Y - X if Y > X
    returns X - Y if X > Y
    if X > Y then the result is
    (X + Y + X - Y)/2 = X
    if X < Y, then the result is
    (X + Y + Y - X)/2 = Y
    This will give you the results you want.
    Note: the formula measures apply at all levels of the hierarchy and is not the aggregation from the lowest levels.
    Please be careful and validate this solution against your total set of requirements.

  • Demand Plan and Supply commit

    The forecast or demand plan from Demantra (monthly bucket) is sent to suppliers by Collaboration planning Via ASCP (broken to weekly bucket). The supply commit will be received through CP (wkly bucket) to ASCP (wkly bucket) to Demantra (aggregated to monthly).
    The reason being demantra values are in montly bucket and we want weekly break up and thats why we are thinking to use ASCP.
    Is this true?
    View Plan vs. commit by month in Demantra
    View Plan vs. commit by week in ASCP
    CP is a portal for file exchange
    Or supply commit is visible only in CP?
    Please explain and suggest alternate design if possible?
    Thanks

    Hi,
    You need to define the SNP Demand Profile and SNP Supply Profile in the Product Location master data.
    Goto -> /n/SAPAPO/MAT1 -> On the selection screen below the Product / location fields, you see the fields for 
    - Lot Size Profile
    - Demand Profile
    - SNP: Demand Profile
    - SNP: Supply Profile
    - Deplloyment Profile.
    Here you can enter the name of any profile you want to create and use the 'Create' button to create your profile. This will be then available for selection when you create your Product Location master.
    Hope this helps. Let us know if you still have any doubts.
    Cheers,
    Srinidhi
    Hope this helps.

  • ***Demand Planning Open Interfaces*****MSD_DP_SCENARIO_ENTRIES****

    Hi,
    Can someone let me know the demand planning open interface used to load the table MSD_DP_SCENARIO_ENTRIES table in oracle and how it works??
    I really appreciate your help.
    Thanks,
    Kumar

    For demantra questions, post to the APS forum - Advanced Planning & Scheduling (APS)
    You will get better response.
    Hope this helps,
    Sandeep Gandhi

  • Demand Planning:  creation of several Instances or Organizations

    Hello,
    I have to setup and ODP environment for several entities. The data will come from legacy systems (not Oracle Applications) from each entity.
    We will have as many plans as entities. I would like to know if it is better to create only One Instance, and each entity is defined as organization, or if it is better to create one Instance for each entity.
    What are the pros and cons of each method ?
    Thanks in advance.

    ct,
    It is usually about common data and workload.
    If going the Instance per Entity route: each Instance will require a full collection of data (Products, Bill of Materials, Customers, Organisation etc.) to set up the structures that Demand Planning needs. There can be tremendous data management issues with having multiple instances.
    If your multiple entities share common data then it would be easier to manage them as Organisations of one Instance. The maintenance and loading of data would be much easier. The new Demand Plan Scoping functionality will also enable easy Demand Plan creation per Org.
    Making the assumption that your entities don't share common data I would advise doing some analysis to determine how easily they could be merged and what the maintenance effort would be. If the source data is merged then you may get benefit in reduced customisation of hierrachies and data streams.
    Regards
    Simon.

  • Not able to Upload data in Demand Planning data view

    Hi
    I am trying to upload a csv  file in to Demand planning interactive planning through " Upload Data " functionality
    First I exported data from interactive planning , updated some data in file and again trying to upload same file.
    I am getting following error
    File cannot be uploaded
    Message no. /SAPAPO/SDP_UPLOAD009
    Diagnosis
    File  has no technical information or incorrect technical information.
    Procedure
    Save the file again locally. Make sure that the file has the technical information.
    Could u please suggest what needs to be done
    Thanks and regards,
    Nitin Lavhe

    Hello,
    For using the upload data functionality from interactive planning grid, you need to first download the data. While downloading the data, please check the check box for "Prepare the file for upload at later time", and then select the option of putting the technical setting into the file or into the system. Either way is okay. Then try uploading the same file.
    This should solve your problem.
    Thank you.
    Regards,
    Jacky Jain.
    SAP APO Architect.

  • Oracle EPM Planning 11.1.2.1 - Ziplogs utility not working on all servers

    Oracle EPM Planning 11.1.2.1 - Ziplogs utility not working on all servers
    We have Planning 11.1.2.1 distributed so that Planning web app, EAS etc. are on own webservers and Essbase is on separate cluster.
    Currently we have an issue with ziplogs utility - it seems to work on Essbase servers gathering all necessary ODL logs for over 100MBs, but on Planning Webservers ziplogs utility seems to start, but generates only empty 1kb zip file without any content.
    We haven't touched logging otherwise, everything should be pretty much in original state.
    Unfortunately I can't remember now exactly, but I have a a hunch that ziplogs utility worked prior patching Planning element on webservers to 11.1.2.1.600.
    Other servers or elements haven't been patched (although Oracle recommends also FS, EB etc. to be patched to 11.1.2.1.600). I'm wondering, could this be the reason as in a way FS and EB are on same patching level whereas Planning is not?
    Also, there seems to be a bit of limited diskspace on webservers (still waiting for extension), but I would imagine lack of diskspace for preparing any temp files etc. would results in some errors, the problem is that ziplogs doesn't give any errors, just runs very short time and then ends bringing 1kb empty file.
    Has anyone experienced anything similar and are you perhaps able to give quick guidance how to enhance or modify ziplogs batch file etc. to make it create a bit of logging of its own actions?
    Thanks in advance if anyone has ideas what could be the root cause for this or faced something similar.

    Okay, I was able to get it installed and Common Components installed correctly this time. I still can't access workspace though.
    Is there something I need to do before I can browse to http://localhost:19000/workspace/index.jsp?
    All I get is the following error:
    Error 404--Not Found
    From RFC 2068 Hypertext Transfer Protocol -- HTTP/1.1:
    10.4.5 404 Not Found
    The server has not found anything matching the Request-URI. No indication is given of whether the condition is temporary or permanent.
    If the server does not wish to make this information available to the client, the status code 403 (Forbidden) can be used instead. The 410 (Gone) status code SHOULD be used if the server knows, through some internally configurable mechanism, that an old resource is permanently unavailable and has no forwarding address.
    Anyone know what's going on?

  • Business Process: Final Demand Plan Key Figure in the past for APO DP

    Hello APO process experts,
    I have a BPX question for APO DP process owners, consultants or gurus:
    1.- Have you ever seen in any SAP APO customer, that in their APO DP planning books, they chose or designed to update the Final Demand Plan key Figure in the past closed historical buckets with the Actual Sales?
    Meaning that that in the Past closed historical Buckets, Actual Sales and Final Demand Plan, look exactily the same.
    Meaning that they create a dynamic Final Demand Plan key figure so to speak, yet they did not choose to create a key figure that also keeps the Final Demand Plan as originally entered.
    2.- Would you think that doing the above, without keeping any keyfigure in the planning book that actually shows what the Final Demand Plan was in the Past, is a good practice?
         The Demand Planner could still retreive the Final Demand Plan from BI reports, yet, dynamically they could never really see it in the planning book.
    3.- Do you think the above dynamic key figure would bias the Demand Planner's behaviour to manipulate the future open Final Demand Plan buckets to enter volumes in order sum to a monthly total, independently of what were the over and underachievements in the past (since they are not really visible to him) ?
    I would really like your feedback,
    thanks in advance!
    JD Loera

    Hello Thanks for your feedback.
    I agree with your point, and I hope that i still get more feedback from other Business Process Experts.
    I am trying to build a case for my client, to challenge the decision of their initial design as this practice is going to hurt the Demand Management process, if what they intend to achieve is a true "unconstrained demand plan"
    Much appreciated
    JD Loera

  • Oracle.jbo.NoDefException: JBO-25002: Definition oracle.epm.planning.applic

    All,
    Want some pointers to the error that I am running into. The application supports webcenter and when we bring up the web page we get the error below
    oracle.jbo.NoDefException: JBO-25002: Definition oracle.epm.planning.application.ui.DataControls of type null is not found
    caused by the nested error Caused by: oracle.mds.core.MetadataNotFoundException: MDS-00013: no metadata found for metadata object "/oracle/epm/planning/application/ui/DataControls.dcx"
    at oracle.mds.core.MetadataObject.getBaseMO(MetadataObject.java:1279)
    There is no file called DataControls.dcx under the "/oracle/epm/planning/application/ui/ package.
    How do we remove the runtime reference that webcenter still seems to hold onto?
    Any help is really appreciated.

    It supports WebCenter Customizable Components tag library in the ViewController project. The DataControls.dcx file which was under the oracle.epm.planning.application.ui package was still present under the classes folder. Since this file was deleted from the JDEV view it seemed that it should not be included. It worked on my environment but not for others who did not have the file stored under classes folder under the ViewController project.
    I have the problem resolved now. Thanks for all the pointers.

  • Error Message When Opening Interactive Demand Planning

    Hello Experts,
    I have one user who is receiving the following error message when trying to open Interactive Demand Planning Workbook.  Only one user is experiencing this issue.  Has anyone run into this before? 
    GP: Graphics product not available in this system; see long text
    Message no. APPLG225
    Diagnosis
    The required graphics product is not available on the current platform. It is either not permitted, or it does not work properly.
    The application does not have a fallback strategy.
    Procedure
    Application/Specialists
    Contact your developers to see if a fallback strategy can be implemented.
    Development
    Check the call method of the graphics proxy. If the graphics product is not mandatory (parameter FORCE_PROD), then the graphics proxy can select a different graphics product that is available on this platform.

    Dear Adam,
    The prerequisite for graphics in planning folders is the SAP Internet Graphics Server. The connection between the SAP Internet Graphics Server and the system in which you operate BPS must take place using an RFC destination of the type TCP/IP with the predefined name IGS_DEST_POFO.                                                          
    Please make sure that your settings are correct and check the online help at:   http://help.sap.com/saphelp_sem320bw/helpdata/en/05/                  
      242537cedf2056e10000009b38f936/frameset.htm                                                                               
    Planning Folder                                                         
      > Editing a Planning Folder: Details                                  
          >Planning Folder: Portfolio Graphic"                                                                               
    Please have a look at the following notes as well that helped to solve problems with the IGS. 454042 IGS: Installing and Configuring the IGS                          
    676532 Dumps in transactions with splitter containers                   
    I hope this helps.
    Regards,
    Tibor

  • Issue in creating Duet  Demand Planning Sheet on the basis of Dataview

    Hi all,
    We are using following landscape
    Landscape Details-
     SAPAPO = SCM 700 0002 - SAPKY7002
     Duet 1.5 - 150.700 SP3
     Duet Demand Planning u2013 1000.150.700.3.0 (Server Component), 1000.150.700.3.0 (Client Component)
    There are 2 ways available to create Duet Demand Planning Sheet
    1. On the basis of existing Demand Planning Scenario
    2. On the basis of existing Data views( with SAP macros)
    We are able to create Duet planning Sheet with 1 option. But we got erro with second Option that is on the basis od Data view(with macros).
    Planning area, Planning Book/Data view and Selection Ids are existing and active.All the Webservices given by SAP are released.
    Duet is able to retrive the list of Dataviews avilable for the Planning Area. But it is failing to retrieve the Data View Details the Error is as follow
    "No view Details were found Please choose another dataview."
    Web Service Call (PlanningViewDetails):
    java.rmi.RemoteException:Service call exception; nested exception is:
    java.rmi.UnmarshalException: Attribute schemeAgencyID is required in element ID !
    Data: TYPEID DUET_JAVA_ADDON
    Data: SEVERITYCODE 2
    Exception of type 'System.Exception' was thrown.
    Is there any SAPNOTE for this ?Any specific configuration requirement from SAPAPO side?
    Any webservices to be applied?
    Please help in this Issue
    Thanks &  Regards
    Rahul

    Hi
    There are couple of OSS  notes, you might have already seen:
    1371328 Internal Error using Planning Book with Aux. KF
    1431661 Duet Demand Planning 1.5 SP4.
    Regards
    Datta

Maybe you are looking for

  • Major FCP Glitching Render Problem - Any Ideas?

    Hey folks, I'm running into massive render glitches with FCP. Here's what happens: In a scene with a lot of fast cutting, and dupe frames, it all plays fine in realtime. However, once I render the footage, or make a self contained QuickTime, these ar

  • Is there a way to have CUPC alerts go to PC speaker when a headset is used?

    I would like incoming chat alerts to 'beep' the PC speaker, but I use a headset (which I do not wear constantly) to make voice calls. If I go to Options -> Audio and change Speakers to the PC speakers, I am always on speakerphone and the headset does

  • To change the format of the list

    Hi Guys , I have schduled a batchjob its a report program runs every week and after completion of the job it sends mail to the concerned guy  with the details of the report .Its an Standard report everything is configured by using SM36 transaction .

  • BDC for Uploading data from XL sheet with unknown order of fields

    Hi SAP Gurus, My requirement is as follows, A BDC is to be developed for uploading data from an XL sheet, but the problem here is , the order of fileds in the sheet can be changed . ie,  for example the fields in the XL sheet are :-   matnr    maktx 