Overhead Actualization

Dear Members,
If the overheads are applied to an order based on the activities performed and from the overheads secondary cost elements of costing sheet, and those are later not actualized from the expense posted in FI module, will it double charge the expenses in GL And on product Cost?

I think my question is not being understood, Let me put some numbers which might help us understanding the situation.
I have a product whose standard cost is set to say $100 ($90 Material, $5 Labor & $5 Overheads) and price is set to be $120, there is no opening & closing inventory and the goods will be sold in the same month and only one unit is produced during the month
When the actual materials consumed at was $92 and while making the confirmations & finalizing the goods movement lets assume the standard cost of overheads & labor was charged ($5 each) and now the order contains a debit of $102
When settling this order without running allocation cycle,  splitting/revaluation of prices etc, The cost debit to FG account will be the standard cost i.e $100 while the difference i.e $2 will be settled in the variance account (Only material variance)
My question is when this FG is later transferred to COGS it will be again $100 and remember since to revaluation of overhead prices is done the standard overheads & labor cost is included in this $100 while the variance of $2 will be shown again.
Now lets suppose in isolation the FI is charged with $12 of cost in terms of labor and overhead accounts, who, since are not allocated & written on the orders, are isolated and will be appearing in the expenses section instead of only incremental part of theirs i.e ($12-$10=$2) should be shown as unabsorbed costs
Will the P&L in this scenario depict a picture of
Particulars                        $
Renevue                         120
COGS (STD)                 (100) (90+5+5)
Variance                          (2)
GP                                   18
Expenses                         12
Net Profit                             6
Instead of
Particulars                        $
Renevue                         120
COGS (STD)                 (100) (90+5+5)
Variance                          (4)
GP                                   16
Expenses                         0
Net Profit                             16

Similar Messages

  • Error while entering  the Overhead percentage 0.3693 in Costing Sheet

    HI,
    While defining costing sheet in the system,i need to give the overhead percentage as 0.3692 as per the client requirement.but the system is giving the below error.
    Input should be in the form __,___,__~.___V
    Message no. 00088
    Diagnosis
    Your entry does not match the specified input format.
    System response
    The entry in this field was rejected.
    Procedure
    The entry must comply with the edit format. The following edit format characters have a special meaning:
    "_" (underscore)
    There should be an input character at this point; this should be a number for numeric fields.
    "." (decimal point) (applies to numeric fields)
    The decimal point occurs here (setting in the user master record).
    "," (thousands separator) (applies to numeric fields)
    This separator occurs (optionally) for more than three figures. Depending on the setting in the user master record, it can be a period or a comma.
    "V" (applies to numeric fields)
    The operational sign appears here. If used, it must by at the right margin of the field. The sign is either "-" or " "(space).
    "~" (tilde) (applies to numeric fields)
    As of and including this character, leading zeros must also be entered. Otherwise, this character has the same meaning as an underscore. Leading zeros need not be entered on the left of the tilde. They are not output at this position.
    All other characters have their normal meanings and must be entered in the same position as in the edit format.
    Thanks
    Sunitha

    hi Sunitha,
    this error is related to Decimal Format pls check your setting in country
    For 4.7C
    SPRO > IMG > General Setting > Define countries in mySAPsystem
    For ECC 6.0
    SPRO > IMG > SAP Netweaver > General Setting > Define countries in mySAPsystem
    select your countries and double click in that there is last field for Decimal Pt. format check that format and try to enter value according to that format because in error it showing 4 decimal and there you may have maintained in two decimal. also check decimal currecy setting. One more reason could be there instead of full stop you may have maintained comma in setting.
    thx.
    Ganu

  • PRECISO DE AJUDA. Após instalar a ultima actualização do Mavericks, meu MacBookPro não inicia no arranque.

    Depois de baixar e instalar a ultima actualização do Mavericks 10.9.3
    Pediu a activação da conta do iCloud (Apple id e password), eu escolhi "fazer isso mais tarde"
    Cerca de 7 minutos depois tentei reiniciar,
    Mas o sistema não arranca, só aparece o símbolo da Apple e um sinal de "processamento", mas depois desliga-se....
    Alguém me ajude, please.

    deve ver uma janela como esta. caso o Shift não resolva tente usar o Alt ou Option como é chamado em Inglês

  • Adobe Creative Cloud - Photoshop CC / Photoshop CC (2014) i had first install Photoshop CC with some actualizations , I have install now Photoshop CC (2014) without desinstalling Photoshop CC... I would like stay only with the 2014 version but i don´t fin

    Adobe Creative Cloud - Photoshop CC / Photoshop CC (2014) i had first install Photoshop CC with some actualizations , I have install now Photoshop CC (2014) without desinstalling Photoshop CC... I would like stay only with the 2014 version but i don´t find more the desinstaller of old CC version and the 2 versions takes a lopt of space on my disk... is it normal or is there a necessity to stay with the 2 versions... Now I use only the 2014 version but the old version is always there ????

    Topic or subject titles should be clear, pertinent and concise so that individual users can tell at a glance if they can help or not. 
    That field is not for attempting to fit your entire question in there.
    Please keep this in mind next time you post.  Thank you.

  • What is the overhead of Supplemental Logging?

    We would like to copy data from a 600 GB Oracle database (9i) to a separate database for reporting. We want to use Data Guard in Logical Standby mode. The source database is heavily used and we can't afford a significant increase in system load (e.g. I/O activity) on that system.
    To set up a Logical Standby, we need to put the JD Edwards database into Supplemental Logging mode. I am concerned that this will noticibly increase the load on the source server.
    Has anyone analyzed the additional overhead of Supplemental Logging?
    I have done some testing using Oracle 10.2 (Oracle XE on my computer) which indicates that when I turn on Supplemental Logging, the size of the archive logs grows by 40%. I have not yet tested this on our 9i database.
    Thank you in advance for your help!
    Best Regards,
    Mike
    =================================
    The code below demonstrates the symptoms mentioned above:
    RESULTS - size of archive logs generated:
    - With Supplemental Logging: 120 MB
    - Without: 80 MB
    =================================
    CREATE TABLE "EMP"
    (     "EMPLOYEE_ID" NUMBER(6,0),
         "FIRST_NAME" VARCHAR2(20),
         "LAST_NAME" VARCHAR2(25) NOT NULL ENABLE,
         "EMAIL" VARCHAR2(25) NOT NULL ENABLE,
         "PHONE_NUMBER" VARCHAR2(20),
         "HIRE_DATE" DATE NOT NULL ENABLE,
         "JOB_ID" VARCHAR2(10) NOT NULL ENABLE,
         "SALARY" NUMBER(8,2),
         "COMMISSION_PCT" NUMBER(2,2),
         "MANAGER_ID" NUMBER(6,0),
         "DEPARTMENT_ID" NUMBER(4,0)
    alter table emp add CONSTRAINT "EMP_EMP_ID_PK" PRIMARY KEY ("EMPLOYEE_ID")
    CREATE TABLE "STAT"
    (     "F1" NUMBER,
         "ID" VARCHAR2(10)
    The "employee" table is from Oracle XE samples
    The procedure below generates transactions to test archive log size.
    To run, put the database in archive log mode. Then pop an archive log by executing
    ALTER SYSTEM ARCHIVE LOG CURRENT;
    To flip between running with Supplemental Logging, use one of:
    ALTER DATABASE drop SUPPLEMENTAL LOG DATA (PRIMARY KEY, UNIQUE INDEX) COLUMNS;
    ALTER DATABASE ADD SUPPLEMENTAL LOG DATA (PRIMARY KEY, UNIQUE INDEX) COLUMNS;
    declare
    i number;
    begin
    i := 0;
    while i < 1000
    loop
    delete from emp;
    insert into emp select * from employees;
    update emp set COMMISSION_PCT = COMMISSION_PCT * .5;
    update stat set f1 = i where id = 'UPD';
    commit;
    if i mod 1000 = 0 then
    dbms_output.put_line(i);
    end if;
    i := i + 1;
    end loop;
    end;
    /***********************************************/

    Unless the bottleneck of your system is related in any way to the redo log files, I don't see any risk in generating supplemental logging. A good way to find out is to look at a Statspack report, and see which events are the top 5 time-wise.
    Daniel

  • Overhead Percentage is not getting updated in KONX

    Hi All,
    The Overhead percentage which we maintain in KZZ2 is not getting updated in KONX table. Can anybody suggest whether the OH percentage is available in KONX table only or anyother table also? Or Is there any program which needs to be run to update the KONX table?
    Regards,
    Rajeswari Shankar.

    Hi,
    U can also check konx1 table.
    Check whether overhead calculations are run.  Check whether CO42(in case it Product Cost Collector), KGI2(in case of costing by order), VA44(incase of costing by salesorder) run as applicable.
    Regards
    Sudhakar Reddy

  • Overhead is not getting updated in the production order

    Hi all,
    I am running actual overhead calculation with KGI2.
    But the overheads are not getting updated in the order.
    Order contains relevant overhead key also.
    What could be the possible causes?
    SmanS

    Arun/ Suleman,
    Thank you for your reply.
    I have maintained the % in the costing sheet against the 'Overhead rate' but I didn't get the secondary cost element.
    Request you to elaborate it further & explain me how to maintain the same.
    Also I will be thankful to you, if you could explain me the exact process of loading the overhead on the order i.e. how it loads the overhead form the cost center to order? What happens to the total cost which was lying on the cost center etc, in details.
    Mean while I had maintained the required values in costing sheet in KZS2.
    Maintained the % against material overhead rate as well as manufacturing overhead rate.
    Maintained the credit values for the overhead rate.
    Maintained the calculation base values also.
    Now while overhead calculation with KGI2, I am getting two errors as follows,
    1. S:K5:162 E02 20090831
    2. Error CREDIT_SEGMENTS_ADD COIOB NOT FOUND for object
    I can not figure out the reason.
    SmanS
    Edited by: SAP PP Consultant on Aug 10, 2009 6:47 AM

  • PL/SQL to Java Interface - Overwhelming Overhead?

    My company is running Oracle 10g R2. I am currently exploring the use of java classes from PL/SQL. This is because we have multiple code bases, including Java, PowerBuilder (which can interface with Java), and PL/SQL (which can interface with Java).
    Doing some performance testing, I found some rather alarming results. Running a simple java function 1 million times, I tested performance of PL./SQL to java and PowerBuilder to Java.
    In PL/SQL, the 1 mil calls executed in ~120 s.
    In PowerBuilder, the 1 mil calls executed in ~54 s.
    Is it possible that our database is incorrectly configured for best java performance? Not only does it appear that PowerBuilder, a much less pervasive language than PL/SQL, is over twice as fast, but the PB test was run on my laptop, which is no where near as powerful as the database server that the PL/SQL procedure ran against, leading me to believe that the performance gap is actually much wider.
    Anyone have any tips to improve the performance? Or is this simply the nature of the beast? I can't seem to find any posts on the net about people experiencing huge PL/SQL to Java overhead, so I'm hoping it is just something I am doing wrong.
    Thanks for your help!
    -Brett Birschbach

    Below is my test code. Any suggestions are appreciated.
    Thanks!
    -Brett
    ==================================================
    Java Class:
    public class TestConvert {
        // For running straight from Java
        public static void main(String[] args){
            System.out.println(callAndTime());
        // For running 1 mil calls with only one call from PowerBuilder or PL/SQL
        public static long callAndTime(){
            TestConvert.convertEsnDecToHex("13005454488");
            long start = System.currentTimeMillis();
            for (int i = 0; i < 1000000; i++){
                TestConvert.convertEsnDecToHex("13005454488");
            long end = System.currentTimeMillis();
            return end-start;
        // For performing the actual work
        public static String convertEsnDecToHex(String esn) {
            String result = null;
            result = Integer.toHexString(new Integer(esn.substring(0, 3)).intValue());
            result += Integer.toHexString(new Integer(esn.substring(3)).intValue());
            return result.toUpperCase();
        // Non-static wrapper necessary for PowerBuilder
        public String callAndTimeNS(){
            return String.valueOf(callAndTime());
        // Non-static wrapper necessary for PowerBuilder 
        public String convertEsnDecToHexNS(String esn){
            return convertEsnDecToHex(esn);
    }PL/SQL Script for 1 Million Java Calls:
    DECLARE
      var       VARCHAR2( 20 );
      t_begin   NUMBER;
      t_end     NUMBER;
    BEGIN
      var := testconvert.convertesndectohex( '13005454488' );
      t_begin := DBMS_UTILITY.get_time;
      FOR i IN 1 .. 1000000
      LOOP
        var := testconvert.convertesndectohex( '13005454488' );
      END LOOP;
      t_end := DBMS_UTILITY.get_time;
      DBMS_OUTPUT.put_line( var );
      DBMS_OUTPUT.put_line(  ( t_end - t_begin ) / 100 || ' seconds' );
    END;
    /PowerBuilder for 1 Million Java Calls:
    EJBConnection lEJBConn
    TestConvert lnv_test
    String ls_ret
    Long i
    Time t_begin, t_end
    lEJBConn = CREATE EJBConnection
    lEJBConn.CreateJavaInstance( lnv_test, "TestConvert")
    ls_ret = lnv_test.convertesndectohexns("13005454488")
    t_begin = now()
    FOR i = 1 TO 1000000          
         ls_ret = lnv_test.convertesndectohexns("13005454488")
    NEXT
    t_end = now()
    MessageBox("Hex Version",ls_ret + " - " + String(SecondsAfter(t_begin, t_end)) + " seconds")
    DESTROY lEJBConn

  • Overheads not calculated

    Hello Experts,
    After launching the KKS5, error messages for no calculation of the overheads on some materials.
    When launching KKF6N for June the Indirect Costs are there but it's not the case for the month of July.
    The costing variant planned for the materials is PREM.
    I would like to have more explanations about this issue.
    Thanks in advance,
    Edited by: Ferdaws ABID on Sep 19, 2011 3:57 PM

    Hello Tarek,
    I have checked the configuration of the overhead in the transaction KZZ2 as you mentionned but everything seems to be OK.
    The validity period is OK and the overhead rate is maintained correctly.
    Do you have other suggestions ?
    Regards,
    Ferdaws

  • Overheads not calculated in CK11N cost estimation

    Hi all,
    I have two issues
    1. When i am executing CK11N,i am not able to get the overhead calculation in itemization,but its showing some ridiculess firgure in cost component structure.I am using dependency D020.
    2 . when i am using  dependency D050 the system not calculating overheads.
    We have single plant with two process Repetative and Process order.I want to calculate the overhead on the Order type basis but the system is not calculating the overhead.
    So i changed the dependency to D050,now its showing the overhead figure in cost component structure but whic is not matching with the overhead rate i have given..
    as my go live is 20 of this month .....its bit emergency
    Revert
    Regards
    Pran

    Hi all,
    Thnx for your reply.
    But i have maintained all the entries in the respective  area,even though  i am geeting the issue.
    It was working fine for my previous repetative manufacturing ...i am using the single cost sheet for both  repetative and process order.
    And one more thing is that i have a Semi finished goods which is the output of REIM  order and is included in process order of the finished good.
    The system is calculating the overheads for the semi finished good too once again.
    Eg,
    Raw Material A and B produces Semi finish material C overheads and the utilities are calculated correctly in Repetative manufacturing.
    The semi finished material C is used in producing the finished material D ....in which the system is not caculating the utilities.The big problem is that the figure(value) of  itemzation and the Cost component structure is showing two different values.
    I am not sure and able to know how and why the system calculates and from where it gets these values  ......  totally  confussed and under pressure (may not be able to to explain properly).
    Revert
    Pran

  • Costing Sheet Overhead Rate Change Mid Month

    Does SAP Support a mid month overhead rate change in a costing sheet?  I have an overhead rate change effective 5/12/2007, but my PM Order is not recognizing the change unless the Basic Start Date of the order is 6/1/2007.

    hi
    it will not support mid month overhead. it should be either period basis or yearly basis.
    regards,
    siva

  • With the new actualization of my ipod, app store wont let me download apps like kik, tumblr and more, i really need kik cause theres were i text my friends, what is happening?

    With the new actualization of my ipod, app store wont let me download apps like kik, tumblr and more, i really need kik cause theres were i text my friends, what is happening?

    What does "new actualization" mean?
    Do you have Restrictions set that world prevent installing those apps? Settings>General>Restrictions

  • HT1338 I'm trying to attach my MacBook Pro to an overhead projector and can't get it to work. If I go to System Prefs/Displays, I see the box on the screen.  But when I collapse the Prefs the desktop is not seen. Can you help?

    I'm trying to get an overhead projector to identify my macbookpro.  If I go to Prefs and select screens that dialogue box comes up on screen.  So I know there's nothing wrong with the VGA cable.  But when the screen box is collapsed nothing happens.  My computer is not recognized by the projector.  Can anyone help? 
    On a PC I used to hit "control F5.  But I don't believe that works on a MacBook. Any suggestions?

    About the only thing you can try is using the Online Internet Recovery system to reinstall Lion on your Mac over the top of the current install. that will reset all system files and should not touch your personal files or the apps you have installed.
    Or iof you have a recent Time Machine backup use that to restore your Mac to that point in time.

  • I have the option to actualization of iMovie, but I can`t no change the Apple ID, the e-mail its appearing I don`t use anymore, how may I delete that e-mail address?

    Dear People,
    I have the option to do the actualization of iMovie for my MacBook pro, but I can`t no download that because the Apple ID don`t let me change the e-mail address, there is an e-mail address that I don`t use anymore since long time a go, when I'm log in with my Apple ID, and I try to download the actualization, the system request again to log in, with the old e-mail address, and have no option to change the e-mail address for the right one, some body may help me?

    Take a look at this Apple doc -> Frequently asked questions about Apple ID
    How do I change or recover a forgotten Apple ID Password?
    If you've forgotten your Apple ID Password or want to change it, go to My Apple ID and follow the instructions. See How to change your Apple ID password if you'd like more information.
    If that doesn't work for you, contact Apple via Express Lane.

  • HT1689 How can I change an old Apple ID that comes automatically for actualization of my first Apps?

    Can't get rid of my first Apple ID, it comes automatically when I need to actualize my Apps. I did all the necessary steps in iTunes Store and for all the new Apps it's ok, but for my first Apps always comes the old one and the remark that my Apple ID or password are incorrect

    That's up to you.  Apps are tied to the ID so you will only be able to use apps purchased to a specific ID when logged in as that ID.

Maybe you are looking for

  • How to set a default value in a comboeditor of xamdatagrid .

    Hi, In WPF application i have a  medical report page , there is a xamdatagrid to represent the values like medical centres . Medical centre column in xamdatagrid i have a xamcomboeditor to popup the values from db . But i want to set one of  the valu

  • How to convert an excel file where customers have partial access for selecting items.

    Please Advise, I have created an excel file with columns that calculates price and quantity. I need to know how my customers can access the file without seeing all my calculations, etc. and just select the number of items. I need to keep my excel for

  • Cannot view personalize link in the portal header

    I cannot see the personalize link in the portal header of the BI portal. I have already verified the two things below: 1) personalize link is enabled in masthead iview through portal content->portal users->standard portal users->default frame work pa

  • Time Code discrepancies

    Hi all Does anybody have an idea how to get FCP to display the correct time and key code of the clips I am importing in my timeline? The clips are telecines the contain both video tc and film frame numbers. Thanks

  • T. Code to create the GR / GI Material Document No. Ranhe

    Hi,   I want to know the T. code and step  how to create new material document for GI and Gi  accounting doc. i know with T. Code  OMBA and OBF4 i want how to create goods movemen tdoc. no. regards, zafar